Virtual Power Plant Flipbook: 2026 Update How utilities and their customers are benefiting from VPPs and insights for future implementation

October 2026


Virtual Power Plant Flipbook: 2026 Update TABLE OF CONTENTS

Contents Executive Summary . . . . . . . . . . . . . . . . . . . . . 3 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 Utility VPP Features . . . . . . . . . . . . . . . . . . . . 18 Arizona Public Service (APS) . . . . . . . . . . . . . . . 22 Bandera Electric Cooperative (BEC) . . . . . . . . . . . 26 Con Edison DR Portfolio . . . . . . . . . . . . . . . . . . 30 ConnectedSolutions . . . . . . . . . . . . . . . . . . . . 36 Dominion Energy VPP Pilot . . . . . . . . . . . . . . . . 40 Luma Energy CBES . . . . . . . . . . . . . . . . . . . . . 45 Puget Sound Energy (PSE) . . . . . . . . . . . . . . . . . 50 Rocky Mountain Power (RMP) . . . . . . . . . . . . . . . 56 XCel Energy AVPP (Colorado ) . . . . . . . . . . . . . . . 60 XCel Energy Capacity*Connect (Minnesota) . . . . . . 64

Authors and contributors

Acknowledgments

Authors • Kevin Brehm (kbrehm@rmi.org) • Leah Komos (leah.komos@rmi.org) • Will Long (william.long@rmi.org) • Sam Mardell (smardell@rmi.org) • Lauren Shwisberg (lshwisberg@rmi.org) • Mary Tobin (mary.tobin@rmi.org)

The authors would like to thank the following individuals for their contributions to this work:

The authors would like to thank Elena Essa and Neevetha Nadarajah, formerly of RMI, for their early contributions to this work. Market Research and Analysis Support courtesy of Ohm Analytics • Teddy Storrs (teddy@ohmanalytics.com) • Madeline Turner (madeline@ohmanalytics.com)

Endnotes . . . . . . . . . . . . . . . . . . . . . . . . . . . 68

2 Virtual Power Plant Flipbook 2.0

• Aaron Breidenbaugh • Kevin Coss, Xcel Energy • David Cruz, LUMA Energy • Kasey Curtis, Puget Sound Energy • Patrick Dalton, Sparkfund • Eliza Dean • Sam Duncan, Puget Sound Energy • Geoffrey Ferrell, Sonnen • Nathan Frost, Dominion Energy • Kristin Gaspar, Xcel Energy • Shawn Grant, Pacific Power • Renee Guillory, Arizona Public Service

• Karin Haas, Xcel Energy • Brad Harris, Weave Grid • Sam Hartnett, Uplight • Emma Johnson, Puget Sound Energy • Francis Jordán-Cuebas, LUMA Energy • Ray Martinez, Arizona Public Service • Josiah Mayo, Xcel Energy • Gabriela Olmedo, EnergyHub • Noel Pagan, LUMA Energy

• Brittainy Pond, Puget Sound Energy • Anna Remington, Xcel Energy • Javier Rúa-Jovet, Solar and Energy Storage Association of Puerto Rico (SESA) • Mark Schoenheider, Xcel Energy • Monisha Shah, EnergyHub • John Slocum, Sparkfund • Mike Smith, National Grid • Tom Smith, Puget Sound Energy • Allison Wannop, Sparkfund • Paul Wassink, National Grid

In addition, the authors would like to acknowledge members of RMI’s Virtual Power Plant Partnership whose input and insight contributed to the development of this work. For a list of current VP3 members, see vp3.io.

The Virtual Power Plant Partnership (VP3) brings together a coalition of industry stakeholders to scale the

Rocky Mountain Institute (RMI) is an independent, nonpartisan nonprofit founded in 1982 that transforms

benefits of VPPs across the United States. The technologies and systems that create VPPs already exist. VP3

global energy systems through market-driven solutions to secure a prosperous, resilient, clean energy future

works to scale their deployment by developing research and resources to share with key stakeholders, such as

for all. In collaboration with businesses, policymakers, funders, communities, and other partners, RMI drives

state policymakers and regulators across the United States, that showcase the variety and size of the benefits

investment to scale clean energy solutions, reduce energy waste, and boost access to affordable clean energy

VPPs can offer. VP3 members convene to collaborate and share what is working and what challenges can be

in ways that enhance security, strengthen the economy, and improve people’s livelihoods. RMI is active in over

resolved together, all while supporting excellence in the market.

50 countries.


Executive Summary

Virtual Power Plant Flipbook 2.0

3


Introduction

Virtual power plants (VPPs) are maturing and scaling into increasingly

VPPs featured in this flipbook

impactful grid resources as utilities, regulators, policymakers, and

Click on the utility and program names below to go directly to corresponding content about the utility.

large energy users look for faster and more affordable ways to address load growth, reliability needs, and customer resilience. This second edition of the Virtual Power Plant Flipbook includes 10 short case

Puget Sound Energy (PSE)

studies, referred to as “features.” These features were selected for their impact, innovation, and relevance to utilities and policymakers

Xcel Energy Capacity*Connect

designing or refining VPP programs. The features are not intended to be comprehensive; they highlight leading and emerging approaches that

Con Edison DR portfolio

Rocky Mountain Power (RMP) Wattsmart Battery

can inform program design, regulatory decisions, and implementation.

ConnectedSolutions

This flipbook is designed to help readers: • Build a shared understanding of VPP definitions and types. The introductory section defines VPPs and distinguishes utility VPPs, marketparticipant VPPs, and bring-your-owndistributed-capacity (BYODC) models. • Compare VPP program designs. The features describe how specific VPPs are structured, including resource types, utility and thirdparty roles, customer participation, compensation, dispatch, and measurement.

• Identify policy and regulatory pathways. The introduction and features highlight how legislation, regulatory authorization, planning, tariffs, and program design choices can enable VPP deployment and scale.

Readers can use the flipbook as a full narrative, scan the overview material for framing, or dive directly into individual features. 4 Virtual Power Plant Flipbook 2.0

Xcel Energy Aggregator VPP (AVPP)

• Understand reliability, resilience, and affordability impacts of VPPs. Where data is available, the flipbook highlights participant compensation, system benefits, and the performance of VPPs in supporting local and regional grid needs.

Dominion Energy VPP

Arizona Public Service (APS) Cool Rewards

Bandera Electric Cooperative VPP Geographies covered by featured programs Featured programs

LUMA Energy Customer Battery Energy Sharing (CBES)


Overview

Virtual Power Plant Flipbook 2.0

5


Overview

GENERATION

What is a virtual power plant (VPP)? TRANSMISSION

VPP

VPPs are aggregations of distributed energy

A note on the VPPs included in this flipbook

resources (DERs) that can be dispatched to support the grid in exchange for compensation. DISTRIBUTION

DERs include equipment located on or near the end-use site that can provide demand flexibility, electricity generation, storage, or other energy services at a sub-utility scale and are typically connected to the lower-voltage distribution

RESIDENTIAL

COMMERCIAL

• Smart thermostats​ • Battery storage​ • Heat pumps​ • Electric hot water​ • Smart appliances

• HVAC loads​ • Plug loads​ • Battery storage​ • Distributed generation​

TRANSPORTATION

INDUSTRIAL AND DATA CENTERS

grid. The diagram provides examples of DERs that can be included in VPPs.

• EV managed charging​ • Bi-directional EV charging​

Note: This is not a comprehensive list of DERs that can be included in VPPs. Demand response involves reduction in demand during a time period and can leverage a variety of DERs.

6 Virtual Power Plant Flipbook 2.0

• Industrial operations​ • Compute scheduling​ • Battery storage​ • Distributed generation​

Utilities, regulators, and market participants use a variety of terms for programs and resources that perform VPP-like functions. Some features in this flipbook are not labeled “VPPs” by the utility or regulator, but they are included because they align with the definition above and offer lessons for future VPP program and policy design. In particular, there are features included in this flipbook that are portfolios of utility demand response (DR) programs where assets are aggregated and operated in concert.


Overview

What DER technologies are involved in VPPs?

Technologies by VPP feature in this flipbook

From 2023 to 2025, VPP capacity grew 29% from 28,900 to 38,600 megawatts (MW). This diagram, based on data from market intelligence firm Ohm Analytics, shows technology contributions to tracked VPP capacity from 2023 through 2025.

Arizona Public Service (APS) Cool Rewards (Arizona)

Total and residential VPP capacity by technology

Con Edison DR portfolio (New York)

Enrolled VPP capacity

Enrolled residential VPP capacity

VPP feature

Commercial and industrial (C&I) DR or battery storage

Residential BESS

Smart thermostat

C&I (DR & BESS)

153% YOY growth

25% YOY growth

14% YOY growth

Note: The VPP definition on the preceding slide includes additional technologies not shown in this table. This table should be read as a snapshot of currently tracked, high-volume VPP technologies rather than a comprehensive list of DERs that participate in VPPs.

i

Smart thermostat

Electric vehicle (EV) managed charging

Other*

X

Bandera Electric Cooperative VPP (Texas)

X

X

X

X

X

ConnectedSolutions (New England)

X

X

X

Dominion Energy VPP (Virginia)

X

X

X

X

X

X

X

X

X

X

X

LUMA Energy Customer Battery Energy Sharing (CBES) (Puerto Rico)

Active managed charging 122% YOY growth

Residential battery storage

X

X

Puget Sound Energy (PSE) (Washington)

X

X

Rocky Mountain Power (RMP) Wattsmart Battery (Idaho, Oregon, Utah, Washington)

X

X

Xcel Energy Aggregator Virtual Power Plant (AVPP) (Colorado)

X

X

Xcel Energy Capacity*Connect (Minnesota)

X

*Other includes behavioral DR, appliances, plug loads, bidirectional charging (including electric school buses), and other DERs.

Virtual Power Plant Flipbook 2.0

7


Overview

What are the types of VPPs? This flipbook distinguishes two primary VPP participation models: utility VPPs and market-participant VPPs. In addition, we profile a funding and contracting arrangement: bring your own distributed capacity (BYODC). BYODC VPPs could be classified as either utility VPPs or market-participant VPPs. Each can be broken into two subtypes.

Utility VPPs Utility procures grid services from aggregated DERs and compensates customers, aggregators, or both.

Market-participant VPPs VPPs, managed by aggregators or retail electricity providers, participate in competitive electricity markets and earn value primarily through market-based revenues or savings.

BYODC VPPsii

An emerging commercial model in which large loads, such as data centers, help sponsor or procure distributed capacity.

The following pages briefly define each model. This flipbook focuses on utility VPPs.

The authors would like to acknowledge Alliance to Save Energy and the Ad Hoc Group for popularizing the BYODC term and concept through the report Bridging the Load Gap: A Collaborative Path for Utilities, Hyperscalers and Customers.

ii

8 Virtual Power Plant Flipbook 2.0


Overview WHAT ARE THE TYPES OF VPPS?

Utility VPPs In utility VPPs, the utility is the resource offtaker: it procures grid services from aggregated DERs and sets or administers compensation through a tariff, program, procurement, or contract.

Aggregator-access utility VPPs

Customer program utility VPPs

Utility asset VPPs

Third-party aggregatorsiii are compensated by the utility or through a utilityadministered mechanism for providing verified grid services. Aggregators are typically responsible for customer acquisition, enrollment, payment, and dispatch of devices, and may offer customers different compensation and engagement models.

Customers or end-users participate directly in a utility-administered program and receive predetermined, prescribed, or performance-based compensation, typically from the utility. These VPPs may involve a third-party distributed energy resource management system (DERMS) provider, original equipment manufacturer (OEM), or program implementer operating parts of the program on the utility’s behalf. Customer program utility VPPs most closely resemble traditional utility demand-side management (DSM) programs.

The DER assets are planned for and owned by the utility, and managed by the utility as a VPP. Capacity*Connect is an example of this type of VPP.

There is not yet broad consensus on the types of utility VPPs. In addition to the VPP types listed above, additional commonly used terms include: open-access VPPs, bring your own device (BYOD) VPPs, distributed capacity procurement, and others. The types above have been offered as an illustrative if not comprehensive set of utility VPPs. iii

Aggregators may include DER original equipment manufacturers and third-party owners or finance providers for DERs.

Virtual Power Plant Flipbook 2.0

9


Overview WHAT ARE THE TYPES OF VPPS?

Market-participant VPPs Market-participant VPPs are qualified and registered market participants and compensation is determined primarily by competitive market value, including wholesale market revenues or retail electricity products whose economics are tied to market prices. This category includes wholesale market aggregations and competitive retail VPPs.

Subtype

Description

Example

Where is this available?

Market aggregation VPPs

Third-party aggregators enroll commercial, industrial, or residential customers and bid aggregated DER capability into wholesale energy, capacity, ancillary services, or DR markets where rules allow participation.

CPower represents more than 2,000 C&I customers and operates approximately 6.7 gigawatts (GW) of capacity across all US deregulated energy markets.1 2, iv

Available where RTO/ISO rules and state policy allow aggregated retail demandside resources to participate in wholesale markets.

Competitive retail VPPsv

Competitive retail electricity providers work with customers to install or dispatch DERs and manage load in ways that reduce a retailer’s cost of serving customers or increase the value of market participation. Savings may be shared with customers through bill savings, incentives, or bundled retail products.

Leap partners with more than 100 technology providers and connects more than 400,000 DERs to grid programs through its VPP platform.3 In Texas, NRG and Renew Home plans to build a 1 GW residential VPP through NRG retail. Available where RTO/ISO rules and state policy allow aggregated retail demand-side resources to participate in wholesale markets electricity providers.4

Available in states or markets with retail electricity competition. The relevance of this model depends on customer switching levels, retail supplier offerings, and rules governing customer-sited DER participation.

In Illinois, Base Power offers ComEd-area customers a 40 kWh home battery for $295 and retail electricity at a discount while retaining battery dispatch rights.5

CPower was acquired by NRG Energy in a transaction with LS Power that was announced in 2025 and completed in January 2026. Competitive retail VPPs may not be referred to as VPPs, but they are an important source of innovation in US regions with robust retail competition as well as in leading global markets such as Australia and Great Britain. The authors recommend GridLab’s A Vision for a Customer-Led Low Cost Power Grid as a useful resource for exploring this topic.

iv v

10 Virtual Power Plant Flipbook 2.0


Overview WHAT ARE THE TYPES OF VPPS?

Market-participant VPPs Analysis notes: Market aggregations Market aggregations are only possible in states and regions served by competitive RTOs. Some states are partly served by RTOs/ISOs; in the following states and the District of Columbia, 20% or more of load is served by RTO/ISOs: • Arkansas, California, Connecticut, Delaware, Illinois, Indiana, Iowa, Kansas, Kentucky, Louisiana, Maine, Maryland, Massachusetts, Michigan, Minnesota, Mississippi, Missouri, Montana, Nebraska, New Hampshire, New Jersey, New York, North Dakota, Ohio, Oklahoma, Pennsylvania, Rhode Island, South Dakota, Texas, Vermont, Virginia, West Virginia, Wisconsin, and Wyoming

Federal Energy Regulatory Commission (FERC) Order 719 required RTOs/ISOs to allow aggregators of retail customers (ARCs) to bid DR on behalf of retail customers directly into organized markets. It also provided states the option to opt out of allowing ARCs to participate in their state. The following states have exercised the Order 719 opt-out to ban ARCs: • Arkansas, Iowa, Kentucky, Louisiana, Minnesota, Mississippi, Montana, Nebraska, New Mexico, North Dakota, South Dakota, Wisconsin, and Wyoming • Indiana, Michigan, and Missouri initially opted out but have partially lifted ARC bans.

Market-participant VPPs: Availability by state The map indicates states and regions where, under current policy, there is potential to develop competitive retail VPPs.

Analysis notes: Competitive retail VPPs Fourteen states offer full retail electric choice. However, only a subset of these states have robust markets for competitive retail electricity, in which more than 20% of residential customers have switched from their default provider.

States with 30% or more load served by a RTO and have not opted out of Order 719

States with 30% or more load served by a RTO, have not opted out of Order 719, and have robust competitive retail electricity (at least 20% of customers served by a third party)

Virtual Power Plant Flipbook 2.0

11


Overview WHAT ARE THE TYPES OF VPPS?

BYODC VPPs Defining BYODC VPPs

How it worksvi

As electricity demand rises across much of the United States, utilities and grid operators are under increasing pressure to connect new large loads quickly while maintaining reliability. This has prompted the emergence of bring-your-own distributed capacity (BYODC) approaches, in which large customers provide dedicated generation or other grid resources as part of the interconnection process.

BYODC is a new funding and contracting arrangement for scaling VPPs in which: • Large loads “sponsor” and provide capital to invest in distributed capacity at scale. • DER aggregators or program administrators (with varying degrees of utility involvement) develop and deliver needed capacity to utilities or market operators. • Utilities or market operators may set an approved “exchange rate”: What is the compensation (e.g., expedited interconnection, economic risk reduction) for each MW of distributed capacity sponsored by the customer?

Traditional utility-scale generation faces many of the same headwinds as new large loads, including long equipment lead times, transmission bottlenecks, and multiyear interconnection timelines. As a result, some customers are exploring BYO VPP strategies that aggregate DERs as a fast, affordable, and flexible option to create headroom and relieve generation or transmission bottlenecks.

vi

See https://rmi.org/resources/how-virtual-power-plants-can-help-the-united-states-win-the-ai-race/ for further discussion on BYODC business models.

12 Virtual Power Plant Flipbook 2.0

BYODC VPPs could be classified as either utility VPPs or market-participant VPPs. BYODC utility VPP Google plans to invest $50 million in Xcel Energy’s Capacity*Connect (Minnesota) to support Google’s Pine Island Data Center. BYODC market-participant VPP Google and Voltus entered a three-year agreement to aggregate 100 MW of DERs each year in the PJM region.


Overview

Why are utilities advancing VPPs? Underlying drivers: What system needs are VPPs addressing? Several underlying system needs or drivers appear across the features in this flipbook. These needs vary by region and include: • Improving reliability in light of aging generation infrastructure and frequent forced outages (LUMA) • Reducing peak demand and supporting contingencies on the distribution system in a densely populated distribution network (Con Edison) • Developing new capabilities to leverage and integrate customer-sited resources to advance a more efficient and reliable grid (Xcel Energy in Minnesota; RMP) • Managing peak demand and reducing reliance on fossil fuel generation (PSE)

The most common crosscutting driver is the need to meet load growth affordably. • Xcel Energy’s Colorado AVPP was designed in part to address rapid load growth across Colorado’s Front Range and concerns about the cost of new generation and grid infrastructure. • Legislation leading to Dominion’s VPP was prompted by the need to meet rapidly growing load driven in part by data center development. • APS initially launched Cool Rewards to help manage peak demand, which is largely driven by air conditioning in Arizona’s hot climate.

Launch catalysts: What caused this VPP to be advanced? A grid need that can be met with a VPP is not always sufficient to launch a VPP. Regulated utilities often also need a policy, regulatory, planning, or customer-driven catalyst that creates authority, funding, or a clear implementation path. Three launch catalysts stood out from the VPP features included this flipbook. Catalyst

Discussion

Examples

Direct regulatory requirement or authorization

The regulator directs or authorizes the utility to establish a VPP.

