Village of Downers Grove
Village Manager’s Budget Message
Village Manager’s Budget Message
Introduction
The Municipal Budget is the Village’s annual implementation plan of its mission and strategic goals. The purpose of the budget is to align everyday operations and Village resources with community priorities outlined in planning documents such as the Long-Range Plan and the Comprehensive Plan. It also includes shorter term priority action items identified by the Village Council. The FY15 Proposed Budget is consistent with the Village’s strategic goals, specifically the goal to be a Steward of Financial Sustainability.
The Proposed Budget is a starting point for council discussion. The budget will be reviewed and discussed over several months in an open, transparent and participative process. The budget review process provides ample opportunity for dialogue among community members, the Village Council and staff in a series of public meetings and workshops.
Budget Review and Approval Schedule
Saturday Budget Workshop (Fire Station 2) Saturday, October 11 Budget First Reading at Village Council Meeting Tuesday, October 14 Budget Coffee with the Council (Fire Station 2) Saturday, October 18 Budget Discussion at Regular Council Meeting (If Necessary) Tuesday, October 21 Public Hearing Tuesday, November 4 Motion to Estimate Levy/Budget Adoption Tuesday, November 11 Tax Levy Public Hearing Tuesday, December 2 Adopt Tax Levy Tuesday, December 9
Village Budget Reflects Planning Documents and Reports
The Village’s annual budget is the implementation document for plans and studies that have already been discussed or approved including: ● ● ● ● ●
Long-Range Plan 2013-2015 Comprehensive Plan 2014 Stormwater Project Analysis 2013 Flood Report 2012 Stormwater Utility Study
● ● ● ● ●
2010 Water Rate Study 2006 Stormwater Master Plan Sidewalk Matrix Bicycle and Pedestrian Plan Downtown Parking Plan
1-1
Summary
Village Manager’s Budget Message
1-2
The FY15 Proposed Budget demonstrates the Village’s commitment to continuous improvement and innovation as well as to the provision of exceptional municipal services at a value to residents, businesses and other stakeholders. The following key components are evidence of this commitment: A. Property Tax Levy Decrease: As proposed, the Village’s property tax levy would decrease by nearly $180,000 (1.55%) in FY15. The public safety pension levies will be lowered due to strong investment returns. All other levy components are proposed to remain unchanged from FY14. (See page 4-2.)
B. Sustainable General Fund: The Village’s General Fund is financially sound and sustainable, with proposed expenses and revenues of $44.8 million, demonstrating a commitment to cost containment and continued modest revenue growth. (See page 4-2.)
C. Staffing Reduced: In the Proposed Budget, the Village would reduce its total full-time equivalent (FTE) staff by 3.6 positions in FY15. The reduction is due in part to the elimination of 3.4 FTE bus driver positions as the Grove Commuter Shuttle service will be operated by PACE using a third party contractor and the elimination of the vacant Community Development Director position as these job responsibilities were assigned to the Planning and Building Division Managers. Since 2009, the Village has reduced staffing by over 37 FTE positions. D. Continued Investment in Infrastructure: The Village will continue to make major investments in the Village’s infrastructure, including $9.5 million in streets, $4.6 million in stormwater and $5.6 million for water. The budgeted investments in infrastructure follow the plans previously created by the Village Council. The improvements are designed to reduce the total life cycle cost of owning and operating the infrastructure systems. (See page 6-2.) E. Funding for Priority Action Items: The FY15 Proposed Budget provides funding for the priority action items identified by the Council to be completed in 2015.
The Village budget is comprised of 24 active funds. The total budget for all funds is approximately $126.4 million in revenues and $135.0 million in expenses. Expenses will exceed revenues in FY14 due to planned spending down of accumulated fund balance and the continued investment of bond proceeds into street, water and stormwater infrastructure projects.
Transportation Fund Eliminated -
The Transportation Fund has been eliminated because the Village will no longer operate the Grove Commuter Bus Shuttle, the only service provided by this fund. In 2014, the Village took two major steps regarding this service:
1) Used a portion of the General Fund balance to eliminate a $1.9 million deficit in the Transportation Fund, a result of several years during which the cost of providing the service exceeded available revenues, and
2) Terminated an agreement with PACE to manage the service on PACE’s behalf. The existing commuter shuttle routes will be served by a private PACE contractor and there will be no impact to commuters.
Village Manager’s Budget Message
Property Tax Levy Decrease Description
The total municipal budget relies on several sources of revenues, but the property tax levy is one of the most significant sources of funding. Property taxes account for approximately 23% of the General Fund budget. The Village’s property tax is comprised of five components that support specific services and obligations of the Village. The two most significant components of the levy are the levy for operations and the levy for pension obligations.
Recent History
Since FY11, the Village’s property tax levy for operations has been flat or decreased each year.
FY14 Budget Considerations
Equalized Assessed Valuation: Based on conversations with the Township Assessor’s Office, the total Equalized Assessed Valuation of all taxable property in the Village is expected to remain approximately the same.
In FY13, the Village shifted stormwater management costs from the property tax levy to the stormwater fund using a separate stormwater utility fee. This resulted in a decline in the total property tax levy of $1.98 million or 15.2%.
Operations: As proposed, the property tax levy for operations will not increase in FY15. This would be the fourth consecutive year of a flat or decreasing levy for operations. This reflects the Village’s commitment to controlling operating expenses and aligns with the Long Range Plan strategies. Pensions: Due to strong investment returns exceeding return expectations, the property tax levies for the Police and Fire Pension Funds will decrease by nearly $180,000. (See page 4-4.)
Proposed Village Tax Levy
Under the proposed budget the total tax levy would decrease for the third time in four years.
Village Tax Levy FY11 to FY15 $16,000,000 $14,000,000
$13.38M
$12.98M
$12,000,000
$11.01M
$11.59M
$11.41M
FY13
FY14
FY15
$10,000,000 $8,000,000 $6,000,000 $4,000,000 $2,000,000 $0 FY11 Corporate Levy
FY12 Fire Protection
Fire Pension
Police Pension
Stormwater/Capital
1-3
Village Manager’s Budget Message 1-4
Village Property Tax Levy FY14 vs. FY15 The components of the tax levy are shown in the table below.
Tax Levy Component
FY14
FY15
Corporate Levy
$2,997,145
$2,997,145
--
--
Fire Protection
$2,850,000
$2,850,000
--
--
Fire Pension
$2,467,520
$2,330,108
($137,412)
(5.57%)
Police Pension
$2,303,858
$2,261,516
($42,342)
(1.84%)
$971,524
$971,524
--
--
$11,590,047
$11,410,293
($179,754)
(1.55%)
Capital Total
Change
Percent Change
Impact of Proposed Tax Levy on a Typical Residential Property
In 2014 a typical residential property with a market value of $300,000 paid $574.30 to the Village. The taxable value of the same property is expected to remain unchanged in 2015. With the reduction in the Village property tax levy, a typical residential property would be expected to pay about $565.40 in Village property taxes, a reduction of $8.90.
Equalized Assessed Value Village Tax Rate Village Tax Amount
FY14
FY15
Difference
$100,000
$100,000
--
.5743
.5654
(.0089)
$574.30
$565.40
($8.90)
Village Manager’s Budget Message 1-5
Property Tax Breakdown
The Village portion of the property tax bill is generally about 9% of the total tax bill. Below is a breakdown of the percentage of distribution to local government entities from a typical tax bill. The information, as well as the property tax history of each parcel, is available on the DuPage County website at www.dupageco.org.
