Skip to main content

Security Service Headquarters Contract Documents

Page 1


N.I.C. NOT IN CONTRACT NO. OR # NUMBER

NR. NUMBER

NOM. NOMINAL

N.T.S. NOT TO SCALE

O.A. OVERALL

OBS. OBSCURE

O.C. ON CENTER

O.D. OUTSIDE DIAMETER

OFF. OFFICE

OPNG. OPENING

OPP. OPPOSITE

P. PAINT

P.A. PLANTING AREA

PRCST. PRECAST

PL. PLATE

P.LAM PLASTIC LAMINATE

PLAS. PLASTER

PLWD. PLYWOOD

PR. PAIR

PT. POINT

P.T.D. PAPER TOWEL DISPENSER

P.T.D/R PAPER TOWEL DISPENSER AND RECEPTACLE

Q.T. QUARRY LINE

R RISER OR RELOCATE

RAD. RADIUS

R.D. ROOF DRAIN

REF. REFERENCE

REFR. REFRIGERATOR

RGTR. REGISTER

REINF. REINFORCE

REQTD. REQUIRED

RESIL. RESILIENT

RM. ROOM

R.O. ROUGH OPENING

RWD. REDWOOD

R.W.L. RAIN WATER LEADER

S. SOUTH

S.A.F.B. SOUTH ATTENUATION BLANKETS

S.C. SOLID CORE

S.C.D. SEAT COVER DISPENSER

SCHED. SCHEDULE

S.D. SOAP DISPENSER

SECT. SECTION

SH. SHELF

SHR. SHOWER

SHT. SHEET

SIM. SIMILAR

S.N.D. SANITARY NAPKIN DISPENSER

S.N.R. SANITARY NAPKIN RECEPTACLE

SNT. SEALANT

S.O.B. SYMBOL ON BACKGROUND

SPEC. SPECIFICATION

SQ. SQUARE

S.S. STAINLESS STEEL

S.SK. SERVICE SINK

STA. STATION

STD. STANDARD

STL. STEEL

STQR. STORAGE

STRL. STRUCTURAL

SUSP. SUSPENDED

SYM. SYMMETRICAL

T. TREAD

T.B.D. TOBE DETERMINE

T.C. TOP OF CONCRETE

TEL TELEPHONE

TER TERRAZZO

T.&G. TONGUE AND GROOVE

THK. THICK

T.O.C. TOP OF CURVE

T.O.P. TOP OF PAVEMENT

T.P.D. TOILET PAPER DISPENSER

T.V. TELEVISION

T.W. TOP OF WALL

TYP. TYPICAL

UNF. UNFINISHED

U.O.N. UNLESS NOTED OTHERWISE

UR. URINAL

V.C.T. CINYL COMPOSITE TILE

VERT. VERTICAL

VEST. VESTIBULE

V.I.F. VERIFY IN FIELD

W. WEST

W/ WITH

W.C. WATER CLOSET

WD WOOD

W/O WITHOUT

W.0. WHERE OCCURS

WP. WATERPROOF

MEET UNT DESIGN STANDARDS, U.N.O.

CONTRACTOR TO SEE THAT ALL SUBCONTRACTORS RECEIVE COMPLETE SETS OF DRAWINGS, ADDENDUMS, AND REVISED DRAWINGS OR ASSUME FULL RESPONSIBILITY FOR COORDINATION OF WORK WHEN COMPLETE SETS ARE NOT AVAILABLE TO THE SUBCONTRACTOR.

CONTRACTOR IS RESPONSIBLE FOR REVIEWING EXISTING CONDITIONS IN THE BUILDING AND BECOMING FAMILIAR WITH THE BUILDING SYSTEMS, DETAILS, AND DIMENSIONS.

THE CONTRACTOR SHALL CONFIRM THAT THE WORK IS BUILDABLE AS SHOWN BEFORE PROCEEDING WITH CONSTRUCTION AND ANY DISCREPANCIES SHALL BE COMMUNICATED TO THE OWNER IN WRITING BEFORE PROCEEDING WITH THE WORK.

