Career + Technical Education

Page 1

Career + Technical Education



PREPARING STUDENTS There are significant gaps in how schools prepare all students for jobs in the future workforce. “The great majority of high school students want to attain a bachelor’s or advanced degree — because many high school students and their parents know that such degrees provide access to managerial and professional jobs with higher salaries, attractive working conditions, and greater employment security — but in fact, only about one in three will complete a bachelor’s degree. If high schools only try to prepare students for four-year colleges and universities, many young people will finish their schooling without any technical knowledge or skill to earn a living.” (Visher & Stern, 2015). Rather than letting students slip through the cracks, our clients are discovering that they need to offer more non-traditional learning opportunities that will provide their students with the skills and experiences necessary to thrive after graduation. They are focusing on the student as a whole person—considering their mental, physical, and emotional health and well-being—as well as designing student-centered learning opportunities for all.



V M D O Ca reer + Tec h n i c al Edu cati on

Avancing Students in Our Community One way to provide students with more holistic learning opportunities is by offering career and technical education (CTE) opportunities within the K-12 school system. In recent years, school systems have revived and modernized their CTE programs in response to a growing body of data that shows many jobs will disappear or require new skills in the next few decades. Therefore, school districts want to better support and prepare their students for the future workforce. “According to a 2017 Brookings Institution report, in 2015 alone 39 states created 125 new laws, policies, or regulations concerning CTE, some of which involved the allocation of state funding” (Simmons, 2018). The desire to better prepare students for what may come after high school is also reflected here in Virginia. Virginia’s statewide “Profile of a Virginia Graduate” describes the knowledge, skills, experiences, and attributes students must attain to be successful in college and/or the workforce. “Life-ready” skills include appropriate academic and technical knowledge, workplace skills, responsible community, and civic engagement, and the ability to align personal interests with career opportunities (VDOE). VMDO Architects has witnessed this emergence of wanting to better prepare students— academically, emotionally, and mentally—in many of our clients. We’ve had the opportunity to design CTE centers and see firsthand how these dynamic, innovative educational programs can benefit students and their communities. Most notably, we’ve worked closely with clients to develop CTE programs, curricula, and flexible learning spaces in Winchester, Arlington, Fairfax, and Charlottesville, Virginia, and the District of Columbia. As architects that specialize in happy, healthy, and high-performing learning environments, we truly believe that our work can make a positive impact in communities. As the demand for CTE programs and learning environments increases, we believe the architecture industry can play a crucial and impactful role in helping to advance the future of education.

5


Case Studies 1

Emil + Grace Shihadeh Innovation Center Winchester, Virginia

2

Original Mt. Vernon High School Human Development Center Alexandria, Virginia


3

Advanced Technology + Student Success Center at PVCC Charlottesville, D.C.

4

DC Infrastructure Academy at Spingarn High School Washington, DC


Emil + Grace Shihadeh Innovation Center Winchester, Virginia



Carpentry Lab in renovated Gymnasium


V M D O Ca reer + Tec h n i c al Edu cati on

Project Overview The Shihadeh Innovation Center is a hub of workforce development for the community – preparing students and the community to meet the demands of the regional job market. The average age of skilled workers is 56 years old, and by 2025, there will be a 10 million job shortfall in the skilled labor market in the US. Rising to meet these challenges, the new Emil and Grace Shihadeh Innovation Center will prepare Winchester Public Schools students and community members for the new workforce of tomorrow. The project is a product of multiple funding sources, including private donations, grants, and an unprecedented amount of state funding. A radical transformation of an existing unused elementary school, the mission of the Center is to ensure that every student is prepared and empowered with a marketable skill that leads to full, high-paying employment and that every regional industry has access to dedicated, skilled workers that will sustain and improve their business model. A joint venture with Laurel Ridge Community College and local industry partners, the Shihadeh Innovation Center will be a hub of workforce development for the community. Using hands-on learning strategies, students will develop the necessary skills that will lead to marketable certifications. Industry partners will play an active role in the development of the program of study while also committing to work-based learning opportunities for students. Laurel Ridge Community College will provide instructors and equipment for certification and credit bearing courses. The Center will embody Winchester Public School’s motto of “Learning for all, whatever it takes.” The culture at the Center will be interdisciplinary and organized into industry themes where CTE teachers, academic teachers, and students will be working together on real-world problems. All John Handley High School students will have an opportunity to apply their academic knowledge to practical skills at the Center, and adults and professionals wilh have the opportunity to mentor youth interested in their professional field or learn a new trade to re-enter the workforce.