VILLAGE
Township
1.45% of DOWNERS College DuPage DuPage GROVE 4.66% County 9.05% 3.21% of
Distric 58
35.63%
Sanitary District
0.58% DuPage Airport Authority
0.28%
Forest Preserve District 99
Park District
32.66%
5.82%
Library
3.94%
2.61%
Sustainable General Fund Description
Recent History
Village Manager’s Budget Message
The General Fund is the main operating fund of the Village and includes funding for the majority of Village services. The proposed General Fund budget is sustainable and fiscally sound with revenues and expenses of $44.8 million. The General Fund derives its revenue from several sources, with the top four sources being property tax, sales tax, utility tax and state shared revenue (income tax). Since 2009, the Village eliminated a structural gap in the General Fund by reducing staffing levels, implementing cost-cutting process improvements including significant savings in the areas of Fleet management and special events, and controlled health expenses. Revenues increased 15.09%, an average of 2.51% per year, driven by increases in the distributed state income tax (19.94% increase since 2009), sales tax (15.04% increase since 2009) and some large one-time revenues due to commercial redevelopment. As a result, the Village established a strong fund balance of $20.4 million in FY13.
The Village used $3.8 million of the fund balance to eliminate the Transportation Fund accumulated deficit and to reduce the cash deficit in the Risk Fund (see Long Range Plan page 6). The Village will add approximately $300,000 to the General Fund Fund Balance at the end of FY14. The projected fund balance will be 38% of 2015 expenses, within the Village’s policy and consistent with the LRP strategy to keep a AAA bond rating.
FY15 Budget Considerations
As proposed, the General Fund expenses would increase by 2.6% compared to the FY14 budget and 2.1% compared to FY14 estimated expenses prior to transferring funds to the Risk Fund and Transportation Fund. (See page 4-3.) Personnel expenses, including salaries, health benefits and post-employment benefits such as pensions, account for about 77% of the General Fund. Personnel expenses would increase by .21% over the FY14 budget. As proposed, non-personnel expenses would increase by 11.29%.
Revenues are budgeted to increase by 2.4% over the FY14 budget and 1.3% over the FY14 estimated revenues. The Village anticipates moderate growth in sales tax, income tax, licenses and permits. Consistent with the Long-Range Plan, user fees, licenses and permits will be adjusted at a rate similar to personnel expenses to align with the costs of providing services. (See page 4-4.)
1-6
Village Manager’s Budget Message
Proposed General Fund Revenues & Expenses, FY10 to FY15 (in millions) Revenue
Expenses
Difference
Fund Balance
Fund Balance % of Expenses
FY10 (Actual)
$39.44
$39.20
$0.24
$15.68
40.00%
FY11 (Actual)
$41.86
$40.33
$1.52
$17.20
42.65%
FY12 (Actual)
$43.32
$41.31
$2.01
$19.20
46.48%
FY13 (Actual)
$43.56
$42.33
$1.23
$20.43
48.26%
FY14 Budget
$43.79
$43.70
$.09
$15.91
36.42%
FY14 Estimate Prior to Risk & Transportation Fund Transfers
$44.24
$43.91
$.33
$20.76
47.28%
FY14 Estimate Including Risk & Transportation Fund Transfers
$44.24
$47.71
($3.47)
$16.97
38.65%
FY15 Proposed Budget
$44.82
$44.82
--
$16.97
37.88%
Proposed General Fund Expenses by Category FY14 vs. FY15 Category Personnel Non-Personnel Total
FY14 Budget
FY15 Budget
Change
% Change
$34,399,433
$34,473,223
$73,790
0.21%
$9,299,180
$10,349,039
$1,049,859
11.29%
$43,698,613
$44,822,262
$1,123,649
2.57%
The FY15 Proposed Budget aligns with the Long-Range Plan goal to limit personnel-related cost increases. Employee wages are budgeted to increase by 3.0% while benefit expenses are budgeted to increase by 3.8%. The Village will see a decrease in annual pension contributions to for Police and Fire ($180,000) due to very favorable investment returns and IMRF ($350,000) due to the expiration of early retirement incentives offered to some employees in the early 2000s.
Pursuant to the strategy outlined in the Long-Range Plan, the Proposed Budget includes an increase in the annual contribution to the Risk Fund in FY15. This annual contribution of $1.3 million is considered a non-personnel expense. (See page 4-8.) Other increases in non-personnel related expenses include $150,000 for an upgrade to the in-car camera system in the Police Department. This cost is offset by revenues from DUIs.
These increases would be offset by decreases for Emerald Ash Borer costs which are now being budgeted in the Capital Fund, and in most other non-personnel accounts due to Lean improvements throughout the organization. (See EAB Report.)
1-7
Village Manager’s Budget Message
Top Ten General Fund Revenues RANK
FY 2012 Actual
SOURCE
1
Sales Tax
2
FY 2013 Actual
FY 2014 Budget
FY 2014 Estimate
FY 2015 Budget
$10,772,180
$11,345,002
$11,300,000
$11,600,000
$11,850,000
Property Taxes - Operations
$6,728,914
$5,898,786
$5,847,145
$5,847,145
$5,847,145
3
Utility Taxes
$5,690,708
$5,275,316
$5,505,000
$5,258,000
$5,440,000
4
State Income Tax
$4,203,160
$4,557,546
$4,400,000
$4,570,000
$4,750,000
5
Property Taxes - Pensions
$3,747,734
$4,218,455
$4,771,378
$4,771,378
$4,591,624
6
Home Rule Sales Tax
$1,862,873
$1,909,870
$1,975,000
$1,975,000
$2,000,000
7
Building Related Permits
$1,445,138
$1,234,564
$1,023,000
$1,250,000
$1,250,000
8
Cellular Equipment Rental Fees
$1,105,625
$1,175,653
$1,195,844
$1,200,000
$1,128,000
9
Ambulance Fees
$1,112,859
$1,060,869
$1,100,000
$1,100,000
$1,107,000
$832,460
$851,675
$860,000
$860,000
$860,000
Sub -total
$37,501,651
$37,527,736
$37,977,367
$38,431,523
$38,823,769
All Other Total
$5,821,723
$6,030,308
$5,815,451
$5,807,517
$6,000,855
Total General Fund Revenues
$43,323,374
$43,558,044
$43,792,818
$44,239,040
$44,824,624
10
Hotel Tax
1-8
Staffing Reduction Description
Recent History FY15 Budget Considerations
Village Manager’s Budget Message 1-9
Personnel expenses make up approximately 77% of total expenses. The Village continually seeks to reduce or control personnel expenses by seeking alternative service providers, consolidating functions with other entities or using technology to make existing employees more efficient.
Since 2009, the Village has reduced its total staffing by 37.2 FTEs from 366.5 to a proposed 329.3 in FY15. This was accomplished through various methods, including attrition, involuntary reductions in staff, and consolidation of services with other entities. The Proposed Budget would reduce the total number of FTEs by 3.6 over the FY14 total. This is a result of the following actions: ● The transition of Grove Commuter Shuttle to a PACE operated system resulted in the elimination of 3.4 part-time bus driver positions. ● The elimination of the vacant Community Development Director position. The responsibilities previously assigned to this position have been reassigned to the Building Division Manager and the Planning Manager. Additional assistance in building permit plan review, building inspections and code enforcement inspections will be provided using private sector contractors. ● Addition of a Management Analyst position in the Village Manager’s Office - Using a portion of the funds made available by the elimination of the Community Development Director position, the FY15 budget includes a Management Analyst position that will support key functions in most Village departments.