In 2017, the Arizona Corporation Commission authorized APS to implement DR and load management programs, leading to the APS Cool Rewards program.

Specific legislation initiating a VPP

Between 2024 and 2025, four states passed laws that specifically required utilities to set up VPPs.

In 2024, Colorado passed the Modernize Energy Distribution Systems Act. The legislation included a requirement that Colorado utilities enable DER aggregation and VPP participation.

Meeting broader policy, planning or member/ customer objectives

In some instances, regulators or utilities see VPPs as necessary to help meet broader peak management or decarbonization goals, or improve customer outcomes.

Washington state policies including Clean Energy Transformation Act (CETA) (2019) and HB1589 (2024) set ambitious targets for grid decarbonization, load flexibility, and peak management. These policies informed the development of PSE’s VPP.

In 2023, the Puerto Rico Energy Bureau (PREB) approved the regulatory framework, tariffs, and customer protections for customer-sited batteries to participate in LUMA’s CBES program.

In 2025, Virginia passed the Community Energy Act directing Dominion Energy to design a VPP pilot capable of aggregating up to 450 MW of DER capacity.

Bandera Electric Cooperative (BEC) is a member-owned cooperative and set up its VPP to better meet member needs.

Virtual Power Plant Flipbook 2.0

13


Overview

How are VPPs supporting system reliability and customer resilience? Reliability is the ability of the electric grid to consistently deliver power when and where it is needed, including having enough resources to meet demand and maintaining stable grid operations.

Resilience is the ability of the electric system to withstand, respond to, and recover from disruptions, especially major or unusual events that may cause outages.

VPPs in this flipbook are being used to support reliability (both local and regional). Some VPPs also support customer resilience by improving the economics of batteries, which can provide backup power during outages. Regional or system resilience benefits are more limited today.

Reliability focus Distribution reliability: DER/VPP dispatch can relieve grid constraints and provide N-1 contingency management.vii

Resource adequacy: VPPs are dispatched to reduce peak demand and support regional resource adequacy.

Example: Con Edison’s DR portfolio is designed and operated to enhance distribution reliability.

Example: Cool Rewards’ capacity is equivalent to ~2% of APS’s peak summer demand.

Local

Regional Emergency grid support/system resilience: VPPs can provide services such as fast response and ancillary services to stabilize the grid, and in the future VPPs may be able to support resilience by diversifying the grid and potentially supporting black start.viii These benefits are not currently supported by VPPs profiled in this flipbook.

Resilient power supply: Customer-sited battery energy storage can provide resilient backup power in the event of a service disruption. Example: Customer demand for resilient power supply has driven battery deployment in Puerto Rico and has supported CBES development.

Resilience focus

vii

N-1 contingency refers to the grid’s ability to continue operating reliably following the unexpected loss of a single system component, such as a transmission line, feeder, transformer, or generator.

viii

Black start refers to the ability to restart and energize portions of the electric grid following a widespread outage without relying on an external electricity supply. Traditionally, this service is provided by generators that can start independently.

14 Virtual Power Plant Flipbook 2.0


Overview

How are VPPs supporting affordability? VPPs support affordability by providing direct value to participating customers and system savings that can benefit all customers.

Participant compensation

System savings

Net system savings

Households and businesses that participate in a VPP may receive direct bill credits, up-front rebates, performance payments, or indirect compensation through aggregators.

When VPPs are incorporated into planning and operations, they can help reduce, avoid, or defer spending on capital investments and operations that would otherwise be passed on to customers.

Compensation paid out to participants or aggregators from VPPs

System savings examples from this flipbook

Net system savings are created when the avoided system costs or grid service value produced by a VPP exceed participant compensation, aggregator payments, technology costs, and program administration costs. These savings can provide downward pressure on rates and bills when they are reflected in utility planning, procurement, and ratemaking.

Example of system savings Capacity*Connect is expected to avoid approximately $440 million in system costs.

VPP LUMA CBES (Puerto Rico)

CBES provides an estimated $9 million in payments to consumers..7, ix

Xcel Energy Capacity*Connect (Minnesota)

By 2030, Xcel Energy’s AVPP is projected to deliver $24 million/year in compensation.8

Bandera Electric Cooperative VPP (Texas)

Bandera’s VPP generates $5.7 million in revenue, which offset costs for the co-op’s 30,000 members in Texas Hill Country

ConnectedSolutions (New England)

In 2025, National Grid’s residential and C&I ConnectedSolutions initiatives reported approximately $227.6 million in total benefits, including $126.2 million from residential ConnectedSolutions programs and $101.4 million from C&I demand response.9

Xcel Energy AVPP (Colorado)

* In aggregator-led VPPs, aggregators may retain a portion of compensation to cover business and operating expenses associated with customer enrollment, management, dispatch, and performance risk.

ix

VPP

Total compensation paid out to participants/ aggregators*

Net system savings are often documented through cost-benefit analysis, especially utility cost tests (UCTs) that focus on system costs and benefits.

Net system saving examples from this flipbook VPP

Example of net system savings

ConnectedSolutions (New England)

In 2025, Residential and Commercial ConnectedSolutions in Massachusetts delivered a total $55 million in benefits against $27 million total program cost.10

RMP Wattsmart (Idaho, Oregon, Utah, Washington)

The Wattsmart Battery program passed the UCT in both Idaho and Utah in 2025.11

FY2026 Q4 Consolidated Transition Period Plan and Demand Response Administrative Costs Quarterly Report, Case No. NEPR-MI-2022-0001, submitted to the Puerto Rico Energy Bureau, LUMA Energy, August 14, 2026.

Virtual Power Plant Flipbook 2.0

15


Overview

What are some key trends and emerging themes for VPPs? Trends and themes across flipbook features

New programmatic approaches to dispatch and compensation for locational distribution grid services

Increased use of performance-based compensation

Several VPPs in this flipbook are designed to provide distribution grid services. Xcel Energy’s Colorado AVPP and National Grid’s ConnectedSolutions+ both compensate DERs or aggregations for locational value in specific constrained areas of the grid.x This is an emerging focus area for VPP policy and design.

Several VPPs use performance-based compensation linking payment to the performance of the VPP during dispatch events. Xcel Energy’s AVPP and Dominion’s VPP both include elements of performancebased compensation. While performancebased compensation is not entirely new, there seems to be increased interest in it, as opposed to fixed up-front and annual compensation.

x

ConnectedSolutions+ is a pilot expansion of ConnectedSolutions operating in EverSource’s and National Grids’s Massachusetts service territories.

xi

See Maryland PUC Docket 9715 for current discussion as of the writing of this document

16 Virtual Power Plant Flipbook 2.0

Utility ownership of DER assets

Portfolio approach for DSM and VPP programs

Xcel Energy’s Capacity*Connect has drawn attention because it allows the utility to own distributed battery assets and recover the associated costs through customer rates. It is the only VPP featured in this flipbook with this ownership model. However, utility ownership of DER assets, including front of the meter battery assets, is being explored in a number of jurisdictions, including Maryland.xi

Several of the VPPs featured in this flipbook, including Dominion’s, Con Edison’s, and PSE’s, involve multiple utility customer programs, often with different compensation structures, technologies involved, or customer classes that are operated as a portfolio.


Overview

How can utilities and policymakers approach VPP policy and program design? The features in this flipbook point toward priorities that can support VPP deployment while maximizing VPP affordability and reliability benefits.

Increase access to VPPs

Maximize VPP value by stacking services

Ensure VPPs are leveraged to avoid system costs

Adopt a pragmatic and learning mindset

Near-term action policy and program design can ensure more customers have the option to participate in VPPs.

VPPs best support system and customer affordability when they can provide and be compensated for multiple grid services, rather than being limited to a single grid service or use case.

For VPPs to meaningfully impact system costs, they must be visible in planning and trusted in operations.

Because VPP markets, technologies, and policy frameworks are evolving quickly, programs should be designed to launch, learn, and improve.

• Remove barriers to market-participant VPPs. In regions served by RTOs/ISOs, policymakers can expand VPP participation by improving third-party access to customer advanced metering infrastructure (AMI) data and reviewing or removing ARC restrictions that prevent DER aggregations from offering capacity to wholesale markets. • Establish utility VPPs where none are available. Policy directives can create a clear pathway for utility VPP development. State legislation directly led to the creation of Dominion Energy’s VPP pilot and Xcel Energy’s Colorado AVPP. • Advance BYODC solutions. BYODC models provide a unique opportunity to enhance customer affordability by enabling large-load customers to make investments in devices or offer compensation for load shifting. Policymakers and utilities in large states should consider implementing appropriate pathways in their jurisdictions. xii

• Design VPPs to provide local as well as bulk system services. Customer program utility VPPs in this flipbook, including RMP Wattsmart and APS Cool Rewards, dispatch VPPs not only to provide regional or bulk system services, but to address local grid constraints. Aggregator-access utility VPPs including ConnectedSolutions+ and Xcel Energy’s Colorado AVPP provide both compensation for peak demand reductions and targeted compensation to strained areas of the distribution grid. • Enable dual enrollment in wholesale market and utility VPPs. Con Edison’s DR portfolio shows how resources can be compensated for wholesale services (via New York Independent System Operator [NYISO] market aggregations) while also providing distributionlevel services (through Con Edison utility VPP), provided program rules define eligible co-participation, performance measurement, and settlement.xii

• Integrate VPPs into planning. Utilities should evaluate VPPs alongside traditional generation, transmission, and distribution investments in resource and distribution planning. RMP’s Wattsmart Battery program and Xcel Energy’s Capacity*Connect illustrate how distributed resources can be positioned as planning resources. • Integrate VPPs into operations. VPPs are more likely to deliver system value when operators have sufficient visibility and agency over calling dispatch for the VPPs. Programs such as RMP’s Wattsmart Battery program and Con Edison’s DR portfolio show how operational integration can build confidence in dispatching VPPs during grid events.

• Learn from leading practice. Utilities and policymakers can draw from well-documented VPPs instead of starting from scratch. ConnectedSolutions shows how a common program design can be replicated across utilities and states, while RMP shows how a utility-operated battery VPP can expand across a multistate utility territory. • Start with a workable policy or program and improve it over time. VPP policy touches diverse domains; not every issue needs to be fully resolved before launch. Policymakers should clarify critical decision points and can define iteration points, as ConnectedSolutions has done by launching quickly, then expanding from peak demand reduction toward more targeted locational services.

There are important considerations with dual enrollment, and having two reliability purposes is not feasible and should not ideally be designed into policy.

Virtual Power Plant Flipbook 2.0

17


Utility VPP Features

18 Virtual Power Plant Flipbook 2.0


Utility VPP Features

Introduction to features included in this flipbook

VPPs featured in this flipbook Click on the utility and program names below to go directly to corresponding content about the utility.

Puget Sound Energy (PSE)

The following section provides short case studies, or features, of 10

Xcel Energy Capacity*Connect

VPPs. Each VPP feature follows a similar format. There is a description of context and background, a callout on impact to date, and some notable key takeaways. In addition, each feature includes a standard metrics

Con Edison DR portfolio

Rocky Mountain Power (RMP) Wattsmart Battery

table to facilitate comparison across VPPs.

ConnectedSolutions

Xcel Energy Aggregator VPP (AVPP)

Dominion Energy VPP

Arizona Public Service (APS) Cool Rewards

Bandera Electric Cooperative VPP Geographies covered by featured programs Featured programs

LUMA Energy Customer Battery Energy Sharing (CBES) Virtual Power Plant Flipbook 2.0

19


Utility VPP Features

Program design table glossary

Each feature includes a program design table with the following metrics to enable comparison across VPPs.

Overview VPP type Grid services provided Resource type Customers enrolled MW enrolled

VPP types include Utility VPPs and Market-Participant VPPs These include bulk system services (e.g., generation capacity, energy, resilience) as well as locational services (e.g., distribution capacity relief). Technology type(s) involved in VPPs. This includes individual DER technologies and use cases (e.g., demand response). Number of reported customers participating in the VPP. Total reported capacity (MW) enrolled in the VPP.

Policy environment State Utility type Wholesale market Enabling policy or plan

State(s)/territory in which the VPP operates. Examples include investor-owned utility or rural electric cooperative. If applicable, name of RTO/ISO operating in the region. Name or description of legislation, regulation, or planning processes that led to this program.

VPP roles and responsibilities Resource offtaker Program operator Participating OEMs and aggregators Device owner

20 Virtual Power Plant Flipbook 2.0

Entity (typically utility) responsible for procuring and settling payment for provision of grid resources provided by the VPP. Entity responsible for coordinating devices and aggregations to perform when called upon by the resource offtaker. Operator is often a grid DERMS or a software provider. Technology OEMs or aggregators that are eligible to participate. Owner of the enrolled DER device. This may be a customer, third-party finance provider, or the utility.


Utility VPP Features

Program design table glossary

Each feature includes a program design table with the following metrics to enable comparison across VPPs.

Customer experience Customer segment Customer enrollment Customer payment channel Compensation structure Compensation levels Customer participation requirements

Participating customer segments in the VPP, typically residential, commercial, or industrial. Party responsible for enrolling and aggregating DERs, typically the utility third-party aggregators, installers, or OEMs. Party responsible for delivering customer payments. This may be the utility, third-party aggregator, or OEMs. This could include up-front, annual, or performance-based compensation. Value of compensation. This may be provided directly to the customer or to the aggregator. Any requirements for customers to participate in the VPP program (enrollment, exit rules, etc.).

Operations DER control Metering, telemetry, and verification notes Dispatch timing

The level of DER control the VPP and customer have during the program. Typically, device dispatch will be autonomously VPP-initiated, although in some instances customers may dispatch DERs in response to an event notification. Customers may also be able to override dispatch. Discussion of how the VPP manages metering and telemetry. Metering data is used to ensure fair and accurate compensation. Telemetry helps support real-time grid management. Frequency, duration, and scheduling of VPP dispatch.

Virtual Power Plant Flipbook 2.0

21


Utility VPP Features ARIZONA PUBLIC SERVICE (APS)

Arizona Public Service (APS) Cool Rewards: Smart thermostat-enabled demand flexibility at scale Context and background Cool Rewards is a utility-managed, third-party-operated VPP that uses enrolled customer smart thermostats to reduce or shift demand. APS owns and operates the customer program, while EnergyHub provides the third-party platform that supports device aggregation.

Impact to date • Total enrollment: As of the end of Q1 2026, Cool Rewards has enrolled ~100,000 thermostats. • Scale: 162 MW of load-shedding capacity in 2026, up from 145 MW in 2023 and 42 MW in 2020. • Peak demand reduction: In 2025, capacity for Cool Rewards represented ~2% of peak summer demand.17 • Affordability impacts: Cool Rewards offers residential customers up to $85 in first-year value, including a $50 one-time enrollment credit and a $35 annual participation credit.18 • Speed to deployment: 12 months.

Customers receive incentives in exchange for allowing limited thermostat adjustments during DR events. As one of the largest direct load control thermostat programs in the country, Cool Rewards compiles 162 MW of capacity with ~100,000 enrolled thermostats.

Cool Rewards launched in 2018 as a response to the 2017 Arizona Corporation Commission decision that authorized APS to implement DR and load management programs. The program has scaled quickly, with capacity increasing from 42 MW in 2020 to 145 MW in 2023 and approximately 162 MW in 2026 with a long-term goal to target more than 250 MW.14 The program also took only 12 months to operationalize, underscoring its fast deployment and ability to scale.15

During a typical cooling season dispatch event, APS aggregates participating smart thermostats across residential and small- to medium-sized businesses. In the hours leading up to an event, typically from noon to 3 or 4 p.m. depending on the customer’s rate, thermostats are lowered to precool the customer’s home or business.12 During the three-to-four-hour peak period, thermostat setpoints are raised a few degrees to reduce electricity demand, and afterward the thermostat returns to its original schedule. The program prioritizes customer comfort and participation by offering flexible opt-outs at any time, ongoing incentives, and clear communication about the broader grid and community benefits of participation. In 2026, APS eliminated the mandate for a minimum of

22 Virtual Power Plant Flipbook 2.0

ancillary services.13 Further, APS is designing year-round DR programs and transitioning Cool Rewards into a more flexible grid resource that can provide value across all seasons and hours.

APS is also exploring direct aggregation partnerships with smart thermostat manufacturers to bring additional customers and devices into Cool Rewards and increase the program’s capacity.16

two-hour advance customer notifications, making the Cool Rewards fleet more nimble and unlocks additional value, such as more timely locational response and

Cool Rewards is part of APS’s broader multi-DER VPP portfolio, which also includes C&I demand response, a residential bring-your-own-device (BYOD) battery offering, and managed EV charging. These programs reflect APS’s broader strategy to scale flexible, customer-sited resources, with a long-term goal of building a 1 GW VPP.


Utility VPP Features ARIZONA PUBLIC SERVICE (APS)

Key takeaways

Leveraging online marketplaces to pre-enroll customers at point of purchase can simplify VPP enrollment. APS Marketplace and APS Business Marketplace pre-enroll customers into the Cool Rewards program at the customer’s point of purchase. At the end of Q1 2026, the program had 26,000 participating devices that were pre-enrolled from the marketplace channel.19 In addition to increased enrollment, this allows APS to reduce overall marketing and recruitment costs for the program. APS also offers free in-home thermostat installation for residential customers shopping on APS Marketplace.

Dynamic load shaping can support customer affordability by avoiding peak time-of-use rates. In summer 2024, APS used EnergyHub’s Edge DERMS dynamic load shaping capability to precool homes during high solar generation, sustain a controlled load shape ahead of the peak period, and gradually increase load shed during peak time-of-use hours. The strategy extended the optimization window to more than seven hours and ultimately helped customers avoid high-cost peak rates.20

Leveraging online marketplaces to pre-enroll customers at point of purchase can simplify VPP enrollment. During a major July 2024 storm in Phoenix, APS used an internal mapping tool to identify Cool Rewards customers near affected substations and feeders.21 APS then initiated its first location-based Cool Rewards event, targeting about 2,800 customers in Phoenix for voluntary power conservation.22 This helped reduce localized grid strain while crews worked to repair storm damage, demonstrating how smart thermostat VPPs can support reliability during acute grid events.

“Arizona is experiencing incredible growth in both the residential and industrial sectors. APS is wellpositioned to meet our customers’ growing energy needs, and programs like Cool Rewards help not only meet energy demand but do so in a way that serves Arizonans more efficiently. Our virtual power plant is a triple win, benefitting our customers, the grid and the environment.”

— Kerri Carnes, APS Director of Customer Technology23

More information can be found on the Cool Rewards website.

Virtual Power Plant Flipbook 2.0

23


Utility VPP Features ARIZONA PUBLIC SERVICE (APS)

Metrics at a glance Overview VPP type Grid services provided Resource type Customers enrolled MW enrolled

Utility VPP Peak demand reduction, targeted local dispatch for distribution constraints Smart thermostats ~100,000 162 MW

Policy environment State Utility type Wholesale market Enabling policy or plan

Arizona IOU Will join Southwest Power Pool (Markets+) in 2027 for real-time and day-ahead markets APS Cool Rewards was part of a portfolio of strategic amendments to APS’s 2016–2017 DSM plans, resulting in initiatives and programs for demand response, energy storage, and load management. It was authorized by Arizona Corporation Commission Decisions 76314 and 76313 (Docket No. -01345A-15-0182).

