Scion xb 2010 service repair manual

Page 22

2008 Scion xB 2008 ELECTRICAL 2AZ-FE Charging - xB

3. INSTALL GENERATOR COIL ASSEMBLY a. Using SST and a press, press in the generator coil assembly to the drive end frame. SST 09612-70100 (09612-07240)

Fig. 40: Pressing Generator Coil Assembly To Drive End Frame Courtesy of TOYOTA MOTOR SALES, U.S.A., INC. b. Tighten the 4 bolts. Torque: 5.8 N*m (59 kgf*cm, 51 in.*lbf)

Fig. 41: Locating Bolts Courtesy of TOYOTA MOTOR SALES, U.S.A., INC. c. Install the cord clip with the bolt. Torque: 4.6 N*m (47 kgf*cm, 41 in.*lbf)

Microsoft Monday, June 07, 2010 8:54:10 AM

Page 22

© 2006 Mitchell Repair Information Company, LLC.


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.