IDS 60804-DETAILING & WORKING DRAWING (FINAL ASSIGNMENT) 0339193-NGAN XIAO ROU SEMESTER MARCH-JULY 2022 TUTOR: FATIMAH.MOHD KHAIRI
INTRODUCTION THIS ASSIGNMENT REQUIRES STUDENTS’ TO PRODUCE A SERIES OF WORKING DRAWINGS. THE OBJECTIVE IS TO ENABLE STUDENTS TO PRODUCE DOCUMENTS WITH AN INTEGRATION OF THE BUILDING SERVICES COMPONENTS BY WORKING TOGETHER IN THE DESIGN PROCESS AND IDENTIFY SOLUTIONS TO DESIGN NEEDS WITH INTERIOR DESIGN PROPOSAL OF APPROPRIATE BUILDING SCALE.
DRAWING LIST NO.
DRAWING NO.
SHEET NAME
REV
DATE
DESCRIPTION
ISSUED
1
ASSM3_DWD_NXR_SOA_01
SCHEDULE OF ACCOMMODATION -BLOCK 1 4TH FLOOR
3
5TH JULY 2022
ISSUED FOR CONSTRUCTION
NO
2
ASSM3_DWD_NXR_SOP_02
SETTING OUT PLAN - BLOCK 1 4TH FLOOR
4
5TH JULY 2022
ISSUED FOR CONSTRUCTION
NO
3
ASSM3_DWD_NXR_FLP_03
FURNITURE LAYOUT PLAN - BLOCK 1 4TH FLOOR
4
5TH JULY 2022
ISSUED FOR CONSTRUCTION
NO
4
ASSM3_DWD_NXR_RCP_04
REFLECTED CEILING PLAN
4
5TH JULY 2022
ISSUED FOR CONSTRUCTION
NO
5
ASSM3_DWD_NXR_LLP_05
LIGHTING AND LOOPING PLAN
4
5TH JULY 2022
ISSUED FOR CONSTRUCTION
NO
6
ASSM3_DWD_NXR_FFP_06
FLOOR FINISH PLAN
4
5TH JULY 2022
ISSUED FOR CONSTRUCTION
NO
7
ASSM3_DWD_NXR_SEC_07
SECTION A-A
5
5TH JULY 2022
ISSUED FOR CONSTRUCTION
NO
8
ASSM3_DWD_NXR_BSP_08
BE-SPOKE - PLAN
6
5TH JULY 2022
ISSUED FOR CONSTRUCTION
NO
9
ASSM3_DWD_NXR_BSS_09
BE-SPOKE - SECTION
6
5TH JULY 2022
ISSUED FOR CONSTRUCTION
NO
10
ASSM3_DWD_NXR_BSD_10
BE-SPOKE - DETIAL
6
5TH JULY 2022
ISSUED FOR CONSTRUCTION
NO
11
ASSM3_DWD_NXR_BQ_11
BILL OF QUANTITIES
7
5TH JULY 2022
ISSUED FOR CONSTRUCTION
NO
12
ASSM3_DWD_NXR_BQ_12
BILL OF QUANTITIES
7
5TH JULY 2022
ISSUED FOR CONSTRUCTION
NO
14
ASSM3_DWD_NXR_SOF_13
SCHEDULE OF FINISHES
8
5TH JULY 2022
ISSUED FOR CONSTRUCTION
NO
15
ASSM3_DWD_NXR_FFE_14
FIXTURE, FITTING AND EQUIPMENT SCHEDULE
9
5TH JULY 2022
ISSUED FOR CONSTRUCTION
NO
CHANGE
SCHEDULE OF ACCOMMODATION AREA PER PERSON (sqm)
NO. PER PERSONS
AREA PER ROOMS (sqm)
NO. OF ROOMS
TOTAL AREA OF THE ROOMS (sqm)
1.8900
10
55.0500
1
55.0500
8.361
20
61.0940
1
61.0940
3
20
21
1
21
LOCKER
0.9200
12
6.4930
1
6.4930
WAITING AREA
1.8900
24
43.1770
1
43.1770
CHILLING POD
0.5500
5
6.2850
1
6.2850
LIBRARY AREA
2.3220
15
32.0800
1
32.0800
PIPE FUN
5.2000
20
32.0800
1
32.0800
PAINTING AREA
2.3220
13
19.4000
1
19.4000
BEVERAGE BAR
1.7500
11
32.0800
1
32.0800
LOUNGE
0.5500
5
20.3430
1
20.3430
OFFICE
16.2000
10
16.3070
1
16.3070
OKU TOILET
3.5500
1
7.3280
1
7.3280
UNISEX TOILET
3.3300
4
14.7370
1
14.7370
SUBTOTAL:
367.4540
SPACE PUBLIC SPACES RECEPTION ACTIVITIES ROOM LOBBY
SERVICES MATV
0.8100
1
0.5750
1
0.5750
TELEPHONE
0.8400
1
0.5200
1
0.5200
ELECTRICAL
0.8100
1
0.5200
1
0.5200
WAT
0.8100
1
0.6010
1
0.6010
REFUSE ROOM
2.0100
3
3.7100
1
3.7100
SSU ROOM
0.8100
1
3.0270
1
3.0270
PUMP ROOM
0.8100
3
4.4880
1
4.4880
GENERATOR ROOM
0.8100
5
4.4880
1
4.4880
SUBTOTAL: TOTAL:
17.9290 371.9420
A
E 34725 10000
5027
10000
WAT
0.520SQM
0.575SQM
600
655
660
595
730
725
850
2500
4580
1995
150
3420
1610
1660
1500
1995
3.027 SQM
1965
2950
100
100
2550 100
600 500
105 900 900
100 1500
470
1500
7.328 SQM
100 900
1750
600 600 2775
OKU TOILET
3600
150
250
1500
2175
3970
2825
14.737 SQM
1500
4100
300
UNISEX TOILET
1250
920 100
1980
750
1500
2000
500
4555
1980
100
2600
4.488SQM
2000
PUMP ROOM
8.921SQM
8770
GENERATOR ROOM
465
2500
2000
5250
1500
1500
1500
1380
3915
55
95
600
2000
2200
SSU ROOM
10 PERSON PASSENGER LIFT
1745 100
100 570
10 PERSON PASSENGER LIFT
3.71 SQM
275
REFUSE ROOM
16150
600
LOBBY
5390
ELEC
6320
635
TEL 0.520SQM
5700
250 600
2500
5250
0.601SQM
3490
MATV
2200
2500
2825
1
9700
SOP SETTING OUT PLAN L4 SCALE : 1 : 100
NOTE:
No.
Description 00
ARCHITECT :
CLIENT :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
Date
ID CONSULTANT :
QUANTITY SURVEYOR :
PROJECT TITLE :
PROPOSED RENOVATION WORK FOR LIVING ROOM-WORKING AREA
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
NC ARCHITECTS
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
Level 1 & 2, 19, Jalan PJS 8/12, Bandar Sunway, 46150 Petaling Jaya, Selang
DRAWING TITLE :
FURNITURE LAYOUT PLAN - LIVING_WORKING SPACE SCALE : AS SHOWN
DATE : 5TH JULY 2022
CHECKED BY : MS. FATIMAH DRAWN BY : NGAN XIAO ROU DRAWING NO :
ASS2_DWD_NXR_SOP_02
REF NO :
04
BUILT-IN FURNITURE LEGEND DESCRIPTION
QUANTITY
5200MM(L) * 600MM(W) RECEPTION COUNTER
1
2000MM(L)*350MM(W)LOCKER
1
PIPE FUN
1
BEVERAGE BAR
1
LOUNGE
1
LIBRARY AREA
4
400MM(W) * 360MM(D) CHILLING POD
5
CODE
A
E
BF1
34725 9700
10000
10000
5027 BF3
3038
1
3712
BF2
2500
2825
BF4
BF5
BF6 MATV 0.601SQM
TEL
ELEC
WAT
0.520SQM
0.520SQM
0.575SQM
Ø300
LF3
Ø80
2500
Ø1000
2058
1885 LOBBY
BF6
21 SQM
2200
16150
BF7
0
LIBRARY AREA 32.08 SQM
10 PERSON PASSENGER LIFT
REFUSE ROOM
Ø400
SSU ROOM
10 PERSON PASSENGER LIFT
28 00
37 10
5250
LF2
LF6
LOOSE-IN FURNITURE LEGEND
BF4
BEVERAGE BAR 32.08 SQM
3.027 SQM
Ø1810
LF4
3.71SQM
LF7
BF3
PIPE FUN 32.08 SQM
LF1
Ø400
LF1
CODE
DESCRIPTION
QUANTITY
LF1
610MM(W) * 490MM(D) * 1140MM(H) POLYURETHANE FOAM SEAT OFFICE CHAIR IN BLACK
3
LF2
800MM(L) * 740MM(H) TIMBER TABLE
10
LF3
460MM(W) * 540MM(D) * 800MM(H) POLYPROPYLENE PLASTIC CHAIR IN WHITE
23
LF4
800MM(W) CUSTOMMADE WALL CHAIR IN METAL
6
LF5
1800MM(W) * 810MM(D) * 600MM(H) CUSTOMIZE OTTOMAN CHAIR, SEATING COVERED WITH FABRIC,LEG IN POLYPROPYLENE
3
LF6
680MM(W) * 680MM(D) * 1040MM(H) POLYURETHANE COOLING FOAM SEAT OFFICE CHAIR IN GUNNARED DARK GARY
8
LF7
2000MM(L)*1000MM(W) TIMBER OFFICE TABLE
1
LF8
600MM(W)*850MM(L) TIMBER PAINTING TABLE
12
LF9
390MM(W) * 360MM(D) * 670MM(H) POLYPROPYLENE PLASTIC KID CHAIR
12
LF10
500MM(W)*900MM(L) TIMBER PAINTING STORAGE BOX
10
BF1
Ø400
LF1
1380
1885
RECEPTION
OFFICE 16.307 SQM
Ø420
400
00
10
650
LF5
2000
5250
LF9
WAITING AREA
LF8
43.177SQM
GENERATOR ROOM
PUMP ROOM
8.921SQM
4.488SQM
ACTIVITIES ROOM 51.094 SQM
350
500
PAINTING AREA 19.4 SQM
LF9
900
2000
BF2
LOCKER
UNISEX TOILET
A"
3970
2000
BF5
300
2825
14.737 SQM
OKU TOILET
LOUNGE 20.343 SQM
CHILLING POD
7.328 SQM
A"
BF7
FLP FURNITURE LAYOUT PLAN L4 SCALE : 1 : 100
NOTE:
No.
