ARAR MUSEUM JADAH,SUDAI
Project Information Project Type: Recreational
Location: KSA
Footprint Area : Around 8500m2
Description : The new museum in Saudi Arabia 2 basements and ground floor and five floors above. Northern Border Museum One of the museums of the northern border region of Arar, was established to preserve and document the effects and heritage of the northern border region of Saudi Arabia, followed by the Saudi Commission for Tourism and Antiquities, opened in 1428H 2007, and contains the halls of museum exhibitions and the Hall of the Kingdom and natural history and geology, On the geological images of the northern border area and its surroundings and the most important components as well as the most important archaeological sites discovered with a selection of artifacts. 2
Project Process
Kickoff Meeting
BXP
Project preparation
Startup
Coordination
LOD
4D
5D
7D 3
Template
Kickoff Meeting
BXP
Project preparation
Execution
Coordination
4D
5D
6D
7D
4
Template
Kickoff Meeting
BXP
Project preparation
Execution
Coordination
4D
5D
6D
7D
5
Kickoff Meeting
BXP
Project preparation
Execution
Coordination
4D
5D
6D
7D
Base file
6
Kickoff Meeting
BXP
Project preparation
Execution
Coordination
4D
5D
6D
7D
Families
7
Kickoff Meeting
BXP
Project preparation
Execution
Coordination
4D
5D
6D
7D
Families
8
Kickoff Meeting
BXP
Project preparation
Execution
Coordination
4D
5D
6D
7D
Families
9
Kickoff Meeting
BXP
Project preparation
Execution
Coordination
4D
5D
6D
7D
Model ownership of Elements
10
Kickoff Meeting
BXP
Project preparation
Execution
Coordination
4D
5D
6D
7D
LOD 300 “Arch”
LOD 400 “Arch”
11
Kickoff Meeting
BXP
Project preparation
Execution
Coordination
4D
5D
6D
7D
LOD 400 “Arch”
Basement Floor Plan
12
Kickoff Meeting
BXP
Project preparation
Execution
Coordination
4D
5D
6D
7D
LOD 400 “Arch”
Sections
13
Kickoff Meeting
BXP
Project preparation
Execution
Coordination
4D
5D
6D
7D
LOD 400 “Arch”
Details
14
Kickoff Meeting
BXP
Project preparation
Execution
Coordination
4D
5D
6D
7D
LOD 400 “Arch”
Details
15
Kickoff Meeting
BXP
Project preparation
Execution
Coordination
4D
5D
6D
7D
LOD 400 “Arch”
Details
16
Kickoff Meeting
BXP
Project preparation
Execution
Coordination
4D
5D
6D
7D
LOD 400 “Arch”
Details
17
Kickoff Meeting
BXP
Project preparation
Execution
Coordination
4D
5D
6D
7D
LOD 300 “Str”
LOD 400 “Str”
18
Kickoff Meeting
BXP
Project preparation
Execution
Coordination
4D
5D
6D
7D
LOD 400 “Str”
Ground Mezz
19
Kickoff Meeting
BXP
Project preparation
Execution
Coordination
4D
5D
6D
7D
LOD 400 “Str”
Details
20
Kickoff Meeting
BXP
Project preparation
Execution
Coordination
4D
5D
6D
7D
LOD 400 “Str”
Details
21
Kickoff Meeting
BXP
Project preparation
Execution
Coordination
4D
5D
6D
7D
Coordination
Visual inspection
22
Kickoff Meeting
BXP
Project preparation
Execution
Coordination
4D
5D
6D
7D
Coordination
Clash detection
Clash matrix
23
Kickoff Meeting
BXP
Project preparation
Execution
Coordination
4D
5D
6D
7D
Coordination
Clash detection
24
Kickoff Meeting
BXP
Project preparation
Execution
Coordination
4D
5D
6D
7D
Clash detection Dynamo script to Isolate clashed elements
25
Kickoff Meeting
BXP
Project preparation
Execution
Coordination
4D
5D
6D
7D
Clash detection Dynamo script to Isolate clashed elements
9
26
Kickoff Meeting
BXP
Project preparation
Execution
Coordination
4D
5D
6D
7D
Data validation and quality control
27
Kickoff Meeting
BXP
Project preparation
Execution
Coordination
4D
5D
6D
7D
Project time schedule
Primavera
28
Project WBS
General Works
Materials
Shop Drawing
Construction Works
Finishing Works
Mechanical
Works
Submitting
Submitting
Excavatio n works
Bricks Works
Sanitary Works
Approving
Approving
Foundatio ns Works
Plastering Works