11


12

VM DO Care e r + Tec hn ic a l Edu c a t ion

N

Shihadeh Innovation Center The Innovation Center occupies a transformed 1970’s elementary school located a short walk from Handley High School.

John Handley High School Originally built in 1923, Handley High School was conceived with powerful, progressive ideals at its core. Handley’s legacy focuses on the heritage of the school as a central civic institution and a focus of regional programs and pageantry. The majestic landscape and powerful 2010 renovation (by VMDO) in many ways reinforces Winchester’s “educational promise” to the surrounding community.


V M D O Ca reer + Tec h n i c al Edu cati on

Small Space, Big Impact Shihadeh prepares students for the future with smartly designed spaces and empowers teachers with novel means of educating 21st century learners. The culture at the Innovation Center is interdisciplinary and organized into industry themes where CTE teachers, core academic teachers, and students work together on real-world problems. Laurel Ridge Workforce Solutions will also partner to increase opportunities. The Innovation Center is organized around three academies •

Health Sciences Academy

Advanced Technology Academy, and

Professional Skills Academy

Each offer programs that will equip students with the skills and credentials needed for their future career. The building will house CTE classes currently offered at Handley High School, featuring high intensity trades and professional skills labs, a health sciences suite, and lab spaces that support cybersecurity, digital design, robotics, and computer technology. High visibility work labs, dynamic collaboration and presentation spaces, abundant natural daylighting, healthy materials, indoor air quality, and reduced energy use were all design-drivers.

13


14

VM DO Care e r + Tec hn ic a l Edu c a t ion

“If we can help educate and give people the chance to make good wages, and also give back to the community while we’re doing it, what bigger win can there be?” – Jimmy Robertson Coordinator of Innovation, Career Technical Education & Business Partnership Winchester Public Schools

Existing exterior conditions before renovation.


V M D O Ca reer + Tec h n i c al Edu cati on

15


16

VM DO Care e r + Tec hn ic a l Edu c a t ion


V M D O Ca reer + Tec h n i c al Edu cati on

Planning Phase Key to the philosophy of the Center’s curriculum is “Project Based Learning,” acquiring educational knowledge or skill sets by engaging in real-world projects and scenarios. The Innovation Center includes specialized spaces to support the intended curriculum and a diverse range of academic programs. “The Five C’s” of the Shihadeh Innovation Center provide guiding principles for how learning happens in the Center and connects to the larger global job market: 1. Critical Thinking - Student owned projects that solve authentic problems through critical thinking with engaging student designed activities requiring reflection, revision, and renewal. 2. Creative Thinking - Projects blended with personal choice and developmental solutions while finding resources and discovering answers to in-depth questions for contemporary problems. 3. Citizenship - Student-owned learning processes, mentorships with community partners, and a visible celebration of place. 4. Collaboration - Mastering competencies while acquiring time management, perseverance, and team conceptual understanding for the modern workplace through project and blended instructional strategies. 5. Communication - Projects based on interactive community partnerships with businesses focusing on a “work local, think global” directive requiring student-initiated collaboration. Prior to building design, a programming and planning phase sought to explore how space can support “Project Based Learning.” Engagement with Winchester Public Schools educators and leadership directly informed the range of programming that the Innovation Center ultimately includes, with a focus on flexible, collaborative learning environments and high-intensity, “realworld” workshops. In addition, preference was expressed for less “finished” spaces with the ability to adapt easily, as needed.

17


V R

R

V G

O

V

P

A

B

N

W

C A

U R

M

Q D

T X

R S

J

L

K F

E I


V M D O Ca reer + Tec h n i c al Edu cati on

Interdisciplinary Program The Innovation Center is organized around three academies – each offering programs that will equip students with the skills and credentials needed for their future careers. Technical spaces are stitched together with open commons, hubs, a forum, a cafe, and a roof terrace to promote interdisciplinary collaboration.

