ARCHITECTURAL PORTFOLIO VEDANT KHEDEKAR SELECTED WORKS
2017-2020
VEDANT PRAVIN KHEDEKAR Hello, my name is Vedant Pravin Khedekar, I’m currently studying in Fourth year in Rachana Sansad’s Academy of Architecture. This portfolio schowcases the work done in the past three years. In these years, I have always tried to solve the complicated problems in the simplest ways possible. I have always tried to design space that enhance the public interaction and bring people closer to each other. I always seek to improve my skills and gain more from the people around me. Hence, I am looking for a platform to develop and learn from the practise to absorb good values, knowledge and experience. 2
PERSONAL INFORMATION Residential : 402, Avishkar prashant, Vinayak Address Ramchandra bhide marg, Dadar (W), Mumbai. Date of birth : 8th January 2000.
EXTRA CURRICULUM COMPETITIONS : : TINY LIBRARY
Vol Zero
Library for the rural community to make education more accessible.
THE LITTLE BIG LOO
Email ID
Rethinking public toilets.
: vedantk17@aoamumbai.in khedekarvedant0803@gmail.com
: DREAM HOUSE
Archasm
Designing house of desire.
Contact no. : +91 7066983727 Instagram
: k_vedant08
: CITYSCRAPER
UNI
Skyscraper catering the need of increasing population density
Languages : English I Marathi I Hindi DOCUMENTATION
: DOYAPADA, PALGHAR.
EDUCATION 2005 - 15 : Bharat shikshan mandal’s Patwardhan Highschool, Ratnagiri. SSC - 94.80 %
SKILL SET Autodesk Autocad Adobe Photoshop Adobe Illustrator
2015 - 17
2017 - 22
: Abhyankar-Kulkarni junior college, Ratnagiri. HSC - 84.30 % : Rachana Sansad’s Academy of Architecture, (Unaided), Mumbai. Current CGPI - 9.20
Adobe Indesign Trimble Sketchup Lumion Twinmotion MS Office Physical Modelling Rhinoceros 3
4
CONTENT 1.
MUNICIPAL COMMUNITY FC.
6
ARCHITECTURAL DESIGN SEM V
2.
COMMUNITY CENTER
14
ARCHITECTURAL DESIGN SEM VI
3.
DREAMING DOYAPADA
22
ARCHITECTURAL DESIGN SEM IV
4.
WORKING DRAWING
34
DOCUMENTING DOYAPADA
40
6.
THE CITYSCRAPER, THE ANCHOR
46
7.
DREAM HOUSE, OCEAN PEARL
52
8.
TINY LIBRARY, SAMVAD
54
5.
ARD SEM VI
DOCUMENTATION
COMPETITION (UNI)
COMPETITION (ARCHASM)
COMPETITION (VOLUME ZERO)
9.
THE LITTLE BIG LOO, MIEN SIEVE
56
COMPETITION (VOLUME ZERO)
10.
INTERIOR DESIGN
58
INTERIOR DESIGN SEM VII
11.
LANDSCAPE DESIGN
60
LANDSCAPE DESIGN SEM V
5
1. MUNICIPAL COMMUNITY FC. ARCHITECTURAL DESIGN SEM V SITE - DADAR WEST, MUMBAI. YEAR- 2018-2019
BRIEF-
The program explores the concept of Place-making in the urban context of Dadar, through the dynamics of a Municipal Citizen Facilitation Centre and public programs. It act as a catalyst for a continuous exchange of multiple Inter-dependencies in an Inclusive environment for all stakeholders. The design program for the project looks at the context of site selected in Dadar; identifies with its land value and commercial potential. It deals with public spaces and volumetric explorations. 7
1. Supermarket and restaurant are added on the ground floor along with the grand staircase to act as a huge entrance with penetrable glass facade.
3. According to the intimacy gradient and required floor areas, floor are stacked and the desired form was achieved.
5. Public plaza with the interactive intstallations is added to engage the people with the structure.
FORM DEVELOPMENT8
2. Upper mass is added to accomodate offices and multipurpose halls with a publlic plaza acting as a buffer space in between two masses.