Fire Fighting Works
Concrete Works
Doors and Windows Works
Elevators Works
Supplying
Electrical Works
Cladding and Flooring Works Paintings Works Facades Works
29
Kickoff Meeting
BXP
Project preparation
Execution
Coordination
Integration between
Timeline
MSP
Revit & Robot
4D
5D
6D
7D
30
Kickoff Meeting
BXP
Project preparation
Execution
Coordination
Integration between
Timeline
Navisworks
Revit & Robot
4D
5D
6D
7D
31
Kickoff Meeting
BXP
Project preparation
Execution
Coordination
Integration between
Cost estimation
Revit & Robot
4D
5D
6D
7D
32
BXP
Project preparation
Execution
Coordination
Integration between Revit & Robot
4D
5D
6D
7D
Info. provided by design
COBIE Structure Info. provided by Construction
Kickoff Meeting
(contractor)
Info. shared In common
33
Contact Work Sheet It is the first COBIE data It contains information about:
◦ ◦ ◦
manufactures suppliers of equipment installed in the project authors of each of the parts of the COBIE file
34
Floor Work Sheet It Divide a facility into a set of vertical slices , then spaces can be added to show specific areas where human activity takes place within each of those slices or floors. It contains information about:
• Floor name • Floor elevation • Height
35
Space Work Sheet It is used to define areas within each floor that need to be managed or maintained It contains information about:
• Space / Room Name • Floor Name • Gross Area And Net Area Of Space
36
Zone Work Sheet It is used to group spaces based on the specific of the facility , Zones can be used to identify (occupancy ,areas and building service regions) It contains information about:
• Zone name • Category • Space name
37
Type Work Sheet
◦
It is used to identify each scheduled type used in the design drawings It contains information about:
◦ • Warranty Guarantor Parts • Warranty Duration Parts • Warranty Duration • Duration Unit • Relacement Cost • Expected Life • Length,width,height • Shape • Size • Color • Finish • Material
38
Component Work Sheet It is used to identify each piece of managed or maintained equipment , Any thing appear in the installed equipment list should also appear in the component work sheet It contains information about:
• Component name • Serial Number • Installation Date • Warranty Start Date • Bar code
39
System Work Sheet It is used to identify each piece of managed or maintained equipment , Any thing appear in the installed equipment list should also appear in the component work sheet It contains information about:
• Component name • Serial Number • Installation Date • Warranty Start Date • Bar code
40
Spare work sheet It is used to list the on-site spare parts , the list of typical replacement parts and consumables needed to operate the facility It contains information about: • Name • Type name • Suppliers • Set number • Part number
41
Resource work sheet It is used to identify the materials,tools and training needed to operate the facility It contains information about: • Name • description
42
Job work sheet It is used to identify a variety of different types of tasks that need to be completed to sustain the facility It include:
• Maintenance tasks • Operational tasks(startup and shutdown,…) • Emergency management instructions • Safety instructions • And any other type of activities that the facility owner need to conduct
43
Document work sheet It is used to link the documents developped during the project to the facility assets identified in COBIE It contains information about:
• Name • Description • References
44
Kickoff Meeting
BXP
Project preparation
Execution
Coordination
Integration between Revit & Robot
4D
5D
6D
7D
hhh8jj
45
Visualization by Enscape
46
Visualization by Enscape
47
Visualization by Enscape
48