VPP roles and responsibilities Resource offtaker Program operator Participating OEMs and aggregators Device owner

24 Virtual Power Plant Flipbook 2.0

APS EnergyHub Eight thermostat OEMs in the APS Cool Rewards program; the broader APS VPP comprises 24+ OEMs and aggregator partners Customer


Utility VPP Features ARIZONA PUBLIC SERVICE (APS)

Metrics at a glance Customer experience Customer segment Customer enrollment Customer payment channel Compensation structure Compensation levels Customer participation requirements

Residential single-family homes, small businesses, and proofs of concept for multifamily and single-family rentals Individual OEMs and APS Marketplace APS Direct to customer in the form of annual bill credits Residential: $50 one-time enrollment credit and a $35 annual participation credit. No specific service plan or minimum enrollment term is required.24

Operations DER control Metering, telemetry, and verification notes Dispatch timing

Autonomously VPP-initiated with customer override Device-level data • Frequency: up to 20 events per season • Duration: typically two to three hours; some homes may be preconditioned before events • Scheduling: dynamic, event-based dispatch during peak/high-demand periods or in response to operational needs

Virtual Power Plant Flipbook 2.0

25


Utility VPP Features BANDERA ELECTRIC COOPERATIVE (BEC)

Bandera Electric Cooperative (BEC) Cooperative-led VPP deployment in rural Texas Context and background Bandera Electric Cooperative (BEC) operates two VPPs: its Smart Battery Program and its Smart Thermostat Program. This feature focuses on the Smart Battery Program.

Impact to date • VPP enrollments: At the end of 2024, 866 BEC members participated in the Energy Saver Program, which generated $5.7 million in revenue for the utility.37 By Q1 2026, 1,048 members participated in the Energy Saver Program, with 110 enrolled in the Smart Thermostat Program and 51 in the Smart Battery Program.38 • Market participation: In April 2026, the Lower Colorado River Authority (LCRA) load zone, which includes BEC, had a 1.6-MW resource in the ADER energy market and 0.8 MW in the contingency reserve service product.39

BEC operates the member-sited batteries in the Smart Battery Program for peak reduction, distribution system congestion mitigation, and participation in the Electric Reliability Council of Texas (ERCOT) energy and ancillary service markets. During grid outages, participants gain control of their battery for backup power.25 BEC members can lease a battery through the program or participate with their own Enphase battery. BEC has a partnership with Enphase Energy to offer 20-kWh battery leases. Participants pay a monthly charge, which is added to their electric bill.26 In 2025, BEC announced a similar partnership with Base Power.27 Members who bring their own device receive an annual payment of $50/kW. In 2024, BEC registered a battery VPP in the ERCOT Aggregate Distributed Energy Resource (ADER) Pilot Project.28 ADER aims to test how VPPs can deliver value in energy and ancillary services markets.29 BEC provides Smart Battery Program participants with a monthly credit to compensate them for participation in the ADER VPP.30 BEC operates a second VPP with its Smart Thermostat program.31 Participants receive an ecobee device at no cost,

26 Virtual Power Plant Flipbook 2.0

which BEC directly controls to reduce energy use during peak hours. Participants receive a monthly bill credit.32

the utility and its members, and the battery program aims to help members improve their home resiliency.35

Participants in the Smart Battery Program and Smart Thermostat Program must enroll in BEC’s Energy Saver Program and install Apolloware, an energy monitoring system and DERMS that BEC built in-house.33 BEC uses Apolloware to coordinate its VPPs including its ADER portfolio.34 Both programs aim to reduce energy costs for

BEC intends to grow its ADER participation by using Apolloware to coordinate multiple device types in its VPP. In 2024, the BEC ADER VPP was made up of 26 devices from the Smart Battery Program. BEC intends to qualify up to 6 MW by adding more Smart Battery Program participants and by including smart thermostats and EVs.36


Utility VPP Features BANDERA ELECTRIC COOPERATIVE (BEC)

Key takeaways

Smaller utilities can be leaders.

Energy and ancillary markets create new value for program participants.

Utility programs can help capture value from multiple DER devices.

BEC serves fewer than 31,000 members, but was one of the first entities to qualify a portfolio for the ADER program and was an early utility partner for Enphase Energy and Base Power. Base Power has since expanded its set of electric cooperative partnerships in Texas, including larger portfolios that will participate in ADER.40

In addition to resilience services, BEC members in the Smart Battery Program gain an incentive to manage their energy use during periods when the grid is stressed.

Through Energy Saver, BEC members gain incentives and information to help them participate in utility VPPs and to invest in additional energy efficiency and electrification upgrades. BEC has built its own DERMS platform called Apolloware, which helps the utility integrate DERs and participate in the Texas energy market.41

“We’re actually empowering the member so they can participate in the wholesale market directly. For the first time they have a financial incentive to conserve electricity. Before, it’s always been, ‘Conserve for the good of the cause.’ Now you will be paid market price if you conserve. That is a substantial change.” — Bill Hetherington, BEC CEO42

More information can be found on the Bandera Electric Cooperative Battery Storage Program website.

Virtual Power Plant Flipbook 2.0

27


Utility VPP Features BANDERA ELECTRIC COOPERATIVE (BEC)

Metrics at a glance Overview VPP type Grid services provided Resource type Customers enrolled MW enrolled

Utility VPP Ancillary services, energy, resilience, integration with wholesale markets Battery energy storage systems (BESSs) 51 in 2026 Not available

Policy environment State Utility type Wholesale market Enabling policy or plan

Texas Cooperative ERCOT ERCOT ADER was established by the Public Utility Commission (PUC) of Texas Project No. 53911xii

VPP roles and responsibilities Resource offtaker Program operator Participating OEMs and aggregators Device owner

xiii

BEC BEC Enphase Energy, Base Power OEM and customer

Aggregated Distributed Energy Resource (ADER) ERCOT Pilot Project, Project No. 53911, Public Utility Commission of Texas, accessed August 27, 2026, https://interchange.puc.texas.gov/search/filings/?ControlNumber=53911.

28 Virtual Power Plant Flipbook 2.0


Utility VPP Features BANDERA ELECTRIC COOPERATIVE (BEC)

Metrics at a glance Customer experience Customer segment Customer enrollment Customer payment channel Compensation structure Compensation levels Customer participation requirements

Residential Utility Utility Utility Members can lease a battery system for $36.99/month with no up-front payment and receive an on-bill credit for exports at an avoided cost rate Participants must own their home or property and commit to participating in the program for 10 years.

Operations DER control Metering, telemetry, and verification notes Dispatch timing

Autonomously VPP-controlled without customer override Telemetry requires two-second intervals.xiv BEC uses its Apolloware platform to manage metering, telemetry, and dispatch. Dispatchable, five-minute intervalsxv

xiv

“Empowering Grid Flexibility and Optimizing Energy Control with Apolloware’s ADER Solution,” 27Global, accessed August 27, 2026, https://www.27global.com/blog/portfolio/bec-apolloware-ader/.

xv

EticaAG Team, “ERCOT’s ADER Program: What C&I Users and Utilities Need to Know,” EticaAG, September 12, 2025, updated June 22, 2026, https://eticaag.com/ercot-ader-program/.

Virtual Power Plant Flipbook 2.0

29


Case studies CON EDISON DR PORTFOLIO

Con Edison DR portfolio Locational VPP dispatch at scale Context and background Impact to date • Enrolled customers and capacity: Across the five active DR programs, Con Edison has grown its portfolio from 55,000 enrollments in 2022 to over 115,000 enrollments in 2025,xviii accounting for approximately 500 MW peak load reduction.53 • Load reduction: Across the five different DR programs, the aggregate non-coincident load reduction in 2025 was 736 MW.54 • Load impact: In 2025, CSRP helped reduce approximately 2.7% of network peak demand on the hottest days of the year, and more than 7% during the call window from 11 a.m. to 3 p.m.55 • Contingency events: Con Edison dispatched three Auto-DLM contingency events in 2025 to mitigate local network contingencies.56 • Societal impact: Con Edison evaluates its DR portfolio using New York’s Societal Cost Test (SCT), which values avoided generation, transmission, distribution, reliability, and environmental benefits.xix Con Edison’s DR portfolio achieved BCA > 1.0 in 2025.

Con Edison operates five DR programs across New York, with more than 100,000 enrolled customers collectively supporting distribution system reliability.xvi Con Edison operates its DR portfolio alongside NYISO DR programs, which provide bulk system reliability services through New York’s wholesale electricity markets.xvii Customers can stack value streams across both the utility- and NYISO-administered DR programs, making economic decisions as to how they can best support bulk and distribution system needs in New York. Con Edison’s portfolio of DR programs has five complementary programs:43

infrastructure.45

1. Commercial System Relief Program (CSRP) 2. Distribution Load Relief Program (DLRP) 3. Term Dynamic Load Management (Term-DLM) 4. Automated Dynamic Load Management (Auto-DLM) 5. Bring Your Own Thermostat (BYOT)44

Contingency programs (DLRP, Auto-DLM, BYOT) are dispatched reactively with shorter notice to address realtime or imminent grid constraints (such as transformer or feeder overloads).46 Peak shaving events are called territory-wide, whereas contingency events are dispatched in specific locations as needed.47

Con Edison’s five DR programs are used to support both peak shaving and contingency needs on the distribution system. Peak shaving programs (CSRP, Term-DLM, AutoDLM, BYOT) reduce demand during predictable highload periods, such as heat waves, to relieve stress on

The majority of program enrollments in the DR portfolio have historically been from large commercial customers; however, Con Edison observed significant growth in residential and small business enrollments after 2022, when it completed rollout of AMI across its entire service

While Con Edison refers to these offerings as DR programs, they are consistent with VP3’s definition of VPPs. Key NYISO programs include Special Case Resources and Emergency Demand Response Program, which are dispatched at the bulk system level. Demand-side resources may also be eligible to participate directly in NYISO energy, capacity, and ancillary service markets.

The introduction of AMI expanded eligibility and simplified operations by providing the interval meter data needed for participation and performance measurement across all Con Edison electric customers.49 Con Edison utilizes a broad network of aggregators to recruit, manage, and coordinate participating resources across an increasingly diverse portfolio of programs.50 As of summer 2026, Con Edison is in the process of launching a new Bring Your Own Battery (BYOB) program, enabling behind-the-meter, customer-owned BESS (≤50 kW) to provide load relief during peak demand and reliability events.51 Con Edison will compensate enrolled BYOB customers based on their performance, creating a new opportunity for small-scale battery owners to contribute to grid flexibility.52

Total enrollment counts participation across programs; some customers are enrolled in more than one program. New York’s SCT evaluates whether a program creates net value by comparing its implementation costs with the avoided costs of electricity generation, transmission, and distribution, while also accounting for environmental (e.g., carbon emissions) and other societal benefits.

xvi

xviii

xvii

xix

30 Virtual Power Plant Flipbook 2.0

area.48


Case studies CON EDISON DR PORTFOLIO

Key takeaways

xv

A layered portfolio addresses multiple distribution grid needs.

Value stacking strengthens customer economics and supports the aggregator market.

Aggregators support efficient customer enrollment and engagement.

Participation covers diverse technology and customer segments.

Con Edison’s DR portfolio is layered by design to address distinct types of grid needs, from system-wide peak shaving targeting local network peak windows on the hottest days of the year to feeder- and network-level distribution contingencies and reliability events. Rather than relying on a single program, Con Edison has built complementary programs that target different customer segments and technologies and operate at different speeds, scales, and commitments from participants.

Customers can participate in multiple programs simultaneously (e.g., CSRP and DLRP), enabling them to stack compensation for incremental value (customers may only co-participate in programs that serve different system needs). Con Edison has established clear eligibility criteria to help customers and aggregators choose the right participation pathway within Con Edison’s portfolio of DR programs.xv

Con Edison has more than 30 aggregators participating in its portfolio of DR programs across numerous customer segments and technologies. Aggregators can help customers enroll in DR programs, optimize their energy use to maximize performance in the programs they are enrolled in, and distribute payments. Con Edison has a long track record collaborating with the aggregator community in its service area, including hosting aggregator events to obtain feedback on increasing the effectiveness of its DR programs.57

Con Edison’s portfolio taps into a wide range of customers: large commercial buildings, residential households, small businesses, and dedicated grid assets (e.g., front-of-the-meter batteries), creating geographic and asset diversity.58 Programs are largely technology-agnostic, and the diversity of offerings provides multiple participation options, allowing a broad range of technologies and customer segments to participate. The deployment of AMI in the entire service area has additionally allowed Con Edison to maximize eligibility by making it possible for all residential and commercial customers to participate in at least one program.59

Customers and aggregators can access the DR Program Guidelines for reviewing eligibility criteria in the Demand Response (Rider T) Program Guidelines.

Virtual Power Plant Flipbook 2.0

31


Case studies CON EDISON DR PORTFOLIO

Key takeaways continued from previous page

Varying compensation structures support a diversified portfolio.

Auto-DLM highlights an evolution toward rapid-response resources.

Con Edison’s portfolio of DR programs employs different compensation structures to align price signals with the value of the grid services being procured. Programs such as CSRP and DLRP (~450 MW enrolled in each) have a single-year enrollment commitment, where participants are paid on a pay-as-you-perform basis.60 The average performance factor (e.g., actual load reduction versus customer pledge) in these programs in 2025 was approximately 75%. Auto-DLM and Term-DLM (~40 MW enrolled total) involve multiyear contracts with performance requirements, including financial penalties for performance below a certain threshold. The average performance factor in these programs is nearly 100%.61 The competition introduced within DLM helps deliver more reliable flexibility at a lower cost to customers.

Con Edison’s Auto-DLM program reflects a shift from traditional load curtailment toward automated, rapid-response resources that can be dispatched in near real time to address grid conditions. As of 2025, all enrolled assets are front-of-themeter batteries, enabling fast, reliable load relief. These resources must respond with as little as 10 minutes’ notice, in contrast to programs like CSRP that rely on customerdriven curtailment with up to 21 hours’ advance notice.

32 Virtual Power Plant Flipbook 2.0

“Our diverse set of demand response programs helps us address a variety of grid needs, giving us operational flexibility to support our distribution system during peak summer periods.” — Dimitris Vantzis, Con Edison Department Manager, Targeted Demand Management62

For more information on DR programs, see Con Edison’s website. For more information on Con Edison’s BYOT Program, see the program website.


Case studies CON EDISON DR PORTFOLIO

Metrics at a glance Overview VPP type Grid services provided

CSRP Utility VPP Distribution peak shaving

Resource type Customers enrolled MW enrolled

Technology agnostic 445 ~46,000

DLRP

Term-DLM

Auto-DLM

Distribution-level contingency

Distribution peak shaving

Distribution peak shaving and distribution-level contingency

449 ~45,000

21 142

19 6

BYOT

Smart thermostats 21 ~24,000

Policy environment State Utility type Wholesale market Enabling policy or plan

CSRP DLRP Term-DLM Auto-DLM BYOT New York IOU Deregulated State of New York PUC, Case 00-E-2054, Order Requiring Filings and Reports of Utility Demand Response Programs, 2000;63 New York State Department of Public Service, DR Proceeding 14-E-0423 (NYSDPS-DMM: Matter Master); Climate Leadership and Community Protection Act (2019) (New York State Senate Bill 2019-S6599), Grid of the Future, Case 24-E-0165 (2024), Distribution System Implementation Plan (2016–Present)

VPP roles and responsibilities Resource offtaker Program operator Participating OEMs and aggregators Device owner

CSRP Utility Utility Multiple Customer

DLRP

Term-DLM

Auto-DLM

Aggregators or developers who bid and are awarded contracts through request for proposal (RFP)

BYOT Direct load control (DLC) vendor or implementation contractor Amazon, Sensi, Honeywell

Virtual Power Plant Flipbook 2.0

33


Case studies CON EDISON DR PORTFOLIO

Metrics at a glance Customer Experience Customer segment Customer enrollment

Customer payment channel Compensation structure

Compensation levels

Customer participation requirements

xvi

CSRP DLRP All Con Edison electric customers • Aggregators or directly enrolled customers • Directly enrolled customers must be able to provide at least 50 kW of load relief per event • All enrollments are submitted via the company’s web-based DR portal Aggregator or utilityxvi

Term-DLM

• Compensation to aggregator or directly enrolled customers • Monthly reservation payments, and performance payments per kWh reduced in each event

• Compensation to aggregator or directly enrolled customers • Fixed-price compensation set by the contract • Annual reservation payments, and performance payments per kWh reduced in each event

• Monthly reservation (capacity) payments: $18 or $25/kW-month, depending on location • Energy payments: $1–$3/kWh • Bonus payments: Additional $5/kWmonth for some networks if five or more events are called • No penalties for underperformance Minimum 50 kW of load reduction across all aggregations

• Competitively bid: $/kW fixed price set by contract for term of agreement; $1/kWh; not subject to annual fluctuation • Penalties: 80% obligation value in given year for underperformance in Term-DLM

• Monthly reservation (capacity) payments: $6 or $18/kilowatt (kW)month, depending on location • Energy payments: $1–$3/kWh • Bonus payments: Additional $5/kWmonth if five or more events are called • No penalties for underperformance

For the DLM programs, individual customers could hypothetically bid into DLM programs and receive payments directly from Con Edison.

34 Virtual Power Plant Flipbook 2.0

Auto-DLM

BYOT Small commercial/residential DLC vendor

Utility

• Competitively bid: $/kW fixed price set by contract for term of agreement; $1/kWh; not subject to annual fluctuation • Penalties: 90% obligation value in given year for underperformance in Auto-DLM

Minimum 50 kW of load reduction per network for aggregations; three-to-five-year contract

• Direct to consumer • Up-front enrollment incentive and performance-based retention incentive • $85 one-time enrollment incentive for each eligible thermostat • $25 retention incentive per year if customer participates in 50% or more event hours over the course of three years • No penalties for opting out Central HVAC; approved thermostat OEM


Case studies CON EDISON DR PORTFOLIO

Metrics at a glance Operations DER control

Metering, telemetry, and verification notes Dispatch timingxviii

CSRP DLRP Term-DLM Auto-DLM • Customer-controlled (with optional automation); generally voluntary • Dispatch signals are sent to aggregators and direct participants, and customers choose to respond either manually or via automated systems (e.g., building energy management system [BEMS])xviii • Performance measured using interval meter data (AMI); compares calculated customer baseline load (CBL) to day-of energy consumption using interval meter data; performance = CBL − actual load during events • Device-level telemetry is used for real-time dispatch, performance, and verification64 • Frequency: seasonal (summer) • Frequency: seasonal (summer) • Frequency: seasonal (summer) • Frequency: seasonal (summer) • Duration: four-hour call window • Duration: four-hour call window • Duration: minimum four• Duration: four hours • Scheduling: 21 hours’ advance notice • Scheduling: 21 hours’ advance notice consecutive-hour dispatch • Scheduling: no less than 10 minutes’ • Scheduling: two hours prior to the notice before the start of an event start of the event for contingency events; could be less than two hours’ notice provided for immediate events • Customer-controlled (with optional automation); generally voluntary • Dispatch signals are sent to aggregators and direct participants, and customers choose to respond either manually or via automated systems (e.g., building energy management system [BEMS])xviii

BYOT Autonomously VPP-initiated with customer override; voluntary Device-level telemetry is used for real-time dispatch, performance, and verification • Frequency: seasonal (summer) • Duration: four-hour call window • Scheduling: give customers the ability to respond within 15 minutes of initiation

Curtailment response plans are developed and managed by aggregators and their customers. Aggregators receive notifications from Con Edison when events are dispatched. Aggregators can choose to receive automated messaging via application programming interface (APIs) or OpenADR to streamline customer event dispatches. xvii

xviii

Call windows are network-specific and vary across Con Edison’s service territory.

