K A Z A K H S TA N CLIMATE FACTS AND POLICY POLICIES AND PROCESSES
339 MILLION tCO2e 19 TONNES PER CAPITA
Kazakhstan 2050 strategy
Green Economy concept Ecological code with climate provisions Laws and programmes on energy savings, renewables, emissions trading Industrial development, housing modernization and climate mitigation programmes Energy labelling, audits and certification, special fixed tariffs for renewable energy
2020 targets
Pledge to keep GHG emissions in 2020 at 15 per cent below 1990 level Maintain GHG emissions in power sector at 2012 level Increase the share of solar, wind, biogas and small hydro to 3 per cent. Reduce GDP energy intensity by 25 per cent
2030 targets and INDC
Mitigation Base year: 1990 Unconditional 2030 target: 15 per cent economy-wide reduction compared to base year Conditional 2030 target: 25 per cent economy-wide reduction compared to base year Reduce GHG emissions in power sector by 15 per cent compared to the 2012 level Increase share of renewable energy to 30 per cent, including alternative energies 10 per cent Reduce GDP energy intensity by 30 per cent Adaptation priorities Water security, water use efficiency Food security, agricultural growth
1990-2014 GHG inventory of all sectors & gases
17.5
10 508
POPULATION
PER CAPITA GDP
US $
MILLION
99%
OF TOTAL ENERGY CONSUMPTION FROM FOSSIL FUELS
Established GHG inventory process and cadastre Evolving MRV and GHG emissions modelling systems UNFCCC expert review of GHG inventory Third-sixth national communication to UNFCCC in 2013, as Annex 1 party to Kyoto Protocol Biennial emissions reporting to the UNFCCC since 2014 National Inventory Report submitted to the UNFCCC in 2016
CLIMATE ACTIONS
Sources: 2016 national inventory report submitted to UNFCCC; latest population, energy and economic data from the World Development Indicators of the World Bank http://data.worldbank.org/indicator
Total GHG emissions in 2014 at 20 per cent below 1990 level Growing carbon sequestration by forests and grasslands Countrywide gasification and switch to natural gas
Pioneer in emissions trading since 2013
170 enterprises in power, oil-gas, manufacturing, 150 million tonnes of CO2
32 000 tonnes of CO2 traded in 2014 at EUR 1.5 per tonne of CO2 National allocation plan for GHG emissions quotas approved for 2016-2020 National emissions trading system put on hold as of 2016
Expo-2017 in Astana: Future Energy
Current installed capacity: wind 61 MW, solar 55.5 MW, small hydro 117 MW, biogas 0.8 MW Rapid growth in renewable energy projects
CLIMATE FINANCE US $100 billion investment in greening the energy sector by 2050 Expecting 10 GW of installed capacity of green energy by 2030, and 33 GW by 2050
Climate Investment Funds US $200 million
Renewables, modernizing district heating, waste management, railways
UNDP-GEF
Promoting renewable energy investment NAMA for low carbon urban development
EBRD
US $80 million support to Yereymentau wind project Burnoye solar plant phase II Kulan solar plant (pending approval)
Incentives for renewables and energy savings Subsidies for renewable energy Tax rebates for energy efficiency
S
I
Tobo l
ChelyabinskKostanay
Ufa
A
Ishim
Petropavlovsk
Karagaly (planned)
Kostanay
Expo 2017 AstanaSolar
K
A
Z
Aktobe
K
l
(planned)
K
A ral A S ea Z
A
K Da
r
Aktau
Aral
Cas
pian
A ral S ea
r ya
pian
Sea
Urganch
more than 5
Mary Tejen
Tehran
Tejen
Tehran
2-5
IRAN
Karakum Canal
A
N
Balkhash (under construction) Ili Taldykorgan Ghulja Kapchagay Solar Shelek Dzhungar Gates Balkhash (planned) C H Ch Almaty(planned) Otar u Lake Balkhash
I N A
Issyk-Kul Ili Taldykorgan Ghulja Shymkent im Shokpar K Y R Kapchagay GYZSTAN Tar Solar (under construction) Shelek Naryn Tashkent 0 n C Toxka (planned) C H Almaty Ferghana Otar h u
I N A
Taraz
Burnoe Kujand
Bishkek
Osh
Samarkand
Uchquduq Am uD ary a
Karshi
Naryn Solar park Ferghana Korug Osh
Termiz Qurghonteppa Samarkand Installed capacity: Kujand BukharaRenewable energy installations Am uD ary a
Karshi
Mazar-eDushanbe Sharif
Wind park
