1997 2004 yamaha vx700st long track snowmobile service repair manual

Page 25

ENGINE IDLE SPEED ADJUSTMENT I THROTTLE CABLE ADJUSTMENT

IINSP I(0) I ADJ ~

&....:.-=;..;:;~-~;;;;;...,

2E101

500/600

ENGINE IDLE SPEED ADJUSTMENT 1. Adjust: • Engine idle speed Adjustment steps: • Start the engine and let it warm up. • Turn the throttle stop screw CD in or out to adjust the engine idle speed. Turning in

Idle speed increases.

Turning out

Idle speed decreases.

Cl

Engine idle speed: 1,450 - 1,650 r/min (600) 1,500 - 1,700 r/min (500, VT600, MM600) 1,500 - 1,700 r/min (700)

NOTE: After adjusting the engine idle speed, thethrottie cable free play should be adjusted. 2E131

THROTTLE CABLE ADJUSTMENT NOTE: _ _ _ _ _ _ _ _ _ _ __ Before adjusting the throttle cable free play, the engine idle speed should be adjusted.

1. Measure: • Throttle cable free play ® Out of specification ~ Adjust. Throttle cable free play: 1.0 - 2.0 mm (0.04 - 0.08 in) 2. Adjust: • Throttle cable free play Adjustment steps: • Loosen the locknut CD. • Turn the adjusting nut CV in or out until the specified free play is obtained. Turning in

Free play is increased.

Turning out

Free play is decreased.

• Tighten the locknut.

2-13


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.