Virtual Power Plant Flipbook 2.0

35


Case studies CONNECTEDSOLUTIONS

ConnectedSolutions A multistate, multi-technology VPP evolving toward providing targeted grid reliability services Context and background Impact to date • Scale: 800+ MW of dispatchable flexible capacity in participating utilities’ service territory delivered via 450 MW of ConnectedSolutions capacity across Massachusetts and New York, and 350 MW of C&I capacity from National Grid in New York.72 • Systems benefits: In 2025, National Grid’s residential and C&I ConnectedSolutions initiatives reported approximately $227.6 million in total benefits, including $126.2 million from residential ConnectedSolutions programs and $101.4 million from C&I DR.73 • Dispatch: National Grid dispatches residential and commercial batteries on average 50 times per summer season.74 • Program retention: Overall customer retention is 96%.75

36 Virtual Power Plant Flipbook 2.0

ConnectedSolutions is a Northeast regional VPP program that allows multiple OEMs, aggregators, and device types to participate. The program is active across five states — Connecticut, Massachusetts, New Hampshire, New York, and Rhode Island — with participation from multiple utilities. Today, the program includes more than 280,000 participating DERs, representing approximately 800+ MW of flexible capacity across residential thermostats, residential batteries, and C&I DR.65 EnergyHub’s Edge DERMS platform serves as the primary technology platform supporting ConnectedSolutions operations, including enrollment, forecasting, dispatch, and reporting. The platform integrates with OEMs and aggregators to standardize communication and control signals across device types.66 When an event is forecasted, the utility can use the platform to send dispatch signals to enrolled devices and aggregators, allowing participating customers to reduce or shift load. The program pilot was launched in Massachusetts in 2016 by National Grid, Eversource, and energy efficiency service provider Cape Light Compact as a thermostatbased DR program designed to reduce summer peak demand. Its development was shaped by the Massachusetts Green Communities Act of 2008, which required IOUs to administer three-year energy efficiency plans that pursue all cost-effective efficiency and demand reduction measures.67 The importance of peak demand management was further reinforced by the 2016 State of Charge report, which found that 40% of each year’s

electric expenditures in Massachusetts are devoted to the 10% of hours with the highest demand.68 National Grid fully launched versions of the program in New York in 2016 and Rhode Island in 2018. In 2019, the ConnectedSolutions pilot expanded into a multi-DER program, adding residential batteries and EVs. Since then, the program has continued to expand across utilities in Connecticut, New Hampshire, and New York.69

Looking ahead, National Grid is expanding the ConnectedSolutions model through ConnectedSolutions+, a location-specific initiative launched in 2026 that offers a 40% increase in customer incentives in targeted areas.70 Eligible locations are selected from distribution system areas where National Grid has identified a locational grid services need. Under the Massachusetts Electric Sector Modernization Plan framework, electric distribution companies are assigned to identify areas where DERs can provide grid value, estimate the avoidable or deferrable grid costs, and determine the needed capacity, timing, and operating conditions.71


Case studies CONNECTEDSOLUTIONS

Key takeaways

Replicable program design enables faster deployment with lower operational burden.

Attractive, performance-based incentives sustain customer participation.

National Grid’s ConnectedSolutions+ reflects the program’s evolution toward providing targeted grid reliability.

ConnectedSolutions’s program structure has been replicated across multiple utilities and states, creating a consistent framework that other utilities can more easily adopt for enrollment, incentives, dispatch, and program administration. National Grid deployed its multi-DER VPP with EnergyHub in under four months, showing how a shared platform and thirdparty aggregation model can help utilities launch new VPP programs faster and with less operational burden.76

ConnectedSolutions offers clear compensation tied to the grid services each DER provides, including seasonal payments for thermostats and capacitybased payments for residential batteries. This competitive incentive structure has helped keep customers engaged over time, with the program reporting 96% overall customer retention.77

ConnectedSolutions+ builds on benefits of the existing program by adding location-specific dispatch and offering higher incentives for targeted grid services. This marks a shift from providing a single primary grid service to more targeted flexibility that can help address distribution-level constraints and bridge or defer traditional infrastructure investments.78

Virtual Power Plant Flipbook 2.0

37


Case studies CONNECTEDSOLUTIONS

Metrics at a glance Overview VPP type Grid services provided Resource type Customers enrolled MW enrolled

Residential thermostats Residential batteries Utility VPP Electric and natural gas peak demand reduction, targeted local dispatch for distribution constraints Smart thermostats Batteries 280,000+ DERs 800+79

C&I DR

Residential thermostats Residential batteries Connecticut, Massachusetts, New Hampshire, New York, Rhode Island National Grid, Eversource, Rhode Island Energy, Cape Light Compact, Unitil ISO-New England and NYISO ISO-New England and NYISO Massachusetts Green Communities Act of 2008, 2025–2027 Massachusetts Three-Year Energy Efficiency and Decarbonization Plan

C&I DR

DR

Policy environment State Utility type Wholesale market Enabling policy or plan

VPP roles and responsibilities Resource offtaker Program operator Participating OEMs and aggregators Device owner

38 Virtual Power Plant Flipbook 2.0

Residential thermostats Residential batteries National Grid, Eversource, Rhode Island Energy, Cape Light Compact, Unitil EnergyHub 24+ OEMs and aggregator partners Customer

C&I DR


Case studies CONNECTEDSOLUTIONS

Metrics at a glance Customer experience Customer segment Customer enrollment Customer payment channel Compensation structure Compensation levelsxix Customer participation requirements

Residential thermostats Residential Individual OEMs Utility of third-party aggregators

Residential batteries Individual OEMs or third-party service providers

Direct to customer, performance-based seasonal incentives determined by aggregator $50–$75 sign-up bonus + $20 per season $225–$275/kW committed capacity (~$1,500/year)

C&I DR C&I Third-party curtailment providers Third-party curtailment providers

Daily dispatch: $200/kW per summer • Targeted dispatch: $35/kW per summerxx

No fixed participation term

No multi-year participation requirement. The five-year incentive lock guarantees the same per-kW incentive rate for a battery’s first five years in the program but does not require the customer to remain enrolled for all five years.80

Residential thermostats Autonomously VPP-initiated with customer override Device-level data

Residential batteries

• Frequency: seasonal, ~15 summer events • Duration: three hours • Scheduling: dynamic responses to day-of signals

• Frequency: seasonal, 30–60 summer events • Duration: two to three hours • Scheduling: dynamic responses to day-ahead signals

•

Operations DER control Metering, telemetry, and verification notes Dispatch timingxxi

C&I DR Interval AMI data

xix

Compensation levels sit within the ranges listed and vary by program across states. These numbers represent are updated as of April 2026.

xx

Daily dispatch numbers for the C&I demand response program reflects National Grid’s program in Massachusetts.

xxi

Dispatch timing numbers reflect National Grid’s program in Massachusetts.

•Frequency: seasonal, summer • Daily: 30–60 events per summer • Targeted: two to eight events per summer • Duration: • Daily: two to three hours • Targeted: three hours • Scheduling: dynamic responses to day-ahead signals

Virtual Power Plant Flipbook 2.0

39


Case studies DOMINION ENERGY VPP PILOT PROGRAM

Dominion Energy VPP Pilot Program Legislation-enabled large-scale pilot Context and background Dominion Energy’s VPP pilot program is a utility-managed, Bring Your Own Device (BYOD) aggregator-access program designed to coordinate and expand on the utility’s existing DSM portfolio by integrating both existing and newly proposed DR programs under a single DERMS framework, creating one centralized platform for managing and dispatching participating DERs.81 Approved by the Virginia State Corporation Commission on August 3, 2026, the pilot program will increase Dominion Energy’s existing 54 MW of DR capacity and support a pathway to approximately 450 MW of VPP capacity by 2030.82 Customers may enroll directly through established DSM programs such as Residential Smart Thermostat Rewards, Residential EV Peak Shaving, Residential Peak Time Rebate, and Non-Residential Curtailment.83 New programs intended to broaden participation include a Residential Battery Storage, Residential Managed Charging, Income- and Age-Qualifying (IAQ) Battery Storage Pilot, and a Non-Residential HVAC program targeting small and medium-sized businesses. In addition to these DSM programs, Dominion Energy has indicated that it will propose a Grid Transformation Plan in 2027 that develops two additional grid flexibility resources.84 The plan is expected to include a battery pilot focused on providing non-wires alternative solutions, as well as an expansion of the utility’s electric school bus program by December 2027. The school bus program is intended to 40 Virtual Power Plant Flipbook 2.0

Impact to date • Scale: Dominion Energy’s VPP pathway will build on 54 MW of existing DR capacity and expand to approximately 450 MW by 2030.

enable participating fleets to provide flexible charging and potentially vehicle-to-grid capabilities. As of March 2024, Dominion Energy had 135 electric buses enrolled across 25 school districts in Virginia.85 A central new component of the program is the Bring Your Own Device (BYOD) Aggregator Access program, which enables participation from a broad range of eligible thirdparty aggregators. It offers pay-for-performance incentives to eligible aggregators to compensate them for providing flexible DER capacity and successfully delivering load reductions during grid events.86 Customers can work with any eligible OEM to purchase a smart thermostat, home battery storage, or an EV charger, and enroll in the VPP.

Tentative VPP Capacity Growth Projections, Dominion Energy89 Potential pathway to 450 MW VPP capacity Approved DSM programs (DSM-XIII and prior)

Proposed DSM programs (DSM-XIV)

GT Plan programs

2024 savings

2030 approved

R Smart thermostat

53 MW

69 MW

R + IAQ battery

17 MW

Battery pilot (NWA)

10 MW

R EV programs

<1 MW

<1 MW

Managed charging

1 MW

Electric school bus

11 MW

R PTR

N/A

200 MW

NR SMB HVAC

8 MW

NR Curtailment

N/A

61 MW

BYOD Agg Access

88 MW

54 MW

331 MW

2030 proposed

2030 proposed

114 MW

21 MW 466 MW


Case studies DOMINION ENERGY VPP PILOT PROGRAM

Dominion Energy was directed to develop the pilot through Virginia’s Community Energy Act, which was signed into law in May 2025.87 Amid growing concerns of emerging load growth in Virginia, the pilot proposes to demonstrate how VPPs can support a flexible and reliable grid while lowering costs for all customers. Once approved by the commission, the pilot is expected to launch in the first quarter of 2027 and run through mid-2028. During the pilot, Dominion Energy will evaluate the program with the goal of informing a permanent VPP program that could launch in 2030 or later.88

“[This] legislation provides Virginia with a new and innovative tool to address distribution system challenges and capacity constraints, especially in an era of significant projected load growth.”

— Angela Navarro, former State Corporation Commissioner and current President of the clean energy advocacy firm ALN Policy and Law93

For more information: • VPP Bill HB2346 and VPP Complete Filing • Department of Energy, Pathways to Commercial Liftoff: Virtual Power Plants 2025 Update • RMI, Virtual Power Plant Flipbook, 2024 • PV Magazine, “Virginia Mandates Dominion Energy Create Virtual Power Plant Pilot,” 2025 • Virginia Mercury, “In Puerto Rico, Customers Are Helping to Keep the Lights On. Could a Virginia Program Do the Same?”, 2025

Key takeaways

The BYOD Aggregator Access program expands customer choice and market competition.

Streamlined program portfolio supports scale.

Targeted equity incentives expand participation.

The BYOD Aggregator Access program offers a competitive third-party pathway alongside Dominion’s utility-led programs. This model gives customers more ways to participate in the VPP, while allowing aggregators and technology providers to deliver verified grid services through customer-owned devices on a pay-forperformance basis.

Dominion’s VPP approach brings existing and newly proposed demand-side DR and DER programs into a single, harmonized portfolio. By coordinating these programs under one DERMS framework, the pilot creates a more streamlined pathway for managing, dispatching, and scaling DERs over time.

As required by the Community Energy Act, the pilot includes equity-focused incentives to ensure historically economically disadvantaged communities benefit from the program. The Income- and AgeQualifying (IAQ) Battery Storage Pilot, for example, provides eligible customers with no-cost residential battery installations valued at approximately $20,000. Households with annual incomes not exceeding 80% of the local area median income as set forth by Virginia Housing or 60% of the state median income are eligible to participate in the incentive. It is also available to customers who are 60 years or older with a household income of 120% of the state median income.90

Virtual Power Plant Flipbook 2.0

41


Case studies DOMINION ENERGY VPP PILOT PROGRAM

Key takeaways continued from previous page

Performance-based incentives align compensation with delivered grid services.

Existing DR programs can provide a faster starting point, but full VPP operationalization still takes time.

The pilot introduces a pay-for-performance structure that compensates both aggregators and participating customers based on the verified grid services delivered during DR events. This outcomebased approach encourages aggregators to recruit and manage portfolios of DERs while rewarding customers for allowing their devices or energy use to support grid operation.91

Dominion’s pilot is designed to build on existing DR programs while adding new pathways for DER participation. This approach can help accelerate early VPP development by leveraging existing customer programs and regulatory frameworks, but the filing still anticipates a multiyear pathway from approval to full implementation. The pilot is expected to launch in Q1 2027, run for an 18-month evaluation period, and inform a permanent VPP program in 2030 or later.92

42 Virtual Power Plant Flipbook 2.0


Case studies DOMINION ENERGY VPP PILOT PROGRAM

Metrics at a glance While the case study includes a broader set of programs and associated metrics, these metrics tables focus on two new components proposed in the pilot, the BYOD Aggregator Access program and the Residential IAQ Battery Storage Pilot, for brevity. These two programs were selected because they represent especially distinctive elements of the proposal and help illustrate two important dimensions of Dominion’s approach, enabling broader aggregator participation and testing targeted residential battery storage solutions.

Overview VPP type Grid services provided Resource type Customers enrolled MW enrolled

BYOD Aggregator Access Program Utility VPP Peak demand reduction, voltage support, reliability and emergency response Smart thermostats, residential batteries, EV chargers/managed EV charging, electric water heaters Not applicable 450 MW across all programs by 2030 (MW by program) Proposed program MW goals by 2030: • BYOD Aggregator Access: 88 MW • Residential IAQ Battery Storage: 17 MW • Residential Managed Charging: 1 MW • Non-Residential Small and Medium Business HVAC: 8 MW

Residential IAQ Battery Storage Pilot Peak demand reduction Residential batteries

Grid Transformation Plan program goals: • Non-wires alternative battery pilot: 10 MW • Electric school bus: 11 MW

Approved program MW goals by 2030: • Residential Smart Thermostat: 16 MW • Residential Managed Charging: 1 MW • Residential Peak Time Rebate: 200 MW • Non-Residential Curtailment: 61 MW

Policy environment State Utility type Wholesale market Enabling policy or plan

Virginia IOU PJM VPP Bill HB2346 and VPP Complete Filing

Virtual Power Plant Flipbook 2.0

43


Case studies DOMINION ENERGY VPP PILOT PROGRAM

Metrics at a glance VPP roles and responsibilities Resource offtaker Program operator Participating OEMs and aggregators Device owner

Dominion Energy Dominion Energy • BYOD Aggregator Access Program: Device agnostic • Residential IAQ Battery Storage Pilot: 13.5 kWh Tesla Powerwall 3 energy storage battery system Customer

Customer experience Customer segment Customer enrollment Customer payment channel Compensation structure Compensation levels Customer participation requirements

BYOD Aggregator Access Program Residential, commercial, and industrial Third-party aggregators Third-party aggregators Pay-for-performance to aggregator Incentive level varies by device, customer segment, and performance* Exit/enrollment rules to be finalized after program approval

Residential IAQ Battery Storage Pilot Residential Dominion Energy Dominion Energy Direct to customer No-cost battery installation at a value of $20,000 and average annual incentive payment of $183 Participation in all DR events required

*Detailed incentives for additional Dominion programs not highlighted here can be found in Appendix C of the Virtual Power Plant Customer Participation Tariff, page 51 of the filing of the VPP.

Operations DER control Metering, telemetry, and verification notes Dispatch timing

44 Virtual Power Plant Flipbook 2.0

Autonomously VPP-controlled with customer override Specific data communication rules to be finalized after program approval Not specified


Case studies LUMA ENERGY CBES

LUMA Energy CBES Battery storage for customer resilience and grid support Context and background Impact to date • Scale: As of July 2026, CBES has reached 110,000+ enrollments and 587 MW of total enrolled battery capacity.101, xxvi • Dispatch: LUMA called 60 events from July 1, 2025, to June 30, 2026. During four events in June and July 2026, the CBES program contributed an average of ~86 MW of capacity per event.102, xxvii • Resilience support: On average, customers contributed 27% of their battery capacity to the CBES program in FY2026, leaving approximately 73% for customer battery reserves.xxviii • Customer benefits: Based on FY2026 year-to-date data, CBES has provided an estimated $9 million in payments to customers enrolled in the program.103

Launched in 2023, the CBES program is an emergency DR program in Puerto Rico that coordinates 100,000+ customer-sited BESSs to discharge during grid events when electricity demand exceeds available generation capacity and the system is at risk of load shedding or rolling outages.94, xxii The program enables customer-defined battery backup reserves so participating households retain power during outages.xxiii LUMA Energy, the private transmission and distribution operator in Puerto Rico, partners with aggregators such as Sunrun and Tesla to enroll customers, manage communications, and coordinate dispatch. LUMA system operations determine when grid events are needed and signal aggregators to dispatch their fleets. All aggregators are compensated $1.25 per kWh of energy discharged, with a portion of this value passed on to participating customers. 95, xxiv LUMA has documented multiple instances in which CBES dispatches helped avoid manual load shedding or reduce its severity, demonstrating how aggregated customer-owned batteries can provide a flexible capacity resource that supports system reliability during periods of generation shortfall.96 LUMA’s monthly status reports from

2025 indicate that CBES reliability served as a final buffer before critical failure. On 18 specific days during July and August, LUMA’s reserve logs showed that without the ~40–48 MW injection from CBES, the system’s operating reserves would have dropped below the 200-MW critical floor.97 Puerto Rico operates an isolated electric grid with no interconnections to neighboring systems, making reliability heavily dependent on local generation resources and imported fuels. These structural vulnerabilities were exposed and intensified by Hurricane Maria in 2017, which caused widespread destruction across the island’s power system. Subsequent earthquakes in 2020 and Hurricane Fiona in 2022 further aggravated the grid, causing additional generation failures and forced outages.

xxii

Following a strong pilot performance, PREB approved the expansion of CBES into a long-term program through 2028. The program scaled rapidly with approximately 11,000 customers in May 2025 to more than 100,000 participants by July 2026, driven largely by the introduction of automatic customer enrollment.

xxiv

xxiii On average, participating customers retained 73% of their battery state of charge as backup reserve during CBES dispatch events in LUMA’s FY2026 (July 2025–June 2026).

xxv

At the same time, communities across Puerto Rico have increasingly adopted solar-plus-storage systems to improve energy resilience at their homes and businesses. xxv This rapid growth in customer-sited storage created a large, distributed asset base that could be leveraged through a VPP to support system reliability. In 2019, the Puerto Rico legislature passed the Energy Public Policy Act (Act 17), establishing a policy framework to support Puerto Rico’s transition to renewable energy.98 Building on this foundation, PREB approved the regulatory framework necessary to enable VPPs on the island, including tariffs and customer protection requirements that allow customer-sited batteries to participate in grid service programs like CBES.99 Looking ahead, LUMA plans to continue expanding CBES through streamlined enrollment approaches, and to develop additional distributed battery programs that enable dispatch during nonemergency conditions to further improve reliability and reduce system costs.100

Customer compensation is determined by each aggregator’s contract. Publicly available information from several participating aggregators indicates that customers are typically compensated $1/kWh of energy discharged during grid events. Puerto Rico’s installed BESS energy capacity reached 2.86 gigawatt-hours by December 2025, an increase of more than 600% since 2021.

