Skip to main content

YiWang_Portfolio_Art_2026

Page 1

yi wang 2026 portfolio


Content Art Project Liminal Means.................................................................03-05 Where the body ends.......................................................06-09

Other work Timber Furniture - Momo.................................................11-12 Undergroun City of Memorial...........................................13-16 Planned Obsolescence..................................................... 17-20


Liminal Means is a sculptural investigation into threshold as a material condition.

0

3


Liminal Means

0

4


Liminal Means Process...

0

5


where the body ends The series explores bodies in states of transition, suspended between anatomical structure and organic growth, questioning where the body ends and another presence begins.

0

6


Graphite drawing 420 x 290mm

0

7


Graphite drawing 210 x 148m

0

8


Acrylic Paint on Canvas 400 x 500m

0

9


11-12 Planned Obsolescence

Underground City Of Memorial

Timber Furniture - Momo

Other Work

13-16 17-20


T i m ber Fur niture

Produced during the ExLab subject Experimental Timber Furniture, University of Melbourne. @ex_lab

M0mo is an exploration of thick wood form manipulation and structural stabilization through the techniques of steam bending and glue lamination.

M o m o

Material: American Ash & Walnut

The curving legs of the stool create a motional dialogue, evoking an animalistic character embedded in the formal composition. The saddlelike seat emphasizes this character, celebrating the natural color and texture of the raw material.

1

1


The making of Momo begins with soaking the trimmed timber pieces overnight, followed by steaming for over 30 minutes immediately prior to bending. A series of moulds are pre-fabricated based on digital modelling.

process

Once all four legs and the central structural components for the seat are completed, the natural colour of the timber is retained. A cow-like pattern is created by routing into the surface of the wood. After the components are trimmed to fit precisely within the chair structure, the entire composition is assembled and glued. The piece is left to cure for a full day before undergoing final finishing and polishing.

Each leg is formed from four 20 mmthick timber laminations, which are bent, aligned, and glued within the mould. The laminated components are then left to cure and dry overnight before removal.

1

2


Master’s Thesis

Project Location: Queen Victoria Market Car Park Melbourne, Australia

Underground City of Memorial Melbourne, like many major cities worldwide, is facing increasing land shortages for inner-suburban activities. Among these, memorial services urgently require a more sustainable model to redefine their role within contemporary life. Drawing inspiration from the ancient burial typology of the catacomb, this project explores the potential of underground construction as a response to limited land availability, proposing an alternative approach to funeral storage and memorial services.

1

3


(b) (a) Aboveground public space perspective (b) Project Longitudinal Section

(a)

The underground columbarium serves as a memorial and archival space for physical remains and digital memories, freeing the ground level for programs that engage with the surrounding context. This included a market-linked food waste facility for local energy generation and public spaces that enhance site connectivity.

1

4


Columbarium, Bridge & Materiality

To achieve a visually open and ventilated spatial experience, bridges are used as the primary circulation elements. The raw texture of exposed earth and integrated indoor planting introduce a sense of nature into the underground environment. These material strategies echo the conditions above ground, creating a smooth transition to the programs below.

8

2

1

3

8

8

9

4

5

5

6

7

Basement 3 Floor Plan

6

1. Lift

4. Columbarium Office

2. Columbarium Office Break Room 3. Columbarium Office

01

3 5

10

15m

Waiting Room

10

7

8. Public Seatings with Cafe

Meeting Rooms

9. Digital Archive Memorial Chambers

5. Disabled Bathrooms

10. Parents Room

6. Female Bathroom 7. Male Bathroom

9

2

1

3

4

5

5

6

7

Basement 2 Floor Plan

6

1. Lift 2. Columbarium Office Break Room 3. Columbarium Office

01

3 5

10

15m

Waiting Room

4. Columbarium Office Meeting Rooms 5. Disabled Bathrooms 6. Female Bathroom 7. Male Bathroom

8

7

8. Parents Room 9. Digital Archive Memorial Chambers

1

5


Columbarium & the Memorial Chambers

9

2

The translucent nature of polycarbonate panels allows the travel of light while protecting the privacy of the urn storage and memorial activity. The material also allows the warm earthen tone from the vault, blending seamlessly into the interior of the memorial space, creating a serene, contemplative, and naturally illuminated environment for visitors.