Description 00
ARCHITECT :
CLIENT :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
Date
ID CONSULTANT :
QUANTITY SURVEYOR :
PROJECT TITLE :
PROPOSED RENOVATION WORK FOR LIVING ROOM-WORKING AREA
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
NC ARCHITECTS
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
Level 1 & 2, 19, Jalan PJS 8/12, Bandar Sunway, 46150 Petaling Jaya, Selang
DRAWING TITLE :
FURNITURE LAYOUT PLAN - LIVING_WORKING SPACE SCALE : AS SHOWN
DATE : 21 TH JUNE 2022
CHECKED BY : MS. FATIMAH DRAWN BY : NGAN XIAO ROU DRAWING NO :
ASS2_DWD_NXR_FLP_03
REF NO :
04
A
B
D
C
E
34725 9700 3712
10000
10000
5027
3038
2500
SYMBOL
DESCRIPTION
SWITCH
450
2
2825
1
LEGEND
EXIT
EXIT
EXIT
EXIT
2500
DOUBLE GANG SWITCH FLOOR SOCKETS 1300MM ABOVE FLOOR LEVEL SINGLE GANG TWO WAYS SWITCH FLOOR SOCKETS 1300MM ABOVE FLOOR LEVEL
1 E A E
2200
16150
E
1 E A E
E
DOUBLE GANG TWO WAYS SWITCH FLOOR SOCKETS 1300MM ABOVE FLOOR LEVEL
1380
ELECTRICITY
14W 65K SQUARE WHITE LED RECESSED SPOT LIGHT
2000
5250
3
5250
SINGLE GANG SWITCH FLOOR SOCKETS 1300MM ABOVE FLOOR LEVEL
110V ROUND WHITE DOWNLIGHT
12W 65K ROUND WHITE LED RECESSED SPOT LIGHT
3970
2825
4
CEILING CASSETTE AIR CONDITIONER
360 DEGREE ROTATE CCTV
EXIT
EMERGENCY SIGN
5
EXIT
R
RCP REFLECTED CEILING PLAN L4 SCALE : 1 : 100
NOTE:
No.
Description 00
ARCHITECT :
CLIENT :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
Date
ID CONSULTANT :
QUANTITY SURVEYOR :
PROJECT TITLE :
PROPOSED RENOVATION WORK FOR LIVING ROOM-WORKING AREA
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
NC ARCHITECTS
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
Level 1 & 2, 19, Jalan PJS 8/12, Bandar Sunway, 46150 Petaling Jaya, Selang
DRAWING TITLE :
FURNITURE LAYOUT PLAN - LIVING_WORKING SPACE SCALE : AS SHOWN
DATE : 21TH JUNE 2022
CHECKED BY : MS.FATINAH
DRAWN BY : NGAN XIAO ROU
DRAWING NO :
ASS3_DWD_NXR_LLP_04
REF NO :
04
A
E 34725 9700 3712
10000
10000
5027
3038
2500
2825
1
LEGEND SYMBOL
DESCRIPTION
SWITCH S
EXIT
S
EXIT
EXIT
SINGLE GANG SWITCH FLOOR SOCKETS 1300MM ABOVE FLOOR LEVEL
S2
S
2500
S2
S
S3
SINGLE GANG TWO WAYS SWITCH FLOOR SOCKETS 1300MM ABOVE FLOOR LEVEL DOUBLE GANG TWO WAYS SWITCH FLOOR SOCKETS 1300MM ABOVE FLOOR LEVEL
S
S
S
S
10 PERSON PASSENGER LIFT
S2
S
10 PERSON PASSENGER LIFT
S
1380
S2
16150
2200
S
S
DOUBLE GANG SWITCH FLOOR SOCKETS 1300MM ABOVE FLOOR LEVEL
S2
5250
S
S
S2
S
SWITCHED WALL SOCKETS 350MM ABOVE FLOOR LEVEL
S
S
SWITCHED WALL SOCKETS 1100MM ABOVE FLOOR LEVEL
S
S
S2 S
S
S3
S
SWITCHED FLOOR SOCKETS ON FLOOR LEVEL
ELECTRICITY
14W 65K SQUARE WHITE LED RECESSED SPOT LIGHT
S
3970
S
S2
S
S3
S
2825
S2
S3
2000
5250
S
110V ROUND WHITE DOWNLIGHT S2
S2
S
S
S
EXIT
12W 65K ROUND WHITE LED RECESSED SPOT LIGHT
CEILING CASSETTE AIR CONDITIONER
LLP LIGHTING & LOOPING PLAN L4 SCALE : 1 : 100
NOTE:
No.
Description 00
ARCHITECT :
CLIENT :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
Date
ID CONSULTANT :
QUANTITY SURVEYOR :
PROJECT TITLE :
PROPOSED RENOVATION WORK FOR LIVING ROOM-WORKING AREA
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
NC ARCHITECTS
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
Level 1 & 2, 19, Jalan PJS 8/12, Bandar Sunway, 46150 Petaling Jaya, Selang
DRAWING TITLE :
FURNITURE LAYOUT PLAN - LIVING_WORKING SPACE SCALE : AS SHOWN
DATE : 21TH JUNE 2022
CHECKED BY : MS.FATINAH
DRAWN BY : NGAN XIAO ROU
DRAWING NO :
ASS3_DWD_NXR_LLP_05
REF NO :
04
A
E 34725 9700
10000
10000
5027
3038
2500
2825
1
3712
F2
0.520SQM
F1
0.520SQM
F1
0.575SQM
F6
FLOOR LEGEND
LF3
LF3 LF2
F6
2500
F1
LF2
WAT
ELEC
TEL F1
0.601SQM
LOBBY
10 PERSON PASSENGER LIFT
REFUSE ROOM
SSU ROOM
10 PERSON PASSENGER LIFT
WHITE HEXAGON PORCELAIN FLOOR 3.027 SQM TILE
WHITE HEXAGON PORCELAIN FLOOR TILE
1380
AREA/ SQM
F1
WHITE HEXAGON PORCELAIN FLOOR
60.116 SQM
F2
600MM(L)* 600MM(W) GRANITE POLISHED TILE IN WHITE ANTIQUE
270.9SQM
F3
BLACK OLIVE PORCELAIN FLOOR TILE
16.307 SQM
F4
THK 2MM HOMOGENEOUS VINYL FLOORING IN LIGHT BROWN COLOR
97.947 SQM
F5
THK 2MM HOMOGENEOUS VINYL FLOORING IN GRAY COLOR
194.55 SQM
F6
THK 2MM HOMOGENEOUS VINYL FLOORING IN LIGHT GREEN COLOR
33.903 SQM
F7
THK 8MM WHITE TILE IN GLOSS FINISH
21 SQM
F8
WHITE MATTE PAINTING FLOOR
25.23 SQM
F9
PINT MATTE PAINTING FLOOR
15 SQM
F1
3.71SQM
F1
F8 F6
OFFICE 16.307 SQM
F5 F9
F1
F3
F6
WAITING AREA
2000
5250
DESCRIPTION
F7
RECEPTION
43.177SQM
F5 F1
GENERATOR ROOM
F1
WHITE HEXAGON PORCELAIN FLOOR TILE 8.921SQM
PUMP ROOM
F5
ACTIVITIES ROOM 51.094 SQM
WHITE HEXAGON PORCELAIN FLOOR TILE 4.488SQM
LOCKER
F1
UNISEX TOILET
F5
WHITE HEXAGON PORCELAIN FLOOR TILE 14.737 SQM
F1
3970
2825
CODE
F4
WHITE MARBLE TILE 21 SQM
2200
5250
LF3
LF3
LF2
MATV
16150
LF3
LF3
F6
OKU TOILET
F1
CHILLING POD
WHITE HEXAGON PORCELAIN FLOOR TILE 7.328 SQM
F5
F6
FFP FLOOR FINISH PLAN L4 SCALE : 1 : 100
NOTE:
No.