Termiz Qurghonteppa
Installed capacity:
Mashad
Mazar-e Sharif
n Toxka Hydropower plant
Gilgit
PAKISTAN
AFGHANISTAN
50 MW -100 MW
Mingora
Hydropower plant
INDIA
Mingora
Less than 50 MW More than 100 MW
200 km
Map produced by ZOÏ Environment Network, November 2015
More 100 MW TAthan J I K I STAN Solar park KorugMW 50 MW -100
im Tar 0
and plans Kashgar
AFGHANISTAN
200 km
Issyk-Kul
Dushanbe Tashkent TA J I K I STAN
Wind park
Kuqa
Map produced by ZOÏ Environment Network, November Kuqa2015
Bishkek installations and plans A N BukharaRenewable energy Shymkent K Y R G Y Z S T Kashgar
b Murga
2-5 Mashad CO2 emissions from thermal power plants, million tons per year: Ashgabat Qom AtrIRAN ek 1-2 Mary 0.5 more- 1than 5 Thermal power-plant (coal/oil/gas) less than 0.5Sari
b Murga
Thermal power-plant (coal/oil/gas) Sari Fossil fuel energy installations and carbon emissions
Karakum Canal
N
Balkhash (under Semeyconstruction)Oskemen Ereymentau (under construction)
Burnoe Zhanatas (planned)
Zhanakorgan (under construction)
Energy and emissions
A Z ER B A IJAN Dashoguz CO2 emissions from thermal power plants, million tons per year: Ashgabat Turkmenbashi A t re k T U R K M E N I S T A N Baku
T
Taraz
Da Kyzylorda r ya Uchquduq
Fossil fuel energy installations and carbon emissions U Z B E K I S T A N
1-2 0.5 - 1 less than 0.5
S
r
Cas
Kuryk (planned)
Turkmenbashi T U R K M E N I S T A N
Lake Zaysan
Shokpar (under construction)
(planned) Zhanakorgan (under construction)
Urganch
Oskemen
Lake Zaysan Dzhungar Gates KaragandaBalkhash (planned) Lake Balkhash
Zhanatas (planned)
Sy
Sea
Dashoguz
Barnaul
Semey Ereymentau (under construction) Pavlodar
TAstana A
Kyzylorda Zhezkazgan
UZBEKISTAN
Makhachkala A Z ER B A IJAN Aktau
Qom
H
Sarysu
Kuryk (planned) Fort Shevchenko (planned)
S Zhezkazgan Expo 2017
Sy
Atyrau
Baku
H
Aral
Ura Fort Shevchenko (planned)
Astrakhan Makhachkala
A
Karagaly (planned) Sarysu
Ura Vol ga
Atyrau
Ob
Ekibastuz Karaganda
l
Aktobe
Volgograd Astrakhan
Irt
AstanaSolar Petropavlovsk
Barnaul
Novosibirsk
Pavlodar
Ekibastuz Omsk
Astana
Volgograd
Oral
Ob
Yarka nd
Oral Samara
A
Yarka nd
S
I
Ishim
U
Samara
S
Tobo l
R
S
Irt
ysh
Vol ga
U
Novosibirsk
Omsk ysh
R
Chelyabinsk
Ufa
Gilgit
PAKISTAN INDIA
Less than 50 MW
Policies and institutions The Kazakhstan 2050 strategy and the Green Economy concept are guiding Kazakhstan’s transition to a green economy. Launched in 2013, these initiatives take a long-term (until 2050) strategic approach to promoting best available technologies, introducing new financial mechanisms and incentives, improving environmental performance in all key economic sectors and curbing greenhouse gas emissions. Unique among Central Asian countries, Kazakhstan has an ecological code based on comprehensive environmental and climate change legislation. The country introduced this code in 2010, and has updated it frequently since then to reflect regulations and targets for GHG emissions. Kazakhstan is the leading producer of uranium in the world, but has no active nuclear power plants. Responding to the global drops in oil and gas prices and the emergent domestic energy deficit, the country is considering adding nuclear power to its
energy mix. Reflecting the increased importance of energy as a key economic driver, in 2014 Kazakhstan moved climaterelated matters (such as the development of a green economy and the reduction of carbon emissions) from the dissolved Ministry of Environment and Water Resources to the reformed Ministry of Energy. Responsibilities for the water and forestry sectors were assigned to other ministries, including the Ministry of Agriculture. KazAtomProm – the national nuclear company – also contributes to the development of renewable energy. The Kazakhstan-led Green Bridge partnership, agreed at regional ministerial environmental conferences in 2010 and 2011, is intended to support green economic growth throughout Central Asia through international cooperation, support in technology transfer, exchange of knowledge and climate financing.
