Predelivery checks Break-in In the test run, the break-in operation is performed in the following three stages. 1. One hour a at 2,000 r/min or at approximately half throttle. 2. One hour b at 3,000 r/min or 3/4 throttle and one minute out of every ten at full throttle. 3. Eight hours c at any speed, however, avoid running at full speed for more than five minutes.
0
1
2
10
S62Y1580
Ăˆ Hour
After test run 1. Check for water in the gear oil. 2. Check for fuel leakage in the cowling. 3. After a test run and while the engine is at idle, flush the cooling water passage with fresh water using the flushing kit.
62Y3A11
1-36
1 2 3 4 5 6 7 8 I