H

Civic + Social

Health Sciences

A Synapse Hubs

M Nursing Lab

B Genius Bar

N Physical Therapy

C Forum

O Med Lab

D Community Cafe

P Anatomy Lab

E South Lobby

Q EMT Training

F Secure Entry Vestibule

R Shared Classroom

G West Entry and Roof Terrace H East Entry

Food Service J Reception K Administration Suite L Community Commons I

Advanced Technology

Professional Skills

S Arch. / Eng. Drafting Lab

V Prof. Skills Labs

T Computer Tech Lab

W Welding Lab

U Cyber Security Lab

X Carpentry Lab

19


20

VM DO Care e r + Tec hn ic a l Edu c a t ion

East Entry to Professional Skills


V M D O Ca reer + Tec h n i c al Edu cati on

Civic + Social As all learning is fundamentally social, students must learn to collaborate, laying an important foundation for communication — an essential prerequisite for students to practice critical thinking and creative innovation... which ultimately helps develop the confidence to take risks and iterate on failures. To do this, civic learning needs to be part and parcel of the current movement across many schools in America to equip young people with 21st-century skills. Advances in the science of learning have bolstered the 21st-century skills movement. Learning scientists offer that young people master math, reading, and science much better if they have an educational experience that develops their social and emotional learning competencies—like self-awareness and relationship skills which are the foundation of later workplace skills—and puts academic learning in a larger, more meaningful context. Alongside academic competencies, these students have support spaces to spearhead small group projects and collaborative work. Universal design principles (illustrated at left) were used to make all spaces accessible, and corridors were purposed for independent learning and collaboration while making programming visible. The Community Cafe is a choice touchdown space for independent learning and sharing a meal.

21


Nursing Lab

Med Lab


V M D O Ca reer + Tec h n i c al Edu cati on

Health Sciences Students within the Health Sciences Academy gain skills and knowledge in lab spaces that emulate real-world settings.

The Health Sciences Academy provides students a foundation for postsecondary education or work force readiness in certified health-related professions. Students explore core content with technology through integrated projects, case studies, and focused learning experiences. Highly specialized equipment and professionally planned lab spaces allow students to obtain clinical laboratory practice in a safe and supervised learning environment. The Nursing Lab emulates a real-world hospital environment with state-of-the-art equipment donated by community partners. Adjacent Simulation Labs and an ambulance pad allow for supervised emergency scenario simulations and testing.

23



V M D O Ca reer + Tec h n i c al Edu cati on

Advanced Technology The mission of Advanced Technologies Academy is to keep pace with innovation to prepare and empower students for careers in high-tech roles.

To compliment the adjacent academic programs of Handley High School, the Innovation Center is infused with flexible, technologically advanced spaces that support discovery and experimentation. Spaces that support architectural design, engineering, cybersecurity, computer networking, and systems technology are custom-designed for hands-on learning and co-located to promote visibility and collaboration. The Architectural / Engineering Drafting Lab supports a vibrant program of design and fabrication. Shared 3D printers and plotters located on the adjacent mezzanine make fabrications visible to all students, and there is an adjacent Computer Tech Lab on display through the original stage opening.

25


Welding Lab with overhead door to exterior work court


V M D O Ca reer + Tec h n i c al Edu cati on

Professional Skills The Professional Skills Academy addresses the skills gap in our workforce by equipping students with technical skills and training in state-of-the-art lab spaces that support hands-on, real-world projects. Maker Foundations, Welding, and Carpentry Labs include equipment and tools to support hands-on training of materials assembly and construction techniques. Adjacent shared classrooms are utilized for lessons on safety, compliance, and technical content. In addition, flexible lab spaces are equipped for instruction on Plumbing, Mechanical, and Electrical trades and support evening classes in partnership with the local community college.

27


Original Mt. Vernon High School Human Development Center Alexandria, Virginia



30

VM DO Care e r + Tec hn ic a l Edu c a t ion

A Nod to the Past, An Eye for the Future The Original Mount Vernon Welcome Center honors its past while looking to the future with an environmentally responsible design that shifts the concept of a community center to a human development center. Built in 1939 the Original Mount Vernon High School stands as a classic example of Colonial Revival architecture on a 22-acre site that was once part of George Washington’s estate. With a renewed sense of purpose, robust public engagement, comprehensive renovation, and historic preservation and adaptive reuse strategies, the former high school will now offer the South Fairfax County community a place to gather, learn, innovate, and be inspired: The Original Mount Vernon Welcome Center (OMVWC). The culture of the OMVWC is to provide pathways of opportunity for all patrons at every stage of life. To bring this vibrant energy into existence, the OMVWC had to be radically shifted from its previously vacant state and redesigned. The entire facility now has a refined sense of flow through three distinctive anchor spaces: Education, Performance, and Health. The design of the revitalized space creates a circular flow pattern through the building where many community programs, once housed in neighboring buildings, are now centrally located, and new programs and opportunities are unified. Each program equips patrons with skills, information, and opportunities to connect more deeply to their community and create career and economic pathways. The building will house classes, training sessions, performances, cultural events, non-profit operations, and more.