S
S
Samara Oral
I
Volga
Petropavlovsk
Astana
Kostanay
Aktobe
KAktobe A l
Ura
K
A Z A ral S ea
A Da
r
Aral
K r ya
Sy
pian
r
Rivers with intense water use and increased stress from
weather and crop losses
IRAN
Mary
Karakum Canal
H
Karakum Canal
Sari
IRAN
b Murga
Caspian Sea: risk of flooding due to sea level fluctuation Mashad and changes in winter ice cover Qom
Tejen
Tehran
Uchquduq
Bukhara Am uD ary a
Am uD ary a
Oskemen
Semey
Altai Oskemen
Semey
N
S
T
Taraz Shymkent
Shu-Talas basin Tashkent
N
Il
Balkhash i
Taldykorgan
Lake BalkhashAlmaty Ch
u
Taraz Ferghana Shymkent Kujand
Lake Zaysan
Lake Balkhash
A
Shu-Talas Ili River basin basin
Kyzylorda
Bukhara b Murga
Tejen
Turkmenbashi T U R K M EAshgabat NISTAN Baku A t re k Major food producing and populated areas: risk of extreme Mary weather and crop losses Rivers with intense Sari water use and increased stress from climaticTehran and hydrological changes Caspian Sea: risk of flooding due to sea level fluctuation Ashgabat Mashad and changes in winter ice cover A t re k Qom food producing and populated Major areas: risk of extreme
A
Lake Balkhash and Ili River basin
as Tal
Sea Sea pian Cas
ar y Uchquduq a
UZBEKISTAN
A Z ER B A IJAN Dashoguz Urganch Impacts ofhydrological climate change climatic and changes
T
as Tal
Cas
Turkmenbashi T U R K M E N I S T A N
Urganch
S
Barnaul
Lake Zaysan
Zhezkazgan Ch Kyzylorda Lake Balkhash and u
U Z B E K I S T AD N
Dashoguz
Ekibastuz
KaragandaBalkhash
A ral S ea
Makhachkala Aktau A Z ER B A IJAN
Baku
H
Aral
Northern Caspian
Aktau
K
Sy
Makhachkala
A
Zhezkazgan
Northern Caspian
Atyrau
Astrakhan
Z
Sarysu
Atyrau
OAltai b
Ekibastuz Karaganda
Astana
Oral
Sarysu
Ura
Volgograd Astrakhan
Novosibirsk
Pavlodar
Irt
Pavlodar
l
Volgograd
A
Omsk
Barnaul
Bishkek
Ili
C H I N A
Issyk-Kul Taldykorgan
Bishkek
Ghulja
Kuqa
im Tar 0C H
KYRGYZSTAN Naryn Almaty Osh
Ghulja
I 200 N Akm n Toxka Kuqa Map Issyk-Kul produced by ZOÏ Environment Network, November 2015
im K Y R G Y Z S T Kashgar AN Tar Densely populated and agriculturally important Narynareas with increased Tashkent 0 200 km environmental stress and impacts of climate change n Dushanbe TAprojected J I K I STAN Toxka Karshi Ferghana Map produced by ZOÏ Environment Network, November 2015 Osh Forest- and bush fires Korug Kujand Samarkand
Yarka nd
U
Chelyabinsk Kostanay
Ob
ysh
R
Ufa
Petropavlovsk
Samarkand Termiz Qurghonteppa
Densely populated and agriculturally important areasKashgar with increased Severe droughtstress impacts projected impacts of climate change environmental Dushanbe and Gilgit TA J I K I STAN Yarka nd
Volga
A
Ishim
Samara
I
Irt
Ishim
S
Tobo l
S
Novosibirsk
Omsk
Tobo l
U
Chelyabinsk
ysh
R
Ufa
Karshi Mazar-e Sharif
Reduction ice cover of glacial lakes outburst floods Forestandofbush fires and risk PAKISTAN AFGHANISTAN Korug Termiz Qurghonteppa
Severe drought impacts
INDIA
Mingora Gilgit
Mazar-e Sharif
Reduction of ice cover and risk of glacial lakes outburst floods PAKISTAN AFGHANISTAN Mingora
INDIA
Kazakhstan scorecard Country’s share of global emissions
National climate policy actors
Country’s emissions per capita General climate action ambition
Policy leadership: Green Economy Council under the President, Ministry of Energy
Mitigation commitment: Emissions reduction
UNFCCC focal point: Ministry of Energy
Decoupling from population growth
GHG inventory and projections: Jasyl Damu
Decoupling from economic growth
Climate technology network coordination: Nazarbaev
Renewable energy prospects
University
Adaptation action
Greenhouse gas emissions and projections for Kazakhstan Million tonnes 400 350
-15%
300
-25%
250 200 150
50 0 -25
Projections 1990
1992 Energy
1994
1996
1998
Industrial processes
2000 Agriculture
2002
2004
Waste
2006
2008
2010
Land use change and forestry
2012
2014
Lower range
2020 2030 Higher range
Projections are based on Kazakhstan’s INDC
© Zoi Environment Network (2016)
100
Climate actions
Climate finance
