2025 Facility Shutdown Summary

Page 1

The recent facility shutdown was productive, with a wide range of upgrades and maintenance tasks completed to enhance operations, safety, and the overall user experience. Key accomplishments include:

Pool Upgrades: The second section of the competition pool basin floor tiling was removed and re-tiled, increasing its lifespan. A new pump was installed for each of the competition pool and the hot tub, and pool valves were replaced for improved performance and efficiency.

Mechanical Enhancements: A second CO2 tank was installed to increase the chemical system capacity and reliability. Additionally, new emergency shut-off actuators were installed in the chlorine room to enhance safety measures. Waterslide Maintenance: The waterslide bolts were replaced and the shutdown lanes were resurfaced, thereby extending their service life.

Facility-Wide Improvements: The pool basins were thoroughly cleaned, and the entire facility underwent a deep clean to ensure top-tier hygiene and presentation. Extensive painting and touch-ups were completed throughout the facility. Community changeroom lockers were refinished giving a refreshed appearance.

These improvements ensure a safer, more eff icient, and welcoming environment for all patrons and staff.