Virtual Power Plant Flipbook 2.0

45


Case studies LUMA ENERGY CBES

Key takeaways

Flexible financing and compensation broadens participation.

Investment in customer education and local enrollment support builds trust.

Auto enrollment can help grow participation before peak seasons.

Design programs for iteration and regulatory evolution.

Flexible financing and compensation models can reduce barriers to customer participation. For example, Sunrun’s customer compensation structure allows CBES incentive payments to be provided as a prepaid reward card or Sunrun bill credit, giving customers flexibility in how they receive program incentives while helping reduce the cost of battery ownership.104

Successful VPP enrollment requires more than financial incentives. For example, Sunrun paired bilingual outreach and step-by-step enrollment videos with trusted local sales partners and dedicated customer support, helping customers understand the program and successfully enroll in CBES.105, xxx

Eligible customers may either enroll manually with an approved aggregator or, where authorized through their contract with an aggregator, be automatically enrolled in CBES while retaining the ability to opt out of dispatch events.xxxi Opt-out auto enrollment, when enabled by regulators and supported by existing customer contracts, can significantly accelerate program growth and expand dispatchable capacity with minimal administrative burden.

Ahead of the 2026 summer season, PREB approved CBES aggregators’ proposed increase in the default auto-enrolled dispatchable battery capacity from 20% to 30%, doubling dispatchable capacity in the program.106 VPPs should be treated as adaptive infrastructure: pilot, evaluate, and refine program rules (e.g., enrollment pathways, compensation, capacity increases, dispatch structure) in coordination with regulators to improve reliability.

Total enrolled battery capacity does not reflect customer backup reserve settings or average participation rates. LUMA estimates that approximately 100 MW of battery capacity is available for dispatch during a typical grid event.

xxx

This number is an estimate based on aggregator reported performance. Official metrics are set to be released in LUMA’s 2026 transition period plan (TPP).

xxxi

xxvi

xxviii

Customer batteries that enroll in the CBES program via auto enrollment are automatically set to dispatch 20% of their battery capacity during events unless modified by the customer. On June 12, 2026, the default enrolled capacity was increased from 20% to 30% for all new and current auto-enrolled customers. This change will be reflected in future LUMA quarterly reports and is expected to increase available capacity by 50%.

xxvii

46 Virtual Power Plant Flipbook 2.0

After identifying the required ID locality field for utility account verification as a common customer enrollment barrier, Sunrun partnered with Tesla to prepopulate customer information during enrollment, reducing data entry errors and application rejections over time. Eligible customers are residential and commercial customers that have a battery storage system connected to a photovoltaic system and are enrolled in LUMA’s Net Energy Metering Program. Sunrun noted that less than 7% of its auto-enrolled customers opted out of participating in CBES in 2025.


Case studies LUMA ENERGY CBES

Key takeaways from previous page

Partner with OEMs and aggregators to enable scale. Third-party providers reduce utility burden, facilitate customer adoption and trust through education and enrollment, build local installer networks, and transform distributed batteries into a coordinated grid resource. Their support is particularly valuable for utilities with small VPP teams, providing the operational capacity and expertise needed to recruit participants, manage programs, and coordinate distributed resources at scale.

Screenshots of Tesla’s Puerto Rico VPP Dashboard showing Powerwall battery activity across the island. Live dashboard can be accessed here.

“The challenge with VPPs isn’t proving the tech, it’s proving you can scale it cost-effectively. In tandem with our aggregator partners, my team scaled the program from a few thousand to around 110K customers and crossing the 100 MW available capacity while consistently lowering our per customer administrative cost. This is how you build a scalable, lean, and economically viable foundation for the future grid.” — David Cruz, CBES Director, LUMA Energy107

Virtual Power Plant Flipbook 2.0

47


Case studies LUMA ENERGY CBES

Metrics at a glance Overview VPP type Grid services provided Resource type Customers enrolled MW enrolled

Utility VPP Customer resilience, peak demand reduction, reliability and emergency response Batteries (BESS) 110,000 in 2026 587 MW nameplate capacity in 2026

Policy environment State Utility type Wholesale market Enabling policy or plan

Puerto Rico IOU N/A Energy Public Policy Act (Act 17-2019), LUMA Transition Period Program Plan for Energy Efficiency and Demand Response (2022), Battery Emergency DR Program — Cost Structure (2023)

VPP roles and responsibilities Resource offtaker Program operator Participating OEMs and aggregators Device owner

48 Virtual Power Plant Flipbook 2.0

Utility Third-party aggregators Sunrun, Sonnen Inc., Virtual Peaker, Tesla, Flip Energy, Fortress Energy, SunStrong Customer


Case studies LUMA ENERGY CBES

Metrics at a glance Customer experience Customer segment Customer enrollment Customer payment channel Compensation structure Compensation levels

Customer participation requirements

Residential, commercialxxxii Third-party aggregators and OEMs Third-party aggregators Compensation to aggregators; pay-for-performance • Aggregator payment: ~$1.25 per kWh of energy discharged during grid events108 • Customer payment (typical): up to $1.00 per kWh (varies by aggregator and contract structure)109 • Penalties: No direct customer penalties; participation is voluntary with opt-out options. Aggregator performance expectations exist but formal penalty structures are not publicly detailed. • Customers must have a grid-connected solar plus battery storage system that meets program technical requirements and is compatible with an approved aggregator platform.110 • Customers must enroll through a participating aggregator (e.g., Sunrun, Tesla), typically via an existing service agreement or contract. • Systems must be enrolled in LUMA’s Net Energy Metering Program. • Customers can typically exit the program without penalty (subject to aggregator-specific contract terms).

Operations DER control Metering, telemetry, and verification notes Dispatch timing

xxxiii

Autonomously VPP-initiated with customer override (voluntary participation) Device-level telemetry, aggregator-reported performance data • Frequency: event-based, primarily during emergency conditions or periods of generation shortfall; events may occur multiple times per month depending on system needs • Duration: typically about four hours per event (consistent across most dispatches) • Scheduling: dynamically scheduled (day of), based on real-time system conditions and forecasts; events are called by LUMA system operations and communicated to aggregators in advance of dispatch

In addition to residential customers, eligible small businesses may participate in CBES. As of FY2026 Q3, 998 small business customers were enrolled, representing approximately 9 MW of battery capacity.

Virtual Power Plant Flipbook 2.0

49


Case studies PUGET SOUND ENERGY (PSE)

Puget Sound Energy (PSE) A portfolio approach for ambitious peak demand reduction Context and background PSE’s current DR portfolio • ADR • Flex Smart (includes residential and small and medium business) • Flex EV • Flex Water Heaters • Ecobee Grid Resiliency (emergency)113 • BDR • Flex Rewards • Peak Time Savings • Flex Business (small and medium businesses) • Residential Battery Energy Storage (Flex Batteries) • Flex C&I • Peak • Emergency

PSE’s DR portfolio includes a suite of programs spanning residential and commercial customers under its automated demand response (ADR), behavioral demand response (BDR), residential battery energy storage (Flex Batteries), and business DR (Flex C&I) offerings.xxxiii PSE’s DR portfolio has expanded since 2021 to more than 741,000 total customer enrollments (136 MW of available capacity) across VPP programs as of 2026.111, xxxiv These programs enable participation across a wide range of flexible end uses, including smart thermostats, EV charging, water heating, and residential battery energy storage. PSE partners with several VPP vendors: Uplight, Enel, ecobee, ChargeScape, and Opower, to support the operation of programs across the portfolio.xxxv PSE’s VPP portfolio is built on an approach that combines BDR and ADR to balance scale and reliability. Behavioral programs (e.g., Peak Time Savings,xxxvi Flex Rewards, Flex Business) rely on customer actions in response to event notifications (email/text), prioritizing broad participation through low-friction enrollment. In contrast, automated programs (e.g., Flex Smart thermostats, EV charging, and battery storage) use direct device control or preset schedules to deliver more consistent and dispatchable load reductions. These approaches work by using behavioral programs as a entry point for customers and

The passage of Washington’s CETA in 2019 provided a key policy driver for PSE’s DR programs. By requiring utilities to plan for and deploy clean energy resources (including DR) through recurring clean energy implementation plans (CEIPs), CETA elevated demand flexibility from a pilot activity to a core component of utility planning. In March 2024, Washington passed HB 1589, requiring 80% nonemitting resources by 2030 and 100% by 2045. PSE

Equity considerations play a key role in PSE’s DR program design and deployment. In compliance with CETA, PSE has committed to ensuring that at least 30% of the benefits from DR and other clean energy programs are delivered to “named communities” and customers with the greatest energy burden.xxxix This commitment is formalized in PSE’s DR Equity Action Plan and informs outreach, incentive design, and program accessibility.115 Looking ahead, PSE plans to deploy approximately 3,660 MW of demand-side resources and DERs to its system by 2045, while also piloting new DR programs (including a vehicle-to-home pilot ) and sourcing new vendors to supply unaddressed capacity and technologies.

Enrollment figures represent total program enrollments rather than unique customers. Individual customers may be enrolled in more than one DR program. PSE serves a total of 1.2 million electric customers.

Compensation varies across programs. Peak Time Savings provides utility bill credits during events; Flex Rewards and Flex Smart programs provide enrollment, retention, and performance payments via gift card; Flex Business provides incentive and performance payments via check or direct deposit; Flex EV (via gift card) and Flex Batteries (via check) provide enrollment and performance incentives.

Uplight administers PSE’s flex programs: BDR (Flex Rewards and Flex Business), ADR, and Batteries. Enel administers PSE’s Flex C&I programs. Ecobee and Uplight administer the Ecobee Grid Resiliency program. ChargeScape supports Flex EV. Opower administers the Peak Time Savings program.

Or the maximum amount deemed technically and commercially feasible by the Washington State Utilities and Transportation Commission. This is required by the 2024 Decarbonization Act for Large Combination Utilities.

xxxiii

While PSE refers to offerings as utility-dispatchable DR programs, they are consistent with VP3’s definition of VPPs.

automated programs to deepen performance and reliability over time.xxxvii

is required to plan to achieve a load flexibility portfolio accounting for 10% of peak load beginning in 2030.xxxviii PSE anticipates needing approximately 500 MW of DR capacity available year-round to meet the 10% peak demand goal.114

xxxiv

xxxv

xxxvi

Starting in summer 2026, enrolled customers will receive a bill credit for kWh saved during events that will include behavioral EV participation.

50 Virtual Power Plant Flipbook 2.0

xxxvii

xxxviii

“Named communities” is PSE’s umbrella term for impacted communities and vulnerable populations identified under CETA, representing customers facing disproportionate environmental, health, and socioeconomic burdens. PSE’s DR programs have surpassed the minimum designation target of 30% for named communities.

xxxix


Case studies PUGET SOUND ENERGY (PSE)

Impact to date • Customers participating: PSE’s DR portfolio has grown to more than 741,000 total customers across programs since 2021.118, xl • Available capacity: Across the portfolio of DR programs, PSE has approximately 136 MW of available capacity as of July 2026.119 • Events called: The 2025–2026 season (includes both summer 2025 and winter 2025–2026) called 34 events across the DR portfolio. The events had a 4.2hour duration average, 51.9-MW event average, and 93.8-MW event peak.120, xli • Largest dispatch: The largest of the 34 events occurred on February 19, 2026, lasted five hours, had an event average of 57 MW, and peaked at 93.8 MW.121

xl

Key takeaways

Behavioral and automated approaches can be leveraged to tap into a broad portfolio of customers and devices.

Multichannel marketing drives participation at scale.

Peer learning accelerates VPP deployment timelines.

To ensure load reliability, PSE’s DR programs bring together resources from residential and C&I customers and draw on a wide range of asset types to provide the greatest scale and enrollments. This mix includes opt-out program designs that help scale programs quickly.

PSE’s investment in multichannel marketing, including digital campaigns, direct outreach, and in-person engagement, has resulted in customer awareness levels exceeding 60% for its Flex programs.xli This broad visibility supports high enrollment, particularly for opt-out and behavioral programs that rely on customer understanding and trust.

PSE rapidly deployed its VPP portfolio by leveraging lessons learned from other utilities. Engagement with regional and national peers informed program design, technology selection, and implementation strategy.

Enrollment figures represent total program enrollments rather than unique customers. Individual customers may be enrolled in more than one DR program. PSE serves a total of 1.2 million electric customers.

PSE runs twice-weekly automated battery response events to test load response use cases. These happen automatically and are not counted in the impact numbers above. If PSE were to count these battery-only events, the number of events through the summer 2025 and winter 2025–2026 seasons would be 74 with an average duration of 2.9 hours and an average event MW of 25.7. xli

xlii

Reported in quarterly PSE online surveys of randomly selected customers.

Virtual Power Plant Flipbook 2.0

51


Case studies PUGET SOUND ENERGY (PSE)

Key takeaways continued from previous page

Integrating VPPs into utility operations unlocks system value.

Policy-driven ambition enables system-scale VPPs.

Equity focus supports broad participation and shared benefits.

PSE is integrating its VPP portfolio into utility operations by incorporating DR into forecasting, dispatch processes, and resource planning. Through its centralized VPP platform, PSE can aggregate and dispatch distributed resources in a manner similar to traditional generation, improving visibility and operational confidence. This integration has supported transitioning DR from a programmatic offering to a dispatchable, system-level resource that delivers measurable reliability and cost benefits.

While pieces of Washington legislation such as CETA and HB 1589 do not explicitly mandate DR targets, they establish clean energy and reliability requirements that require growth in flexible, nonemitting resources. In response to HB 1589, PSE is expanding its DR portfolio to meet the 10% of peak load planning requirement through demand-side flexibility, positioning its DR portfolio to scale from ~100 MW today to several hundred MW over the next decade.

PSE’s DR portfolio integrates equity as a core design principle, with a commitment to deliver at least 30% of program benefits to named communities and customers with the greatest energy burden. This requirement has driven more intentional outreach, accessible program design, and targeted incentives, expanding participation beyond traditional early adopters. Embedding equity into VPP programs can unlock additional flexible load while ensuring benefits are more broadly shared.

52 Virtual Power Plant Flipbook 2.0

“How we’re thinking about it at Puget is ‘energy orchestration’ … where you’ve got decentralized systems that if you can create the right engagement mechanism with customers, you can literally transform when and how customers use energy.” — Aaron August, PSE Senior Vice President, Chief Customer and Transformation Officer122


Case studies PUGET SOUND ENERGY (PSE)

Metrics at a glance Overviewxliii VPP type Grid services provided Resource type

Flex Rewards Utility VPP Peak demand reductionxliv DR: behavioral load shaping

Flex Smart

Flex EV

Flex Batteries

Flex C&I

Smart thermostats and HVAC

Residential battery energy storage

Customers enrolled MW enrolled

53,067 33.8

40,942 33.4

EVs/electric vehicle supply equipment (EVSE) 11,081 14.6

987 6.8

DR interruptible load and automated HVAC Peak: 149 Emergency: 160 Peak: 11.7 Emergency: 21.1

Flex EV

Flex Batteries

Flex C&I

Policy environment State Utility type Wholesale market Enabling policy or plan

Flex Rewards Flex Smart Washington IOU California Independent System Operator (CAISO) Western Energy Imbalance Market (WEIM) CETA (2019), CEIPs, UE-210795, HB 1589

Virtual Power Plant Flipbook 2.0

53


Case studies PUGET SOUND ENERGY (PSE)

Metrics at a glance VPP roles and responsibilities Flex Rewards Uplight (aggregator)

Flex EV Uplight and ChargeScape (aggregators), PSE list of compatible brands and/or compatible chargers

Flex Batteries Uplight (aggregator), PSE list of compatible devices

Flex C&I Enel

Uplight and ChargeScape Uplight and ChargeScape (aggregators), PSE list of compatible vehicle brands and/or compatible chargers

Uplight Uplight (aggregator), PSE list of compatible devices

Enel Enel

Flex Rewards Flex Smart Flex EV Customer-controlled Autonomously VPP-initiated with customer override Voluntary (customers choose whether/how to respond) Combination of x of y based on meter x of y based on meter interval data interval data and telemetry

Flex Batteries

• Frequency: winter (November 1–March 31) and summer (May 1–September 30), up to daily; not dispatched on holidays; 15 events per season • Duration: two to four hours, between 7 a.m. and 10 p.m. • Scheduling: dynamically scheduled day-ahead

• Frequency: winter (November 1–March 31) and summer (May 1– September 30) • PSE may call on battery up to 50 times per season, or 100 times per year • Dispatched within the hours of 6 a.m.–10 p.m., no holidays

Flex C&I Customer-controlled Voluntary (customers choose whether/how to respond) x of y based on meter interval data • Frequency: winter (November 1–April 30) and summer (May 1–October 31), up to daily; not dispatched on holidays; eight events per season • Duration: one to four hours, between 7 a.m. and 10 p.m. • Scheduling: dynamically scheduled day-ahead

Resource offtaker Program operator Participating OEMs and aggregators

PSE Uplight Uplight (aggregator)

Device owner

Customer

Flex Smart Uplight (aggregator), PSE list of compatible devices

Uplight (aggregator), PSE list of compatible devices

Operations DER control Metering, telemetry and verification notes Dispatch timingxlv

xliii

Voluntary enrollment and telemetry

PSE seasonal load patterns: winter peak period: December–February, typically 7–10 a.m. and/or 5–10 p.m.; summer peak period: July–August, typically 3–9 p.m. Peak day characteristics: cold winter days (<30°F) or hot summer days (>85°F). Load duration: winter peak sustained four to six hours, summer peak three to four hours.