4. Additional mass is added in order to incorporate functions such as panchakarma center, cafe and consultation program.
6. Facade is added later on with the varying diagonal openings creating interesting pattern on the face of the building.
The structures makes a place for the people living around while creating spaces for the municipal functions. It gives place to the mini weekly bazar also provides facilities which can not be found in the immidiate context along with the interesting form exploration and facade .
EXPLODED ISOMETRIC9
A
A
GROUND FLOOR PLAN10
SECTION11
PHYSICAL MODEL12
SOUTH-EAST ELEVATION13
2. COMMUNITY CENTER. ARCHITECTURAL DESIGN SEM VI SITE - GOLCONDA FORT, HYDERABAD YEAR- 2019-2020
BRIEF-
Project aims towards resilience as an essential focus in current times of unplanned, informal settlements, while keeping in mind the unsure nature of things associated with such informal settlements. Architecture should be designed to have a capacity to accommodate changing environmental and social conditions within a building’s useful life. Thus this nature of survival of the local community, their resilient nature in achieving a sustenance is a very important character of the community that requires attention through the process of institutionalizing some of its aspects. 15
1.While keeping on 3 entries and topography of the site, ground is kept open in order to have some open area for kids and plaza on ground.
3. Second floor is given for the education programs including individual spaces to study, classrooms and informal spaces for meetings.
4. Due to the height of the structure terrace is given as a viewing deck overlooking golconda fort along with sitting and open gym for the youth.
STACKING IDEOLOGY16
2. First floor is started on the 4.00m elevation accomodating permanent functions such as food services, admin and health care facility.
3. Third floor is provided for the workshop spaces such as wood crafting, jewellery, block printing, kalamkari art for tourists visiting.
5. Facade system expresses the nature of function, temperory and permanent, responds to the climate with specially designed fenestration .
The structure tries to uplift the community living around by generating revenue by growing vegetables on each floor, also attracts tourists to invest time and money in local art. With changing floor plate configuration it creates democratic spaces for the users to accomodate their changing needs.
EXPLODED AXONOMETRIC17
FIRST FLOOR PLAN18
NORTH ELEVATION-
WEST ELEVATION19
Seating on each midlanding level.
Public plaza on the playground.
Reading space near playground.
Double heighted meeting space.
Bazar space on the ground floor.
FOR THE PEOPLE20
Entrance plaza with seating on a side.
SOUTH ELEVATION-
SECTION21
3. DREAMING DOYAPADA. ARCHITECTURAL DESIGN SEM IV SITE - DOYAPADA, PALGHAR. YEAR- 2018-2019
BRIEF-
The project aims towards creating a mixed-use facility in Doyapada village, to be used by the local community, which includes all 12 villages that are part of Wehelpada group. It will be used by children & adults – for various activities – at various times of day, week & year. The facility is also a meeting/exchange point for the villagers and o utsiders who come to teach and/or learn. It includes a community center, primary school for kids and night school for elders along with housing for teachers who are coming to teach in the school. 23
1. Community center is placed on the topmost elevation as a symbol of the community with entries planned according to the trails on site.
3. To store the rainwater, stepped pond is created on the lower elevation, trapping the water and a secondary gathering space is created around it.
5. L-shaped primary school is proposed with classrooms that can be merged together with north light trusses to maximize the light inside.
SITE MANAGEMENT24
2. Instead of a structure for ceremonial events, platforms are added covered with trees for functions such as weddings and religious events.
4. 6 houses are given on the road side for teachers with 3 houses having common corridors enhancing the interaction along with central gathering space.
6. The community center and school are provided with the north light trusses. Earthy materials like brick, bamboo are used with minimum use of steel and concrete.
ENTRY
PRIMARY SCHOOL
COMMUNITY CENTER
HOUSING FOR TEACHERS
GATHERING SPACE In order to respond to the rural context, local materials within the 1km radium such as brick, stone, bamboo are used. Multiple water channels are created to divert and store the waters in the ponds, wells that are created on the various part of the site.
