
1 minute read
PARTNER SINCE 2011
In our Riepe factory we produce Pilling boilers and other special welding constructions for the galvanising industry.
With our experience of more than one hundred years and continuous improvement of both materials and production technologies, we are able to produce zinc boilers of all sizes and shapes for all types of heating systems.
Advertisement
Pumping and keeping molten metal hot
Our special pilling service for galvanizing plants makes kettle replacement faster and therefore more economical for you. The liquid zinc can be temporarily be stored in our heatable holding furnaces during kettle replacement. These furnaces developed by Pilling make it possible to significantly reduce the startup phase of your new kettle.
USI measurement
In addition, we offer wall thickness measurement of your kettle. At the same time, we check the condition of the kettle in the filled state with an ultrasonic probe at intervals specified by you. This service takes only a few hours and can be carried out in off-peak times without or with little restrictions on your production.
• Information: www.pilling.de | post@pilling.de
• Contact: Mr. Nikolai Prinz | +49 2352 2015 - 30 | n.prinz@pilling.de