54 Virtual Power Plant Flipbook 2.0


Case studies PUGET SOUND ENERGY (PSE)

Metrics at a glance Customer Experience Flex Rewards All PSE electric customers with AMI

Customer segment

Residential

Customer enrollment

Uplight and utility

Flex Smart All PSE electric customers with AMI and own qualifying Wi-Fi-enabled smart thermostat Residential, commercial (small and medium business) Uplight and qualified OEMs

Customer payment channel Compensation structure

Uplight

Uplight

Pay-for-performance

Event-based, seasonal bill credits

Compensation levels

Enrollment incentive $25, + $1 per kWh reduced, + $15 anniversary incentive • Structure: enrollment incentive, anniversary incentive, and pay-forperformance ($/kWh reduced) • Penalties: none

Up to $50 per device enrollment + up to $40 per device for anniversary • Structure: enrollment incentive + anniversary incentive • Penalties: none; customers can opt out of events

Customer participation requirements

All PSE electric customers with AMI

All PSE electric customers with AMI and own qualifying Wi-Fi-enabled smart thermostat

Flex EV All PSE electric customers with AMI and own qualifying EV or level 2 charger

Flex Batteries All PSE electric customers with AMI and own qualifying battery

Residential

Residential

Flex C&I C&I located within PSE’s electric service area, and current PSE electric customer under select schedules C&I

Uplight/ChargeScape and qualified EVs and chargers Uplight/ChargeScape

Uplight and qualified battery OEMs

Enel

Uplight

Enel

Enrollment incentive (varies) and bill credits for managed charging $50 per vehicle enrolled + $0.50 per kWh reduced • Structure: enrollment incentive + incentive for reduction • Penalties: none; opt-out allowed

Up-front incentive and event-based performance payments • Enrollment incentive: up to $1,000 per battery (calculated at $75/kWh of storage) • Participation incentive: up to $500 per battery (calculated at $0.50 per kWh of energy provided during events) • Structure: up-front rebate + performance or capacity-style payments • Penalties: none; opt-out not available unless OEM allows All PSE electric customers with AMI and own qualifying battery

Event-based, pay-for-performance

All PSE electric customers with AMI and own qualifying EV or level 2 charger

~$25–$130/kW-year (dependent on program enrollment) • Event payments: $/kW reduced during events, compared to committed enrollment kW • Structure: ($/kW enrolled) performance/event payments • Penalties: yes, reduced payments on nonperformance during events

C&I located within PSE’s electric service area, and current PSE electric customer under select schedules

Virtual Power Plant Flipbook 2.0

55


Case studies ROCKY MOUNTAIN POWER (RMP)

Rocky Mountain Power (RMP) Customer-owned, utility-managed battery storage Context and background Impact to date • Total enrollment: As of May 2025, the program has enrolled more than 7,000 batteries across Idaho, Oregon, Utah, and Washington.130, 131 • Scale: 40 MW of dispatchable capacity across participating states.132 • Dispatch: In 2025, RMP dispatched participating batteries 350 times, totaling 29 hours across the year.133 Average monthly available capacity also increased from 23.6 MW in January to 35.2 MW in December.134 • Cost-effectiveness: The Wattsmart Battery program passed the UCT in both Idaho and Utah in 2025. Idaho’s analysis used a four-year net present value framework,135 while Utah just reported that the program passed the UCT.136, 137 • Program retention: RMP reported to the Utah Public Service Commission that no participants have unenrolled from the Wattsmart Battery program since its approval in December 2020. It notes that after the four-year commitment period, customers continue to receive annual incentives, with the expectation that participation will extend throughout the useful life of the battery.138

56 Virtual Power Plant Flipbook 2.0

RMP’s Wattsmart Battery program is a utility-managed, customer-sited battery VPP where enrolled batteries are actively managed by the utility to provide multiple grid services, including bulk demand reduction, frequency response, and customer resilience and backup. As of May 2026, the program has enrolled about 7,000 batteries across Idaho, Oregon, Utah, and Washington, representing an estimated total of 40 MW of dispatchable capacity.123 When the program was in development, multiple battery OEMs worked in partnership with RMP to ensure battery chemistries and control systems would integrate directly into RMP’s grid management software to support multiple dispatches per day, providing a high degree of system visibility.124 As a result, RMP grid operators can initiate rapid, automated responses to grid signals, with some battery systems responding in as little as three seconds and all systems required to respond within 50 seconds.125 Unlike many VPPs that operate only during peak periods or seasons, Wattsmart batteries are dispatchable year-round, 24 hours per day.126 Since launching the program in 2020, RMP has expanded it to include multiple new OEM providers, and residential customers are no longer required to pair a battery with onsite solar.127 RMP is also expanding participation beyond residential batteries to include larger C&I systems.128 Looking ahead, RMP plans to continue expanding the

Residential “Wattsmart Battery Control Events,” Rocky Mountain Power, 2025 Month January February March April May June July August September October November December

Number of events 4 13 36 48 41 34 16 25 61 38 17 17

Reason for event Frequency Frequency Frequency Frequency Frequency Frequency Frequency Frequency Frequency Frequency Frequency Frequency

Avg kW potential 23,583 24,516 25,342 26,530 27,294 28,757 29,788 30,452 32,212 33,262 34,643 35,156

Wattsmart Battery portfolio across participating states and into Wyoming, with capacity targets of roughly 600 MW by 2025 and 2,800 MW by 2038.129


Case studies ROCKY MOUNTAIN POWER (RMP)

Key takeaways

Utility integration and clear OEM requirements enable reliable dispatch.

Proven performance supports scale across states and regulatory jurisdictions.

Integration into long-term utility planning supports program growth.

Wattsmart Battery is designed as a utilityoperated VPP, with participating batteries required to meet technical standards for telemetry. The program uses a sonnen software layer directly integrated into RMP’s supervisory control and data acquisition (SCADA) system, allowing RMP’s grid operating team to dispatch enrolled batteries automatically in response to grid conditions.140 By working with OEMs to ensure systems can meet these operational requirements, RMP can keep the program open to multiple manufacturers while still treating residential batteries as a dependable grid resource.

The Wattsmart Battery program is a PacifiCorp initiative that has expanded across multiple states within the utility’s service territory, including areas served by RMP and Pacific Power. This growth demonstrates how a utility-operated VPP can scale across regulatory jurisdictions within a multistate utility system.

By including the Wattsmart Battery program in its integrated resource plans (IRPs), PacifiCorp creates the opportunity for customer-sited batteries to avoid more costly alternative investments while meeting reliability needs.

The Wattsmart Battery program is “among the most advanced [VPPs] in the US due to its degree of integration into the utility’s overall system operations and the wide array of use cases (grid services) of the battery aggregation.” — US Department of Energy, Pathways to Commercial Liftoff: Virtual Power Plants141

Virtual Power Plant Flipbook 2.0

57


Case studies ROCKY MOUNTAIN POWER (RMP)

Metrics at a glance Overview VPP type Grid services provided Resource type Customers enrolled MW enrolled

Utility VPP Bulk system capacity, frequency response, customer resilience and reliability Batteries 7,000 40142

Policy environment States Utility type Wholesale market Enabling policy or plan

Idaho, Oregon, Utah, and Washington IOU Western Interconnection RMP’s proposed tariff revisions to Electric Service Schedule No. 114, Load Management Program, which added the Wattsmart Battery program PacifiCorp 2025 IRP Update

VPP roles and responsibilities Resource offtaker Program operator Participating OEMs and aggregators Device owner

58 Virtual Power Plant Flipbook 2.0

RMP, Pacific Power RMP, Pacific Power Tesla, sonnen, Torus, SolarEdge, Fortress Power, FranklinWH Customer


Case studies ROCKY MOUNTAIN POWER (RMP)

Metrics at a glance Customer experience Customer segment Customer enrollment Customer payment channel Compensation structure Compensation levels

Customer participation requirements

Residential, commercial, industrial Individual OEMs and RMP RMP Up-front installment incentives and direct to customer in the form of annual bill credits • Up-front incentive: $400 per kW (capped at $2,000 per household) • Annual participation incentive: $15 per kW during initial four-year commitment • Post-commitment incentive: $50 per kW Participants must maintain commit to the program for four years; withdrawing early may require repayment of a prorated portion of the up-front incentive. Standalone residential batteries must also be enrolled in a time-of-use rate.143

Operations DER control Metering, telemetry, and verification notes Dispatch timing

Autonomously VPP-initiated with customer override Device-level data • Frequency: batteries may be dispatched daily, seasonally, or solely for emergencies • Duration: active dispatches are generally five minutes and generally impact state of charge by 2%–4%, allowing customers a sufficient reserve for backup power • Scheduling: dynamic, autonomously

Virtual Power Plant Flipbook 2.0

59


Case studies XCEL ENERGY AVPP (COLORADO)

Xcel Energy AVPP (Colorado) A technology-neutral, aggregator-led program delivering flexible grid capacity Context and background Impact to date • Current stage: The Xcel Energy AVPP program is active as of April 1, 2026, and in the early stages of implementation, with initial efforts focused on onboarding and qualifying aggregators. • Intended capacity: The Colorado PUC authorized the full 125 MW of AVPP capacity to be made available in 2026, with a maximum individual DER capacity allowance of 750 kW, and up to 2 MW of enrolled capacity per feeder and up to 5 MW per bank. • Projected benefits: If fully enrolled, the VPP is expected to avoid Xcel Energy system costs (generation, transmission, and distribution) equivalent to approximately $25.4 million per year, including approximately $3.7 million per year in avoided distribution costs.xlix

Xcel Energy’s AVPP is a voluntary program that enables third-party aggregators to enroll and manage customerowned DERs to enhance electric grid reliability. The program is technology-agnostic, allowing a wide range of DERs to participate, and provides compensation for services that support both the bulk power system and local distribution grid. The Colorado PUC authorized Xcel Energy to make the program’s full 125 MW of AVPP capacity available in 2026, accelerating availability from the original phased five-year rollout through 2031.144, xlvi Aggregators must enroll portfolios with a minimum aggregate capacity of 100 kW AC, while individual DERs within an aggregation may not exceed 750 kW in nameplate capacity.145 In addition, total enrolled capacity is subject to local distribution constraints, including limits of 2 MW per feeder and 5 MW per bank.146 These requirements allow aggregators to scale portfolios across multiple customers while maintaining system reliability and avoiding localized grid constraints. Aggregators are compensated based on the location and performance of their aggregated portfolios during dispatch events. The AVPP performance tariff is unbundled into three distinct layers: a generation

The AVPP program was originally approved with authorization for up to 125 MW of capacity to be phased in over five years (25 MW annually). xlvii

xlvii Capacity incentives are derived from the original AVPP program tariff, effective April 1, 2026. Presented numbers are associated with year-round aggregations enrolled in program year 1.

60 Virtual Power Plant Flipbook 2.0

capacity credit ($151.70/kW/year), transmission capacity credit ($21.67/kW/year), and distribution capacity credit ($64.74/kW/year).xlvii Aggregators may stack the capacity credits; however, only aggregator resources located within specific areas of the distribution grid (on eligible feeders and banks) will be eligible for the distribution capacity credit.xlvii DERs must be controllable 24/7 during the selected participation period.147 For each resource aggregation, aggregators may choose one of two participation options: • Year-round: events may occur in any month, at any time of day

The avoided distribution value represents the estimated cost savings from deferring distribution system capacity investments by one year through resource aggregations added by the AVPP program. The distribution capacity credit is valued based on Xcel Energy’s forecasted distribution capacity costs reflected in the most recent Xcel Energy Distribution System Plan.

xlviii

• Summer only: events may occur from June through September The AVPP program was developed in response to Colorado’s Senate Bill 24-218, which directs Colorado utilities to enable DER aggregation and VPP participation. The legislation was enacted amid rapid load growth along Colorado’s Front Range, increasing customer adoption of DERs, and growing concerns about the cost of expanding generation and grid infrastructure. The program reflects a policy-driven effort to manage peak demand and support affordability using flexible, customer-sited resources as an alternative to traditional system investments. The program also aligns with Xcel Energy’s focus on increasing customer participation in the energy system and supporting Xcel Energy’s goal of a carbon-free grid by 2050.

Estimated using the approved year 1 AVPP tariff capacity values (year-round enrollments) and the program’s total authorized 125 MW capacity. Distribution value assumes 46% of enrolled capacity qualifies for the distribution incentive (372 eligible feeders out of 809 total). Actual values will vary based on enrollment, performance, and resource location. xlix


Case studies XCEL ENERGY AVPP (COLORADO)

Key takeaways

State policy can accelerate VPP development and standardize program design.

Performance-based compensation tied to avoided system costs can align DER value with grid needs.

Colorado’s SB 24-218, passed in 2024, required Xcel Energy to file a VPP program with specific program elements, including pay-for-performance, third-party aggregation, and technology neutrality. This sequence illustrates how legislation can create a clear regulatory pathway for VPP deployment while establishing participation models designed to benefit customers and the grid.

The AVPP program compensates aggregators based on delivered capacity using avoided generation, transmission, and distribution costs as the basis for performance payments. While most compensation is based on systemwide values, additional distribution capacity incentives are only available for aggregations located on eligible feeders with identified constraints. This creates a partial locational signal, encouraging DER deployment in areas where flexibility can provide the greatest grid value and potentially defer targeted infrastructure investments.

Aggregator-led program design can enable new market-driven approaches to customer participation and DER compensation. By relying on third-party aggregators rather than utility-controlled programs, the AVPP allows aggregators to develop their own customer acquisition strategies, engagement models, and compensation structures. This approach can support innovation in how customers participate in grid services, shifting some program design and delivery responsibilities from the utility to the market.

“The AVPP program provides Public Service with an opportunity to explore how third-party aggregators can help address system needs and play a meaningful role in managing and supporting our grid.”

— Xcel Energy149

For more information about Xcel Energy’s Colorado AVPP, visit the program website.

Virtual Power Plant Flipbook 2.0

61


Case studies XCEL ENERGY AVPP (COLORADO)

Metrics at a glance Overview VPP type Grid services provided Resource type Customers enrolled MW enrolled

Utility VPP Peak demand reduction, local dispatch for distribution constraints Technology-agnostic* Unknown in 2026 125 MW expected by 2030

Policy environment State Utility type Wholesale market Enabling policy or plan

Colorado IOU Non-ISO; vertically integrated (Colorado – Colorado Public Utilities Commission jurisdiction) Colorado Senate Bill 24-218 (Modernize Energy Distribution Systems / Grid of the Future law)156

VPP roles and responsibilities Resource offtaker Program operator Participating OEMs and aggregators Device owner

Xcel Energy Third-party aggregators Any eligible aggregator/OEM via Xcel Energy Program Plan Customer**

* Refer to Xcel Energy’s AVPP website for full list of eligible technologies. ** The AVPP tariff does not specify that participating customers must own the DERs. Instead, ownership, compensation, and participation arrangements are determined through private contracts between aggregators and customers rather than by Xcel Energy.

62 Virtual Power Plant Flipbook 2.0


Case studies XCEL ENERGY AVPP (COLORADO)

Metrics at a glance Customer experience Customer segment Customer enrollment Customer payment channel Compensation structure Compensation levels Customer participation requirements

Residential and C&I (under 750 kW AC) Third-party aggregators Third-party aggregators Compensation to aggregators. Aggregators are paid for performance during VPP events based on the commission-approved avoided cost values. The distribution capacity incentive is available only on eligible feeders. Aggregators are responsible for compensating their enrolled customers. Compensation is based on avoided system costs in $/kW-year. Initial values are derived from avoided generation, transmission, and distribution capacity costs, with indicative total compensation on the order of ~$200+/kW-year (stacked value across components). Aggregators are subject to performance requirements, with payments tied to delivered capacity during dispatch events. Open to all Xcel Energy electric customers on an eligible rate with advanced metering in place and an eligible DER located at their premises. DER must be controlled by an approved aggregator and not exceed 750 kW (AC) nameplate capacity. DERs cannot be enrolled simultaneously in another Xcel Energy demand management program.

Operations DER control Metering, telemetry, and verification notes Dispatch timing

Xcel Energy dispatches events to aggregators that are responsible for controlling enrolled DERs to meet their capacity obligations. Aggregators determine how devices respond and may offer customers opt-out or override options based on their individual program designs. Aggregators are responsible for providing performance data needed to verify enrolled DERs using AMI interval data or revenue-grade inverter telemetry depending on the DER type. • Frequency: Events may occur year-round or during the summer season (June–September), depending on the selected participation option. Aggregations may be dispatched for up to 80 events per year (year-round) or up to 60 events per year (summer only), with at least one event per quarter. • Duration: Events last up to four hours and may occur on any day and at any time within the selected participation window. • Scheduling: Events are dynamically scheduled based on system needs. Aggregators typically receive day-ahead notification (target ~24 hours), though events may be called with as little as one hour’s notice. A limited number of short-notice events (up to five per year) may be excluded from performance calculations. Severe weather events may also be excluded from performance scoring if defined criteria are met.

Virtual Power Plant Flipbook 2.0

63


Case studies XCEL ENERGY CAPACITY*CONNECT (MINNESOTA)

Xcel Energy Capacity*Connect (Minnesota) A new model for scaling distributed storage Context and background Impact to date • PUC approval: In May 2026, the Minnesota PUC approved phase 2 deployment of up to 200 MW of 1–3 MW distributed BESS on 50–200 customer host sites.159, lv • Expected system benefits: Program phase 2 is expected to deliver approximately $440 million in quantified system benefits, including avoided capacity, transmission, and distribution costs.160 • Data center agreement: In February 2026, Google announced a $50 million investment in Capacity*Connect to support the energy needs of its Pine Island, Minnesota, data center. This investment signals growing interest from large-load customers in DERs as a flexible and scalable capacity solution.161

liii

Xcel Energy’s Capacity*Connect program deploys utility-owned, MW-scale distributed storage assets at customer sites across Minnesota. The program is focused on providing a flexible, near-term bulk system capacity solution that complements traditional resource investments and supports long-term grid modernization, with distribution-level benefits evaluated through phased deployment. The Capacity*Connect program is being implemented in phases to evaluate and scale the program across Minnesota. Xcel Energy has collaborated with Sparkfund, a deployment services company, to implement the program and to support program design across current phases (Phase 1 and 2). Sparkfund developed the distributed capacity procurement (DCP) model to enable the strategic siting and deployment of front-of-the-meter distributed energy resources at scale to provide dispatchable grid capacity. The model deploys DERs - primarily battery energy storage systems at non-residential customer host locations - as utility-owned, operated, and dispatchable distributed capacity infrastructure. Xcel Energy introduced the DCP model in an August 2024 letter filed in its Integrated Resource Plan proceeding and has since worked with Sparkfund to develop and implement the Capacity*Connect program through a phased approach.

Phase 1 of Capacity*Connect included a total of 3–5 MW of BESS sited on commercial customer properties.