Existing exterior with historic brick detailing.



32

VM DO Care e r + Tec hn ic a l Edu c a t ion

Community & Social Center The new Original Mount Vernon Lifetime Center will be a vibrant hub built to create opportunity, create career pathways, connect different generations, and better integrate residents into the local Virginia economy. Achieved through the innovative transformation of a historic high school, this new hub will serve as a lasting thread through the fiber of Fairfax County’s civic landscape.

BUILDING BUILDING MASSING MASSING TIMELAPSE TIMELAPSE

EXISTING BUILDING EXISTING BUILDING

1939

1939

1944 saw construction two co st The above diagram,The provided above by diagram, the Virginia provided by the Virginia The originally constructed The originally Academic constructed Building Academic Building 1944ofsaw Department of Historic Department Resources of Historic (DHR), shows Resources (DHR), featured shows an iconic brick featured facade an iconic and historic brick facade cupola.and historic the Oldcupola. Shop building the(south) Old Shop an the Home ( additions to the OMVHS additions facility to the by year. OMVHS Thefacility by year. ThisThe portion primarily This housed portion classrooms primarily housed and classrooms and Economics theCottage Home Ec following study charts following building study massing chartsover building time. massing administrative over time. offices. administrative offices.

1951

1951

*1953

*1953

Additional classrooms were added to the east Additional classrooms were added toBy the1953, east several additions New Shop neighbored By 1953,completed several additions construction, completedThe construction, The NewitsShp arm of the Academic Building in 1951. This was toin 1951.including arm of the Academic Building This wasthe to theater, including gym, cafeteria, the theater, andgym, library. cafeteria, the andsouth library. side of the the property south sid in support a growing student supportpopulation. a growing student population.Additional classroom Additional space was classroom also constructed space was alsoEconomics constructedCottageEconomics also receive C south of the main Academic south of the Building. main Academic Building.to the west. to the west.

ORIGINAL MOUNT ORIGINAL VERNON MOUNT HIGH VERNON SCHOOL HIGH SCHOOL RENOVATION AND RENOVATION ADAPTIVEAND REUSE ADAPTIVE REUSE

ADDITIONS OVER ADDITIONS TIME OVER TIME OMVHS STORYTELLING OMVHS STORYTELLING DEBRIEF DE


V M D O Ca reer + Tec h n i c al Edu cati on

Preservation and revitalization of historic buildings for the purpose of expanding community access to resources, opportunities, and cultural experiences can be challenging. The Original Mount Vernon Welcome Center, located on the historic Mount Vernon grounds (aka George Washington’s estate), embodies this challenge and addressed it by illuminating pathways of opportunity for the community and embracing environmental responsibility at the same time. This community-centered campus will capture the historic stories of the building and the historic community’s past, while helping to write new stories filled with purpose for Fairfax’s residents. Within those stories, and within the walls of the reimagined campus, community members can learn more about who they are and who they have yet to be.

ELAPSE G TIMELAPSE

1939

1939

1944

1944

1947

1947

construction of two stand-alone additions: uilding nstructed Academic 1944 Building saw construction 1944 of twosaw stand-alone additions: Extensions to both the Extensions original Academic to both Building the original Academic Building oric c brick cupola. facade and thehistoric Old Shop cupola. building (south) the Oldand Shop thebuilding rst portion (south) of andand the the rstHome portion of Economics and Cottage the Home were Economics added inCottage were added in the Home Economics Cottage (west). ms arily and housed classrooms the Home and Economics Cottage (west). 1947 to expand the western 1947 to edge expand of thethe property. western edge of the property. ffices.

*1953

*1953

1954

1954

1963

1963

The New Shop neighbored its predecessor onstruction, additions completed The New construction, Shop neighbored its predecessor on OMVHS’s on most recent OMVHS’s additions featured most recent a kitchen additions featured a kitchen ater, d library. gym, cafeteria, the and south library. side of the property the south in 1954. side ofThe theHome property in 1954. ThetoHome addition the cafeteriaaddition (west), to a third the cafeteria annex (west), a third annex onstructed oom space was also Economics constructed Cottage also Economics received its Cottage nal addition also receivedbuilding its nal to addition connect thebuilding Old andto New connect Shops the (south), Old and New Shops (south), n Academic Building. to the west. to the west. and a T-shaped end toand the Gym a T-shaped Building end (east). to the Gym Building (east).