EXPLODED AXONOMETRIC25
7
6
5 3
1
2 4
1. RECEPTION 2. MEETING SPACE 3. COMMUNITY KITCHEN 4. MULTIPURPOSE SPACE 5. PLATFORM FOR CEREMONIES 6. TOILET 7. STORAGE
1.COMMUNITY CENTER26
ROAD 4.50 M WIDE
FLOOR PLAT CUT AT LVL 5.00 M27
4 3 5
1
2
1. LIVING ROOM + KIDS BEDROOM 2. OPEN KITCHEN ON FRONT 3. TOILET 4. BACK YARD 5. BEDROOM 1
2.HOUSING UNIT28
ROAD 4.50 M WIDE
FLOOR PLAT CUT AT LVL 1.20M29
2
3
4
2 1
2 2 2
2 5
1. BOYS WASHROOM 2. CLASSROOMS 3. SCHOOL OFFICE 4. STAFF-ROOM 5. GIRLS WASHROOM
3.PRIMARY SCHOOL30
VIEW OF COMMUNITY CENTER-
VIEW OF SCHOOL31
SECTION THROUGH COMMUNITY CENTER-
SECTION THROUGH HOUSES AND SCHOOL32
33
4.WORKING DRAWING. ARCHITECTURAL REPRESENTATION AND DETAILING SEM VI SITE - DADAR WEST, MUMBAI. YEAR- 2019-2020
B
C
E
D
H
G
F
I
2.05
W1
W1
W1
W1
W1
W1
0.60
0.60
0.60
0.60
0.60
0.60
W2
D2
+28.300M C17
2.70
D3
2.00
0.87
T.S
2.33
EQ EQ EQ EQ EQ EQ EQ EQ EQ
UP
D6
0.80
3.50
D3 5.42
2.00
7
D2
2.54
2.12
T.S.
2.70
1.17
SW6
SW5
SW7 3.18
6 5
+21.850M SW 8, 9, 10
EQ EQ EQ EQ EQ EQ EQ EQ EQ
1.20
T.S.
0.53
+24.003M SW 5,6,7
19 18 17 16 15 14 13 12 11
D1
0.53
7
MIDLANDING
W2 F3 C2 S2
0.80
D1
T.S.
STAIRCASE
8
KITCHEN 6.70M X 3.50M
10.6
0.95
TOILET L
RISER-180 MM
2.95
2.95
TOILET M
W1 F1 C1 S1 D1
1 2 3 4 5 6 7 8 9 10
3.03
0.54
0.76
SW3
0.74
0.76
SW4
LIFT 1
LIFT 1 0.74
0.76
W1 F1 C1 S1
0.2
6.44
0.9
C12 450X800
C13 450X600
RESTAURANT 6.70M X 6.70M LVL +0.75M
2.16
ENTRANCE LOBBY LVL +0.75M
+18.300M C10,C11
T.S. T.S.
3.00
UP
EQ
EQ 6.40
EQ
EQ
EQ
C8 450X600
EQ
EQ
D5
EQ
5.80
3
EQ
1.60
C9 450X600
EQ EQ 6.40
EQ
EQ
EQ
EQ
C7 450X600
EQ
EQ
EQ
EQ
3
EQ
C11 450X600
1.30
4 3 2 1
SLOPE RATIO 1:12 UP
+14.300M C7,C8,C9
4
D4
C10 450X600
7.50
6 5
2.3
W1 F1 C1 S1
3.20
4
SW2
LIFT 1
6.60
2.30
2.40
+21.200M C12,C13
SW1
0.90
D6
9
1.20
3.65
D6
2.00
D6
0.20
D6 2.70
10
6.70
2.00
D6
+28.200M C14, C16
4.10
8
C17 450X600
1.20
W1 0.60
UP
EQ EQ EQ EQ
C15 450X800
CHAJJA ABOVE
EQ EQ EQ
9
C14 450X800
C16 450X800
2.00
10 +28.375M C15
UP
0.30 0.30
1.45
1.20
A
12.10
EQ EQ
EQ
EQ
SUPERMARKET 14.33M X 10.84M LVL +0.75M 10.84
EQ
EQ
W1 F1 C1 S1
EQ
EQ
14.39
2 C6 450X600
EQ
EQ
3.27
EQ
EQ
C5 450X600
EQ
C4 450X600
EQ
2
+07.300M C4,C5,C6
+03.400M C1, C2,C3
1
0.3 0.3 0.3 0.3
C1 450X600
C2 450X600
FOB 0.00M Y
C3 450X600
+21.225M C11, C13, C17
PCC
I
H +15.590M SW4
+14.225M C3, C6, C9, C10, C16
F
RCC
G +14.305M SWA
+12.800M SW3
E
D +11.300M SW2
BRICK
C +09.634M SW1
+07.225M C2, C5, C8, C15
A +00.225M C1, C4, C7, C12, C14
FOB 0.00M X
14.45
B
1
4 3 2 1
EQ
EQ
14.29
T.S.