CONSTRUCTION NOTES AND/OR DRAWINGS SUPPLIED ARE TO ILLUSTRATE THE DESIGN AND GENERAL TYPE OF CONSTRUCTION DESIRED AND ARE INTENDED TO APPLY TO THE FINEST QUALITY OF CONSTRUCTION MATERIAL AND WORKMANSHIP THROUGHOUT. IN THE EVENT A CONTRADICTION OCCURS WITHIN THESE CONSTRUCTION DOCUMENTS OR EXISTING CONDITIONS, NOTIFY OWNER IMMEDIATELY FOR INTERPRETATION. WORK UNDERTAKEN PRIOR TO NOTIFICATION WILL BE AT THE CONTRACTOR'S SOLE EXPENSE AND RESPONSIBILITY. THE CONTRACTOR SHALL REMOVE DEBRIS AND WASTE MATERIALS AND PROVIDE FOR ITS REMOVAL FROM THE SITE. SITE AND ADJACENT PROPERTIES SHALL BE LEFT "BROOM CLEAN" AT END OF EACH DAY.

CONTRACTOR TO THOROUGHLY CLEAN THE ENTIRE SPACE TO THE SATISFACTION OF OWNER PRIOR TO BEING TURNED OVER TO THE OWNER.

CONTRACTOR TO COORDINATE ALL STAGING AREAS WITH OWNER AND ANY OTHER CONTRACTORS EMPLOYED BY THE OWNER PRIOR TO COMMENCEMENT OF WORK.

PROJECT SCOPE

VICINITY MAP

SECURITY SERVICE FEDERAL CREDIT UNION

CYPRESS WATERS, 2999 OLYMPUS BLVD

COPPELL, TEXAS

FLOOR 9

ARCHITECTURAL SYMBOLS

CITY OF DALLAS CHAPTER 16: 2021 INTERNATIONAL FIRE CODE, WITH DALLAS AMENDMENTS, (EFFECTIVE MAY 12, 2023)

CHAPTER 52: ADMINISTRATIVE PROCEDURES FOR THE CONSTRUCTION CODE OF THE DALLAS CITY CODE

CHAPTER 53: 2021 INTERNATIONAL BUILDING CODE WITH DALLAS AMENDMENTS

CHAPTER 54: 2021 INTERNATIONAL PLUMBING CODE WITH DALLAS AMENDMENTS

CHAPTER 55: 2021 MECHANICAL CODE WITH DALLAS AMENDMENTS

CHAPTER 56: 2020 NATIONAL ELECTRICAL CODE WITH DALLAS AMENDMENTS (EFFECTIVE JUNE 13, 2022)

CHAPTER 57: 2021 INTERNATIONAL RESIDENTIAL CODE WITH DALLAS AMENDMENTS

CHAPTER 58: 2021 INTERNATIONAL EXISTING BUILDING CODE WITH DALLAS AMENDMENTS (EFFECTIVE JUNE 13, 2022)

CHAPTER 59: 2021 INTERNATIONAL ENERGY CONSERVATION CODE WITH DALLAS AMENDMENTS CHAPTER 60: 2021 INTERNATIONAL FUEL & GAS CODE WITH DALLAS AMENDMENTS

CHAPTER 61: 2015 INTERNATIONAL GREEN CONSTRUCTION CODE WITH DALLAS AMENDMENTS (EFFECTIVE JUNE 13, 2022)