ADDITIONS OVERADDITIONS TIME OVER TIME SHEET: 5 HS STORYTELLING OMVHSDEBRIEF STORYTELLING DEBRIEF JAN.17.2022

SHEET: 5 JAN.17.2022

33


34

VM DO Care e r + Tec hn ic a l Edu c a t ion

A Lifetime of Community Support Key to the philosophy behind the creation of this project is to provide support and opportunity to each member of the community at every stage of their lives.

In collaboration with the Fairfax County client team, we identified four guiding principles to usher in the new era of this important community destination: 1.

Build communities of opportunities by placing emphasis on flexible incubator spaces that encourage people to gather and collaborate.

2.

Create career pathways through partnership with private, public, and non-profit firms to offer career counseling and training.

3.

Connect different generations with vibrant intergenerational contact zones where different generations can come together in a number of ways and for a variety of reasons.

4.

Better integrate residents into the economy by enhancing their lives and skill-sets.

Prior to undertaking the building design, a programming and planning phase sought to explore how space can best promote these principles. With the principle of creating pathways toward a lifetime of learning and support, the building itself also needed a high degree of pathway clarity. So, due to the complexity of programming, careful attention was given to the design of the Center’s navigation and movement between spaces. There are three large anchor programs – the theater, the library, and the gym – that define the overall organization of the Center. The smaller spaces were first organized around these three anchors and then adjusted based on their acoustic and lighting needs. Based on this strategic orientation, we designed a truly multi-functional building operation that can deliver concurrent functions at multiple times of day and be navigated with clarity and ease.



36

VM DO Care e r + Tec hn ic a l Edu c a t ion


V M D O Ca reer + Tec h n i c al Edu cati on

A Human Development Center That Speaks to the Future of Communities The project is organized around learning, performance, health-centric, and entertainment spaces. By providing members of the community with access to resources and services that they would otherwise not have access to in their own homes or places of work, the new “third space” facility will open the door for Fairfax County residents to be lifted up into a better and brighter future. A collective of sophisticated non-profit partners will deliver varied services within the site, bringing to the community focused support in various aspects of their livelihood.

LEARN

GROW

Library

Teen + Senior Center

Incubator Spaces

Workforce Training

Private Classrooms

Multi-use Theatre

Shared Classrooms

Community Health Training

Early Childhood Center Childhood Education

ACTIVATE

Programs

Gym

Financial Development

Pool

Consulting

Gardens

37


38

VM DO Care e r + Tec hn ic a l Edu c a t ion

First Floor + Site Plan

NON-PROFIT LEGEND New construction. Canopy overhead Potential Canopies Fairfax County

KITCHEN LOADING

INT. CTYD.

THEATER

ORIGINAL MOUNT VERNON HIGH SC

int. ctyd.

COMMERCIAL KITCHEN

12000 Government Center Parkway Fairfax, VA 22035

active patio

PARKING

Client Project Number VMDO Project Number

FOOD INCUBATION

Checked By Drawn By

play area 1

WELCOME CENTER play area 2 BUIILDINGS SHOWN HATCHED TO BE DEMOLISHED

MAIN COURTYARD

CHILDCARE DROP-OFF

PARKING

GRAPHIC SCALE 20' - 0"

0

HEADSTART/ PRE-SCHOOL

BUSINESS INCUBATION

SERVICE yARD

40'

DRAWING NO CONSTRUC ISSUES AND REVISIONS NO. SUBMITTAL

PARKING

PUBLIC DROP-OFF LANE ORIGINAL MOUNT VERNON HIGH SCHOOL RENOVATION AND ADAPTIVE REUSE 1

LEVEL 1 KEYPLAN DIAGRAMS

SHEET: 669 APR.15.2021

KEY PLAN - LEVE

EXISTING KEY PLAN - LEVEL 1

EC201 EC101 1" = 20'-0"

EC10


V M D O Ca reer + Tec h n i c al Edu cati on

39

Second Floor Plan

UNIVERSITy SATELLITE COURSES LEGEND New construction. Canopy overhead Potential Canopies Fairfax County