Description 00
ARCHITECT :
CLIENT :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
Date
ID CONSULTANT :
QUANTITY SURVEYOR :
PROJECT TITLE :
PROPOSED RENOVATION WORK FOR LIVING ROOM-WORKING AREA
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
NC ARCHITECTS
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
Level 1 & 2, 19, Jalan PJS 8/12, Bandar Sunway, 46150 Petaling Jaya, Selang
DRAWING TITLE :
FURNITURE LAYOUT PLAN - LIVING_WORKING SPACE SCALE : AS SHOWN
DATE : 21TH JUNE 2022
CHECKED BY : MS.FATINAH
DRAWN BY : NGAN XIAO ROU
DRAWING NO :
ASS3_DWD_NXR_FFP_06
REF NO :
04
A
B
D
C
E
34725 9700
10000
10000
5027
4000
ROOF TOP
4000
4th FLOOR
3000
MEZZANINE FLOOR
3000
26000
3rd FLOOR
4000
2nd FLOOR
4000
1st FLOOR
4000
GROUND FLOOR
SEC SECTION A-A A-A SCALE : 1 : 100
NOTE:
No.
Description 00
ARCHITECT :
CLIENT :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
Date
ID CONSULTANT :
QUANTITY SURVEYOR :
PROJECT TITLE :
PROPOSED RENOVATION WORK FOR LIVING ROOM-WORKING AREA
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
NC ARCHITECTS
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
Level 1 & 2, 19, Jalan PJS 8/12, Bandar Sunway, 46150 Petaling Jaya, Selang
DRAWING TITLE :
BUILDING SECTION SCALE : AS SHOWN
DATE : 21 TH JUNE 2022
CHECKED BY : MS. FATIMAH DRAWN BY : NGAN XIAO ROU DRAWING NO :
ASS2_DWD_NXR_SC_07
REF NO :
05
4800
280
280
280
280
280
280
280
280
280
280
280
280
280
280
475
245
400
155
415
(L)220MM*(W)150MM*(H)1000MM CUSTOMIZED STEAMPUNK COFFEE AND TEA BREWER
BS PL
BE-SPOKE -PLAN SCALE : 1 : 20
NOTE:
No.
Description 00
ARCHITECT :
CLIENT :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
Date
ID CONSULTANT :
QUANTITY SURVEYOR :
PROJECT TITLE :
PROPOSED RENOVATION WORK FOR LIVING ROOM-WORKING AREA
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
NC ARCHITECTS
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
Level 1 & 2, 19, Jalan PJS 8/12, Bandar Sunway, 46150 Petaling Jaya, Selang
DRAWING TITLE :
FURNITURE LAYOUT PLAN - LIVING_WORKING SPACE SCALE : AS SHOWN
DATE : 27TH JUNE 2022
CHECKED BY : MS.FATINAH
DRAWN BY : NGAN XIAO ROU
DRAWING NO :
ASS2_DWD_NXR_BSP_08
REF NO :
06
THK 50MM STAINLESS STEEL WIRE ROPE WITH END FITTING
DETAIL 1
20MM THK STAINLESS STEEL BRACKET COATING
20MM THK STAINLESS STEEL STANDING BRACKET 5MM THK GLASS COFFEE BEAN TANK
(H)40MM METAL COFFEE GRINDER
COFFEE DISPENSER EXTRACTION CONTROL 1L CAPACITY WATER TANK
METAL FINISHED ADJUSTABLE TAP
BS BE-SPOKE -SECTION SEC SCALE : 1 : 20 NOTE:
No.
Description 00
ARCHITECT :
CLIENT :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
Date
ID CONSULTANT :
QUANTITY SURVEYOR :
PROJECT TITLE :
PROPOSED RENOVATION WORK FOR LIVING ROOM-WORKING AREA
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
NC ARCHITECTS
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
Level 1 & 2, 19, Jalan PJS 8/12, Bandar Sunway, 46150 Petaling Jaya, Selang
DRAWING TITLE :
FURNITURE LAYOUT PLAN - LIVING_WORKING SPACE SCALE : AS SHOWN
DATE : 27TH JUNE 2022
CHECKED BY : MS.FATINAH
DRAWN BY : NGAN XIAO ROU
DRAWING NO :
ASS2_DWD_NXR_BSS_09
REF NO :
06
10
15
50
45
STAINLESS STEEL PLATE 10mm THK.
15
DIA 40mm STAINLESS STEEL
DIA 20mm MOUNTING STUD
BS D1 NOTE:
Description 00
SCALE : 1 : 2
ARCHITECT :
CLIENT :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
No.
BE-SPOKE -DETAIL 1
Date
ID CONSULTANT :
QUANTITY SURVEYOR :
PROJECT TITLE :
PROPOSED RENOVATION WORK FOR LIVING ROOM-WORKING AREA
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
NC ARCHITECTS
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
Level 1 & 2, 19, Jalan PJS 8/12, Bandar Sunway, 46150 Petaling Jaya, Selang
DRAWING TITLE :
FURNITURE LAYOUT PLAN - LIVING_WORKING SPACE SCALE : AS SHOWN
DATE : 27TH JUNE 2022
CHECKED BY : MS.FATINAH
DRAWN BY : NGAN XIAO ROU
DRAWING NO :
ASS2_DWD_NXR_BSD_10
REF NO :
06
C01
L01
L02 C02 W1 D4
FU1
FU2
F2
F5
BQ 01
CODE
DESCRIPTION
BILL OF QUANTITIES - BEVERAGE BAR 3D VIEW
C
CEILING
SCALE : 1 : 100
W
WALL
F
FLOOR
FU
FURNITURE
NOTE:
No.
Description 00
ARCHITECT :
CLIENT :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
Date
ID CONSULTANT :
QUANTITY SURVEYOR :
PROJECT TITLE :
PROPOSED RENOVATION WORK FOR LIVING ROOM-WORKING AREA
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
NC ARCHITECTS
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
Level 1 & 2, 19, Jalan PJS 8/12, Bandar Sunway, 46150 Petaling Jaya, Selang
DRAWING TITLE :
FURNITURE LAYOUT PLAN - LIVING_WORKING SPACE SCALE : AS SHOWN
DATE : 27TH JUNE 2022
CHECKED BY : MS.FATINAH
DRAWN BY : NGAN XIAO ROU
DRAWING NO :
ASS2_DWD_NXR_BQ_012
REF NO :
07
TERMS AND CONDITIONS
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
BILL OF QUANTITY 1. Validity : 14 days
Address: No. 1 Jalan Taylor's 47500 Subang Jaya, Selangor Darul Ehsan, Malaysia.
QUOTATION DATE: 27TH JUNE 2022 QUOTE NO: FNASS_DWD_NXR_BQ_09
2. Period of completed: 60 days (refer of down payment upon confirmation of order) 3. All dimension subject to Final site measurement.
ATTENTION: Renovation for the Toddler Town Edutainment Center, Block 1 Level 4
NO
QTY
DESCRIPTION
UNIT
RATE(RM)
TOTAL (RM)
CEILING
C01
To supply material and labour to paint (W):2950MM,(L):6321MM cement textured paint
32.08
SQM
6.80
218.14
C02
To supply material and labour to lay (T): 34MM ,(W): 225MM,(L): 3000MM pine wood cladding in stain dark walnut finish.
136
PIC
170
23,120
SUB:
To supply material and labour to glue (L):2400MM, (W):600MM,(T)21MM acoustic slat wood wall in rustic oak finish.
20
PIC
45
RM900
233.07
6. Design/Works/ Services Disclaimer - Horizon Design cannot be held responsible for designs/works/services that may later be undesirable r cause inconvenience. The Client understands that all designer/constructor interprets the Client's requirements and wishes. However any design/works that are not done according to agreed as per quoted shall be rectifies accordingly by Horizon Design
900
SUB:
DOOR
D4
To supply material and labour to installed Aluminum Frame Tempered Glass Swing Door.
1
NOS
233.07
SUB:
RM233.07
FLOOR
F2
To supply material and labour to installed 600MM*600MM granite tile.
200
PIC
25
5,000
F5
To supply material and labour to installed (T): 2MM homogeneous vinyl floor.
32.08
SQM
1180/20SQM
2,360
SUB:
RM7,360
LIGHTING
L01
To supply material and labour to install (H): 29MM, (L)135MM, (W): 135MM round recessed spot light.
4
PIC
58.15
232.6
L02
To supply material and labour to install (H): 290MM, (L)370MM, (W): 370MM pendant hanging lamp.
