INDICATIVE TIMELINE 2005 - 2015
Pre-Feasibility & Wind Monitoring
2017 - 2018
2018 - 2020
2021 - 2045
Environment & Planning Approval
Detailed Design & Securing Finance
Construction & Operation
2016 - 2017
Project Feasibility
WIND TURBINES Up to 228
LOCATION Golden Plains Shire (south, east and west of Rokewood, VIC)
WIND TURBINE HEIGHT Up to 230m from natural ground level to the tip
SITE AREA 16,739 ha
WIND TURBINE ROTOR Approx. 150m diameter
SITE AREA USED FOR WIND FARM INFRASTRUCTURE FOOT PRINT 1 - 2% of site
WIND TURBINE - LOWER TIP HEIGHT Approx. 50 - 70m above natural ground level
HOST LANDHOLDERS 40
LENGTH OF INTERNAL ACCESS TRACKS Approx. 147km
CONSTRUCTION TIME 2 - 6 years
LENGTH OF UNDERGROUND CABLE TRENCHES 170km
DEVELOPMENT COST $1.5 - $1.7 Billion
INSTALLED RATED CAPACITY Approx. 1,000 megawatts
GENERATION Equivalent to approx. 8 - 10% of Victoria’s electricity consumption