Improved Efficiency Community Development
In support of the Village’s Long-Range Plan goal to reduce personnel costs and increase operating efficiencies, the Village implemented a plan to improve Community Development Department services by eliminating a director-level vacancy, reassigning responsibilities and adding resources for building permit plan review, building inspections and code enforcement. The plan will allow the Village to continue to provide existing service levels at a lower overall cost by using part-time employees and private contracted firms. This approach allows the department to be more flexible and well-positioned to respond to changes in building permit activity and seasonal staffing demands.
Continued Investment in Infrastructure
The Village’s strategic goal to provide Top Quality Infrastructure requires a commitment to ongoing investment in maintenance, as well as investment in replacing or building new infrastructure. Since 2010, the Village has created and followed plans for sustainable funding for infrastructure. As a result, the Village has made major investment in streets, the stormwater system, the water systems and sidewalks. The FY15 proposed budget calls for continued investment in infrastructure. The investment allocation is shown to the right. (See section 6.)
FY15 Capital Budget by Major Program Type Wa ter 24%
Ma jor Buildings 4%
Streets 40%
Tra ffi c, Bikeways a nd Other Projects 3%
Stormwa ter a nd Dra i nage 19% Pa rki ng Deck and Pa rking Lots 7%
Si dewalks 3%
Village Manager’s Budget Message 1-10
Description
Recent History
The Village maintains several major infrastructure systems: streets, sidewalks, stormwater and water. In addition, the Village manages public facilities, traffic and streetlight systems and the parking deck and parking lots. The Village has both long and short-term spending plans for each of its major systems. Short-term spending plans are in the annual Community Investment Plan. In 2014, the Village will complete approximately $20 million of infrastructure projects including: Streets - Completed $6.96 million in street reconstruction projects (Downers Grove Estates, Esterbrook and Brook & Center) and $4.91 million in street maintenance projects. Stormwater - Completed $3.57 million in new projects to mitigate flooding. Acquired and demolished houses susceptible to recurring flooding. Water - Completed $3.75 million in new watermains, valves and hydrants.
FY15 Budget Considerations
Sidewalks - Completed $860,500 in new sidewalks and sidewalk maintenance, as well as ADA-compliant right-of-way improvements.
The Proposed FY15 Budget includes $23.5 million for continued investment in the Village’s water, streets, stormwater, sidewalk and other systems.
Streets - The Proposed FY15 Budget includes $5.1 million for street reconstruction projects (Brookbank Road-59th to 60th St, Clyde Estates, Orchard Brook East, Maple-Fairview to Cumnor, and Lacey Road-north of Ogden) and $4.4 million for street maintenance projects on nine miles of streets. Street reconstruction projects are funded by the 2012 bond issuance; maintenance activities are funded by the Motor Fuel Tax, Home Rules Sales Tax and Local Gasoline Tax. (See page 4-28 - 4-30.)
Stormwater - The Proposed FY15 Budget includes $4.56 million in CIP projects and approximately $1.9 million in operations and maintenance. Revenues for stormwater expenses are provided by stormwater utility fees. These fees are budgeted to increase by 8.7% in FY15. The budget calls for continued spending of existing fund balance in the Stormwater Fund for capital projects as well as gradually increasing maintenance activities in order to reach the full maintenance goals by 2028. (See page 4-20.) Water - The Proposed FY15 Budget includes $5.6 million for water infrastructure projects, including $2 million for the replacement of the meter transmission units, which transmit utility readings from customers to the Village’s billing system. (See AMR Report.) The proposed budget includes a 14% increase in water rates to cover the cost of purchasing water from the City of Chicago via the DuPage Water Commission as well as capital costs for system maintenance and replacement. (See page 4-24.) Sidewalks - As proposed, the FY15 Budget would include $500,000 for new sidewalk construction projects, $211,000 for sidewalk maintenance and $50,000 for crosswalk and accessibility improvements. (See page 4-30.)
Parkway Trees - The Proposed FY15 Budget $261,300 for the installation of new parkway trees including funding for the removal and replacement of trees affected by the Emerald Ash Borer (see EAB Funding and Operations).
Village Manager’s Budget Message
Improving the Streets in Downers Grove
1-11
There are two major categories of street condition: Maintainable and In Need of Reconstruction. Maintainable condition refers to a street that is crack-filled, patched and resurfaced on a regular schedule, allowing it to continue to function. Streets that do not receive that level of maintenance investment eventually fall into the category of In Need of Reconstruction. This means that the pavement has failed and is not salvageable. Reconstruction is the most expensive and disruptive type of pavement project and it is four times as expensive to reconstruct a street segment as it is to maintain it regularly. The Village is currently in the process of bringing all of its streets up to Maintainable condition by the end of 2015. At that point, fewer than 1% will be considered failed. The existing level of funding for infrastructure maintenance is insufficient to maintain this level of maintenance and without additional funding, a significant portion of the Village’s street segments will need reconstruction by 2040. An additional $1.2 million in annual funding will keep 99% of street segments in Maintainable condition. The charts below show how the Village has improved the condition of streets since 2010. During the Long-Range Plan process, the Village identified existing revenue sources that can be reallocated to street maintenance beginning in 2016.
Street Condition in 2010 In Need of Reconstruction
Maintainable
78%
Percentage in maintainable condition vs. in need of reconstruction
22%
Street Condition in 2012 In Need of Reconstruction
Maintainable
84%
16%
Percentage in maintainable condition vs. in need of reconstruction
Street Condition in 2015 In Need of Reconstruction
Maintainable
99%
Percentage in maintainable condition vs. in need of reconstruction
1%
Effect Of Proposed Water Rate Increase On Typical Resident Typical Residential User - Bi-Monthly Bill 2014 Typical Bill
2015 Bill (Plan 9% increase for fixed charge, 14% increase per unit)
$90.00
Typical Residential User (15 units bi- monthly, 5/8” Fixed Meter Charge)
$101.99
Effect Of Recommended Stormwater Fee Increases
The Stormwater Utility plan calls for an increase of approximately 8.7% in FY15. The fee per ERU will increase from $8.94 in FY14 to $9.72 per month in FY15.
Single Family Residential
2014 Fee
2015 Recommended Fee
Typical Residential Property (2,501- 4,000 square feet of impervious area) = 1 ERU
$8.94 per month $107.28 per year
$9.72 per month $116.64 per year
Village Manager’s Budget Message
Priority Action Items
In the FY14 Long-Range Plan process, the Village Council identified action items to further the Village goals. The FY15 Proposed Budget includes resources to accomplish several action items.
Action Item
Funding
Complete Facilities Sustainability Plan and Implementation
The FY15 Proposed Budget includes $4.5 million for the acquisition and improvements of land in the Ogden Avenue TIF, $1.5 million in the Asset Forfeiture Fund, professional services design work and related consulting services on the police station project, and $150,000 in the Major Buildings Fund. (See attached report)
Construct Gateway Signs
The FY15 Proposed Budget includes $100,000 in the Capital Projects Fund for construction costs.
Continue to Improve Resident Engagement
This project will be completed by staff. No specific additional funding is required (See attached report)
Develop Employee Compensation Strategy
This project will be completed by staff. No specific additional funding is required.
Negotiate Collective Bargaining Agreements (Police and Public Works)
This project will be completed by staff. No specific additional funding is required.
Consider Amendments to Stormwater Management
This project will be completed by staff. No specific additional funding is required.
Develop a Standard for ROW Improvements
This project will be completed by staff. No specific additional funding is required.