The Capacity*Connect Cost-Benefit Analysis assigns an avoided distribution capacity value of $40/kW-year to 50% of Capacity*Connect assets over a 20-year period. This reflects the expectation that only a subset of installations will be sited on constrained feeders where system dispatch coincides with local peak demand. Therefore, battery liv

64 Virtual Power Plant Flipbook 2.0

Phase 2, the current phase, was approved by the Minnesota PUC in May 2026 and will deploy an initial 50–200 MW of front-of-the-meter BESS at commercial, industrial, nonprofit, and other eligible host sites by the end of 2028.152 Each 1–3 MW battery will be installed front-of-the-meter at customer sites located on strategically selected distribution feeders.153 Participating host customers will receive compensation in exchange for siting the systems on their property.154 Because the assets are utility-controlled and operated to provide system-level value, host customers do not receive direct energy services such as backup power. Phase 2 is designed to provide value for ratepayers by participating in Midcontinent Independent System Operator (MISO) energy and capacity markets.155 Phase 2 builds on the findings from phase 1, an R&D demonstration approved as a modification to Xcel Energy’s Energy Conservation and Optimization plan.156

Phase 1 evaluated the feasibility of scaling utility-owned, customer-sited BESS across several commercial customer sites over a two-year period.157, liii The demonstration is currently underway, with results scheduled to be reported by Xcel Energy on April 1, 2028. If phase 2 is successful, may expand deployment while evaluating additional system benefits beyond bulk capacity. Although distribution-sited batteries can provide localized benefits such as feeder peak reduction, net demand reduction, and infrastructure deferral, the realization of these benefits depends on how battery dispatch aligns with local grid conditions.liv Distributionlevel benefits will be evaluated by Xcel Energy as siting and operational experience grows over subsequent program phases. Capacity*Connect builds on Xcel Energy’s Upper Midwest IRP, approved by the Minnesota PUC in April 2025. The IRP outlines plans to add 600 MW of battery storage by 2030 and integrate more than 1,800 MW of DERs, energy efficiency, and DR programs across Minnesota.158 Capacity*Connect is positioned as one component of this broader strategy.

dispatch driven by aggregated and/or system peaks may not coincide with local feeder peak demand, limiting the potential for distribution capacity benefits. Approximate number of host sites based on Xcel Energy’s phase 2 proposal. Actual deployment will vary based on total MW installed and individual battery sizes (1–3 MW). lv


Case studies XCEL ENERGY CAPACITY*CONNECT (MINNESOTA)

Key takeaways

Conceptual Capacity*Connect roadmap

Utility-scale capacity can be achieved through distributed resources.

Portfolio approach and utility engagement allow for speed to capacity.

Bulk system capacity can be delivered while enabling future localized grid value.

Capacity*Connect’s proposed deployment of up to 200 MW of distributed battery storage in Phase 2 will test the potential for aggregated, distribution-sited resources to serve as a scalable source of capacity alongside traditional generation assets.

Utility-led planning, interconnection, and operation of the Capacity*Connect portfolio aims to streamline the path to capacity, enabling Xcel Energy to address Minnesota’s resource adequacy needs sooner.

Capacity*Connect’s initial primary revenue stream is bulk system services through participation in MISO energy and capacity markets. By siting distributed storage on strategically selected feeders, the program also creates the potential to capture additional transmission and distribution benefits over time as operational capabilities and dispatch strategies evolve.

Phased deployment is key to manage scale and inform expansion.

Distributed capacity should be integrated into formal resource planning processes.

Capacity*Connect incorporates a staged approach, beginning with a limited phase 1 pilot and defined reporting milestones before broader phase 2 expansion. Phased deployment of operational tools such as a grid DERMS, enables utilities to validate operational assumptions, refine costeffectiveness, and support regulatory transparency as distributed capacity programs scale.

Capacity*Connect is positioned within Xcel Energy’s IRP as part of a broader portfolio of storage and DER investments. Embedding distributed procurement strategies within IRP and distribution planning processes can provide regulatory clarity and align distributed assets with long-term system needs.

2025–26

1. Demonstration

Size: 3-5 MW Benefits: Bulk system Resource: BESS

2026–28

2. Operational expansion

Size: 50-200 MW Benefits: Bulk system Resource: BESS Enabling tools: Limited grid DERMs deployment

2028–31

3. Commercialization “Capacity*Connect represents a vital step toward modernizing the energy grid and meeting the growing electricity needs of our communities. By leveraging innovative battery technology and Virtual Power Plant models, we are not only ensuring a more reliable and resilient system for all Minnesotans but also creating a more equitable energy future that delivers real value back to the communities. ” — Hwikwon Ham, Minnesota Public Utility Comissioner163

Size: 200-500 MW Benefits: Bulk system plus distribution Resource: BESS and/or BESS co-located with solar

2031–

4. Co-optimization

Size: 500+ MW Benefits: Operational coordination between bulk and distribution + customer resilience Resource: BESS and/or BESS co-located with solar

Virtual Power Plant Flipbook 2.0

65


Case studies XCEL ENERGY CAPACITY*CONNECT (MINNESOTA)

Metrics at a glance Overview VPP type Grid services provided Resource type Customers enrolled MW enrolled

Utility VPP Bulk system capacity, bulk system energy Batteries (1–3 MW) 3–5 (2025, phase 1); 50–200 (expected by end of 2028, phase 2) Up to 200 (by end of 2028, phase 2)

Policy environment State Utility type Wholesale market Enabling policy or plan

Minnesota IOU MISO Minnesota PUC IRP Order (E002/RP-24-67 / E002/CN-23-212), Xcel’s Upper Midwest IRP (2024–2040), Minnesota Energy Storage Pilot Authority (Minn. Stat. § 216B.16, Subd. 7e), FERC Order 841

VPP roles and responsibilities Resource offtaker Program operator Participating OEMs and aggregators Device owner

LVI

Xcel Energy Xcel Energy Sparkfund Xcel Energy

Full eligibility criteria for Xcel Energy’s Petition for Approval of Capacity*Connect available here.

66 Virtual Power Plant Flipbook 2.0


Case studies XCEL ENERGY CAPACITY*CONNECT (MINNESOTA)

Metrics at a glance Customer experience Customer segment Customer enrollment Customer payment channel Compensation structure Compensation levels Customer participation requirements

Commercial and/or industrial Sparkfund Xcel Energy Direct payments to host site customers through long-term, fixed hosting (lease-style) compensation Confidential • Located on eligible feeders determined by Xcel Energy • Must be commercial or industrial and current on Xcel Energy electric service accountslvi • Must meet site criteria (space, access, safety)

Operations DER control Metering, telemetry, and verification notes Dispatch timing

Utility-controlled, front-of-the-meter, ADMS/DERMs capabilities Device-level telemetry is used for real-time monitoring and dispatch of battery systems, with performance verified through metered output and MISO market participation requirements. Performance is measured based on actual energy delivery. • Frequency: frequent dispatch (potentially daily), with batteries expected to cycle regularly throughout the year based on market participation (e.g., ~274 cycles/ year modeled) • Duration: multihour dispatch periods, typically about four hours per discharge cycle, aligned with peak demand windows • Scheduling: dynamic, market-driven dispatch based on MISO energy and capacity market signals (day-ahead and real time)

Virtual Power Plant Flipbook 2.0

67


Endnotes

68 Virtual Power Plant Flipbook 2.0


Endnotes

“Generac and CPower Expand Access to DER Technologies to Support Resiliency, Energy Costs and Grid Capacity,” CPower Energy, April 7, 2026, https:// cpowerenergy.com/who-we-are/newsandhappenings/ generac-and-cpower-expand-access-to-der-technologiesto-support-resiliency-energy-costs-and-grid-capacity/; “NRG Energy Inc. to Acquire Premier Power Portfolio from LS Power; Transforming Generation Fleet for Growing Demand,” CPower Energy, May 12, 2025, https:// cpowerenergy.com/who-we-are/newsandhappenings/ nrg-energy-inc-to-acquire-premier-power-portfolio-fromls-power-transforming-generation-fleet-for-growingdemand/. 3 “Leap Outperforms Virtual Power Plant Industry, Growing Capacity by 100% While Surpassing 100 Partners,” Leap, March 27, 2025, https://www.leap.energy/news/leapoutperforms-virtual-power-plant-industry-growingcapacity-by-100-while-surpassing-100-partners. 4 “NRG, Renew Home & Google Cloud Announce Plan to Develop 1 GW Virtual Power Plant in Texas,” Renew Home, October 29, 2024, https://www.renewhome.com/press/ press-release/nrg-renew-home-google-cloud-announceplan-to-develop-1gw-virtual-power-plant-in-texas. 5 “Base Power’s Cheap Batteries Could Help Stabilize PJM,” Canary Media, June 24, 2026, https://www.canarymedia. com/articles/batteries/base-power-cheap-batteries-pjm. 6 “Map of Deregulated Energy Markets — State-by-State Data,” Electric Choice, updated July 2026, https://www. electricchoice.com/map-deregulated-energy-markets/. 7 LUMA Energy, Motion to Submit Fiscal Year 2026 Fourth Quarter Consolidated Transition Period Plan and Demand Response Administrative Costs Quarterly Report and Fiscal Year 2026 Consolidated Transition Period Plan and Demand Response Administrative Costs Annual Report, Puerto Rico Energy Bureau, Case No. NEPR-MI-2022-0001, August 14, 2026. https://energia.pr.gov/wp-content/ uploads/sites/7/2026/08/20260814-MI20220001-2026-FY4Q-TP-plan-and-DR-Report.pdf 1, 2

Direct Testimony and Attachments of Deborah E. Erwin on Behalf of Public Service Company of Colorado, Hearing Exhibit 103, Proceeding No. 25A-__E, Colorado Public Utilities Commission, January 31, 2025. 9 “Quarterly Reports,” Massachusetts Energy Efficiency Advisory Council, accessed July 10, 2026, https://ma-eeac. org/results-reporting/quarterly-reports/. 10 “Revised Exhibit NG-5-ELEC” [benefit-cost model], Microsoft Excel workbook, D.P.U. 24-148, Petition for Approval of the 2025–2027 Three-Year Energy Efficiency Plan, Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid, Massachusetts Department of Public Utilities, 2025. 11 2025 Idaho Energy Efficiency and Peak Reduction Annual Report, Rocky Mountain Power, May 1, 2026, https:// www.pacificorp.com/content/dam/pcorp/documents/ en/pacificorp/environment/dsm/idaho/ID_Energy_ Efficiency_and_Peak_Reduction_Report_2025.pdf. 12 Virtual Power Plant Flipbook, RMI and VP3, 2024, https:// rmi.org/resources/virtual-power-plant-flipbook/. 13 Application for Approval of Arizona Public Service Company’s Second Amended 2024 Demand Side Management Implementation Plan, Which Incorporates the 2024 Transportation Electrification Implementation Plan, Arizona Corporation Commission, Docket No. E-01345A-23-0088, filed June 20, 2025, https://docket. images.azcc.gov/E000044864.pdf?i=1769643400347. 14 SEPA and N.C. Clean Energy Technology Center staff, “VPP and Supporting DER Policy Developments: Q2 2025,” Smart Electric Power Alliance, July 21, 2025, https:// sepapower.org/knowledge/vpp-der-policy-q2-2025/. 15 Pathways to Commercial Liftoff: Virtual Power Plants 2025 Update, US Department of Energy, January 2025, https://www.smartenergydecisions. com/wp-content/uploads/2025/04/liftoff_doe_ virtualpowerplants2025update.pdf. 16 Application for Approval of Arizona Public Service Company’s Second Amended 2024 Demand Side 8

Management Implementation Plan, filed June 20, 2025. 17 Pathways to Commercial Liftoff: Virtual Power Plants 2025 Update, January 2025. 18 “Cool Rewards,” Arizona Public Service, accessed July 8, 2026, https://www.aps.com/en/About/Sustainability-andInnovation/Technology-and-Innovation/Cool-Rewards. 19 Pathways to Commercial Liftoff: Virtual Power Plants 2025 Update, January 2025. 20 “NRG, Renew Home & Google Cloud Announce Plan to Develop 1 GW Virtual Power Plant in Texas,” October 29, 2024. 21 “2025 PLMA Award Winner: Arizona Public Service & EnergyHub,” Peak Load Management Alliance, accessed July 10, 2026, https://flexload.org/industry-awardsprogram/2025-plma-award-winner-aps-energyhub/. 22 “2025 PLMA Award Winner: Arizona Public Service & EnergyHub,” accessed July 10, 2026. 23 Arizona Public Service. (2024, September 24). On the hottest days, APS virtual power plant helps cool demand on grid. APS. 24 “Cool Rewards,” Arizona Public Service, accessed July 26, 2026, https://www.aps.com/en/About/Sustainabilityand-Innovation/Technology-and-Innovation/CoolRewards. 25 Status Report on Voluntary Demand Response Program. Filing in Project No. 55633, Winter Preparedness Work Session 2023, Public Utility Commission of Texas, Bandera Electric Cooperative, Inc., filed December 20, 2023. 26 “Battery Storage Program,” Bandera Electric Cooperative, accessed July 28, 2026, https://www. banderaelectric.com/energy-services/solar-battery/ battery-storage/battery-storage-program/. 27 “Base Power and Bandera Electric Cooperative Announce Industry-First Distributed Battery Storage Partnership,” PR Newswire, March 6, 2025, https://www. prnewswire.com/news-releases/base-power-andbandera-electric-cooperative-announce-industry-firstdistributed-battery-storage-partnership-302393927.html.

“Bandera Electric Cooperative’s Virtual Power Plant Qualifies for ERCOT Wholesale Power Market Participation,” Bandera Electric Cooperative, August 22, 2024, https://www.banderaelectric.com/newsreleases/bandera-electric-cooperatives-virtual-powerplant-qualifies-for-ercot-wholesale-power-marketparticipation/. 29 Robert Walton, “Texas Task Force Aims to ‘Tear Down Barriers’ to Virtual Power Plant Pilot as Participation Lags,” Utility Dive, December 11, 2024, https://www.utilitydive. com/news/ercot-considers-doubling-virtual-power-plantvpp-pilot-ADER/731125/. 30 “Battery Storage Program,” accessed July 28, 2026. 31 Smart Thermostat Program, Bandera Electric Cooperative, Inc., March 13, 2024, https://docs.google. com/document/d/1cpj5nnSYhlYDpvwWl7-oNeLb0O-E4bTfw1Zxm5Jrvc/. 32 “Smart Thermostat,” Bandera Electric Cooperative, Inc., accessed July 28, 2026, https://www.banderaelectric.com/ energy-services/programs/smart-thermostat/. 33 “Apolloware for Utilities,” Bandera Electric Cooperative, Inc., accessed July 28, 2026, https://www.banderaelectric. com/apolloware/for-utilities/. 34 2026 BEC Energy Saver Program Manual, Bandera Electric Cooperative, 2026, https://www.banderaelectric.com/ wp-content/uploads/2026-BEC-Energy-Saver-ProgramManual.pdf. 35 “Smart Thermostat,” Bandera Electric Cooperative, Inc., accessed July 28, 2026, https://www.banderaelectric.com/ energy-services/programs/smart-thermostat/. 36 Cathy Cash, “Texas Co-op Makes History as Virtual Power Plant Enters Wholesale Power Market,” Cooperative.com, August 29, 2024, https://www.cooperative.com/news/ Pages/Texas-Co-op-Makes-History-as-Virtual-Power-PlantEnters-Wholesale-Power-Market.aspx. 37 2024 Annual Report, Bandera Electric Cooperative, 2024, https://www.banderaelectric.com/wp-content/ uploads/2024-Annual-Report-.pdf. 28

Virtual Power Plant Flipbook 2.0

69


Endnotes

Q1, 2026 Report Card, Bandera Electric Cooperative, https://www.banderaelectric.com/wp-content/uploads/ Q1-Report-Card.pdf. 39 “Aggregate Distributed Energy Resource (ADER) Pilot Project,” Electric Reliability Council of Texas (ERCOT), accessed July 28, 2026, https://www.ercot.com/mktrules/ pilots/ader. 40 “CoServ and Base Power Launch 100 MW Residential Storage Program to Bring North Texas Homeowners Affordable Battery Backup Power,” CoServ, March 6, 2026, https://www.coserv.com/coserv-base-powerpress-release/; Brian Martucci, “Base Power Partnership to Mitigate Price Spikes, Load Peaks for South Texas Co-op, CEO Says,” Utility Dive, April 22, 2026, https:// www.utilitydive.com/news/base-power-partnership-tomitigate-price-spikes-load-peaks-for-south-texas/818221/. 41 “Apolloware for Utilities,” accessed July 28, 2026. 42 Cash, “Texas Co-op Makes History,” August 29, 2024. 43 “Smart Usage Rewards,” Con Edison, accessed June 22, 2026, https://www.coned.com/en/save-money/rebatesincentives-tax-credits/rebates-incentives-tax-credits-forcommercial-industrial-buildings-customers/smart-usagerewards. 44 “Enroll Your Smart Thermostat and Claim an $85 Rebate,” Con Edison, https://www.coned.com/en/savemoney/rebates-incentives-tax-credits/rebates-incentivestax-credits-for-residential-customers/bring-yourthermostat-and-get-85. 45 Report on Program Performance and Cost Effectiveness of Demand Response Programs – 2025, Con Edison, filed November 17, 2025, New York State Public Service Commission, Cases 09-E-0115, 10-E-0229, 08-E-1463, 15-E0570, and 14-E-0423. 46 Smart Usage Rewards for Aggregators or Direct Enrollees,” Con Edison, accessed October 13, 2026, https:// www.coned.com/en/save-money/rebates-incentives-taxcredits/rebates-incentives-tax-credits-for-commercialindustrial-buildings-customers/smart-usage-rewards 38

70 Virtual Power Plant Flipbook 2.0

Report on Program Performance and Cost Effectiveness of Demand Response Programs – 2025, filed November 17, 2025. 48 2025 DSIP document: https://documents.dps.ny.gov/ public/Common/ViewDoc.aspx?DocRefId={E07BC2970000-CE11-A9DD-57CF5F65EB97}&DocTitle=CECONY%20 2025%20Distributed%20System%20Implementation%20 Plan. 49 Report on Program Performance and Cost Effectiveness of Demand Response Programs – 2025, filed November 17, 2025. 50 Smart Usage Rewards (Demand Response) Aggregator List, Con Edison, accessed June 22, 2026, https://cdnedcxprod-sitecore.azureedge.net/-/media/files/coned/ documents/save-energy-money/rebates-incentives-taxcredits/smart-usage-rewards/aggregator-list. 51 Commission Order and the Con Ed BYOB website: https://documents.dps.ny.gov/public/Common/ ViewDoc.aspx?DocRefId={30B36D96-0000-CA3C-B0E7C5438CC7E917}&DocTitle=Order%20Addressing%20 Dynamic%20Load%20Management%20Program%20 Modifications; https://www.coned.com/en/save-money/ rebates-incentives-tax-credits/bring-your-own-battery. 52 Commission Order and the Con Ed BYOB website: https://documents.dps.ny.gov/public/Common/ ViewDoc.aspx?DocRefId={30B36D96-0000-CA3C-B0E7C5438CC7E917}&DocTitle=Order%20Addressing%20 Dynamic%20Load%20Management%20Program%20 47

Modifications; https://www.coned.com/en/save-money/ rebates-incentives-tax-credits/bring-your-own-battery. 53 Con Edison Annual Report, 2022, https:// documents.dps.ny.gov/public/Common/ViewDoc. aspx?DocRefId={487C8370-0CEA-44F1-94F8A99BF5C902E0}&DocTitle=2022%20Electric%20 Demand%20Response%20Annual%20Report. Con Edison Annual Report, 2025, https://documents.dps.ny.gov/ public/Common/ViewDoc.aspx?DocRefId={3055939A0000-C412-8EDF-D57E33629A79}&DocTitle=Con%20 Edison%202025%20Demand%20Response%20 Annual%20Report 54 Report on Program Performance and Cost Effectiveness of Demand Response Programs – 2025, filed November 17, 2025. 55 Report on Program Performance and Cost Effectiveness of Demand Response Programs – 2025, filed November 17, 2025. 56 Report on Program Performance and Cost Effectiveness of Demand Response Programs – 2025, filed November 17, 2025. 57 Con Edison, Smart Usage Rewards (Demand Response) Aggregator List, n.d., accessed October 13, 2026. 58 Con Edison Annual Report, https://documents. dps.ny.gov/public/Common/ViewDoc. aspx?DocRefId={3055939A-0000-C412-8EDFD57E33629A79}&DocTitle=Con%20Edison%202025%20 Demand%20Response%20Annual%20Report.