3
PIC
129
387
SUB:
5. Payment Terns: -THE CONTRACT SUM RM Stage 1 Upon confirmation of project/service Stage II Progress Claim (installation of fixtures & fittings) Stage III Progress Claim(Completion of fixtures &fittings) Stage IV Final payment (Full completion of all works) - Services/works shall commence upon receipt of payment o each phase except fro final phase. Time frame of work that has been agreed by both - All outstanding amounts must be paid within ten (10) working days after the handover of site (excluded V.O.period). Shall there be any delay of - Horizon Design do not hold any responsibilities in delay of work from the agreed Time frame that is resulted by payment issues. - Payment not made within above mentioned period will carry interest at the rate of 2% per month (30days) until full payemnt is made. - Cheque should be crossed A/C Payee & Made Payable to Horizon Design. - Horizon Design shall not in any circumstances or fro any reason whatsoever be liable fro any losses, damages, cost, expenses, including without limitation, direct, special or consequential damages or economic losses arising from any such failure to perform.
RM23,338.10
WALL
W1
4. 4 Variation Order: Any alteration not specifies in the quotation will be issued under variation order to follow with an invoice Variation Order (VO).
RM619.60
FURNITURE
FU1
To supply material and labour to customized (W)400MM, (H) 850MM marble island table top in white finish.
1
N/A
13,800
13,800
FU2
To supply material and labour to customized Folding Mobile Rectangular School Dining Table Seats 16 People.
1
N/A
5,018.85
5,018.85
SUB:
RM18,818.85
TOTAL:
RM51,268.77
7. Project Access - Client will provide Horizon Design with access to the project and all information that may be required to completed the project. Failure to do so by the Client provides Horizon Design the right to terminate service (with a written notice)and collect outstanding balances. 8. Termination of Services - Horizon Design has the right to terminate or suspend All works/ Services , upon written notice fails to make payments/ default in accordance with the mentioned terms and conditions herein. - Termination shall be without prejudice to any and all other rights and remedies of Horizon Design and Client shall remain liable for all - Within five (5) working days of termination of or services for any reason, Horizon Design shall submit to Client an itemized invoice for any fees or expenses accrued under this quotation. The Client,upon payment if accrued amounts to Horizon Design whatsoever for any further fees or expenses arising hereunder. 9. Project Time Frame& Fees for extra services - Reasonable time frame fro drawings are t o be discussed & agreed by both party Horizon Design - Estimated time frame for entire project's time frame inclusive of revision will be maximum of TWO (2) MONTHS starts from date of appointment. - If project exceed the estimated time frame, and additional minimum fee of RM150 per month will be charged reimbursement claim &site visit charges. Subject to the Project &remaining job-scope. 10. Site Visit, Inspection & Traveling - Site visit or inspection services that requires Horizon Design to travel by air (overseas, Sabah & Sarawak) 11. Acknowledge of Quoted Fees, Terms & Conditions - Upon receiving payment according to the [percentage stated above, we will acknowledge that you have read & agreed on out scope of design/works/ services, fees, terms & conditions.This quotation shall be treated as a contract legally binding once being signed. - English language/wordings shall prevail and be used as contract terms shall any discrepancies due to translation. ISSUE BY:
ACKNOWLEDGED & AGREED BY
Horizon Design ________________ NGAN XIAO ROU
________________
SCHEDULE OF FINISHES
DESCRIPTION
AREA (sqm)
LOCATION
SUPPLIER
F1
WHITE HEXAGON PORCELAIN FLOOR
60.1160
UNISEX TOILET, OKU TOILET
NIRO GRANITE
F2
600x600mm GRANITE POLISHED TILE IN WHITE ANTIQUE
270.9900
BALCONY
KASTONE
F3
BLACK OLIVE PORCELAIN FLOOR TILE
16.3070
OFFICE
LEOCERAMIKO
F4
HOMOGENEOUS VINYL FLOORING IN BROWN COLOR 2mm THK.
97.9470
RECEPTION
PEASB
F5
HOMOGENEOUS VINYL FLOORING IN GRAY COLOR 2mm THK.
194.5500
LOUNGE, CORRIDOR
PEASB
F6
HOMOGENEOUS VINYL FLOORING IN GREEN COLOR 2mm THK.
33.9030
WAITING AREA
PEASB
F7
WHITE TILE IN GLOSS FINISH
21.0000
LOBBY
NIRO GRANITE
F8
WHITE MATTE PAINTING FLOOR
25.2300
ACTIVITIES ROOM
NIPPON PAINT
F9
PINT MATTE PAINTING FLOOR
15.0000
ACTIVITIES ROOM
NIPPON PAINT
CODE
NOTE:
Description 00
ARCHITECT :
CLIENT :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
No.
IMAGE
Date
ID CONSULTANT :
QUANTITY SURVEYOR :
PROJECT TITLE :
PROPOSED RENOVATION WORK FOR LIVING ROOM-WORKING AREA
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
NC ARCHITECTS
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
Level 1 & 2, 19, Jalan PJS 8/12, Bandar Sunway, 46150 Petaling Jaya, Selang
DRAWING TITLE :
FURNITURE LAYOUT PLAN - LIVING_WORKING SPACE SCALE : AS SHOWN
DATE : 21TH JUNE 2022
CHECKED BY : MS.FATINAH
DRAWN BY : NGAN XIAO ROU
DRAWING NO :
ASS2_DWD_NXR_SOF_13
REF NO :
08
SCHEDULE OF FURNITURE, FIXTURES, AND EQUIPMENT
SPECIFICATION
QUANTITY
SUPPLIER
PRICE RM/UNIT
LF1
610x490x1140mm (WxDxH) POLYURETHANE FOAM SEAT OFFICE CHAIR IN BLACK
3
SSFHOME
242.73
LF2
800x740mm (LxH) TIMBER TABLE
10
IKEA
499.00
LF3
460x540x800mm (WxDxH) POLYPROPYLENE PLASTIC CHAIR IN WHITE
23
IKEA
125.00
LF4
800mm CUSTOM MADE WALL CHAIR IN METAL
6
KRYPTOMAX
325.00
LF5
1800x810x600mm (WxDxH) CUSTOMIZED OTTOMAN CHAIR, SEATING COVERED WITH FABRIC LEG IN POLYPROPYLENE
3
PNZ DESIGN
289.00
LF6
680x680x1040mm (WxDxH) POLYURETHANE COOLING FOAM SEAT OFFICE CHAIR IN GUNNARED DARK GRAY
8
IKEA
220.66
LF7
200x1000mm (LxW) TIMBER OFFICE TABLE
1
IKEA
899
LF8
600x850mm (WxL) TIMBER PAINTING TABLE
12
AFIAH MANUFACTURE
715
LF9
390x360x670mm (WxDxH) POLYPROPYLENE PLASTIC KID CHAIR
12
IKEA
39.90
LF10
500x900mm (WxL) TIMBER PAINTING STORAGE BOX
10
IKEA
49.90
CODE
NOTE:
Description 00
ARCHITECT :
CLIENT :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
No.
ITEM
Date
ID CONSULTANT :
QUANTITY SURVEYOR :
PROJECT TITLE :
PROPOSED RENOVATION WORK FOR LIVING ROOM-WORKING AREA
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
NC ARCHITECTS
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
Level 1 & 2, 19, Jalan PJS 8/12, Bandar Sunway, 46150 Petaling Jaya, Selang
DRAWING TITLE :
FURNITURE LAYOUT PLAN - LIVING_WORKING SPACE SCALE : AS SHOWN
DATE : 21TH JUNE 2022
CHECKED BY : MS.FATINAH
DRAWN BY : NGAN XIAO ROU
DRAWING NO :
ASS2_DWD_NXR_FFE_14
REF NO :
09
FINAL ASSIGNMENT REFLECTION Through this task, with the progress of the activity, I can feel that my drawing skills need to be strengthened in this assignment. The first is the lineweight that tutor has been talking about, and the second is to understand the structure of objects and make improvements when drawing their own drawings. However, compared with the previous assignment, this one basically needs to be completed by yourself, and it needs to be managed very accurately in terms of time. At the same time, I also learned the complicated parts of production (SOP), (FLP), (RCP), (LLP) & (FFP).
IDS 60804-DETAILING & WORKING DRAWING (ASSIGNMENT 2) 0339193-NGAN XIAO ROU SEMESTER MARCH-JULY 2022 LECTURER:
NORJI.NASIR
DRAWING LIST NO.
DRAWING NO.