BBC
GROUND FLOOR ARCHITECTURAL PLAN35
GENERAL NOTES
7
9
2
3
4
1. DO NOT SCALE THE DRAWINGS. ALL THE WRITTEN DIMENSIONS TO BE FOLLOWED. 2. ALL THE DIMENSIONS CHECKED ON THE SITE BY THE CONTRACTOR AND TO BE HIS/HER RESPONSIBILITY. 3. DRAWING ERROR AND OMMISS=ION TO BE REPORTED TO THE PROJECT MANAGER. 4. ALL DIMENSIONS AND LEVELS ARE UNFINISHED UNLESS OTHERWISE SPECIFIED. 5. ALL THE DIMENSIONS ARE IN METERS AND LEVELS IN METERS UNLESS OTHERWISE SPECIFIED. 6. AL DIMENSIONS ARE FROM UNIFISHIED TO UNFINISHED SURFACE. 7. BRICK MASONARY TO BE DONE IN ENGLISH BOND WITH 1: 6 CEMENT MORTAR UNLESS AND OTHERWISE SPECIFIED. 8. ALL INTERNAL PLASTER IS 15MM THK IN 1: 4 PROPORTION CEMENT MORTAR AND APPLIED IN SINGLE COAT. 9. ALL EXTERNAL PLASTER IS 25MM THK IN 1: 4 PROPORTION CEMENT MORTAR AND APPLIED IN DOUBLE COAT.
OVERHEAD TANK
SCHEDULE FOR DOOR
3.65
3.45
3.57
SYMBOL
W2
1 HR. FIRE RATING, TIMBER PANELED DOOR
1000 X 2100
STAIRCASE
D3
TIMBER PANELED SINGLE LEAF, VENEER FINISH WITH MELAMINE POLISH
1100 X 2100
SUPERMARKET
D4
TIMBER PANELED DOUBLE LEAF, VENEER FINISH WITH MELAMINE POLISH
1400 X 2100
ROOMS
D5
TIMBER PANELED DOUBLE LEAF, VENEER FINISH WITH MELAMINE POLISH
2000 X 2100
MULTIPURPOSE HALL
D6
TIMBER PANELED SINGLE LEAF WITH OIL PAINT FINISH
600 X 2100
TOILET ENTRY
TOILET
0.60
0.60 0.90
W2 F3 C2 S2
SYMBOL NOS.