Annual Report, https://documents.dps.ny.gov/public/ Common/ViewDoc.aspx?DocRefId={3055939A-0000-C4128EDF-D57E33629A79}&DocTitle=Con%20Edison%20 2025%20Demand%20Response%20Annual%20Report. 60 Communication with representatives from Con Edison Demand Response Team, 2026. 61 Report on Program Performance and Cost Effectiveness of Demand Response Programs – 2025, filed November 17, 2025. 62 Con Edison Demand Response Team, email correspondence, June 2026. 63 Order Requiring Filings and Reports on Utility Demand Response Programs, Case 00-E-2054, In the Matter of a Status Report on the Demand/Supply Component of the Department’s Electric Price and Reliability Task Force Including Recommendations for Specific Utility Actions on the Demand-Side, New York State Public Service Commission, issued December 20, 2000. 64 Customer Baseline Load Procedure, Con Edison, accessed June 22, 2026, https://cdne-dcxprod-sitecore.azureedge. net/-/media/files/coned/documents/save-energy-money/ rebates-incentives-tax-credits/smart-usage-rewards/ customer-baseline-load-procedure.pdf. 65 ConnectedSolutions: A Framework to Scale Flexibility Programs Through a Unified Program Design, EnergyHub, 2026, https://415845.fs1.hubspotusercontent-na1. net/hubfs/415845/EnergyHub_Case%20Study_ ConnectedSolutions_4.26.pdf. 66 ConnectedSolutions, 2026. 67 Kevin Brehm and Mary Tobin, Virtual Power Plant Flipbook: How Utilities and Their Customers Are Already Benefiting from VPPs and Insights for Future Implementation, RMI, 2024, https://rmi.org/app/uploads/ dlm_uploads/2024/06/VP3_flipbook_v1.1.pdf. 68 RMI and VP3, Virtual Power Plant Flipbook, RMI and VP3, 2024, https://rmi.org/resources/virtual-power-plantflipbook/. 69 ConnectedSolutions, 2026. 59


Endnotes

“ConnectedSolutions+,” National Grid, accessed July 7, 2026, https://www.nationalgridus.com/ ConnectedSolutionsPlus. 71 DER-iving Local Value: Distribution Grid Services in the Commonwealth of Massachusetts, Energy and Environmental Economics, Inc. (E3) and RMI, September 2025, https://www.ethree.com/wp-content/ uploads/2026/03/E3_MassCEC_Grid_Services_Roadmap. pdf. 72 ConnectedSolutions, 2026. 73 “Quarterly Reports,” accessed July 10, 2026. 74 Pathways to Commercial Liftoff: Virtual Power Plants 2025 Update, January 2025. 75 ConnectedSolutions, 2026. 76 Pathways to Commercial Liftoff: Virtual Power Plants 2025 Update, January 2025. 77 ConnectedSolutions, 2026. 78 ConnectedSolutions, 2026. 79 ConnectedSolutions, 2026. 80 National Grid, Program Materials for ConnectedSolutions for Small Scale Batteries (March 13, 2026), https://www. nationalgridus.com/media/pdfs/resi-ways-to-save/ma_ resi_battery_program_materials.pdf. 81 Application for Approval of Its Virtual Power Plant Pilot Program under § 56-585.1:16 of the Code of Virginia, Case No. PUR-2025-00211, Virginia Electric and Power Company, filed December 1, 2025, https://www.scc. virginia.gov/docketsearch#/caseDetails/146609. 82 Application for Approval of Its Virtual Power Plant Pilot Program under § 56-585.1:16 of the Code of Virginia, filed December 1, 2025. 83 Application for Approval of Its Virtual Power Plant Pilot Program under § 56-585.1:16 of the Code of Virginia, filed December 1, 2025. 84 Application for Approval of Its Virtual Power Plant Pilot Program under § 56-585.1:16 of the Code of Virginia, filed December 1, 2025. 85 “Dominion Energy’s Electric School Bus Program 70

Surpasses 1.5 Million Electric Miles in Virginia with Thomas Built Buses’ Jouley,” Daimler Truck North America, March 20, 2024, https://northamerica.daimlertruck.com/newsstories/2024/dominion-energys-electric-school-busprogram-surpasses-15-million-electric-miles-in-virginiawith-thomas-built-buses-jouley. 86 Application for Approval of Its Virtual Power Plant Pilot Program under § 56-585.1:16 of the Code of Virginia, filed December 1, 2025. 87 Rachel Metea, “Virginia Mandates Dominion Energy Create Virtual Power Plant Pilot,” pv magazine USA, May 16, 2025, https://pv-magazine-usa.com/2025/05/16/ virginia-mandates-dominion-energy-create-virtual-powerplant-pilot/. 88 “VA SB 1100: Virtual Power Plant Pilot Program; Each Phase II Utility Shall Petition SCC for Approval to Conduct,” BillTrack50, accessed May 8, 2026, https://www. billtrack50.com/billdetail/1774278. 89 Application for Approval of Its Virtual Power Plant Pilot Program under § 56-585.1:16 of the Code of Virginia, filed December 1, 2025. 90 Application for Approval of Its Virtual Power Plant Pilot Program under § 56-585.1:16 of the Code of Virginia, filed December 1, 2025. 91 Application for Approval of Its Virtual Power Plant Pilot Program under § 56-585.1:16 of the Code of Virginia, filed December 1, 2025. 92 Application for Approval of Its Virtual Power Plant Pilot Program under § 56-585.1:16 of the Code of Virginia, filed December 1, 2025. 93 Brian Martucci, “Virginia Utility-Scale VPP Pilot Mandate Is First amid National Push,” Utility Dive, May 12, 2025, https://www.utilitydive.com/news/virginia-leads-withutility-scale-vpp-pilot-amid-national-push/747770/. 94 “Customer Battery Energy Sharing,” LUMA Energy, accessed June 16, 2026, https://lumapr.com/batterydemand-response/?lang=en. 95 Motion to Submit Costs Associated with Emergency

DR Program in Compliance with Resolution and Order of August 11, 2023, and Request for Confidential Treatment, Case No. NEPR-MI-2022-0001, LUMA Energy, August 23, 2023, https://energia.pr.gov/wp-content/uploads/ sites/7/2023/08/20230823-Motion-to-Submit-CostsAssociated-with-Emergency-DR-Program-in-Compliancewith-Resolution-and-Order-of-August-11-2023-and-Request-for-Confidential-Treatment.pdf. 96 Motion to Submit Monthly Status Report on the CBES+ Program for August 2025, in Compliance with Resolution and Orders of May 20, 2025, and May 29, 2025 (Case No. NEPR-MI-2022-0001), filed by LUMA Energy with the Puerto Rico Energy Bureau on September 22, 2025. 97 Tesla, email correspondence, June 2026. 98 Act No. 17-2019: Puerto Rico Energy Public Policy Act, approved April 11, 2019, https://bvirtualogp.pr.gov/ogp/ Bvirtual/leyesreferencia/PDF/2-ingles/17-2019.pdf. 99 Resolution and Order, Case No. NEPR-MI-2022-0001, Puerto Rico Energy Bureau, February 16, 2023, https://energia.pr.gov/wp-content/uploads/ sites/7/2023/02/20230216-MI20220001-Resolutionand-Order.pdf; Motion to Submit Costs Associated with Emergency DR Program in Compliance with Resolution and Order of August 11, 2023, and Request for Confidential Treatment, August 23, 2023. 100 2025 Integrated Resource Plan, LUMA Energy, https:// setpr.com/wp-content/uploads/2025/10/0.00_IRP-Report_ Main-Report_Revised_Redacted.pdf. 101 Interview with LUMA Energy team, July 2026. 102 Interview with LUMA Energy team, July 2026. 103 FY2026 Q4 Consolidated Transition Period Plan and Demand Response Administrative Costs Quarterly Report, Case No. NEPR-MI-2022-0001, submitted to the Puerto Rico Energy Bureau, LUMA Energy, August 14, 2026. 104 “PowerOn Puerto Rico Terms and Conditions,” Sunrun, accessed July 8, 2026, https://www.sunrun.com/poweronpr-tc-a. 105 Hanna Jones, Lessons Learned from Puerto Rico’s First

Virtual Power Plant, Clean Energy States Alliance, February 2026, https://www.cesa.org/wp-content/uploads/PuertoRico-VPP-Report.pdf. 106 Resolution and Order for Joint Motion for Authorization to Increase the Default Enrolled Battery Capacity for Autoenrolled Customers in the CBES Program, Case No. NEPRMI-2026-0002, Puerto Rico Energy Bureau, June 12, 2026. 107 David Cruz, LUMA Energy, email message to Will Long, July 2026. 108 Motion to Submit Permanent Customer Battery Sharing Program with Exhibit, Case No. NEPR-MI-2022-0001, LUMA Energy, January 31, 2025, https://energia.pr.gov/wpcontent/uploads/sites/7/2025/02/20250131-MI20220001Motion-to-Subm-Perm-Customer-Battery-Sharing-wExhibit.pdf. 109 “PowerOn Puerto Rico,” Sunrun, accessed June 18, 2026, https://www.sunrun.com/poweron-puerto-rico. 110 “Customer Battery Energy Sharing,” accessed June 16, 2026. 111 Puget Sound Energy, team review, 2026. 112 Puget Sound Energy, team review, 2026. 113 “Grid Resiliency,” ecobee, accessed August 23, 2026. https://www.ecobee.com/en-us/utilities/grid-resiliency/. 114 “2026 Demand Response Request for Proposals,” Puget Sound Energy, April 17, 2026. 115 “2025 Demand Response Equity Action Plan,” Puget Sound Energy, accessed June 23, 2026. 116 “PSE and ChargeScape Launch Washington’s First Demonstration Using EVs to Power Residential Homes,” Puget Sound Energy, March 18, 2026, https://www.pse. com/en/press-release/details/PSE-and-ChargeScapelaunch-Washingtons-first-demonstration-using-EVs-topower-residential-homes. 117 Puget Sound Energy, team review, 2026. 118 Puget Sound Energy, team review, 2026. 119 Puget Sound Energy, team review, 2026. 120 Puget Sound Energy, team review, 2026. 121 Puget Sound Energy, team review, 2026. Virtual Power Plant Flipbook 2.0

71


Endnotes

Ethan Howland, “Puget Sound Energy, AutoGrid Aim to Develop a 100-MW Virtual Power Plant by 2025,” Utility Dive, November 28, 2023, https://www.utilitydive.com/ news/puget-sound-energy-autogrid-pse-virtual-powerplant-vpp/700806/. 123 As reported through conversation with utility. 124 Pathways to Commercial Liftoff: Virtual Power Plants 2025 Update, January 2025. 125 Pathways to Commercial Liftoff: Virtual Power Plants 2025 Update, January 2025. 126 Pathways to Commercial Liftoff: Virtual Power Plants 2025 Update, January 2025. 127 “Wattsmart Battery Program,” Rocky Mountain Power, accessed May 15, 2026, https://www. rockymountainpower.net/savings-energy-choices/ wattsmart-battery-program.html. 128 Brian Martucci, “Torus, Rocky Mountain Power Sign MOU for 70-MW C&I Demand Response Capability,” Utility Dive, February 21, 2025, https://www.utilitydive. com/news/torus-rocky-mountain-power-mou-demandresponse-dr/740616/. 129 2024 Utah Energy Efficiency and Peak Reduction Annual Report, Rocky Mountain Power, May 27, 2025, https:// www.pacificorp.com/content/dam/pcorp/documents/en/ pacificorp/environment/dsm/utah/UT_Energy_Efficiency_ and_Peak_Reduction_Report_2024.pdf. 130 As reported through utility conversations. 131 As reported through utility conversations. 132 As reported through utility conversations. 133 2025 Idaho Energy Efficiency and Peak Reduction Annual Report, Rocky Mountain Power, May 1, 2026, . 134 2025 Utah Energy Efficiency and Peak Reduction Annual Report, Rocky Mountain Power, June 1, 2026, https:// www.pacificorp.com/content/dam/pcorp/documents/en/ pacificorp/environment/dsm/utah/UT_Energy_Efficiency_ and_Peak_Reduction_Report_2025.pdf. 135 2025 Idaho Energy Efficiency and Peak Reduction Annual Report, May 1, 2026. 122

72 Virtual Power Plant Flipbook 2.0

2025 Utah Energy Efficiency and Peak Reduction Annual Report, June 1, 2026. 137 Acknowledgment Letter Regarding Rocky Mountain Power’s Semi-Annual Demand-Side Management Forecast Reports, Docket No. 25-035-41, Public Service Commission of Utah, February 25, 2026, https://pscdocs.utah.gov/ electric/25docs/2503541/ 344012AckLtrfromPSC2-25-2026.pdf. 138 Rocky Mountain Power’s Demand-Side Management 2022 Annual Energy Efficiency and Peak Load Reduction Report, Docket No. 23-035-26, Public Service Commission of Utah, September 28, 2023, https://pscdocs.utah.gov/electric/23docs/2303526/ 330062AckLtrfromPSC9-28-2023.pdf. 139 2025 Utah Energy Efficiency and Peak Reduction Annual Report, June 1, 2026. 140 Pathways to Commercial Liftoff: Virtual Power Plants 2025 Update, January 2025. 141 U.S. Department of Energy, Pathways to Commercial Liftoff: Virtual Power Plants (September 2023), https://www. smartenergydecisions.com/wp-content/uploads/2025/04/ liftoff_doe_virtualpowerplants2025update.pdf. 142 Rocky Mountain Power, 2025 Utah Energy Efficiency and Peak Reduction Annual Report (June 1, 2026), 14; Rocky Mountain Power, 2025 Idaho Energy Efficiency and Peak Reduction Annual Report (May 1, 2026), 14; and Pacific Power, 2025 Demand Response Annual Report: Oregon (June 26, 2026), 5. 143 Rocky Mountain Power, “Wattsmart Batteries,” accessed July 26, 2026, . 144 Interim Commission Decision Granting Additional Interventions and Granting, in Part, and Denying, in Part, Motion to Approve Reliability Action Plan, Decision No. C26-0302-I, Proceeding No. 25V-0480E, Colorado Public Utilities Commission, May 11, 2026. 145 Aggregator Virtual Power Plant Program: Program Plan, Attachment 1, Proceeding No. 26AL-____E, 16, Public Service Company of Colorado. 136

Petition for Approval of CapacityConnect, a Distributed Capacity Procurement Program, filed October 3, 2025. 154 Petition for Approval of CapacityConnect, a Distributed Capacity Procurement Program, filed October 3, 2025. 155 Agenda Meeting, video recording, Minnesota Public Utilities Commission, April 2, 2026, https://minnesotapuc. granicus.com/player/clip/2675. 156 Petition for Approval of CapacityConnect, a Distributed Capacity Procurement Program, filed October 3, 2025. 157 Petition for Approval of CapacityConnect, a Distributed Capacity Procurement Program, filed October 3, 2025. 158 2024–2040 Upper Midwest Integrated Resource Plan, Docket No. E002/RP-24-67, Northern States Power Company d/b/a Xcel Energy, January 31, 2024, https:// corporate.my.xcelenergy.com/s/sustainability/plans/uppermidwest-plan. 159 In the Matter of the Petition of Northern States Power Company, d/b/a Xcel Energy, for Approval of CapacityConnect, a Distributed Capacity Procurement Program: Order Approving CapacityConnect Phase 2 with Modifications and Establishing Filing Requirements, May 13, 2026. 160 Petition for Approval of CapacityConnect, a Distributed Capacity Procurement Program, filed October 3, 2025. 161 “Xcel Energy to Power New Google Data Center in Minnesota,” Xcel Energy, February 24, 2026, https:// newsroom.xcelenergy.com/news/xcel-energy-to-powernew-google-data-center-in-minnesota. 162 Petition for Approval of CapacityConnect, a Distributed Capacity Procurement (DCP) Program, Docket No. E002/M-25-378, Attachment C, “Cost-Benefit Analysis,” Northern States Power Company, d/b/a Xcel Energy, October 3, 2025. 163 “Minnesota PUC Advances First of Its Kind, Utility-Owned ‘Virtual Power Plant’ Program to Modernize Energy Grid and Enhance Community Reliability,” Minnesota Public Utilities Commission, April 3, 2026, https://content. govdelivery.com/accounts/MNPUBUC/bulletins/411616d. 153

Communications with representatives from Xcel Energy Colorado, 2026. 147 Aggregator Virtual Power Plant Program: Program Plan. 148 Verified Application of Public Service Company of Colorado for Approval of Public Service Company of Colorado’s Aggregator Virtual Power Plant Program and Tariff, Along with Associated Program Budget and Cost Recovery Methodology, Proceeding No. 25A-____E, Hearing Exhibit 100, Public Service Company of Colorado, filed January 31, 2025. 149 Xcel Energy team, email correspondence, April 2026. 150 Colorado General Assembly, Senate Bill 24-218: Concerning Measures to Modernize Energy Distribution Systems, and, in Connection Therewith, Making an Appropriation, 74th General Assembly, 2nd Reg. Sess. (Colo. 2024), signed into law May 23, 2024. 151 Petition for Approval of CapacityConnect, a Distributed Capacity Procurement Program, Docket No. E002/M-25-378, Northern States Power Company d/b/a Xcel Energy, filed October 3, 2025, https://s3.documentcloud. org/documents/26182909/25-378-petition.pdf. 152 In the Matter of the Petition of Northern States Power Company, d/b/a Xcel Energy, for Approval of CapacityConnect, a Distributed Capacity Procurement Program: Order Approving CapacityConnect Phase 2 with Modifications and Establishing Filing Requirements, Docket No. E-002/M-25-378, Minnesota Public Utilities Commission, May 13, 2026, https://efiling.web. commerce.state.mn.us/documents/%7B7026239E0000-C413-9F39-DBEDE406B2F8%7D/ download?contentSequence=0&rowIndex=7. 146


Virtual Power Plant Flipbook: 2026 Update, 2026, RMI RMI values collaboration and aims to accelerate the energy transition through sharing knowledge and insights. We therefore allow interested parties to reference, share, and cite our work through the Creative Commons CC BY-SA 4.0 license. https://creativecommons.org/licenses/by-sa/4.0/

All images are from istockphoto.com unless otherwise noted.

RMI Innovation Center 22830 Two Rivers Road Basalt, CO 81621 www.rmi.org © September 2026 RMI. All rights reserved. Rocky Mountain Institute® and RMI® are registered trademarks. Virtual Power Plant Flipbook 2.0

73


Turn static files into dynamic content formats.

Create a flipbook