Kazakhstan is a candidate for Annex 1 membership in the UNFCCC, and since 2009 has held special status as an Annex 1 Party for the purposes of the Kyoto Protocol. In August 2016 it signed (though has not yet ratified) the Paris Agreement. The Kazakh GHG inventory leads Central Asia in terms of quality and completeness, and the country’s emissions modelling uses advanced tools. In 2014, the country published its first biannual update report as part of its special status reporting obligations, and submitted its national inventory report in 2016.
Kazakhstan is expected to receive US$ 200 million from the Clean Technology Fund to modernize its district heating system, improve energy efficiency, and catalyze investments in renewable energy.
Kazakhstan’s GHG emissions reached their highest level in 1990 at 357 million tonnes of CO2-equivalent, and in 2014 were 20 per cent below that level. GHG emissions in the energy sector account for more than 85 per cent of total emissions. Under the Kyoto Protocol the country pledged to limit its emissions to near its 1990 levels. The Kazakhstan 2050 strategy and the Green Economy concept all aim for a countrywide reduction of GHG emissions of 15 per cent by 2020 and 25 per cent by 2050, compared to 1990. The Kazakh INDC reiterates a 15 per cent reduction as an unconditional target, and specifies a conditional target of a 25 per cent reduction using 1990 as the base year. The country also has specific emissions targets for the power sector by 2020 and 2030, and has goals related to energy efficiency. During 2014-2015, Kazakhstan pioneered an emissions trading system (ETS) in the energy sector and on industrial installations emitting more than 20 000 tonnes per year. The ETS – currently on hold until 2018 – covers 150 million tonnes of CO2 from 170 enterprises out of 270 million tonnes of CO2 emissions in the energy and industry sectors, but does not include municipal or household energy consumption or the agriculture, waste and forestry sectors. Kazakhstan’s path to decarbonization contemplates low-carbon energy that includes both renewables and nuclear sources. A target for their share is set at 50 per cent by 2050. By 2020, the total installed capacity of solar power stations in Kazakhstan may reach 75-100 MW, and for wind power may exceed 1 000 MW, with an additional 500-700 MW of small-scale hydropower and biogas capacities. At the same time the rapid growth in domestic energy consumption and the new thermal power stations under construction make the transition from coal to cleaner energy challenging.
The EBRD is financing solar power plants, and a 50 MW wind power plant in Yereymentau, 100 km east of Astana – one of the first large-scale wind energy projects in Kazakhstan. The national nuclear industry invests in wind, geothermal and solar applications, and implements these projects with foreign investors such as the French Atomic Energy and Alternative Energies Commission CEA. National authorities are promoting the idea of energy certificates and energy labelling, together with the development of taxation tools to improve energy efficiency. Small-scale remote users of alternative energy sources with installed capacity up to 5 kWh not connected to the central grid may receive a governmental subsidy covering half of the tariff.
Sources of information for the scorecard Kazakhstan 2050 strategy, Green Economy concept, EXPO- 2017 process, Green Bridge Initiative National climate-related assessments and reports: National inventory report (2016), INDC (2015), Biannual emissions report 2014, Third-sixth national communications to UNFCCC 2013, Climate mitigation programme Zoï expertise, intelligence and interviews with stakeholders in Kazakhstan. This publication has been produced with the assistance of the European Union. The contents of this publication are the sole responsibility of the authors and can in no way be taken to reflect the views of the European Union.
The designations employed and the presentation do not imply the expression of any opinion whatsoever concerning the legal status of any country, territory, city or region or of its authorities, or concerning delimitation of its frontiers or boundaries.