Skip to main content

BEDSWING HANGING DIRECTIONS

Page 1

BS_FS

Fact Sheet-Bedswing Installation HANGING HARDWARE 4-POINT HARDWARE Threaded links (8) 5 Foot sections of chain (4) 36” Rods (4) The 4-point hanging hardware system comes standard on all beds and has reduced movement from the 2-point system—3’ in total. When installing, allow 18” of room in front and behind the swing. 2-POINT HARDWARE Threaded links (4) 5 Foot sections of chain (2) 47” Rods (4) 14” Rods (2) If you are looking for more motion in your swing, a 2-point hanging hardware system is available and has a 4’ sway. When installing, allow 24” of room in front and behind the swing.

EYEBOLTS For your safety, refer to a licensed contractor for blocking and eye bolt installation. Eyebolt placement for standard twin size bed swing 88”L 4 point: 84”L x 39”D

2 point: 84” apart centered on depth of bedswing Threaded Links

EYEBOLTS For your safety, refer to a licensed contractor for blocking and eye bolt installation. Eyebolt placement for standard twin size bed swing 88”L 4 point: 84”L x 39”D 2 point: 84” apart centered on depth of bedswing Threaded Links Once the eye bolts are in place, add a quick link (provided in the swing kit) with a threaded opening to each eye bolt. This will be attached to the chain in the next step. Close it securely by turning the nut by hand.

THE SOURCE FOR ART | wendoverart.com

6465 126th Ave N . Largo, FL 33773 . 727.573.1417


Turn static files into dynamic content formats.

Create a flipbook
BEDSWING HANGING DIRECTIONS by Wendover Art Group - Issuu