ORIGINAL MOUNT VERNON HIGH SC 12000 Government Center Parkway Fairfax, VA 22035

THEATER

GyM

Client Project Number VMDO Project Number

WARMING KITCHEN

WORKFORCE READINESS Checked By Drawn By

COMMUNITy SPACE

TEEN & SENIOR CENTER

GRAPHIC SCALE 20' - 0"

0

40'

DRAWING NO CONSTRUC ISSUES AND REVISIONS NO. SUBMITTAL

1

EXISTING KEY PLAN - LEVEL 2

ORIGINAL MOUNT VERNON HIGH SCHOOL RENOVATION AND ADAPTIVE REUSE

LEVEL 2 KEYPLAN DIAGRAMS

SHEET: 670 APR.15.2021

KEY PLAN - LEVE

EC201 EC102 1" = 20'-0"

EC10


40

VM DO Care e r + Tec hn ic a l Edu c a t ion

Reinvention of the Community Center Model at a Historic Place Through the reutilization of a former high school campus, the creation of this facility is first and foremost taking a strong stance on the importance of carbon emission reduction. In addition, the new facility incorporates sophisticated new technology and modern design research and thinking, pointing toward this same ambition. At the central crux of this development’s undertaking is a programmatic reinvention that drove a significant portion of the project’s decision making. This project expands the notion of what a community center can provide by stitching together a diverse set of programs that support overall human development. Services span from childcare to elderly services, as well as career services and spaces to promote health and wellness. The team sought to showcase the historic nature of the building, even amidst the many eras of architecture and construction technology that have been utilized through building renovations and additions over time. Thus the grand, columnar facade structure remains in place, with a new, modern glazed face and arrival experience flipped toward the opposite side of the building.


V M D O Ca reer + Tec h n i c al Edu cati on

41


Advanced Technology + Student Success Center Charlottesville, Virginia



We are pleased to be leading the way by constructing this net zero energy building that incorporates energy efficiency and renewable energy technologies. Not only will the Woodrow W. Bolick Advanced Technology and Student Success Center be a hub for talent creation and student success, the Center will also model the importance of sustainable practices for our community. — Dr. Jean Runyon President of PVCC


V M D O Ca reer + Tec h n i c al Edu cati on

Project Overview As a vibrant hub for academic life, PVCC’s new educational facility includes advanced manufacturing and robotics labs, cyber-security and forensics labs, instructional spaces, administrative offices, a café, student group spaces, and improved outdoor public spaces. Slated for completion by early winter of 2024, this milestone will make the Center the first higher education facility in Virginia and one of just a handful of community college facilities in the United States to achieve net zero energy. In joining the race to net zero, the Center provides a compelling example of how Virginia is taking steps to attain 100% clean energy by 2050, as outlined in Governor Northam’s 2020 Virginia Clean Economy Act. The ATSSC creates a campus destination that takes into account the unique and diverse needs of today’s community college student while also inspiring a sense of community and connection. As a first step in fulfilling the vision of a central pedestrian campus landscape, the building will serve as a new visual landmark from I-64 that showcases PVCC’s comprehensive commitment to workforce training and career development for the region.

45


46

VM DO Care e r + Tec hn ic a l Edu c a t ion

Interconnected Volumes The building is composed of three interconnected volumes: the pavilion, the portal, and the academic / advising wing. The pavilion houses a large multipurpose event space, café, student lounge spaces, student organization offices, and quiet study spaces. Given the public nature of the pavilion, emphasis has been placed on transparency between the various spaces and between interior spaces and the campus and landscape beyond. The exterior of the pavilion is a collage of both solid and visually transparent assemblies that react to views, solar orientation, and adjacent landscape spaces that support the various programs within. The portal serves as the primary vertical circulation space for the building and campus, and provides clear visual wayfinding landmarks to aid navigation to the various parts of the building. A two-story cylindrical tower acts as a focal point within the space and houses a number of front-line support specialists that will guide new and enrolled students to their destinations – both within the building and beyond. The east and west walls of the portal are designed to be nearly-transparent exterior planes of curtain-wall to promote visibility through the building.




V M D O Ca reer + Tec h n i c al Edu cati on

Spatial Variety The combination of programs was a result of necessity. They needed and wanted a student center and then they also had a need for technical training as a result of some of the legislation about supporting workforce training.

