Fact Sheet-Bedswing Installation
HANGING HARDWARE
4-POINT HARDWARE
Threaded links (8)
5 Foot sections of chain (4)
36” Rods (4)
The 4-point hanging hardware system comes standard on all beds and has reduced movement from the 2-point system—3’ in total. When installing, allow 18” of room in front and behind the swing.
2-POINT HARDWARE
Threaded links (4)
5 Foot sections of chain (2)
47” Rods (4)
14” Rods (2)
If you are looking for more motion in your swing, a 2-point hanging hardware system is available and has a 4’ sway. When installing, allow 24” of room in front and behind the swing.
EYEBOLTS
For your safety, refer to a licensed contractor for blocking and eye bolt installation.
Eyebolt placement for standard twin size bed swing 88”L
4 point: 84”L x 39”D
2 point: 84” apart centered on depth of bedswing
Threaded Links
Once the eye bolts are in place, add a quick link (provided in the swing kit) with a threaded opening to each eye bolt. This will be attached to the chain in the next step. Close it securely by turning the nut by hand.
EYEBOLTS
For your safety, refer to a licensed contractor for blocking and eye bolt installation.
Eyebolt placement for standard twin size bed swing 88”L
4 point: 84”L x 39”D

2 point: 84” apart centered on depth of bedswing
Threaded Links