Update New Construction Sidewalk Plan
This project will be completed by staff. No specific additional funding is required.
Continue to Implement Downtown Parking Plan
This project will be completed by staff. No specific additional funding is required.
1-12
Impact of Budget on Typical House Category Property Tax Stormwater Fee Water Fees TOTAL ANNUAL IMPACT OF BUDGET
Village Manager’s Budget Message
1-13
Annual Increase/(Decrease) ($8.90) $9.36 $71.94 $72.40
Risk to Budget
Risks to the Adopted Budget - As discussed during the Long-Range Plan process, the Village faces an ongoing risk that the State of Illinois will decrease or eliminate funding to municipalities currently provided through the Local Government Distributive Fund. The Village currently receives approximately $4 million in a per-capita share of the State’s Income Tax. Additionally, while the revenue increases are conservative, there is a chance that the economic recovery could slow, reducing revenues below budget. The Village’s status as self-insured also represents a risk to the General Fund. The Village maintains insurance against catastrophic claims but smaller, unanticipated claims have the potential to impact the budget significantly. Staff will monitor and report revenue performance to the Village Council as necessary throughout 2015. If revenues fall short of the budget, the Village should be ready to discuss amendments to the budget at any time during 2015. The amendments, if necessary, could increase expense reductions, use of reserves or additional revenue enhancements.
Supplemental Reports
Facilities Planning Report Stormwater Utility Fee and Spending Modeling Stormwater Utility Restructuring Community Grants Report Automated Meter Reading Report Customer Response Management System Report Emerald Ash Borer Funding and Operations Research and Development Proposal
Memorandum To: Mayor & Village Council From: David Fieldman, Village Manager Date: September 26, 2014 Topic: Facility Sustainability Plan _______________________________________________________________________ During the past ten months, the Village Council and staff have worked together to prepare a Facility Sustainability Plan. After considering a wide range of options, the Village Council indicated that the facility sustainability plan should be based on “Option 4 Mixed Use, Partnership Option.” This report: ● Provides background about the facility planning process ● Summarizes the key components of the Facility Sustainability Plan ● Includes a preliminary facility project budget ● Identifies and explains the revenue sources that will be used to pay for project expenses ● Explains the impact of the facility sustainability plan on the Village’s bonding capacity ● Shows the impact of the facility sustainability plan on the proposed FY15 municipal budget
Background In the 201315 Long Range Plan, the Village Council identified as one of the high priority action item the creation of a Facility Sustainability Plan. The action item update sheet is available here: http://www.downers.us/public/docs/mayor_council/StrategicPlanUpdates/2014_Action_Items/HPAI_Re port%20_FacilitySustainability.pdf The Village made progress on this project in 2014, focusing efforts around: ● Understanding the vision and preferences of the Village Council ● Evaluating a wide range of options available for the successful completion of this project ● Engaging the community on the project options and decisionmaking
Facility Sustainability Plan At the Council Meeting on September 9, 2014, the Village Council indicated that the facility sustainability plan should be based on “Option 4 Mixed Use, Partnership Option.” This plan calls for the construction of public facilities and private developments in two phases at two separate locations. Phase 1 includes the construction of a new Police Station, Fire Station #1, (now located in Ellsworth Business Park) and Vehicle Fleet Maintenance Facility approximately 80,000 square feet in area on the rear portion of the vacant 9.8 acre property on Ogden Avenue at Lacey Avenue (see aerial photo
below). The front portion of the property would be developed with privately owned commercial buildings. The budgeted cost for this phase is $38 million and would be paid for with Ogden Avenue TIF District funds (for the cost of acquiring the public portion of the land and the cost of making improvements to the property that benefit both the Village facility and the private commercial development) and a general obligation bond supported by existing property taxes, existing local gasoline taxes and new revenue sources likely to include property taxes. The Village would also explore the use of grant funding. Site development and design of the Village facility is expected to take place in 2015. Construction of the Village facility is expected to take place in 2016.
Phase 2 includes the construction of a new Village Hall, approximately 40,000 square feet in area, on the west side of the Civic Center property (south of the railroad tracks, east of Washington Street; see aerial photo). Further, the plan calls for the balance of the Civic Center property, east of the new Village Hall, to be sold to a real estate developer to be improved with approximately 200 or more residential units (apartments or condominiums). The budgeted cost for this phase is $14 million. The construction of the new Village Hall would be funded by the proceeds of the sale of land to the developer and the property taxes paid by the new residential development for 23 years following the commencement of construction. A tax increment financing district would be created to capture these property tax revenues and would be used to support Village Hall construction costs. Design of the new Village Hall is expected to begin in late 2015 with construction starting in early 2017.
Summary of Village Facility Sustainability Plan
What?
Why?
Phase 1
1. Make site improvements to 9.8 acre Ogden & Lacey parcel 2. Construct combined municipal facility on rear portion of site 3. Facilitate commercial development of Ogden Avenue frontage
Allow for the relocation and consolidation of municipal buildings (police station, fire station & fleet services) to property that: 1. Has limited commercial value 2. Meets Village’s operational needs 3. Helps facilitate commercial/economic development
Phase 2
1. Construct new facility on existing site (Village Hall & possible partners) 2. Facilitate residential/mixeduse redevelopment of remaining site
Leverage private redevelopment of the site to: 1. Provide funding sources for public facilities 2. Achieve comprehensive plan goal of providing transit oriented residential development in the downtown
Preliminary Project Budget Staff prepared the following preliminary budget which was used during the Village Council discussion of the facility plan options. This budget is suitable for planning and preparing the FY15 municipal budget. However, it is not detailed enough to serve as the development and construction budget. One of the first next steps in the project is to prepare a detailed project budget with the assistance of an owner’s representative and a professional cost estimator. The detailed project budget should be completed by the end of 2014.
Expenses
$ (in millions) Revenues
$ (in millions)
Phase 1
Professional Services Land Acq./Site Dev. Hard Costs Furniture, Fixtures & Equipment Contingency Total
2.4 5.8 25.0 1.8 3.0 38.0
Ogden TIF Asset Forf. Fund Bond Issue Existing Rev. (12.0) New Rev. (19.5) Total
5.0 1.5 31.5 38.0
Phase 2
Professional Services Hard Costs Furniture, Fixtures & Equipment Contingency Total
1.2 11.0 0.8 1.0 14.0
Land Sale New TIF Revenue Total
4.0 10.0 14.0
Revenue Sources to be Used for Project Costs Ogden TIF: $5.0 Million With the existing balance in the Ogden TIF fund of $4.75 million and budgeted annual revenue from tax increment of just over $600,000, the Ogden TIF fund can provide $5.0 million for Phase 1 expenses. The money would be used to pay for the cost of acquiring the public portion of the land and the cost of making improvements to the property that benefit both the Village facility and the private commercial development. Expenses would be paid over two years (2015 and 2016). Bond Issue: $31.5 Million The Village would issue a bond of up to $31.5 million to pay for the cost of designing, constructing and furnishing the Village facility. The estimated annual debt service payments on a $31.5 million bond with a 20year amortization period range from $2.0 million to $2.25 million. The Village has existing revenues in place that are currently used to make debt service payments on existing library construction bonds (about $600,000 per year) and Fairview Avenue reconstruction bonds (about $200,000 per year). Both bonds will be retired in 2016. The existing revenues of approximately $800,000 will be used to make debt service payments on the facility bond issuance. Up to $1.2 million in new annual revenue will have to be generated to make the annual payments on the planned bond issuance. Asset Forfeiture Fund: $1.5 Million The Asset Forfeiture Fund has a current balance of $1.27 million and generates approximately $500,000 per year. $1.5 million will be available to pay for Phase 1 project expenses in 2015. Revenues in this fund are unpredictable and highly variable. It is possible that
future year revenues collected in 2016 and 2017 may be allocated to pay for a portion of project construction costs. Land Sale Proceeds: $4.0 Million The facility sustainability plan calls for the Village to sell the east portion of the Civic Center property to a private developer. The property would be developed with a minimum of 200 residential units (midrise development with apartments or condominiums, in conformance with Village plans and ordinances). The sale of this property for this purpose is expected to generate a minimum of $4.0 million. This money would be used to pay for Village Hall development costs. New TIF Revenue: $10.0 Million The facility plan calls for the Village to create a new tax increment financing (TIF) district that includes only the Civic Center property. With the creation of the new TIF district, all of the property taxes generated and paid by the new residential development would be used to pay for Village Hall development costs. The TIF district would generate property tax revenue for 23 years commencing with the start of construction. This revenue stream is expected to generate a total of over $15 million during this period. This revenue stream could be used to fund a Village bond issuance, could be pledged to the residential developer as income allowing the developer to increase the land purchase price, or could be sold to a third party for upfront cash. In any case, the revenue would be used to pay for Village Hall development costs.