1

10

3

8

4 5

6

7

Basement 1 Floor Plan

1. Lift

5. Parents Room

9. Public Office

2. Columbarium Office

6. Female Bathroom

10. Cafe

Break Room 3. Public Seating

01

3 5

10

15m

7. Male Bathroom 8. Corridor Library with Lockers

4. Disabled Bathrooms

(a) & (b) Urn Storage & Memorial Chambers

(a)

(b)

1

6


Master’s research project Project Proposition

Reduce, Recycle & Reuse Building must die

Planned Obsolescence PO is a research project advocating a holistic approach to carbon emissions that considers a building’s entire life cycle. The project asks a “what if” question: what if the demolition stage of a building becomes part of the designer’s responsibility? How a building is demolished would then influence how it is designed. By incorporating time as a design factor, the project promotes construction techniques that maximize recycling and reuse, as well as material choices that support a faster ecological cycle.


Resarching life, living and energy production Jellyfish Protein Serves as Organic Solar Cell

Green fluorescent protein (GFP) is discovered from the jellyfish Aequorea victoria. A droplet of GFP is added on top of two aluminum electrodes with a tiny gap between them, sitting onto a silicon dioxide substrate. The green fluorescent protein then assembles itself into strands between the two electrodes. Methods have been developed to grow artificial green fluorescent protein in the laboratory using bacteria, this would create the GFP without the need to harvest and liquefy large numbers of jellyfish.

Silicon Dioxide Substrate. GFP Electrodes

Resource: https://phys.org/news/2010-10-jellyfish-protein-power-nanodevices.html

Heat Sink Glass Backshield

Organic LED Lamps with Fluorescent Proteins

Dr. Rubén Costa’s research group has been researching the possibility of replacing inorganic materials in LED lights with fluorescent protein. The protein LEDs, named „OLEDs“ (organic LEDs), could thus soon be a cost-effective and organic alternative to the color filters made of rare earth elements.

Bio-solar Cell

Electricity Transfer Concentrated Solar Thermal System with Bio-solar Panel

Resource: https://en.reset.org/blog/organic-led-lamps-fluorescent-proteins-01262017

GFP

GFO Filter Set LED

Concentrated Solar Thermal System with Heat/Coolant Transfer Loop

DC to AC Inverter

Space Frame Textile Awning with Manual Mechanism Coil for Space Heating

Heating Storage Cylinder

Wastewater is pumped as nutrient Algae is pumped from algae tank to facade panels Curtain Wall Double Facade Steel Frame Structure

Algae Facade System Waste water as nutrient for algae

Differs in transparency according to the privacy needs

Coil for facade heating

Facade panels pumped with algae water

Algae can grow in anywhere where there is water, nutrient and sunlight. Under sunlight, electron is created during photosynthesis which can be extracted as electric energy for building use. While pumping algae water into the facade panels, the facade becomes a vertical algae farm in which the direct sunlight can intensify the growing process.

Algae Water Treatment

Wastewater collected from the building is pumped as the growing medium for algae for nutrients and water. During the process algae purifies water and ideally able to be reused.

Algae Facade System Heating system controlled transparency

Heating system from the HVAC system is extended to the facade. Since warmer temperature allows algae to grow thicker and faster, by adjusting the water temperature, the transparency of each facade panel can be controlled according to the level of brightness and privacy, e.g. low transparency for sleeping, higher transaprency for studying.

1

Panels exposed to strong sunlight is also expected to have a thicker layer of algae due to the intense occurance of photosynthesis. The thick layer of

8


Mycelium as Structural and Infill Material Before Growth

Product Facade Panels, Interior Finish Insulation,etc

Growth Phase

Feedstock Disposal/comost material (construction waste)

Initial growth (5 days)

Shredded

Drying- 1 day (Last the longest in an outdoor environment, 70 days)

Substrate Sterilisation

Fungi

Inculate mycelium

Mold growth (21 days)

Heat compress Baking

Given the short life cycle of mycelium, temporary maintenance structures, such as bamboo scaffolding, are deliberately incorporated into the building envelope as key architectural elements. These scaffolds not only support growth and maintenance but also highlight the dynamic, evolving nature of the structure. In this way, the building becomes a celebration of the constant “construction site,” embracing the coexistence of growth, decay, and renewal as part of its architectural expression.

By integrating mycelium, a self-growing fungal material, into the building system, resource consumption can be significantly reduced. This promots a more sustainable and regenerative approach to construction.

1

9


Turn static files into dynamic content formats.

Create a flipbook
YiWang_Portfolio_Art_2026 by Yi Wang - Issuu