SHEET NAME
REV
DATE
1
ASSM3_DWD_NXR_IPS_01
INDIVIDUAL PRECEDENT STUDIES
3
17TH MAY 2022
2
ASSM3_DWD_NXR_GPS_02
GROUP PRECEDENT STUDIES
4
17TH MAY 2022
3
ASSM3_DWD_NXR_FLP_03
FURNITURE LAYOUT PLAN
5
17TH MAY 2022
4
ASSM3_DWD_NXR_SC_04
SECTION
5
17TH MAY 2022
5
ASSM3_DWD_NXR_EL_05
ELEVATION
5
17TH MAY 2022
6
ASSM3_DWD_NXR_BSP_06
BE-SPOKE - PLAN
5
17TH MAY 2022
7
ASSM3_DWD_NXR_BSEL_07
BE-SPOKE - ELEVATION
5
17TH MAY 2022
8
ASSM3_DWD_NXR_BSSC_08
BE-SPOKE - SECTION
5
17TH MAY 2022
9
ASSM3_DWD_NXR_UBBL&FR_09
UBBL & FIRE REQUIREMENT
6
17TH MAY 2022
10
ASSM3_DWD_NXR_SOA_10
SCHEDULE OF ACCOMMODATION
7
17TH MAY 2022
11
ASSM3_DWD_NXR_DS_11
Door Schedules
7
17TH MAY 2022
12
ASSM3_DWD_NXR_WS_12
Window Schedules
7
17TH MAY 2022
14
ASSM3_DWD_NXR_SOF_13
SCHEDULE OF FINISHES
7
17TH MAY 2022
15
ASSM3_DWD_NXR_FFE_14
FIXTURE, FITTING AND EQUIPMENT SCHEDULE
7
17TH MAY 2022
INDEPENDENT OFFICE 05 MAPLE WOOD LAMINATE FLOOR 11MQS
UP
INDEPENDENT OFFICE 04 MAPLE WOOD LAMINATE FLOOR 11MQS
MEETING ROOM 1 WHITE PORCELAIN TILES 13MSQ
MEETING ROOM 2 WHITE PORCELAIN TILES 20MQS
SEC D
UP
SEC D
VOID
INDEPENDENT OFFICE 03 MAPLE WOOD LAMINATE FLOOR 9MQS
ATRIUM MAPLE WOOD LAMINATED FLOOR 86MSQ
INDEPENDENT OFFICE 02 MAPLE WOOD LAMINATE FLOOR 9MQS
INDEPENDENT OFFICE 01 MAPLE WOOD LAMINATE FLOOR 9MQS CO-WORKING SPACE MAPLE WOOD LAMINATED FLOOR 122MSQ
DN
COMMON SPACE BLACK PORCELAIN TILES 30MSQ
SOCIAL SPACE GRAY TERRAZZO TILES 37MSQ
FLP FURNITURE LAYOUT PLAN OF FIRST FLOOR FF SCALE : 1 : 100 NOTE:
No.
Description 00
ARCHITECT :
CLIENT :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
Date
ID CONSULTANT :
QUANTITY SURVEYOR :
PROJECT TITLE :
PROPOSED RENOVATION WORK FOR LIVING ROOM-WORKING AREA
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
NC ARCHITECTS
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
Level 1 & 2, 19, Jalan PJS 8/12, Bandar Sunway, 46150 Petaling Jaya, Selang
DRAWING TITLE :
FURNITURE LAYOUT PLAN - LIVING_WORKING SPACE SCALE : AS SHOWN
DATE : 17TH MAY 2022
CHECKED BY : MS.NORJI
DRAWN BY : NGAN XIAO ROU
DRAWING NO :
ASS3_DWD_NXR_FLP_03
REF NO :
05
A
2
3
4
5
6
7
8
9
10
11
12
13
Fifth Floor
Fourth Floor
Third Floor
Second Floor WASHROOM
MEETING ROOM 1
MEETING ROOM 2
INDEPENDENT LEARNING OFFICE
UNIVERSAL TOILET
First Floor
Ground Floor
FF SC NOTE:
Description 00
SCALE : 1 : 100
ARCHITECT :
CLIENT :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
No.
SECTION OF FIRST FLOOR
Date
ID CONSULTANT :
QUANTITY SURVEYOR :
PROJECT TITLE :
PROPOSED RENOVATION WORK FOR LIVING ROOM-WORKING AREA
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
NC ARCHITECTS
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
Level 1 & 2, 19, Jalan PJS 8/12, Bandar Sunway, 46150 Petaling Jaya, Selang
DRAWING TITLE :
FURNITURE LAYOUT PLAN - LIVING_WORKING SPACE SCALE : AS SHOWN
DATE : 17TH MAY 2022
CHECKED BY : MS.NORJI
DRAWN BY : NGAN XIAO ROU
DRAWING NO :
ASS3_DWD_NXR_SC_04
REF NO :
05
305
1728
PL F
BE SPOKE DETAIL OF PLAN SCALE : 1 : 15
NOTE:
No.
Description 00
ARCHITECT :
CLIENT :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
Date
ID CONSULTANT :
QUANTITY SURVEYOR :
PROJECT TITLE :
PROPOSED RENOVATION WORK FOR LIVING ROOM-WORKING AREA
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
NC ARCHITECTS
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
Level 1 & 2, 19, Jalan PJS 8/12, Bandar Sunway, 46150 Petaling Jaya, Selang
DRAWING TITLE :
FURNITURE LAYOUT PLAN - LIVING_WORKING SPACE SCALE : AS SHOWN
DATE : 17TH MAY 2022
CHECKED BY : MS.NORJI
DRAWN BY : NGAN XIAO ROU
DRAWING NO :
ASS3_DWD_NXR_BSP_06
REF NO :
05
8
9 1730
10 1115
11 1740
12
13 2640
3110
Second Floor
3.30 F.F.L.
First Floor
FF EL
INTERNAL ELEVATION DRAWING OF FIRST FLOOR SCALE : 1 : 100
NOTE:
No.
Description 00
ARCHITECT :
CLIENT :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
Date
ID CONSULTANT :
QUANTITY SURVEYOR :
PROJECT TITLE :
PROPOSED RENOVATION WORK FOR LIVING ROOM-WORKING AREA
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
NC ARCHITECTS
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
Level 1 & 2, 19, Jalan PJS 8/12, Bandar Sunway, 46150 Petaling Jaya, Selang
DRAWING TITLE :
FURNITURE LAYOUT PLAN - LIVING_WORKING SPACE SCALE : AS SHOWN
DATE : 17TH MAY 2022
CHECKED BY : MS.NORJI
DRAWN BY : NGAN XIAO ROU
DRAWING NO :
ASS3_DWD_NXR_EL_05
REF NO :
05
5400
336
350
50
1728
FL
EL F
BE SPOKE DETAIL OF FRONT ELEVATION SCALE : 1 : 15
NOTE:
No.
Description 00
ARCHITECT :
CLIENT :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
Date
ID CONSULTANT :
QUANTITY SURVEYOR :
PROJECT TITLE :
PROPOSED RENOVATION WORK FOR LIVING ROOM-WORKING AREA
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
NC ARCHITECTS
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
Level 1 & 2, 19, Jalan PJS 8/12, Bandar Sunway, 46150 Petaling Jaya, Selang
DRAWING TITLE :
FURNITURE LAYOUT PLAN - LIVING_WORKING SPACE SCALE : AS SHOWN
DATE : 17TH MAY 2022
CHECKED BY : MS.NORJI
DRAWN BY : NGAN XIAO ROU
DRAWING NO :
ASS3_DWD_NXR_BSSC_07
REF NO :
05
305
1728
SC F
BE SPOKE DETAIL OF SECTION SCALE : 1 : 15
NOTE:
No.
Description 00
ARCHITECT :
CLIENT :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
Date
ID CONSULTANT :
QUANTITY SURVEYOR :
PROJECT TITLE :
PROPOSED RENOVATION WORK FOR LIVING ROOM-WORKING AREA
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
NC ARCHITECTS
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
Level 1 & 2, 19, Jalan PJS 8/12, Bandar Sunway, 46150 Petaling Jaya, Selang
DRAWING TITLE :
FURNITURE LAYOUT PLAN - LIVING_WORKING SPACE SCALE : AS SHOWN
DATE : 17TH MAY 2022
CHECKED BY : MS.NORJI
DRAWN BY : NGAN XIAO ROU
DRAWING NO :
ASS3_DWD_NXR_BSSC_07
REF NO :
05
SCHEDULE OF FURNITURE, FIXTURES AND EQUIPMENTS CODE
SPECIFICATION
QTY.
SUPPLIER
PRICE UNIT
180MMø X 46MM (H) 20W LED RECESSED DOWNLIGHT W/ POLYCARBONATE BASE
8
ADVAN LED
RM40.00
7
IKEA
RM79.00
8
WOWSHOP
RM179.00
N/A
PANASONIC
RM3199.00
2
ESL LIGHTING (M) SDN BHD
RM46.00
IMAGE
SOCIAL SPACE (GROUND FLOOR) LF7
550MM(L) X 350MM(W) X 650MM(H) STEEL IN RED POWDER COAT C/W TEMPERED GLASS TOP
LF8
350MM(L) X 350MM(W) X 360MM(H) LF9
W/ YELLOW PU CUSHION
LF3
CENTRALIZED AIR-CONDITIONER SYSTEM
D:\Taylor's_BIA\BIA_Sem 4_AUG-DEC 2021\Detailing & Working Drawing\Project 2\Centralised ac.jpg
MEETING ROOMS (GROUND FLOOR) 613MM(L) X 603MM(W) X 80MM(H)
LF4
LF7
180MMø X 46MM (H) 20W LED RECESSED DOWNLIGHT W/ POLYCARBONATE BASE
2
ADVAN LED
RM40.00
LF10
720MM(L) X 400MM(W) X 510MM(H) BAMBOO BED TRAY AND LAPTOP DESK IN VARNISHED FINISH
4
OLIVIA & AIDEN
RM131.50
CENTRALIZED AIR-CONDITIONER SYSTEM
N/A
PANASONIC
RM3199.00
10
ESL LIGHTING (M) SDN BHD
RM46.00
15
OFFICE FURNITURE ASIA
RM308.00
N/A
PANASONIC
RM3199.00
LF3
D:\Taylor's_BIA\BIA_Sem 4_AUG-DEC 2021\Detailing & Working Drawing\Project 2\Centralised ac.jpg
INDEPENDENT OFFICES (GROUND FLOOR) 613MM(L) X 603MM(W) X 80MM(H)
LF4
570MM(L) X 560MM(W) X 1050MM (H) HIGH TYPIST CHAIR IN BLACK FABRIC C/W POLYPROPYLENE ARMREST
LF2
LF3
NOTE:
No.
