
1 minute read
PORTSIDE AT GRANDE DUNES
W. M. Jordan Company provided Construction Management at Risk services to LIV Development to build the new campus in two phases. The new building has several components, allowing a senior to begin in an Independent Living Unit and progress to Assisted Living or Memory Care as his or her needs change over time. The campus is located right across the street from the local hospital, Grand Strand Medical Center, providing quick access to acute care.
Phase 1 included a 125,000 square foot, three-story Assisted Living Building offering 80 units in five floor plans connected to a single-story, 32-unit Memory Care Building in two floor plans.
Phase 2 added a four-story, 150,000 square-foot Independent Living Building with 134 units in five different floor plans. Eight single-story, two-bedroom duplex cottages adds 16 Independent Living units in two floor plans, adding 30,522 sf.
W. M. Jordan Company provided complete preconstruction phase services including value analysis, constructability analysis and full cost estimating services. The team used Virtual Construction tools such as Building Information Modeling to visualize constructability options, analyze systems to determine the best approach for the project, and identify conflicts between systems.
W. M. Jordan Company introduced lean planning and construction techniques into the project. The trades met every morning in a Daily Huddle to discuss the project schedule, work plans, safety and quality.
$57,088,567 million in 2023 dollars
• Construction Management at-Risk • PRDG LLC




