Skip to main content

Arch513.IntegratedStudio_fa24_B&W Set_wienersz

Page 1


INTEGRATEDPROJECTDESIGNSTUDIO BOSTON,MASSACHUSETTS

A0-00COVERSHEET/TABLEOFCONTENTS

A0-01REFERENCE

A0-02SITEPLANREGIONAL

A0-03SITEPLAN

A0-04CODEREQUIREMENTS

A0-05CODEREQUIREMENTS

A0-06CODEREQUIREMENTS

A1-01FIRSTFLOORPLAN

A1-02SECONDFLOORPLAN

A1-03THIRDFLOORPLAN

A1-04FOURTHFLOORPLAN

A1-05FIFTHFLOORPLAN

A1-06SIXTHFLOORPLAN

A1-07SEVENTHFLOORPLAN

A1-08ROOFPLAN

A2-01BUILDINGELEVATIONS

A2-03BUILDINGSECTIONS

A3-01BUILDINGENVELOPE

A3-02BUILDINGENVELOPE

A3-03BUILDINGENVELOPE

S0-01STRUCTURALNARRATIVE

S1-00FOUNDATIONPLAN

S1-01FIRSTFLOORSTRUCTUREPLAN

S1-02SECONDFLOORSTRUCTUREPLAN

S1-03THIRDFLOORSTRUCTUREPLAN

S1-04FOURTHFLOORSTRUCTUREPLAN

S1-05FIFTHFLOORSTRUCTUREPLAN

S1-06SIXTHFLOORSTRUCTUREPLAN

S1-07SEVENTHFLOORSTRUCTUREPLAN

S1-08ROOFSTRUCTUREPLAN

S2-01 STRUCTUREAXON

S2-02STRUCTUREAXON

S2-03 STRUCTUREAXON

M0-01MECHANICALSYSTEMSNARRATIVE

M1-01 MECHANICALPLAN1,SYSTEM_2,3AIR

M1-02AMECHANICALPLAN2A,SYSTEM_1RADIANT

M1-02BMECHANICALPLAN2B,SYSTEM_2,3AIR

M1-03AMECHANICALPLAN3A,SYSTEM_1RADIANT

M1-03BMECHANICALPLAN3B,SYSTEM_2,3AIR

M1-04AMECHANICALPLAN4A,SYSTEM_1RADIANT

M1-04B MECHANICALPLAN4B,SYSTEM_2,3AIR

M1-05AMECHANICALPLAN5A,SYSTEM_1RADIANT

M1-05BMECHANICALPLAN5B,SYSTEM_2,3AIR

M1-06AMECHANICALPLAN6A,SYSTEM_1RADIANT

M1-06B MECHANICALPLAN6B,SYSTEM_2,3AIR

M1-07AMECHANICALPLAN7A,SYSTEM_1RADIANT

M1-07BMECHANICALPLAN7B,SYSTEM_2,3AIR

M1-08AMECHANICALROOFPLAN,SYSTEM_1RADIANT

M1-08B MECHANICALROOFPLAN,SYSTEM_2,3AIR

M2-01 MECHANICALSYSTEMSAXON

M2-02 MECHANICALSYSTEMSAXON

NORTHELEVATION
3/32"=1'0"
WESTELEVATION
3/32"=1'0"

Structurally, a total of three services were required for this project. One due to the complexity of the site, and two separate systems designed for the distinct conditions of the project’s form.

Of the systems within the building, there is a cast in place, post-tensioned concrete waffle slab system supported by a grid of columns and shear walls around the axial circulation core, and then a standard steel framing system with concrete slabs and HSS columns. The compact, repeatable organization of the building’s plan and its multitude of large spans, and large opening conditions, warrants the utilization of a waffle slab. Waffle slabs perform well with light to average loading, and large spans. A benefit of the waffle slab is its aesthetic quality on the interior. This expression of a grid reflects the building’s composition, both on the facade and organizationally. An issue with the waffle slab is construction and cost. Formwork tends to be the most expensive part of cast in place concrete construction, and this cannot be greatly mitigated unless the clean aesthetic of the exposed waffle is compromised (ie. considering a similar system like holedeck to reduce the amount of concrete used, as well as the cost of formwork). One solution was to make the system Post Tensioned, which effectively reduces the amount of concrete being used by casting the concrete in manner such that tension can be applied to the slabs internally after it is done curing, increasing its allowable spans and relative load capacity. Applying the steel system to the longitudinal portion of the building was a simple solution to connect back to the steel that was being used to support the whole project over the Massachusetts Turnpike.

With that, the structural system below the site and above Interstate - 90 is all steel. This posed a problem for the heavy column loads coming from the cast in place waffle slab which is where the third service comes in: To account for the large loads between the building’s occupied grade and the busy thoroughfare below, a series of 4’x2’ laterally braced precast concrete beams were introduced.

Because of the site’s lack of available land, using geothermal as a source was unrealistic. The building therefore employs Air Source Heat Pumps (ASHP) as a source, and because of the overall proximity to typical urban pollutants at the ground level, they are to be located on the roof. For the building’s climate control, a radiant heating and cooling system is designed to handle the majority of the load, while a centralized Energy Recovery Ventilator (ERV) is used for the ventilaiton and humidity control of the majority of the building. The needs of the building’s program require a suplemental Air Handling Unit (AHU) to help serve the spaces that require more thermal control as well as those that have a higher variance in occupancy. These spaces mainly include the exhibitions and experience centers.

The building uses a technical floor system to hide the duct work and maintain the exposed structural system. The raised floor is where the radiant coils are placed. Together, the AHU and ERV handle the ventilation and humidity control, while the radiant system handles the majority of heating and cooling.

4

Turn static files into dynamic content formats.

Create a flipbook
Arch513.IntegratedStudio_fa24_B&W Set_wienersz by zackwieners - Issuu