
1 minute read
Euramo Cane Railway Level Crossing
THISyear will see an increased presence of Cane Trains crossing the Bruce Highway at our Euramo Cane Railway Level Crossing due to the closure of our Main Cane Railway Bridge for repairs.
The plan is that the bridge will be operational for the 2024 crushing season.
Advertisement
Additional control measures will be put in place to notify the public and road users of the change in cane railway traffic movements at this level Crossing.
Tully Sugar has been working closely with TMR (Cairns) and QR with this increased presence of Cane Trains across the Bruce Highway and the QR Mainline.

Tully Sugar also asks that the community as a whole to be more alert and take extra care when travelling along the roads that traverse our cane rail network through the Euramo and Lower Tully areas due to the increase in train movements in that section of our cane railway network.
Take Care and Look out for Trains
Tom Peatey Cane Supply and Transport
Manager
Tully Sugar Limited.
PRESENCE OF CANE TRAINS OVER THE BELOW CROSSING BRUCE HIGHWAY- EURAMO