Description 00
ARCHITECT :
CLIENT :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
Date
NEU Property
CENTRALIZED AIR-CONDITIONER SYSTEM
D:\Taylor's_BIA\BIA_Sem 4_AUG-DEC 2021\Detailing & Working Drawing\Project 2\Centralised ac.jpg
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
NC ARCHITECTS
ID CONSULTANT :
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
QUANTITY SURVEYOR :
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
PROJECT TITLE :
DRAWING TITLE :
PRECEDENT STUDIES OF CO-WORKING UTOPIC_US CONDE DE CASAL
SCALE : NOT TO SCALE
C. Dr. Esquerdo, 114 bis, 28007 Madrid, Spain
SCHEDULE OF FURNITURE, FITTINGS & EQUIPMENTS DATE : 17 MAY 2022
DRAWN BY : NGAN XIAO ROU CHECKED BY : MS. NORJI DRAWING NO :
CU_DWD_CWS_SOFFE_02
REF NO :
00
SCHEDULE OF FURNITURE, FIXTURES AND EQUIPMENTS CODE
IMAGE
SPECIFICATION
QTY.
SUPPLIER
PRICE UNIT
10
ESL LIGHTING (M) SDN BHD
RM46.00
SOCIAL SPACE (FIRST FLOOR) 613MM(L) X 603MM(W) X 80MM(H)
LF4
3x8W
LF7
180MMø X 46MM (H) 20W LED RECESSED DOWNLIGHT W/ POLYCARBONATE BASE
10
ADVAN LED
RM40.00
LF11
600MM(L) X 600MM(W) SQUARE RECESSED 40W LED PANEL LIGHT
8
SILVER BRIDGE INDUSTRIAL SUPPLIES SDN BHD
RM50.00
LF12
690MM (W)X 690MM (D)X 870MM(H) POLYESTER POWDER COATING LEIFARNE SWIVEL CHAIR
30
IKEA
RM205.00
LF13
800MM(H) X 440MM (W) X 510MM(D)TINTED CLEAR ACRYLIC LACQUER LISABO WOOD CHAIR
20
IKEA
RM245.00
CENTRALIZED AIR-CONDITIONER SYSTEM
N/A
PANASONIC
RM3199.00
10
ESL LIGHTING (M) SDN BHD
RM46.00
LF3
D:\Taylor's_BIA\BIA_Sem 4_AUG-DEC 2021\Detailing & Working Drawing\Project 2\Centralised ac.jpg
OPEN OFFICE AREA (FIRST FLOOR) 613MM(L) X 603MM(W) X 80MM(H)
LF4
LF7
180MMø X 46MM (H) 20W LED RECESSED DOWNLIGHT W/ POLYCARBONATE BASE
10
ADVAN LED
RM40.00
LF12
690MM(W) X 690MM(D) X 870MM(H) POLYESTER POWDER COATING LEIFARNE SWIVEL CHAIR
9
IKEA
RM205.00
LF14
1200MM X 620MM(W) X 600MM(D) STEEL FRAME WITH POLYPROPYLENE PLASTIC OFFICE CHAIR
30
IKEA
RM549.00
LF15
170MM (D) X 1200MM (H) STEEL WITH POLYESTER POWDER COATING TERTIAL WORK LAMP
10
IKEA
RM49.90
CENTRALIZED AIR-CONDITIONER SYSTEM
N/A
PANASONIC
RM3199.00
LF3
NOTE:
No.
Description 00
D:\Taylor's_BIA\BIA_Sem 4_AUG-DEC 2021\Detailing & Working Drawing\Project 2\Centralised ac.jpg
ARCHITECT :
CLIENT :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
Date
3x8W
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
NC ARCHITECTS
ID CONSULTANT :
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
QUANTITY SURVEYOR :
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
PROJECT TITLE :
DRAWING TITLE :
PRECEDENT STUDIES OF CO-WORKING UTOPIC_US CONDE DE CASAL
SCALE : NOT TO SCALE
C. Dr. Esquerdo, 114 bis, 28007 Madrid, Spain
SCHEDULE OF FURNITURE, FITTINGS & EQUIPMENTS DATE : 17 MAY 2022
DRAWN BY : NGAN XIAO ROU CHECKED BY : MS. NORJI DRAWING NO :
CU_DWD_CWS_SOFFE_03
REF NO :
00
DOOR SCHEDULE 2200 550
750
750
150
140 30
900 50
800
50
2100
DOOR NO.
D01
D02
DOUBLE GLASS SWING DOOR
SINGLE LEAF DOOR
FRAME
FRAME-FRAMING C/W 30MM THK. U-PROFILE
40MM METAL DOOR FRAME
DOOR LEAF
6MM THK. TEMPERED CLEAR GLASS PANEL
TIMBER DOOR LEAF
DOUBLE ACTION HINGE
2.5MM THK STAINLESS STEEL DOOR HINGES
LOCK, BOLTS
PATCH LOCK
N/A
STOP, PULLS
PULL BAR HANDLE
STAINLESS STEEL LEVER TYPE HANDLE
MAIN ENTRANCE
INDEPENDENT OFFICE 1, 2, 3, 4, 5
TYPE DESCRIPTION
HINGES IRONMONGERY
2050
2600
30
FLOOR LEVEL
2400
50
EXISTING CEILING LEVEL
LOCATION
930 50
830
1500
50 50
570
50
60
925
60 50
50
945
2100
2350
2400
50
EXISTING CEILING LEVEL
780
60
FLOOR LEVEL
DOOR NO.
D03
D04
SINGLE LEAF DOOR
STEEL FRAME FIRE RATED GLASS DOOR
40MM ALUMINIUM DOOR FRAME
STEEL FRAME IN BRUSHED FINISH
TIMBER DOOR LEAF
32MM THK GLAZED FIRE RATED GLASS PANEL
2.5MM THK. STAINLESS STEEL SUS304 HINGE
FIRE RESISTANT FUNCTIONAL HINGES
LOCK, BOLTS
STAINLESS STEEL SUS304 MECHANICAL LOCK
FIRE RESISTANT FUNCTIONAL LOCK
STOP, PULLS
STAINLESS STEEL SUS304 LEVER HANDLE
STAINLESS STEEL LEVER TYPE HANDLE
MEETING ROOM 1, 2
SOCIAL SPACE
TYPE DESCRIPTION
FRAME DOOR LEAF HINGES
IRONMONGERY
LOCATION
NOTE:
ARCHITECT :
CLIENT :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
Description
Date
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
NC ARCHITECTS
ID CONSULTANT :
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
QUANTITY SURVEYOR :
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
PROJECT TITLE :
DRAWING TITLE :
PRECEDENT STUDIES OF CO-WORKING UTOPIC_US CONDE DE CASAL
SCALE : NOT TO SCALE
C. Dr. Esquerdo, 114 bis, 28007 Madrid, Spain
DOOR SCHEDULE DATE : 17 MAY 2022
DRAWN BY : CHU YONG JUIN CHECKED BY : MS. NORJI DRAWING NO :
CU_DWD_CWS_DS_01
REF NO :
00
SCHEDULE OF FURNITURE, FIXTURES AND EQUIPMENTS QTY.
