Work Sample
Academic Work
Shenzhen University Town
Mingzhuwan Urban Design
Biotech Island Urban Design
601 California Drive
2588 Mission
425 Broadway
Shenzhen, China 1-4
Burlingame, CA 11-12
Guangzhou, China 5-8
San Francisco,CA 13-14
Guangzhou, China 9-10
San Francisco, CA 15-16
Google Village | San Jose San Jose, CA 17-20
Winter Oasis Urban Design Harbin, China 25-28
Future Brisbane | Bayland San Francisco, CA 21-24
Yulia Li Urban Designer / Architectural Designer
Contact yuliali682@gmail.com 510-944-7988
Shenzhen University Town Urban Design Location: Type: Team: Profile:
Shenzhen,China Work Sample Architectural Design & Research Institute of SCUT Co., LTD A mixed-use, large-scale urban planning to connect green area and business center of Shenzhen University Town
Responsibility: Assisted the associate director with design strategies, zoning and policy requirements Developed the conceptual design and schematic design, such as producing the masterplan, 3D models, building drawings, and graphic diagrams Prepared the regulatory reports and official documents for the consultants, regulators, and government clients
2
Yulia Li
Contact yuliali682@gmail.com 510-944-7988
Urban Designer / Architectural Designer
CHIAN-CITY Propose the "Chain-City" concept, which uses the Axis as a space spine to connect five Themed Districts, Universiade Center, Western Mountainside, North Residential Area, and the enclosed redline area.
WALKABLE PASSAGE
Use Universiade Center as the starting point of the Axis and connect public functions(commercial, culture, and residential) to create a continuous walkable passage.
3
Yulia Li
Contact yuliali682@gmail.com 510-944-7988
Urban Designer / Architectural Designer
Five Themed Area
Public Transportation
Green System
Pedestrian System
The plan divides the district into five
Set up the internal ring to provide
Various types of parks form a distinctive
The pedestrian system can classify into
Increase the original bikeway network
Strengthen the sense of community
themed areas: the commercial and
coverage for areas not covered by
Urban Park perspective, which provide
three levels: urban greenway, mountain
density to form a three-level system. The
belonging and the characteristics of
residential quarters, the financial business
the rail system. The increased public
a sharp landscape contrast to the high-
park track, and the core road.
Greenway system covers main roads and
the city axis by using hierarchical street
district, science technology district,
transportation coverage can reduce
density city buildings.
connects with the two mountain park loops.
patterns.
creative workshop area, and deadquarter
vehicle emissions and save up to ⅔ of
base.
track-construction cost.
Biking System
Road Hierarchy
4
Yulia Li
Contact yuliali682@gmail.com 510-944-7988
Urban Designer / Architectural Designer
Guangzhou Mingzhuwan Urban Design Location: Type: Team: Profile:
Guangzhou,China Work Sample Architectural Design & Research Institute of SCUT Co., LTD A mixed-use, large-scale urban design that integrates commercial, exhibition, shipping, and service facilities
Responsibility: Assisted the associate director with design strategies, studied the spatial layout and function ratio, and building volume estimation. Developed two core districts design and produced the masterplan, 3D models, building drawings, and graphic diagrams. Prepared the bid documents for the consultants, regulators, and government clients.
6
Yulia Li
Contact yuliali682@gmail.com 510-944-7988
Urban Designer / Architectural Designer
Ground Floor Plan
Typical Floor Plan
Typical Tower Floor Plan
7
Yulia Li
Contact yuliali682@gmail.com 510-944-7988
Urban Designer / Architectural Designer
Ground Floor Plan
2nd Floor Plan
3rd Floor Plan
4th Floor Plan
5th Floor Plan
8
Yulia Li Urban Designer / Architectural Designer
Contact yuliali682@gmail.com 510-944-7988
Biotech Island Urban Planning and Design Location: Type: Time: Profile:
Guangzhou,China Team Work(All the drawings included are personal work) January 2018-July 2018 A mixed-use ecological master plan for city center district of Guangzhou International Biotech Island. Responsibility: Developed the spatial layout, the ratio of mixing function, building volume estimation, and neighborhood scale Studied the sustainability design, designed ecological the shoreline system, and produced the island drainage plan
9
Yulia Li Urban Designer / Architectural Designer
Contact yuliali682@gmail.com 510-944-7988
STRATEGIES
10
Yulia Li
Contact yuliali682@gmail.com 510-944-7988
Urban Designer / Architectural Designer
601 California Drive Location: Type: Team: Profile:
Burlingame, CA Work Sample Ian Birchall + Associates A 5-story mixed-use project consists of 26 live-work units and a conference room & a exercise room on the ground floor
PROJECT INFORMATION Location: 601 California Drive, Burlingame, CA Building GSF: 10,250 SF Number of Stories: 5-Story Number of Dwelling Units: 26 Units Proposed Uses: Live-Work
RESPONSIBILITY Assisted the project manager in development of design documentation Built and developed Revit model for building permit package Produced detailed drawings from concept design to technical drawings Prepared the outreach public hearing packages Created Enscape renderings of the project
11
Yulia Li
Contact yuliali682@gmail.com 510-944-7988
Urban Designer / Architectural Designer
ROOF PARAPET @ CURTAIN WALL
REVIT MODEL
WALL SECTION
MTL_TRESPA TO STUCCO TO TAKTL_VERT TRANSITION @ SOFFIT CONDITION
12
Yulia Li
Contact yuliali682@gmail.com 510-944-7988
Urban Designer / Architectural Designer
2588 Mission Location: Type: Team: Profile:
San Francisco, CA Work Sample Ian Birchall + Associates A 10-story mixed-use density bonus project consists of 181 residential units and 3838 SF of ground-floor retail.
