UK POWERNEWS
MARCH SUMMER APRIL 2020 2016
P R O M O T I N G S TA N D B Y P O W E R & C O G E N E R AT I O N SUPPORTING THE UK POWER IND DU US S TT R RY Y
ww w.. p po ow we e rreexxlliivvee..ccoo..uukk ww
2 8 O C T 2 0 02 20 0 ,, P PA AR K P L A Z A , L O N D O N
BIOMETHANE FOR HEATHROW AIRPORT - A new deal means that Heathrow Airport will get 100% green biomethane. Page 12 ENGIE UK’s energy centre team has been working 24/7 at ExCeL in London Docklands to put extra resilience in place to ensure critical power, heating & cooling systems remain operational for the new NHS Nightingale coronavirus treatment facility, which will provide up to 4,000 crucial beds. BDP has described the ‘unprecedented’ challenge of helping convert the ExCeL Exhibition Centre in London’s Docklands into a vast temporary hospital for the coronavirus crisis. The UK’s second-biggest practice has been working under main contractor CFES to convert the 115,000m² conference centre into a field hospital. The centre has previously been used as an Olympic venue and to host a G20 summit. It is now fully reconfigured to accommodate two hospital wards with ‘minimum building intervention’. BDP architect director Paul Johnson said that the NHS Nightingale is the first of a number of crisis centres planned around the UK, designed to deal with a surge of patients suffering from coronavirus. BDP said it had been
THE UK’S LARGEST STORAGE BATTERY Zenobe energy will supply United Utilities with the largest battery in the UK water industry.
ÂŁ15M QUEENS QUAY PROJECT The Queens Quay Heat Pump scheme is the largest of its kind in the UK and will take heat from the River Clyde and distribute it.
Page 28
Page 27
DRIVING POWER GENERATION
ENGIE UK WORKING 24/7 ON NHS NIGHTINGALE FACILITY BASED AT THE EXCEL EXHIBITION CENTRE approached by other NHS trusts around the country to work on other field hospitals. The ExCeL Centre’s existing electrical infrastructure has been modified to increase the resilience, UPS and temporary generators. The temporary electrics used for exhibitions has been used to feed 3m sections of bedhead dado trunking which have been prefabricated by electricians on site. The NHS Nightingale Hospital was a ‘monumental team effort’ between a number of clinicians, consultants, contractors, the ExCeL FM team and
MARCH-APRIL 2020 UK PoweR NewS
personnel from the British Army. Constant power supplies are required for the Ward areas, and for the HVAC systems. A key treatment strategy includes the use of ventilators for Covid-19 patient care. These must be powered 24/7. NHS England Chief Executive Simon Stevens has confirmed that two further NHS Nightingale hospitals are located at the Birmingham National Exhibition Centre and the Manchester Central Convention Centre, with further hospitals to follow.
! !
!
Reich TOK Coupling
Reich ARCUSAFLEX Coupling Highly fexible rubber disc couplings for Diesel & Gas engines
Unit 4 Bankside Business Park, Coronation Street, Stockport SK5 7PG
| info@reich-uk.com
PLEASE VISIT WWW.REICH-UK.COM FOR MORE DETAILS