Impact of the Facility Sustainability Plan on the Village’s Bond Capacity The Village could be issuing bonds of up to $41.5 million to construct the facilities. The Village’s financial advisor, Northern Trust, performed an analysis of the potential bond ratings on all potential bond issuances, including bonds for facilities. They concluded that the Village’s overall net debt as a percent of market valuation will continue to remain low and below the Standard & Poor’s guideline.
Project Schedule Milestone
Timeframe
Phase 1 ● Select Professional Services Firms ● Present Proposed Redevelopment Agreement for Ogden & Lacey Property ● Approve Space Program ● Approve Final Design Plans ● Develop Ogden & Lacey Site ● Award Construction Contract
By December 2014 By January 2015 By April 2015 By July 2015 By November 2015 By January 2016
● Construct Facility
By Spring 2017
Phase 2 ● Select Professional Services Firms ● Approve Village Hall Space Program ● Select Developer ● Approve Site Concept Plans ● Approve Redevelopment Agreement ● Approve Final Plans ● Approve TIF District ● Construct Facility
By December 2015 By March 2015 By January 2016 By May 2015 By July 2016 By December 2017 By Spring 2018 By Spring 2018
Impact to FY15 Budget The FY15 proposed budget includes $6.15 million for the implementation of the facility plan. Funding for this project appears in the following funds and for the following purposes: Fund 114 Asset Forfeiture Fund
$1.5 Professional Services and Design of Police Facility
110 Ogden Avenue TIF
$4.5 Purchase of property and site improvements associated with the Ogden and Lacey Site
223 Major Buildings Fund
$ (in millions) Purpose
$0.15 Professional Services
Memorandum To: Mayor & Council From: David Fieldman, Village Manager Re: Potential Changes to Stormwater Utility Plan Date: September 26, 2014 _______________________________________________________________________ At the August 9 LongRange Plan Meeting, the Village Council asked staff to provide alternatives to the existing stormwater utility revenue and expense plan. This report outlines the results of two alternative scenarios that would increase spending on maintenance while reducing spending on capital improvements without changes to planned revenue. The FY15 Stormwater Fund budget includes approximately $3.8 million in revenues. The Village allocates funding between annual capital projects, existing debt service and operations and maintenance (O&M). Over the next two years, the Village will spend down remaining fund balance in the Stormwater Fund before relying exclusively on stormwater fee revenues for capital improvements (including bond issuances) and O&M expenses. Without changing the plan for revenue generation (stormwater fees), the Village could increase maintenance spending from the planned $2 million to up to $3 million beginning in 2015 ($4 million is the recommended level). This incremental spending in maintenance would be directed primarily toward additional storm sewer maintenance (televising and cleaning) and street sweeping. However, this additional funding for maintenance would reduce funding for capital projects that were identified after the April 2013 flood. Analysis Existing Plan: The existing stormwater fund revenue and expense plan will increase maintenance activities from the current level to the recommended level by 2028 and allow for $4.0 to $6.1 million in capital projects each year. The projects will be completed over ten years beginning in 2017. This plan calls for annual rate increases of approximately 8.7%. This plan has two major components: ● Spend approximately $2 million on maintenance in FY15 about 50% of the recommended amount and increase budget for maintenance incrementally each year. ● Complete 26 major capital projects between 2017 and 2023 with $10 million bond issuances in 2017 and 2020 (See attachment for list of planned capital projects.)
Alternative Scenario 1: In this scenario, spending on annual O&M activities would be initially increased to $2.4 million (about 60% of the recommended funding amount) and spending on capital projects would be reduced by $400,000. The scenario would result in: ● Increased televising and cleaning storm sewers ● Increased street sweeping ● Elimination of three floodplain projects and three local drainage projects Alternative Scenario 2: In this scenario, spending on annual O&M activities would be initially increased to $3 million (about 75% of the recommended funding amount) and spending on capital projects would be reduced by $1 million. Due to annual existing debt service payments of $1.14 million, this is the maximum that could be reallocated to maintenance with existing revenues. The scenario would result in: ● Further increased televising/cleaning storm sewers ● Further increased street sweeping ● Elimination of 17 future capital projects identified after the April 2013 floods The table below summarizes the impacts of each scenario. Recommended Level of Service
Annual O&M Spending
$4.0 Million
Annual O&M Activities Televising/Cleaning 143,000 lineal feet of Sewers Street Sweeping 2,150 curb miles Capital Projects to be Completed by 2017
NA
Existing Plan
Alternative 1
$2.0 Million
$2.4 Million
20,000 lineal feet 764 curb miles
85,000 lineal feet 1,300 curb miles
26 9 previously identified in CIP 17 new
Alternative 2 $3.0 Million 143,000 lineal feet 2,150 curb miles
20 9 previously identified in CIP 9 previously identified 11 new in CIP
Lists of Planned Capital Projects for Each Alternative Capital Projects to be Constructed Per Current Plan St Joseph Creek, South Branch Streambank Stabilization Phase 2 St Joseph Creek, Main Branch Japanese Knotweed Control Cumnor Rd,between Sheldon and Chicago Structure Replacement Lacey Creek Streambank Stabilization Phases 2 & 3 PW Parking Lot Reconstruction Stormwater Quality Improvements Chicago & Washington, Local Drainage Improvements Clyde Estates, Local Drainage Improvements Headwall Replacement, Gilbert and Brookbank Headwall Replacement, Grand at 55th St. Middaugh and Jefferson, Local Drainage Improvements Drendel Road South of Indianapolis, Local Drainage Improvements Francisco at Burlington north, Local Drainage Improvements Pershing Between Ogden and Grant, Local Drainage Improvements Downers Drive/Virginia Street/Seeley Ave./40th st.Bellaire to Seeley, Local Drainage Improvements Washington south of Ogden/Highland Court, Local Drainage Improvements Walbank North of Warren, Local Drainage Improvements Downers Drive/Virginia Street/Seeley Ave./40th st., Local Drainage Improvements Elm and Earlston Between Ogden and 41st St., Local Drainage Improvements Black Oak Drive Between Saratoga and Candlewood, Local Drainage Improvements Debolt/Linden/Gierz, Local Drainage Improvements Benton and Elmwood Between Maple and Randall, Floodplain Improvements Deer Creek Subdivision, Floodplain Improvements St. Joe's Creek north of Railroad, Floodplain Improvements South of Prairie Between Forest and Prince, Local Drainage Improvements Chase Avenue between Haddow and Warren, Local Drainage Improvements Hobson Triangle Area, Local Drainage Improvements
Alt. 1 yes yes yes yes yes yes yes yes yes yes yes yes yes
Alt. 2 yes yes yes yes yes yes yes yes yes NO NO NO NO
yes yes yes yes yes yes yes NO NO NO NO NO NO
NO NO NO NO NO NO NO NO NO NO NO NO NO
Memorandum To: Mayor & Council From: David Fieldman, Village Manager Re: Stormwater Utility Exempting Property Tax Exempt Parcels Date: September 26, 2014 _______________________________________________________________________ Background At the September 9, 2014 Village Council meeting, under New Business Commissioner Barnett requested that the Council consider restructuring the stormwater utility to exempt property tax exempt parcels (PTE’s) from paying stormwater fees. This report explains the impact of making this change. Analysis ● All parcels in the Village are charged stormwater fees based on the amount of impervious area located on the parcel. ● The current stormwater fee is $8.94 per Equivalent Residential Unit (ERU) per month. An ERU is 3,300 square feet of impervious area. ● The proposed stormwater fee for FY15 is $9.72 per ERU. ● The FY15 Stormwater Fund budget includes revenues from stormwater fees of $3.65 million. ● Stormwater fees paid by PTE’s account for approximately $218,000 of the FY15 budgeted revenue. ● Exempting PTE’s from paying stormwater fees would reduce stormwater fee revenue by about $218,000 to $3.43 million. ● If the Village were to raise stormwater fees on all other parcels to make up for the loss of $218,000 of revenue, the stormwater fee would have to be increased from the proposed $9.72 per ERU to $10.34 per ERU.
