Skip to main content

BCB C2 PWE Shelter with Connecting Sock

Page 1


C2 PWE Shelter with Connecting Sock

What It Is

The C2 PWE Shelter with Connecting Sock is an inflatable temporary shelter designed to extend the working environment for C2 operators. Lightweight, portable, and easy to deploy, it offers a reliable solution for command and operational needs in the field.

Why Use It?

The PWE Shelter provides fast, effective environmental protection and additional workspace. It enhances operational capability by offering a controlled, sheltered environment that can be connected directly to C2 vehicles. Its inflatable structure ensures rapid deployment while maintaining durability and protection.

The shelter features an inflatable design that enables quick setup by just two personnel using hand pumps, ensuring rapid deployment in the field.

It provides an extended workspace by connecting directly to C2 vehicles with a secure connector sock, increasing operational capacity and efficiency.

Constructed from durable double-sided coated fabrics, the shelter offers robust protection.

Designed for all weather use, it remains fully functional across a wide temperature range, delivering reliable performance in extreme climates.

Its lightweight and portable construction allows it to be packed into a compact transportation bag, making it easy to carry and store.

The shelter ensures secure anchoring through guy ropes, ground pegs, and fastening flaps, maintaining stability in diverse terrain and weather conditions.

With ventilation openings, multiple entrances/ exits, cable sleeves, a heater sleeve, and blackout flaps, it provides excellent access, airflow, and adaptability for operational needs.

Designed to be repairable and maintainable, it is supplied with a repair kit and can be easily cleaned with warm soapy water, extending its service life and reducing costs.

D 3776, Method C

D 1424

Adhesion

ASTM D 751 (Dielectric Weld, RF)

Hydrostatic Resistance ASTM D 751, Procedure B, Procedure 1

D 751, Procedure A, Procedure 1

Resistance

D 6413 (Warp & Fill)

Mildew Resistance

G 21

Product Weight

Approx. 49-50 kg (+/- 5%) (without standard accessories) Operation pressure 0.4 bar (5.8 psi)

MAINTENANCE

+ Clean with warm soapy water or mild detergent using a soft sponge; rinse thoroughly and allow to dry.

+ Protect valves from dirt; clean with compressed air if required.

+ Repair holes or tears using the supplied repair kit; major repairs recommended through the manufacturer’s service team.

+ Store in controlled conditions: <65% humidity, away from direct sunlight, UV, and contaminants.

NSN Product Code Part Name/Description

APPLICATIONS

+ Rapid deployment for command and control operations.

+ Field shelter extension for vehicles.

+ Protection for personnel and equipment in extreme environments.

+ Temporary operational or humanitarian infrastructure.

8340-99-563-9709 GD005 PWE SHELTER - GUY LINE ASSEMBLY

5120-99-379-1387 GD006 PWE SHELTER - HAMMER

8340-99-690-8775 GD007 PWE SHELTER - PEG

8340-99-875-7625 GD008 PWE SHELTER - INNER REMOVABLE FLOOR

8340-99-578-4491 GD009 PWE SHELTER - BREAKAWAY SOCK

8340-99-752-7468 GD010 PWE SHELTER - SHELTER VALISE

5411-99-884-7348 GD011 PWE SHELTER - REPAIR KIT

4820-99-226-6059 GD012 PWE SHELTER - RELIEF VALVE

4820-99-238-9855 GD013 PWE SHELTER - INFLATION/DEFLATION VALVE

4730-99-472-0836 GD014 PWE SHELTER - HOSE CONNECTOR

3940-99-752-7864 GD015 PWE SHELTER - LIFTING BAR

8340-99-563-9819 GD019 END DOOR ASSEMBLY

8340-99-695-4725 GD020 PWE SHELTER - REAR END DOOR ASSEMBLY 8340-99-937-6360 GD023 PWE SHELTER - BREAKAWAY SOCK CONNECTOR ASSEMBLY (ROD) GD025 PWE SHELTER MANUAL

4320-99-495-7733 GD029 PWE SHELTER - HAND PUMP

9320-99-472-0822 GD108 PWE SHELTER - ADHESIVE TAPE

5410-99-671-2065 CT095 PWE SHELTER - PWE ASSEMBLY (INCLUDING SOCK)

Turn static files into dynamic content formats.

Create a flipbook
BCB C2 PWE Shelter with Connecting Sock by Wescom Group - Issuu