The two-story north bar of the building houses the academic / advising wing, which includes the Advanced Technical Training Department on Level One and a one-stop On-Boarding Center on Level Two. Advanced manufacturing and robotics spaces, instructional spaces, and study areas benefit from direct connection to a proposed work terrace via a pair of large overhead garage doors. These doors also enable the labs to receive deliveries of equipment, instrumentation, and materials that their curricula depend on. The On-Boarding Center provides everything a new student needs to begin her journey at PVCC and is organized into suites of rooms that integrate related personnel and functions around common resources and shared circulation.

49



V M D O Ca reer + Tec h n i c al Edu cati on

Regional Training for the Clean Energy Economy Designed to elevate PVCC’s comprehensive commitment to workforce training and career development, the Advanced Technical Training Center will lead the way in training a new generation of students for the clean energy economy. The Center will create a campus destination that meets the unique and diverse needs of today’s community college student while also inspiring a sense of community and connection. The building includes advanced manufacturing and robotics labs, cyber-security and forensics labs, and active instructional spaces. In addition, the Center will create a hub for admissions, advising, and career services as well as a welcoming, student-centered commons with a café, student group spaces, a veterans’ resource center, and a large event room with improved outdoor public spaces for multi-use programming.

51


52

VM DO Care e r + Tec hn ic a l Edu c a t ion

Floor Plans On one side of the building, there’s a technical training center on the lower level and student support programs on the second floor. The building has two upper levels for a cafe and student activities and a lower level with big flexible rooms for meetings and events that are separated from the rest of the building so that it is functional during expanded hours.


V M D O Ca reer + Tec h n i c al Edu cati on

Level 1 • • • • • • • • • •

Two Active Classrooms Wood Shop Machine Lab Electronics Lab Cyber Security Lab Computer Forensics Lab 3D Printing Lab Welding Lab Lower Lobby Event | Conference Space with Catering Support Area

Level 1 Floor Plan

Level 2 • • • • • • • • • •

Student Services Career Services Advising Suite Financial Aid Conference Room Registration Lab Advising Resource Area Integrated Service Hub Gallery Lounge Group Study

• • • • •

Student Commons Café Dining South Commons Upper Level Lobby | Commons

Level 2 Floor Plan

Level 3 • • • • • • • •

Solar Panels SGA | Meeting Rooms Student Organizations Director of Student Activities Forum | Student Publications Veterans Resources Student Commons | Games + Rec Flex Space

Level 3 Floor Plan

53


54

VM DO Care e r + Tec hn ic a l Edu c a t ion

Building Sustainability on Campus VMDO has designed several net zero energy buildings including, notably, the first LEED Zero school in the world (Discovery Elementary School), what is expected to be the largest net zero energy building in the U.S. (Alice West Fleet Elementary School), and what is expected to be the first net zero energy community center in Washington, DC (Stead Park Recreation Center).

According to the National Buildings Institute’s annual Getting to Zero report, net zero energy schools and municipal buildings have been increasing in number across the country, yet higher education facilities have tended to lag in comparison. The Woodrow W. Bolick Advanced Technology + Student Success Center is helping to set the bar for building sustainability in higher education while implementing pragmatic clean energy solutions that double as teaching tools for students.


V M D O Ca reer + Tec h n i c al Edu cati on

38 EUI

Drawing from a menu of energy saving measures, the final building design archives an EUI of 37.6 -- a 68% energy reduction compared to other buildings of its type before renewables. With the energy saving measures, like the improved thermal performance of the exterior wall, a 20% window/wall ratio, and a ground source heat pump, the building needed a far reduced PV array in order to be self sustaining.

55


DC Infrastructure Academy at Spingarn High School Washington, D.C.