Impact of Exempting PTE’s from Stormwater Fees
Fee per ERU Annual Revenue Revenue from PTE’s
Proposed Exempting PTE’s, FY15 Budget No Change to Fee
Exempting PTE’s, Increase Fee to Maintain Total Revenue
$9.72
$9.72
$10.34
$3.65 Million
$3.43 Million
$3.65 Million
$218,000
Attachments 2014 Stormwater Fees for PTE’s
Annual Stormwater Fees* for Property Tax Exempt Parcels Billing Name 1ST BAPTIST CHURCH 1ST CHURCH CHRIST SCIENT 1ST PRESBYTERIAN CHURCH ADVOCATE HEALTH CARE AVERY COONLEY SCHOOL BETHEL EVANGELICAL CHILDSERV INC COMM HOUSING ASSN DUPAGE DIOCESE OF JOLIET DOWNERS GROVE CHURCH DOWNERS GROVE COMM CHURCH DOWNERS GROVE PARK DIST DOWNERS GROVE PUBLIC LIB DOWNERS GROVE SAN DIST DOWNERS GROVE TOWNSHIP FAITH UNITED METHODIST FAMILY SHELTER SERVICE FIRST BAPTIST CHURCH FIRST CHRISTIAN CHURCH FIRST CONGREGATIONAL FIRST PRESBYTERIAN CHURCH FIRST UNITED METHODIST FOREST PRESERVE DISTRICT GLORIA DEI LUTHERAN GOOD SHEPHERD EVANGELICAL GROVE SENIOR LIVING LP HOBSON RD COMMUNITYCHURCH IL ST TOLL HWY AUTH ILL ASSOC OF 7TH DAY ADV IMMANUEL EVANGELICAL IMMANUEL RESIDENCES JEHOVAHS WITNESSES LITTLE FRIENDS INC MARQUETTE MANOR MIDWESTERN UNIVERSITY PROVIDENCE DOWNERS GROVE RAY GRAHAM ASSOCIATION ROMAN CATHOLIC DIOCESE SCHOOL DISTRICT NO 58 SCHOOL DISTRICT NO 99 SENIOR HOME SHARING INC ST ANDREWS EPISCOPAL ST LUKE PRESBYTERIAN ST MARY OF GOSTYN PARISH ST PAULS UNITED CHURCH UNITED STATES OF AMERICA VILLAGE OF DOWNERS GROVE WEST SUBURBAN HUMANE SOC YMCA OF CHICAGO
PIN Count Total ERUs 1 1 1 9 6 1 1 5 20 2 3 153 3 19 5 1 1 2 3 1 1 3 21 1 3 1 2 4 1 6 1 2 6 2 3 2 3 2 38 21 1 5 1 1 4 3 120 3 1
3 5 1 51.9 48.3 1 2 15 111.3 14 16.3 563.4 11 237.5 1.5 19 9 17 22 10 14 24 68.9 13 22 26 20 39 22 22 19 16 39.34 80 61.3 45 6 7 505.9 433 2 12 7 1 19.3 11 372.96 6.3 53
BiMonthly Fee
Annual Fee
$ 53.64 $ 321.84 $ 89.40 $ 536.40 $ 17.88 $ 107.28 $ 927.96 $ 5,567.76 $ 863.60 $ 5,181.60 $ 17.88 $ 107.28 $ 35.76 $ 214.56 $ 268.20 $ 1,609.20 $ 1,990.03 $ 11,940.18 $ 250.32 $ 1,501.92 $ 291.43 $ 1,748.58 $ 10,073.28 $ 60,439.68 $ 196.68 $ 1,180.08 $ 4,246.47 $ 25,478.82 $ 26.80 $ 160.80 $ 339.72 $ 2,038.32 $ 160.91 $ 965.46 $ 303.95 $ 1,823.70 $ 393.36 $ 2,360.16 $ 178.80 $ 1,072.80 $ 250.32 $ 1,501.92 $ 429.11 $ 2,574.66 $ 1,231.86 $ 7,391.16 $ 232.44 $ 1,394.64 $ 393.36 $ 2,360.16 $ 464.88 $ 2,789.28 $ 357.60 $ 2,145.60 $ 697.32 $ 4,183.92 $ 393.35 $ 2,360.10 $ 393.36 $ 2,360.16 $ 339.72 $ 2,038.32 $ 286.07 $ 1,716.42 $ 703.38 $ 4,220.28 $ 1,430.40 $ 8,582.40 $ 1,096.04 $ 6,576.24 $ 804.60 $ 4,827.60 $ 107.28 $ 643.68 $ 125.16 $ 750.96 $ 9,045.41 $ 54,272.46 $ 7,742.00 $ 46,452.00 $ 35.76 $ 214.56 $ 214.56 $ 1,287.36 $ 125.16 $ 750.96 $ 17.88 $ 107.28 $ 345.08 $ 2,070.48 $ 196.68 $ 1,180.08 $ 6,668.34 $ 40,010.04 $ 112.64 $ 675.84 $ 947.64 $ 5,685.84 Total $ 335,480.82
Annual Credits
$ (1,400.00)
$ (1,104.98)
$ (60,439.68) $ (12,739.41)
$ (7,391.16)
$ (4,291.20)
$ (14,727.00) $ (15,455.72)
$ (117,549.15)
Annual Net
Notes
$ 321.84 $ 536.40 $ 107.28 $ 4,167.76Various Credits (0632306003, 008, 009, 014, 025, 026, 032) See 13-SWU-0190. $ 5,181.60 $ 107.28 $ 214.56 $ 1,609.20 $ 10,835.20St Mary's Church 2013/2014 Education Credit 5 PINs 0908221001, -014, -015, -027, -028 $ 1,501.92 $ 1,748.58 $ -100% Partnership Credit $ 1,180.08 $ 12,739.4150% Credit on 16 PINs Direct Discharge $ 160.80 $ 2,038.32 $ 965.46 $ 1,823.70 $ 2,360.16 $ 1,072.80 $ 1,501.92 $ 2,574.66 $ -100% Partnership Credit $ 1,394.64 $ 2,360.16 $ 2,789.28 $ 2,145.60 $ 4,183.92 $ 2,360.10 $ 2,360.16 $ 2,038.32 $ 1,716.42 $ 4,220.28 $ 4,291.2050% Direct Discharge Credit $ 6,576.24 $ 4,827.60 $ 643.68 $ 750.96 $ 39,545.462014/2015 Education Credit (4,909 Students x $3) $ 30,996.282014/2015 Education Credit (2,152 Students x $3) plus Site Runoff, Vol Red, and Water Qlty $ 214.56 $ 1,287.36 $ 750.96 $ 107.28 $ 2,070.48 $ 1,180.08 $ 40,010.04 $ 675.84 $ 5,685.84 $ 217,931.67 *Annual fees extrapolated from billing data as of August, 2014.
