Removal Procedure 1
Remove the radiator cover.
2
Remove the engine hood. (See page 7-61
3
Remove the toe board.
4
Remove the battery, battery case and bracket.
5
Remove the air cleaner case ASSY
6
Disconnect the electrical wiring.
7
Remove the undercover.
8
Disconnect the oil pump drive shaft. [Point 11
9
Remove the exhaust pipe.
1 0 Disconnect t w o radiator hoses. (GM6-262 Engine) 11 Remove the radiator and fan shroud. ( 132 Engine) 12 Disconnect the fuel hose.
13 Slightly hoist the engine. [Point 21 14 Support the torque converter lower side with wooden blocks.
1 5 Remove the flexible plate set bolts. [Point 31 1 6 Disconnect the torque converter end plate from transmission case. 17 Remove t w o engine mount brackets. 18 Remove the engine. [Point 41
19 Remove the flywheel and torque converter end plate.
Installation Procedure The installation procedure is the reverse of the removal procedure.
Note: Tighten the flexible plate set bolts after applying locking agent (08833-00070). The tightening torque for each part is as follows: Unit: N - m (kgf-cm) [ft-lbfl : 48.05 8 9 . 2 4 ( 4 9 0 - 910)[35.45 65.841 Engine mount bracket set bolt 44.13 (300 - 450) [21.71 32.561 Torque converter end plate set bolt : 29.42 : 14.71 24.52 (150 - 250) i10.85 18.091 Flexible plate set bolt Flywheel set bolt : 98.1 156.9 (1000 1600) E72.4 115.81
-
I
-
-
Bleeding Air from Fuel Line (13 2 Engine) 1.
Operate the fuel pump hand pump until it becomes heavy. Air bleeding is completed when the handle is felt heavy.