V M D O Ca reer + Tec h n i c al Edu cati on

Project Overview Infrastructure is one of the fastest-growing industries in the country, soon to be amplified by the passage of the $550 billion Federal Bipartisan Infrastructure Bill in 2021. Recognizing the significance of these trades, the District of Columbia has partnered with private enterprises to develop workforce training focused on viable employment opportunities in energy, construction, and information technology. The DC Infrastructure Academy (DCIA) coordinates, trains, screens, and recruits DC residents to fulfill local infrastructure needs and provide direct pathways to jobs with leading companies. With its offerings and enrollment expanding, the Department of Employment Services (DOES) and the Department of General Services (DGS) decided to transition the Infrastructure Academy to a larger facility: the 1950’s-era Spingarn High School campus. The VMDO-DC / BELL Architects team was chosen to lead the complete programming and design necessary to modernize Spingarn High School to serve as the new home of DCIA. Key to the project is the notable historic significance and sensitivity of the Spingarn site. The DC Preservation League notes that the school was constructed in 1951 as a dedicated facility for African American students in order to relieve overcrowding at other segregated high schools in the District. As such, Spingarn is considered to be the District’s last segregated high school, with the process of desegregation beginning only two years after its opening. Notably, Spingarn’s curriculum focused on life skills including home economics, trade workshops, and laboratories. Although the school was closed and abandoned in 2013, its community role has made it a natural predecessor for the new DC Infrastructure Academy.

59


60

VM DO Care e r + Tec hn ic a l Edu c a t ion

Floor Plans The modernization of Spingarn High School will occur through four key tasks, with a commitment to historic preservation and navigation through DC agency and review boards. Task One will begin with a much-needed stormwater management plan. This will be coupled by a thorough programming and concept design phase, including engagement with DGS, DOES, and potential private stakeholders such as PEPCO, WMATA, DC Water, Washington Gas, DC Solar Works, and more. Building assessment and stabilization will determine the building’s structural needs. Finally, full design services will provide a biddable package intended to move forward into construction. The DC Infrastructure Academy is set to be a significant contribution to the local economy and a promising opportunity for DC residents. The modernization will redefine the next chapter of Spingarn High School with sensitivity, continuing its original promise of providing education, enrichment, and resources for its community.


V M D O Ca reer + Tec h n i c al Edu cati on

Level 0

Level 1

Level 2

61


62

VM DO Care e r + Tec hn ic a l Edu c a t ion


V M D O Ca reer + Tec h n i c al Edu cati on

63


64

VM DO Care e r + Tec hn ic a l Edu c a t ion

DCIA Commons

Lab


V M D O Ca reer + Tec h n i c al Edu cati on

Corridor

Student Lounge

65


CHARLOTTESVILLE OFFICE 200 East Market Street Charlottesville, VA 22902 WASHINGTON DC OFFICE 2000 Pennsylvania Avenue NW Suite 7000 Washington, DC 20006 vmdo.com | 434.296.5684


Articles inside

Community-Driven Design

1min
page 65

Site Plan + Floor Plans

1min
pages 60-61

Project Overview

1min
page 59

Building Sustainability on Campus

1min
pages 54-55

Spatial Variety

1min
pages 49-50

Interconnected Volumes

1min
pages 46-48

Project Overview

1min
page 45

Reinvention of the Community Center Model at a Historic Place

1min
pages 40-41

A Lifetime of Community Support

1min
pages 34-36

TIMELAPSE

1min
page 33

BUILDING MASSING TIMELAPSE BUILDING MASSING TIMELAPSE

1min
pages 32-33

A Nod to the Past, An Eye for the Future

1min
pages 30-31

Advanced Technology

1min
pages 25-27

Health Sciences

1min
pages 23-24

Civic + Social

1min
pages 21-22

Planning Phase

1min
pages 17-18

Small Space, Big Impact

1min
pages 13-16

Project Overview

1min
pages 11-12

Avancing Students in Our Community

1min
pages 5-7

PREPARING STUDENTS

1min
pages 3-4

Community-Driven Design

1min
page 65

Site Plan + Floor Plans

1min
pages 60-61

Project Overview

1min
page 59

Building Sustainability on Campus

1min
pages 54-55

Spatial Variety

1min
pages 49-50

Interconnected Volumes

1min
pages 46-48

Project Overview

1min
page 45

Reinvention of the Community Center Model at a Historic Place

1min
pages 40-41

A Lifetime of Community Support

1min
pages 34-36

TIMELAPSE

1min
page 33

BUILDING MASSING TIMELAPSE BUILDING MASSING TIMELAPSE

1min
pages 32-33

A Nod to the Past, An Eye for the Future

1min
pages 30-31

Advanced Technology

1min
pages 25-27

Health Sciences

1min
pages 23-24

Civic + Social

1min
pages 21-22

Planning Phase

1min
pages 17-18

Small Space, Big Impact

1min
pages 13-16

Project Overview

1min
pages 11-12

Avancing Students in Our Community

1min
pages 5-7

PREPARING STUDENTS

1min
pages 3-4
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.