PROJECT INFORMATION Location: 2588 Mission, San Francisco, CA Building GSF: 178,686 SF Number of Stories: 10-Story 3 Retail Storefront: 3,838 SF Number of Dwelling Units: 181 Units Proposed Uses: Residential, Retail, Community Space
RESPONSIBILITY Responsible for designing the ground floor plan and street facade Produced the building drawings for the site permit package Prepared the outreach public hearing packages Developed and coordinated the 3D models with consultants Created Enscape renderings of the project
13
Yulia Li Urban Designer / Architectural Designer
Contact yuliali682@gmail.com 510-944-7988
B1 PLAN
P1 PLAN 22ND ST. ELEVATION
P2 - P8 PLAN
BARTLETT ST. ELEVATION
14
Yulia Li
Contact yuliali682@gmail.com 510-944-7988
Urban Designer / Architectural Designer
425 Broadway Location: Type: Team: Profile:
San Francisco, CA Work Sample Ian Birchall + Associates A 6-story mixed-use density bonus project consists of 42 residential units and 19,000 SF of office space and ground-floor retail
PROJECT INFORMATION Location: 425 Broadway, San Francisco, CA Building GSF: 51,625 SF Number of Stories: 6-Story 3 Retail Storefront: 4,940 SF 5 Design Office Suites: 18,735 SF Number of Dwelling Units: 42 Units Proposed Uses: Residential, Office, Retail, Community Space
RESPONSIBILITY Produced the building drawings for the site permit package Prepared the outreach public hearing packages Developed and coordinated the 3D models with consultants Created Enscape renderings of the project
15
Yulia Li
Contact yuliali682@gmail.com 510-944-7988
Urban Designer / Architectural Designer
B2 PLAN
B1 PLAN
P1 PLAN
P2 PLAN
P3-P5 PLAN
P6 PLAN
BROADWAY ELEVATION
MONTGOMERY ELEVATION
16
Yulia Li Urban Designer / Architectural Designer
Contact yuliali682@gmail.com 510-944-7988
Google Village | San Jose Location: Type: Time: Profile:
San Jose,CA Academic Work January 2019 - August 2019 A mixed-use, large scale design proposal for Google’s development district adjacent to the Diridon transit hub
18
Yulia Li
Contact yuliali682@gmail.com 510-944-7988
Urban Designer / Architectural Designer
MASTERPLAN
STRATEGY
OPEN SPACE CONTINUITY
PHASING
LANDUSE
Commercial Commercial & Residential Residential Institutional & Residential PDR PDR & Residential PDR & Commercial
19
Yulia Li
Contact yuliali682@gmail.com 510-944-7988
Urban Designer / Architectural Designer
DIRIDON STATION DESIGN
GOOGLE VILLAGE DESIGN
Total Area: 4,800,000 sqft Office: 3,500,000 sqft Retail: 300,000 sqft Residential: 1,000,000 sqft (1,000 D.U.)
STATION CIRCULATION
Landmark
Connections
Internal Streets
Land-use
Building Type
Greenways
20
Yulia Li Urban Designer / Architectural Designer
Contact yuliali682@gmail.com 510-944-7988
Future Brisbane Bayland Urban Design
Location: Type: Time: Profile:
Bayland,San Fransico,CA Academic Work August 2018-December 2018 An actionable plan to restore the original Bay Shore and transform Bayland into a sustainable community
22
Yulia Li
Contact yuliali682@gmail.com 510-944-7988
Urban Designer / Architectural Designer
MASTERPLAN
STRATEGIES
Step 1: Relocating the freeway
Before
After
Resource: Hangzhou Bay Bridge, China
Step 2: Connecting the waterway and reclaiming the shoreline
Before
After
Resource: Stratford Point Living Shoreline
Step 3: Adding canals between different blocks for stormwater runoff
Before
After
Resource: Copenhagen, Denmark
23
Yulia Li
Contact yuliali682@gmail.com 510-944-7988
Urban Designer / Architectural Designer
The function of designed water-retaining space changes seasonally. It is a community garden during the dry season; rainwater that flows through the green roof and permeable pavement is collected to form a reservoir during the wet season.
LANDUSE
PHASING
PUBLIC TRANSIT
EDGE TREATMENT
SEA LEVEL RISING
STORMWATER
24
Yulia Li Urban Designer / Architectural Designer
Contact yuliali682@gmail.com 510-944-7988
Winter Oasis | Factory Renovation Location: Type: Time: Profile:
Harbin,China Academic Work March 2019-June 2019 A factory renovation to optimize the industrial city character of Harbin
26
Yulia Li
Contact yuliali682@gmail.com 510-944-7988
Urban Designer / Architectural Designer
MASTERPLAN
SITE ANALYSIS
27
Yulia Li
Contact yuliali682@gmail.com 510-944-7988
Urban Designer / Architectural Designer
Summer: Green + Trees
Summer: Shadow & Wind Analysis
June: 9:00,12:00,15:00,17:00
Sep: 9:00,12:00,15:00,17:00
Winter: Snow + Oasis
Winter: Shadow & Wind Analysis
Dec: 9:00,12:00,15:00,17:00
Mar: 9:00,12:00,15:00,17:00
28