SUPPLIER
PRICE UNIT
2
IKEA
RM299.00
1
OFFICE FURNITURE ASIA
RM308.00
420MM(L) X 385MM(W) X 510MM(H) RUBBER WOOD LADDER STOOL IN VARNISHED FINISH
1
HOMETECH2U
RM149.00
CENTRALIZED AIR-CONDITIONER SYSTEM
N/A
PANASONIC
RM3199.00
40
OFFICE FURNITURE ASIA
RM308.00
16
ESL LIGHTING (M) SDN BHD
RM46.00
CENTRALIZED AIR-CONDITIONER SYSTEM
N/A
PANASONIC
RM3199.00
LF1
47MMø X 1650MM(H) STEEL GREY PENDANT LAMP IN POLYESTER POWDER COAT
2
IKEA
RM299.00
LF3
420MM(L) X 385MM(W) X 510MM(H) RUBBER WOOD LADDER STOOL IN VARNISHED FINISH
1
HOMETECH2U
RM149.00
LF5
707MM(H) X 439MM(W) X 365MM(D) TWO-WAY MULTIPURPOSE SELF-POWERED SPEAKER
2
JBL
RM1850.00
LF6
1828MM(H) WOODEN LADDER
1
LADDERS-ONLINE
RM4,582.00
CENTRALIZED AIR-CONDITIONER SYSTEM
N/A
PANASONIC
RM3199.00
CODE
IMAGE
SPECIFICATION
ENTRANCE/COMMON SPACE (GROUND FLOOR) ø47MM X 1650MM(H) STEEL GREY PENDANT LAMP IN POLYESTER POWDER COAT
LF1
570MM(L) X 560MM(W) X 1050MM (H) HIGH TYPIST CHAIR IN BLACK FABRIC C/W POLYPROPYLENE ARMREST
LF2
LF3
LF3
D:\Taylor's_BIA\BIA_Sem 4_AUG-DEC 2021\Detailing & Working Drawing\Project 2\Centralised ac.jpg
CO-WORKING SPACE (GROUND FLOOR) 570MM(L) X 560MM(W) X 1050MM (H) HIGH TYPIST CHAIR IN BLACK FABRIC C/W POLYPROPYLENE ARMREST
LF2
613MM(L) X 603MM(W) X 80MM(H)
LF4
LF3
D:\Taylor's_BIA\BIA_Sem 4_AUG-DEC 2021\Detailing & Working Drawing\Project 2\Centralised ac.jpg
3x8W
(GROUND FLOOR)
LF3
NOTE:
D:\Taylor's_BIA\BIA_Sem 4_AUG-DEC 2021\Detailing & Working Drawing\Project 2\Centralised ac.jpg
ARCHITECT :
CLIENT :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
Description
Date
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
NC ARCHITECTS
ID CONSULTANT :
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
QUANTITY SURVEYOR :
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
PROJECT TITLE :
DRAWING TITLE :
PRECEDENT STUDIES OF CO-WORKING UTOPIC_US CONDE DE CASAL
SCALE : NOT TO SCALE
C. Dr. Esquerdo, 114 bis, 28007 Madrid, Spain
SCHEDULE OF FURNITURE, FITTINGS & EQUIPMENTS DATE : 17 MAY 2022
DRAWN BY : NGAN XIAO ROU CHECKED BY : MS. NORJI DRAWING NO :
CU_DWD_CWS_SOFFE_01
REF NO :
00
SCHEDULE OF FINISHES
SCHEDULE OF FINISHES
WINDOW SCHEDULE 1500 40
40 65
65
1550
65 40
530
FIXED
FIXED
FIXED
1830
FIXED
1070
40 1750
EXISTING CEILING LEVEL
40 60
FIXED
851
851
40
1830
1550
60 40
1420
3375 40
FLOOR LEVEL
DOOR NO.
W01
W02
SINGLE GLASS FIXED-PANEL WINDOW
SINGLE GLAZED FIXED CASEMENT WINDOW C/W MUNTIN
40MM THK. ALUMINIUM FRAME
100MM THK. ALUMINIUM FRAME (OUTER FRAME W/ ALUMINIUM PROFILES)
6MM THK. SINGLE TEMPERED GLASS
6MM THK. CLEAR SINGLE GLAZING TEMPERED GLASS
HINGES
N/A
N/A
LOCK, BOLTS
N/A
N/A
STOP, PULLS
N/A
N/A
OPEN-OFFICE AREA
CO-WORKING SPACE
TYPE DESCRIPTION
FRAME DOOR LEAF
IRONMONGERY
LOCATION
3375 1550
65
1550
65 40
530
AWNING
AWNING
FIXED
FIXED
851
40 60
1830
EXISTING CEILING LEVEL
1070
60 40
40 65
FLOOR LEVEL
DOOR NO.
W03
TYPE DESCRIPTION
SINGLE GLAZED FIXED CASEMENT WINDOW C/W AWNING WINDOW PANEL ABOVE 100MM THK. ALUMINIUM FRAME (OUTER FRAME W/ ALUMINIUM PROFILES)
FRAME DOOR LEAF
6MM THK. CLEAR SINGLE GLAZING TEMPERED GLASS STAINLESS STEEL BAR HINGE SYSTEM (OUTWARDS) C/W MATT FINISHES
HINGES IRONMONGERY
STAINLESS STEEL MULTI-POINT SECURITY LOCKING SYSTEM (OUTWARDS) C/W MATT FINISHES STAINLESS STEEL MULTI-POINT SECURITY LOCKING SYSTEM (OUTWARDS) C/W MATT FINISHES
LOCK, BOLTS STOP, PULLS LOCATION
NOTE:
No.
Description 00
ARCHITECT :
CLIENT :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
Date
NEU Property
CO-WORKING SPACE
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
NC ARCHITECTS
ID CONSULTANT :
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
QUANTITY SURVEYOR :
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
PROJECT TITLE :
DRAWING TITLE :
PRECEDENT STUDIES OF CO-WORKING UTOPIC_US CONDE DE CASAL
SCALE : NOT TO SCALE
C. Dr. Esquerdo, 114 bis, 28007 Madrid, Spain
WINDOW SCHEDULE DATE : 17 MAY 2022
DRAWN BY : CHU YONG JUIN CHECKED BY : MS. NORJI DRAWING NO :
CU_DWD_CWS_WS_01
REF NO :
00
SCHEDULE OF ACCOMMODATION NO. OF OCCUPANTS
NO. OF ROOMS
AREA OF ONE ROOM (m2)
TOTAL AREA OF ROOM (m2)
1. ENTRANCE/COMMON SPACE
15
1
29.97
29.9700
2. ATRIUM
45
1
54.35
54.35
3. MEETING ROOM 1
4
1
12.57
12.57
4. MEETING ROOM 2
4
1
19.93
19.93
56
1
122.00
122.00
6. INDEPENDENT OFFICE 1
4
1
9.16
9.16
7. INDEPENDENT OFFICE 2
4
1
9.16
9.16
8. INDEPENDENT OFFICE 3
4
1
9.16
9.16
9. INDEPENDENT OFFICE 4
4
1
11.42
11.42
10. INDEPENDENT OFFICE 5
4
1
11.42
11.42
20
1
11.42
11.42
12. TOILET
1
4
1.68
6.72
13. OKU TOILET
1
1
4.16
4.16
1. OPEN OFFICE SPACE
70
1
256.90
256.9000
2. SOCIAL SPACE
35
1
51.72
51.7200
3. TOILET
1
1
3.30
3.30
4. OKU TOILET
1
1
3.00
3.00
AREAS
GROUND FLOOR - MEZZANINE
5. CO-WORKING SPACE
11. SOCIAL SPACE
SECOND FLOOR
NOTE:
No.
Description 00
ARCHITECT :
CLIENT :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
Date
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
NC ARCHITECTS
ID CONSULTANT :
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
QUANTITY SURVEYOR :
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
PROJECT TITLE :
DRAWING TITLE :
PRECEDENT STUDIES OF CO-WORKING UTOPIC_US CONDE DE CASAL
SCALE : NOT TO SCALE
C. Dr. Esquerdo, 114 bis, 28007 Madrid, Spain
SCHEDULE OF ACCOMMODATION DATE : 17 MAY 2022
DRAWN BY : NGAN XIAO ROU CHECKED BY : MS. NORJI DRAWING NO :
CU_DWD_CWS_SOA_01
REF NO :
00
ASSIGNMENT 2 - REFLECTION Through this assignment, in the initial task assigned by the lecuturer, I feels worried. However, with the progress of the activity, we have a good interest in this activity. At this moment, we are grateful to the teacher for this opportunity. In this activity, my ability, knowledge and communication with the group have been greatly improved. First of all, actively participating in group activities has greatly improved our cooperation ability. Cooperating with group members has made us have great tacit understanding and trust. We encourage and promote each other and cultivate our sense of cooperation. At the same time, they have cultivated their ability to complete tasks independently Secondly, in the whole process of the activity, I have the following achievements: 1. Learned to collect and screen materials. During the cooperation, I learned to reasonably solve various materials required according to my group theme, and preliminarily learned to use these materials to solve problems through analysis, sorting, synthesis and other methods. The data collection has strong pertinence and practicability. 2. Learned to express. Learned to use structured and logical language to describe the conclusions of the group discussion, explain the basic views of the group and describe the relevant activities carried out by the group. 3. Learned to discuss. During the discussion, they can actively express their views on the problem, timely adjust their ideas in combination with the views of group members, and generate more novel ideas. Their awareness of cooperation and ability of cooperation have been preliminarily developed. 4. Learned to listen. In cooperation, be able to listen carefully to the speeches of other members of the group; Be able to listen carefully to the requirements of cooperation; Be able to listen carefully to the division of labor and respective tasks of the group; The efficiency of cooperative learning has been improved by listening to praise and criticism.
IDS 60804-DETAILING & WORKING DRAWING (ASSIGNMENT 1) 0339193-NGAN XIAO ROU SEMESTER MARCH-JULY 2022 TUTOR: MS. FATIMAH.MOHD KHAIRI
3720 950
2590
1150
1500
2350
WR WORKING ROOM FURNITURE LAYOUT PLAN FLP SCALE : 1 : 100
NOTE:
No.