Memorandum To: Mayor & Council From: David Fieldman, Village Manager Re: Community Grants Program Report Date: September 26, 2014 _______________________________________________________________________
At the September 9, 2014 meeting, under New Business Mayor Tully requested staff to prepare a report on the Community Grants Commission that would facilitate Council discussion of reinstating the community grants program. Background The Community Grants Program exists to provide, on a discretionary basis, under the sole discretion of the Downers Grove Village Council, monetary grants to notforprofit organizations to promote, conduct or sponsor community oriented activities that contribute to the quality of life for Village residents. The Mayor, subject to confirmation by the Village Council, appoints the seven members on this Board, who serve threeyear terms and one student member who serves a oneyear term. On December 21, 2004, Village Council passed an ordinance whereby, the amount of funds for the Downers Grove Community Grants Program shall be established on an annual basis through the normal budgeting process and shall equal eight percent (8%) of the Downers Grove Hotel Tax generated in the fiscal year preceding the budget year or $48,000, whichever is greater. The amount budgeted shall be exclusive of any donations. The Community Grants Commission develops criteria for use as guidelines in the preparation and review of grant requests. Priority is typically given to projects that include the following criteria: ● Celebrate and contribute to the cultural arts in the community ● Contribute to the positive image of the Village ● Introduce new events or activities to Downers Grove ● Demonstrate sound management practices by their sponsors ● Indicate sources of funding in addition to the Village grant request ● Attract visitors to Downers Grove ● Provide activities open to the public ● Demonstrate the potential to become financially selfsustaining ● Take place in Downers Grove In 2010, the Village suspended the community grants program as part of the restructuring of the General Fund.
Impact on the Proposed FY15 Budget If the Council were to fund community grants in the FY15 budget, the cost of the program would be $68,800 (8% of the estimated hotel tax revenue of $860,000). Funding the program at this level without making other changes to the budget would increase General Fund expenses by $68,800. Table 1 Impact on Proposed FY15 General Fund Budget
Proposed FY15 GF Budget
FY15 GF Budget with Community Grants Funding
Revenues
44,824,624
44,824,624
Expenses
44,822,262
44,891,062
2,362
(66,438)
Change in Fund Balance
Impact on the FY14 Budget If the Village had funded the community grants program in FY14, the cost of the program would have been $68,800 (8% of the estimated hotel tax revenue of $860,000). Funding History From 2005 to 2009, the Village awarded nearly $335,000 in grant funding to 24 entities. Table 2 Community Grants Funding, 20052009 Year
Number of Entities Receiving Amount Awarded Funds
2009
$79,519
17
2008
$79,200
15
2007
$70,089
20
2006
$43,504
17
2005
$62,619
20
Table 3 Funding by Recipient, 20052009 Recipient
2005
2006
2007
2008
2009
Total
A.A.U.W.
2,000
2,000
4,000
DG Choral Society
10,000
6,000
12,000
15,000
15,000
58,000
DG Concert Association
10,000
4,000
11,000
11,000
11,000
47,000
DGSHS Band Boosters
2,100
3,200
6,500
5,000
16,800
Grove Players
4,100
5,000
6,000
7,920
8,300
31,320
Midwest Ballet Theater
6,200
6,000
4,400
7,000
8,400
32,000
New World Repertory Theater
4,000
5,000
5,500
6,000
6,800
27,300
Our Town Productions
4,000
4,500
8,500
West Town Chorus
2,229
2,300
3,489
6,230
5,000
19,248
Senior Suburban Orchestra
2,000
3,000
5,000
5,000
15,000
600
600
700
500
2,400
1,000
1,500
1,500
2,000
1,819
7,819
400
400
400
1,200
DG Kiwanis DG Rotary Squires of Downers Grove
West Suburban Humane Soc
2,000
2,000
2,000
3,000
2,000
11,000
YMCA
2,100
1,700
1,700
5,500
Downtown Management
3,000
3,000
6,000
3,500
3,000
18,500
Friends of the Library
500
500
500
500
400
2,400
DG Junior Woman’s Club
400
400
500
1,300
Maple Hill Recreation Corp
400
400
VOX Caelestis
504
504
DG Area American Assoc of Women
3,350
3,000
6,350
DG Area Newcomers
1,500
1,400
2,900
SEASPAR
1,400
1,400
After Hours Film Society
1,500
1,500
62,619
43,504
70,089
79,200
79,519
334,931
Memorandum To: Mayor & Council From: David Fieldman, Village Manager Re: Meter Transmission Unit Replacement Project Date: September 26, 2014 _______________________________________________________________________ Synopsis The FY15 Budget includes $2 million in the Water Fund for the replacement of meter transmission units (MTU’s). Proceeds from the 2012 bond issuance will be used to pay for this project. This is a planned use of the bond proceeds. Background The Village owns and maintains a water metering system through which meter readings are transmitted automatically from batterypowered radio units on customer meters to the Village. Information submitted to the Village is used to produce water bills. There are approximately 16,700 MTU’s. Many of the units are beginning to fail to transmit readings consistently, a sign that they are failing and need replacement. The MTU’s, originally purchased and installed in 2002/2003, have performed as expected with a projected useful life of about 12 years. Most meter transmission units are located on the outside of buildings.
MTU Replacement Project The Village will use a private company to remove the existing MTU’s and install the new ones. The project is planned to be completed over a 15month period beginning in January 2015. Staff is planning to complete the project with the following desired outcomes: ● Messaging regarding the project will begin prior to the project kickoff and be ongoing throughout the project ● Water customers (residents and businesses) will be notified when work is planned to occur in their area ● Customers will not see service or billing disruptions and there will be channels to resolve problems or concerns ● The Village will oversee the content of all communication and messaging that comes from the vendor FY15 Budget Impact The FY15 budget includes $2 million in the Water Fund for the MTU replacement project. This replacement was anticipated and budgeted and has been included in outyears in the CIP since FY14. The Village issued an RFQ to identify vendors that could meet the Village’s needs. Staff evaluated the responses and determined that Aclara, the vendor that installed the initial system, proposed a solution that will best meet the Village’s needs, provides the best product and provides the most continuity in metering operations. Staff will present a contract at an October Village Council meeting. The primary cost component is the contract with Aclara to purchase and install the MTUs. The Village will also need temporary administrative support for data entry and quality control to ensure water billing processes continue seamlessly throughout the project. Project costs include temporary administrative support.