ROOM SCHEDULE

LEVEL NAME NUMBER

LEVEL 9 ELEV. LOBBY 900

LEVEL 9 F.S.A.E.L. 901

LEVEL 9 STAIR A 902

LEVEL 9 MEN 903

LEVEL 9 WOMEN 904

LEVEL 9 MECH. 905

LEVEL 9 I.D.F. 906

LEVEL 9 ELEC. 907

LEVEL 9 STAIR B 908

LEVEL 9 JAN. 909

LEVEL 9 RECEPTION 910

LEVEL 9 CARING COVE 911

LEVEL 9 BREAK ROOM 912

LEVEL 9 STORAGE 913

LEVEL 9 ASSEMBLY ROOM 914

LEVEL 9 INTERNAL AUDIT 915

LEVEL 9 EXECUTIVE OFFICE 916

LEVEL 9 EXECUTIVE OFFICE 916

LEVEL 9 EXECUTIVE OFFICE 917

LEVEL 9 EXECUTIVE OFFICE 917

LEVEL 9 EXECUTIVE OFFICE 918

LEVEL 9 EXECUTIVE OFFICE 919

LEVEL 9 EXECUTIVE OFFICE 920

LEVEL 9 EXECUTIVE OFFICE 921

LEVEL 9 EXECUTIVE OFFICE 922

LEVEL 9 EXECUTIVE OFFICE 923

LEVEL 9 EXECUTIVE OFFICE 924

LEVEL 9 PRESIDENTS OFFICE 925

LEVEL 9 BOARDROOM 926

LEVEL 9 FOOD SERVICE 927

9 BOARD OFFICE 930

9 BOARD OFFICE 931

9 BOARD OFFICE 932 LEVEL 9 MANAGER 933

9 MANAGER 935

9 MARKETING 936

9 MANAGER 938

9 MANAGER 939

9 MANAGER 940

9 MANAGER 941

9 MANAGER

Security Service Federal Credit Union Headquarters, Dallas, TX, Tenant Finish Out, including but not limited to, partitions,finishes, lighting and furnishings for the single tenant, Secuity Service to occupy designated spaces in Cypress Waters, 2999 Olympus Blvd., Floor 9, 31,640 gsf, OFFICE AREA, fully sprinklered.

of Texas

Accessibility Code: TDLR: EABPRJ: B7801443 State of Texas Accessibility Standards (TAS)

PATH ONE (P1)

A1: 53'-0"

A2: 23'-0"

MAX: 76'-0"

PATH TWO (P2)

A1: 28'-0"

A2: 42'-7"

MAX: 70'-7"

PATH THREE (P3)

A1: 70'-0"

A2: 29'-0"

MAX: 99'-0"

PATH FOUR (P4)

A1: 34'-0"

A2: 16'-0" MAX: 50'-0"

seats installed therein)

Occupancy Group B = 50 occupants (50 x 100 = 5000 sf)

The Common Path of Egress Travel exceeds the limitations of Section 1014.3

Exit Access Travel Distance (2015 IBC Section 1006): Occupancy B – 300 -0” with Automatic Sprinkler

(2015 IBC 1017.1 Aisles (2015 IBC Section 1006): In Group B and M occupancies, the minimum clear aisle width shall be determined by Section 1005.1 for the occupant load served, but shall not be less than 36 inches. Exception: Nonpublic aisles serving less than 50 people and not required to be accessible by Chapter 11 need not exceed 28 inches in width.

and fire exit hardware (2015 IBC 1006) Dead end corridor (2015 IBC Section 1006) Corridor width (2012 IBC 1018.2): The minimum width of corridors specified in Table 1018.2 shall be as determined in Section 1005.1.

ACCOUNTING 946 EXECUTIVE OFFICE 916 EXECUTIVE OFFICE 917

FROM ENTRANCE DOOR TO CENTERLINE OF LIGHT NOTE KELVIN TEMPERATURE OF LIGHTING FIXTURE ADHERES TO TYPE SIZE FOR VODE LED LINEAR LIGHTING EXECUTIVE OFFICES, PRESIDENTS OFFICE, ARE ALL 10' - 5" A.F.F. ALL OTHER CEILING

CONTRACTOR TO FIELD VERIFY PRIOR TO START OF CONTRUCTIONS AND COORDINATE LOCATIONS OF NEW AND EXISTING HVAC EQUIPMENT WITH LIGHT FIXTURES SHOWN. CONTRACTOR IS RESPONSIBLE FOR ANY RELOCATION OF HVAC EQUIPMENT IN THEIR SCOPE OF WORK. NOTIFY DESIGNER OF ANY CONFLICTS. PROVIDE THERMOSTATS

