
1 minute read
Section A: Ready to vaccinate
by WBOP PHO
Section A: Summary of Changes
Version Date Section Summary of Changes
48.0 9/12/22 9.2 Updated information and photos to reflect the upgraded temperate monitoring device which will commence being used in DHL deliveries from 28 November 2022.
Section guidance
This section should be read and interpreted in conjunction with the Standards. For onboarding sites, this section should be used alongside the Ministry’ s Onboarding Guidelines.
This section provides operational guidance, including equity, site considerations, onboarding, vaccination workforce, IPC guidance, ordering, planning, vaccine handling and storage, logistics, and site closure; to ensure consistent, equitable and quality vaccination.
Purpose
This section is designed to be applicable from the preparation of a vaccination site (from the selection and setting up of a suitable site), through to the closing of a site.
Appendices relevant to this section
• Appendix A: Site checklist • Appendix B: New facility/site setup • Appendix C: Facility/site closure • Appendix D: Logistics and Inventory Management • Appendix E: NIP logistic overview/ cheat sheets