Memorandum To: From: Re:
Mayor & Council David Fieldman, Village Manager Continue to Improve Resident Engagement & Communication Impact on FY15 Budget Date: September 26, 2014 _______________________________________________________________________ In the 201315 Long Range Plan, the Village Council identified as one of the high priority action items Continue to Improve Resident Engagement and Communication. The Village has made progress on this project in 2014, including the following accomplishments/objectives: ● Expanded use of YouTube to create awareness of Village projects and activities ● Live broadcast of informal workshopstyle Village Council meetings ● Launch of NextDoor.com presence ● Stream of DGTV to mobile devices (October 2014 planned launch) The proposed FY15 budget includes resources to continue to enhance resident engagement and communications efforts in several areas, building upon the successes listed above. The next major project to be pursued in support of this action item is the development of a CRM (customer relationship management) system to improve the manner and consistency in which Village staff communicates with the public and with one another on individual requests and inquiries. While there are currently systems in place to see that requests to the Village are responded to, these systems can vary by department and do not capitalize on modern technology to facilitate interaction or response. An improved system would include the following components: 1. The ability for residents to access the system using multiple devices or forms of communication based on their preference and convenience 2. The ability for staff across multiple departments to access and share information in a manner that facilitates the most effective and timely response For instance, if a resident had a concern about a stormwater issue, it could be entered into the system by the resident through their computer or mobile device, or by a staff person, following an interaction over the phone or in person. The system would maintain a realtime and accessible record of this interaction and its resolution, along with others, constructing a more informative history of issues and the efforts of the Village to address them. The system will be GIS (Geographic Information Systems) based, which means that it will capitalize on the tools already available in the Village’s robust GIS system. After reviewing several thirdparty
products that are available on the market, staff has concluded the an inhouse developed app and webbased tool most will most effectively meet the Village’s needs. In addition, Village staff possesses the knowledge, skills and abilities to develop such a system. The inhouse approach requires minimal commitment of further Village resources (less than $5,000) in the FY15 budget. Completion Timeframe: ● Complete design of system, test functionality & train staff by December 2014 ● Conduct beta test of system by March 2015 ● Launch CRM system by April 2015
Memorandum To: Mayor & Council From: David Fieldman, Village Manager Re: Emerald Ash Borer CIP Project Date: September 26, 2014 _______________________________________________________________________
SYNOPSIS The FY15 Capital Projects Fund budget includes $147,000 for the treatment, removal and replacement of 300 ash trees affected by the Emerald Ash Borer (EAB). Staff plans to budget a similar amount for the next six years. This funding plan is reflected in the Community Investment Plan. BACKGROUND In the four years since Emerald Ash Borer was discovered in the Village, the Village has been working to treat and save as many ash trees as possible while removing and replacing trees that are too damaged to save. Staff recently conducted a thorough inspection of all ash trees to assess the progression of EAB and the effectiveness of treatment. The inspection shows that EAB has significantly progressed, in particular in ash trees that have not been treated, those that have only been treated for a couple of years, and those in stressful situations (narrow parkways, near high speed traffic, or have significant surrounding concrete). Despite early positive signs seen for ash trees with EAB treatment, the periods of drought and extreme temperature have taken a toll. Based on the current level of decline, this would eventually result in the removal and replacement of approximately 1,750 ash trees over the next 6 years, about 300 ash trees per year. The estimated increased cost for the tree removal and planting program for these 6 years at this rate would be approximately $147,000/year. In FY14, staff has been addressing the increasing cost of tree removal and tree plantings through change orders to the contracted services for tree removal and tree plantings. In December 2012 the Village entered into a three year contract with D. Ryan Tree and Landscape for the removal of trees and stumps. The annual contract amount of $115,800 provides for the removal of approximately 400 trees per year. The FY13 and FY14 budgets have included an amount of $140,000 for tree removal services, anticipating an increasing number of removals due to EAB. In August 2013 a change order was approved for this contract for an amount of $30,000. On October 14th a change order for $30,000 will be presented for Council consideration for the 2014 program. This will provide for the removal of 100120 additional trees this year.
Based on the estimated cost of $147,000 per year for six years beginning in 2015, staff included the treatment, removal and planting of Ash Trees as a project in the CIP beginning in 2015, for a five year period, and included a budget of $261,300 per year. After that time, staff anticipates this cost will be reduced to include a lower level of chemical treatment to preserve the remaining trees. The following table lists the number of ash in each canopy dieback rating percentage that were identified in the early 2014 survey. Dieback is defined as a condition in which a tree begins to die from the tip of its leaves or roots backwards, owing to disease or an unfavorable environment. For the dieback rating percentage, a tree with 50% dieback has had its branches die from their tips at least halfway back toward the trunk of the tree.
Rating %
Blue Ash
European Ash
Green Ash
White Ash
0
4
0
80
404
10
1
1
304
271
20
0
1
415
114
30
0
1
334
57
40
0
0
240
26
50
0
1
246
26
60
0
1
151
30
70
0
1
117
12
80
0
0
93
11
90
0
0
69
6
100
0
0
59
13
Removal Pending
0
0
143
15
Total
5
6
2251
985
Memorandum To: Mayor & Council From: David Fieldman, Village Manager Re: Creation of Research & Development Team Date: September 26, 2014 _______________________________________________________________________ At the September 9, 2014 meeting, under New Business Commissioner Barnett requested that the Village consider creating a Research & Development Team. Commissioner Barnett prepared the following summary of the proposal. What I am seeking to do, is have a personnel structure which adds capacity to our ability to work on ideas that come up. Innovation incubation, if you will. We have done a solid job of embracing LEAN and while there always remain opportunities to improve, I would like to have additional manpower flexibility to investigate ideas or concepts that come up without necessarily diminishing our resources in other, existing, areas of effort. To be sure, such flexibility in and of itself will continue to be limited but in my mind now, we're talking about an upper level management person with the authority and resources to supervise 12 intern~esque folks. I would expect annual costs in $150k $250k kind of neighborhood. Specifically for FY2015, I'd like to budget $200k recognizing that such a program won't start on January 1st and thus actual expenditures may be lower. In order to avoid raising our levy, I'd like to test the idea by using the projected reduction in pension contribution requirements. Actual savings or, improved service levels seem likely and while savings at levels to fund the program may well be the result that is not the sole factor in deciding whether to engage this initiative. If the above concept were included in the FY15 Budget, General Fund expenses would increase by $200,000 and revenues would increase by $180,000. The proposed property tax levy would also increase by $180,000 (see tables 1 and 2 below).
Table 1 Impact on Proposed FY15 General Fund Budget
Proposed FY15 GF Budget
FY15 GF Budget Research & Development Team
Revenues
44,824,624
45,004,624
Expenses
44,822,262
45,022,262
2,362
(17,638)
Change in Fund Balance Table 2 Impact on the Proposed FY15 Property Tax Levy Tax Levy Component
FY14
Proposed FY15
FY15 With Funding for R&D
Corporate Levy
$2,997,145
$2,997,145
$3,177,145
Fire Protection
$2,850,000
$2,850,000
$2,850,000
Fire Pension
$2,467,520
$2,330,108
$2,330,108
Police Pension
$2,303,858
$2,261,516
$2,261,516
$971,524
$971,524
$971,524
$11,590,047
$11,410,293
$11,590,293
Capital Total