CENTERED AT 48" A.F.F. AS REQUIRED PER MECHANICAL PLANS. CONTRACTOR IS RESPONSIBLE FOR TEST AND BALANCE OF HVAC AS REQUIRED PER NEW PARTITION LAYOUT AND IS TO PROVIDE DESIGNER AND PROPERTY MANAGEMENT WITH NEW AIR BALANCE REPORT FROM AN APPROVED NEBB (NATIONAL ENVIRONMENTAL BALANCING BUREAU) CERTIFIED HVAC CONTRACTOR PRIOR TO SUBSTATION COMPLETION. CONTRACTOR TO LOCATE NEW AND/OR EXISTING SPRINKLER HEADS AS REQUIRED PER CODE IN AREAS AFFECTED BY CONSTRUCTION. SPRINKLER HEADS ARE TO BE CENTERED IN CEILING TILE.SHOULD CONFLICT ARISE BETWEEN LIGHT FICTURE LAYOUT AND FIRE PROTECTION SYSTEM, PLUMBING SYSTEM, EXIT SIGNS, OR MECHANICAL EQUIPMENT, LIGHT FIXTURE LAYOUT SHALL TAKE PRECEDENCE. ADJUSTMENT OF CONFLICTING ELEMENTS SHALL BE MADE IN SUCH A WAY AS TO MAINTAIN ENGINERING DESIGN INTENT/CODE COMPLICANCE. NOTIFY DESIGNER OF SUCH CONFLICTS.

DUPLEX OUTLET

TV/DATA OUTLET

NOTES ALL WALL-MOUNTED OUTLETS AND DATA CONNECTIONS ARE TO BE PLACED AT 18"

ALL FLUSH FLOOR OUTLETS TO BE FLUSH WITH FLOOR FINISH.

ALL TV/DATA OUTLETS TO BE CENTERED ON WALLS U.N.O.

ALL CORE DRILLS IN MANAGER DEMOUNTABLE OFFICES, EXECUATIVE OFFICES, AND PRESIDENTS OFFICES TO BE PLACED CLOSEST TO DESK LOCATION AS DRAWN IN PLAN

ALL CORE DRILLS LOCATED AT WORKSTATIONS TO BE IN CENTER AS DRAWN ON PLAN

DUPLEX OUTLETS IN EXECUTIVE PRIVATE OFFICES AND PRESEIDENTS OFFICE, TO BE LOCATED BY SOFA

QUAD OUTLETS ADDITIONALLY TO BE LOCATED BY SECONDARY/TERTIARY DESK IN EXECUATIVE AND PRESIDENTS OFFICE

FLOOR CORE FURNITURE FEEDS ARE LOCATED IN BOARDROOM, SMALL CONFERENCE ROOM, AND ASSEMBLY ROOM FOR COLLABORATION

F W C LVT-01 PT-01,PT-02,TL-01, QT-01 ACT-01,ACB-01,ACB-02, GC-01

F W C LVT- 01 PT- 01, GL-01, TL-01, QT-01 ACT-01, ACB-01

F W C LVT-01 PT-02 AGC-01, ACT-02

F W C LVT-01,CPT-01 PT-02,PT-03,TL-01,QP-01 ACT-01, AGC-01, ACB-01

F W C LVT- 01, CPT-02 PT-02 ACB-01,ACB-02

F W C LVT-01, CPT-01 PT-02 ACT-01, ACB-02

INTERIOR PAINT; WHITES & PASTELS; NEUTRAL GROUND 7568 INTERIOR PAINT; WHITES & PASTELS; IBIS WHITE 7000

PAINT; RUSTIC & REFINED; SERENLY CERAMIC BACKSPLASH; MOD 3D IN DENIM BLUE

TERRAZZO COUNTERTOP; ECO-TERR SLABS; SAVANNAH GREEN

ACOUSTIC GYPSUM BOARD CEILING; ACOUSTIBUILT SEAMLESS CEILING SYSTEM

ACOUSTIC CEILING BAFFLE; DROP; 50 IVORY

ACOUSTIC CEILING BAFFLE; HERADESIGN BAFFLE ELEMENT ARC

F W C LVT-01 PT-01, GL-01 ACT-01, ACB-01

F W C LVT-01 PT-02 ACT-01, ACT-02

ACOUSTIC CEILING BAFFLE

Turn static files into dynamic content formats.

Create a flipbook