Description 00
ARCHITECT :
CLIENT :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
Date
ID CONSULTANT :
QUANTITY SURVEYOR :
PROJECT TITLE :
PROPOSED RENOVATION WORK FOR WORKING AREA
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
NC ARCHITECTS
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
2 No.8,Jalan BS 10 , Taman Bukit Serdang, Seri Kembangan,43300 Selangor
DRAWING TITLE :
FURNITURE LAYOUT PLAN - LIVING_WORKING SPACE SCALE : AS SHOWN
DATE : 18 TH APRIL 2022
CHECKED BY : MS. FATIMAH DRAWN BY : NGAN XIAO ROU DRAWING NO :
ASS1_DWD_NXR_FLP_01
REF NO :
01
INTERIOR
EXTERIOR
W01 SLIDING WINDOW DETAILED OPENING PLAN DOP SCALE : 1 : 5 NOTE:
DRAWING TITLE :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL CLIENT DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
No.
Description 00
Date
ARCHITECT :
:
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
ID CONSULTANT :
NC ARCHITECTS
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
QUANTITY SURVEYOR :
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
PROJECT TITLE :
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
PROPOSED RENOVATION WORK FURNITURE LAYOUT PLAN - LIVING_WORKING SPACE FOR WORKING AREA Level 1 & 2, 19, Jalan PJS 8/12, Bandar Sunway, 46150 Petaling Jaya, Selang
SCALE : AS SHOWN
DATE : 27TH JUNE 2022
CHECKED BY : MS.FATINAH
DRAWN BY : NGAN XIAO ROU
DRAWING NO :
ASS1_DWD_NXR_W01DOP_02
REF NO :
01
W01 DETAILS 1 D1 SCALE : 1 : 5 NOTE:
No.
Description 00
ARCHITECT :
CLIENT :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
Date
ID CONSULTANT :
QUANTITY SURVEYOR :
PROJECT TITLE :
PROPOSED RENOVATION WORK FOR LIVING ROOM-WORKING AREA
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
NC ARCHITECTS
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
Level 1 & 2, 19, Jalan PJS 8/12, Bandar Sunway, 46150 Petaling Jaya, Selang
DRAWING TITLE :
FURNITURE LAYOUT PLAN - LIVING_WORKING SPACE SCALE : AS SHOWN
DATE : 27TH JUNE 2022
CHECKED BY : MS.FATINAH
DRAWN BY : NGAN XIAO ROU
DRAWING NO :
ASS1_DWD_NXR_D1_3.1
REF NO :
01
W01 DETAILS 2 D2 SCALE : 1 : 5 NOTE:
No.
Description 00
ARCHITECT :
CLIENT :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
Date
ID CONSULTANT :
QUANTITY SURVEYOR :
PROJECT TITLE :
PROPOSED RENOVATION WORK FOR WORKING AREA
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
NC ARCHITECTS
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
Level 1 & 2, 19, Jalan PJS 8/12, Bandar Sunway, 46150 Petaling Jaya, Selang
DRAWING TITLE :
FURNITURE LAYOUT PLAN - LIVING_WORKING SPACE SCALE : AS SHOWN
DATE : 27TH JUNE 2022
CHECKED BY : MS.FATINAH
DRAWN BY : NGAN XIAO ROU
DRAWING NO :
ASS1_DWD_NXR_D2_3.2
REF NO :
01
480 LF01 LOOSE FURNITURE DETAILED OPENING PLAN DOP SCALE : 1 : 5 NOTE:
DRAWING TITLE :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL CLIENT DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
No.
Description 00
Date
ARCHITECT :
:
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
ID CONSULTANT :
NC ARCHITECTS
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
QUANTITY SURVEYOR :
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
PROJECT TITLE :
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
PROPOSED RENOVATION WORK FOR WORKING AREA 2 No.8, Jalan BS10 , Taman Bukit Serdang,Seri Kembangn, 43300 Selangor
FURNITURE LAYOUT PLAN - LIVING_WORKING SPACE
SCALE : AS SHOWN
DATE : 27TH JUNE 2022
CHECKED BY : MS.FATINAH
DRAWN BY : NGAN XIAO ROU
DRAWING NO :
ASS1_DWD_NXR_LS01_DOP_04
REF NO :
01
LF01 LOOSE FURNITURE ELEVATION ELE SCALE : 1 : 5 NOTE:
DRAWING TITLE :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL CLIENT DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
No.
Description 00
Date
ARCHITECT :
:
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
ID CONSULTANT :
NC ARCHITECTS
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
QUANTITY SURVEYOR :
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
PROJECT TITLE :
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
PROPOSED RENOVATION WORK FOR WORKING AREA 2 No.8, Jalan BS 10 , Taman Bukit serdang, 43300 Selangor.
FURNITURE LAYOUT PLAN - LIVING_WORKING SPACE
SCALE : AS SHOWN
DATE : 27TH JUNE 2022
CHECKED BY : MS.FATINAH
DRAWN BY : NGAN XIAO ROU
DRAWING NO :
ASS1_DWD_NXR_LS01_ELE_06
REF NO :
01
160
720
LF01 LOOSE FURNITURE SECTION SEC SCALE : 1 : 5 NOTE:
DRAWING TITLE :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL CLIENT DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
No.
Description 00
Date
ARCHITECT :
:
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
ID CONSULTANT :
NC ARCHITECTS
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
QUANTITY SURVEYOR :
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
PROJECT TITLE :
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
PROPOSED RENOVATION WORK FOR WORKING AREA 2 No.8, Jalan BS 10 , Taman Bukit serdang, 43300 Selangor.
FURNITURE LAYOUT PLAN - LIVING_WORKING SPACE
SCALE : AS SHOWN
DATE : 27TH JUNE 2022
CHECKED BY : MS.FATINAH
DRAWN BY : NGAN XIAO ROU
DRAWING NO :
ASS1_DWD_NXR_LS01_SEC_05
REF NO :
01
SCHEDULE OF FINISHES SPACE STUDY/ GUEST/ UTILITY ROOM CODE
DESCRIPTION
BRAND
NOTE:
Description 00
Date
WALL
FLOOR
PC1 PLASTER CEILING IN WHITE PAINT FINISH
BW01 150MM THICK BRICK WALL IN PINK PAINT FINISH
T01 300MM * 300MM MATTE CERAMIC TILE
JUTON PAINT
JUTON PAINT
WHITE HORSE
ARCHITECT :
CLIENT :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
PLASTER CEILING
ID CONSULTANT :
QUANTITY SURVEYOR :
WINDOW
W01 D01 1150MM (L) * 1050MM (L) * 1150MM (H) 2170MM (H) SWING DOUBLE SLIDING TIMBER DOOR C/W TIMBER FRAME IN WINDOWS C/W ALUMINUM BEIGE PAINT FRAMED FINISH WINDOW ELEMENT JUTON PAINT
PROJECT TITLE :
PROPOSED RENOVATION WORK FOR WORKING AREA
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
NC ARCHITECTS
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
DOOR
2 No.8,Jalan BS 10 , Taman Bukit Serdang, Seri Kembangan,43300 Selangor
DRAWING TITLE :
FURNITURE LAYOUT PLAN - LIVING_WORKING SPACE SCALE : AS SHOWN
DATE : 18 TH APRIL 2022
CHECKED BY : MS. FATIMAH DRAWN BY : NGAN XIAO ROU DRAWING NO :
ASS1_DWD_NXR_SOF_
REF NO :
02
NOTE:
No.
Description 00
ARCHITECT :
CLIENT :
THIS DRAWING IS COPYRIGHT DRAWING, THE AUTHORIZED USER IS TO CHECK ALL DIMENSIONS ON SITE. ONLY FIGURED DIMENSIONS ARE TO BE WORKED ON. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO IPARTNERSHIP BEFORE PROCEEDING. C COPYRIGHT RESERVED
Date
ID CONSULTANT :
QUANTITY SURVEYOR :
PROJECT TITLE :
PROPOSED RENOVATION WORK FOR WORKING AREA
NEU Property
sdn.bhd
Level 25, Jalan PJS 3/12, Bandar Sunway, 46150 Petaling Jaya, Selangor Email : NEUproperty@gmail.com
NC ARCHITECTS
Sdn.Bhd.
L15-02-01, Suite pejabat KL gateway, No.8 Jalan Kerinchi, Gerbang Kerinchi Lestari, 59200, Kuala Lumpur, West Malaysia. Email : NC ARCHITECTS.info@gmail.com
HORIZON DESIGN 60-1, Jalan PJS 1/50, Pjs 1, 46150 Petaling Jaya, Selangor Email : horizondesign.cs@gmail.com
YJ QS Consultancy Unit 15-08, Block A, Kelana Centre Point, No. 3, Jalan SS 7/19, 47301 Petaling Jaya, Selangor Email : W0ND3R_Build@gmail.com
2 No.8,Jalan BS 10 , Taman Bukit Serdang, Seri Kembangan,43300 Selangor
DRAWING TITLE :
FURNITURE LAYOUT PLAN - LIVING_WORKING SPACE SCALE : AS SHOWN
DATE : 18 TH APRIL 2022
CHECKED BY : MS. FATIMAH DRAWN BY : NGAN XIAO ROU DRAWING NO :
ASS1_DWD_NXR_WS
REF NO :
02