3.00
MULTIPURPOSE HALL 14M X 10.9M W1 F1 C1 S1
D4
SPECIFICATION MARBLE FRAMED, GLASS LOUVERED ALUMINIUM PANELLED WINDOW
600 X 900
W2
THREE SHUTTER SLIDING, FULLY GLAZED, GRANITE FRAMED ALUMINIUM PANELLED WINDOW
2000 X 2100
ALL ROOMS
DOUBLE SHUTTER SLIDING, FULLY GLAZED GRANITE FRAMED ALUMINIUM PANELLED WINDOW
1000 X 2200
STAIRACASE
W3
0.90
0.75
W2 F3 C2 S2
3.02
MULTIPURPOSE HALL 14M X 10.9M LVL +11.55M W1 F1 C1 S1
D4 W2
THIRD LEVEL
W2 F3 C2 S2
F1
20 MM. THK 1:2:4 SCREEDING, 25 MM WHITE MARBLE TILES OF SIZE 60CM. X 60CM., GRADE-2 POLISHING, 1MM. WHITE CEMENT GROUT.
ALL ROOMS
20 MM. THK WATER PROOFING AGENT SCREEDING, 100MM. BB COBA LAID TO SLOPE, 20MM. SCREEDING, 6 MM. ANTI SKID CERAMIC TILES OF SIZE 30 CM. X 30CM
TOILET, LOBBY
20 MM. THK 1:2:4 SCREEDING, MARBONITE TILES OF SIZE 30CM. X 30CM.
STAIRCASE
7.000
SCHEDULE FOR CEILING 10 MM. THK 1:1:2 PLASTER, 2 COATS OF WHITE WASH, 1 COAT OF 5 MM. P.O.P. PUTTY, 2 COATS OF PRIMER, 2 COATS OF WHITE DISTEMPER WITH 30CM P.O.P FALSE CEILING
C1
3
3.00
3.45
VACCINATION ROOM 6.7M X 3.9M
W1 F1 C1 S1
SCHEDULE FOR DADO
0.90
STAIRCASE
0.60
0.60
0.60
RISER-180 MM W2 F3 C2 S2
D1
25CM.,DADO ABOVE KITCHEN PLATFORM TILL CEILING HEIGHT.
KITCHEN
D2
20 MM. THK WATER PROOFING AGENT MIXED PLASTER, 6 MM. IVORY WHITE CERAMIC TILES OF SIZE 20 CM. X 20 CM
TOILET
3.00
3.45
PUBLIC PLAZA 13.5M X 11.7M LVL +4.35M W1 F1 C1 S1
D4
KEY PLAN AT 1:500
RISER-180 MM
FIRST LEVEL 4.20M LVL
0.60
0.60
0.43
4.62
W2
0.60
TOILET, LOBBY
ALL ROOMS, TOILETS, LOBBY, BALCONY,STAIRACASE
20 MM. THK PLASTER, 6 MM. 100 MM WIDTH WHITE RED GRAINITE SKIRTING
SECOND LEVEL 7.80M LVL
C
0.90
STAIRCASE
0.90
ALL ROOMS
10 MM. THK 1:1:2 PLASTER, 2 COATS OF WHITE WASH
SCHEDULE FOR SKIRTING
D4
0.75
TOILET, LOBBY
F3
C2
W2
1800X600X150 R.C.C CHAJJA
ALL ROOMS
23 MM. THK 1:2:4 PLASTER, 2 COATS OF WHITE WASH, 2 COATS OF PRIMER, 2 COATS OF WHITE EXTERIOR PAINT
F2
11.40M LVL
0.90
0.75
STAIRCASE
0.60
0.60
0.60
230 THK. BRICK WALL RISER-180 MM
12 MM. THK PLASTER, 2 COATS OF WHITE WASH, 1 COAT OF 5 MM. P.O.P. PUTTY, 2 COATS OF PRIMER, 2 COATS OF WHITE DISTEMPER.
SCHEDULE FOR FLOOR FINISH
3.45
1800X600X150 R.C.C CHAJJA
W1 W1
STAIRCASE
TOILETS
SCHEDULE FOR WALL FINISH
0.600
0.60
0.60
RISER-180 MM
REMARKS
SIZES
W1
FOURTH LEVEL 15.00M LVL
230 THK. BRICK WALL
REMARKS
1000 X 2100
D2
SCHEDULE FOR WINDOW
STAIRCASE
W2
100 MM WATA
SIZES
TIMBER PANELED SINGLE LEAF, VENEER FINISH WITH MELAMINE POLISH
0.43
RISER-180 MM
3.45
100 MM WATA
.60
250 THK. WATER PROOFING ON TERRACE
TERRACE LEVEL 18.90M LVL
0.75
230 THK. PARAPET WALL
SPECIFICATION
NOS.
D1
SUPERMARKET 14.33M X 10.84M LVL +0.75M
3.00
3.45
W2 F3 C2 S2
W1 F1 C1 S1
PLINTH LEVEL 0.75M LVL B
D
FINISHED GR LEVEL 0.15M LVL
A
+00.15
UP
UP
+00.10 +00.00
DATE:
DWG NO.
REVI NO:
STATUS:
BRICK
DRAWING NAME:
SCALE: 1:50
SECTION AA PROJECT NAME:
RCC
7
9
RACHANA SANSAD ACADEMY OF ARCH.
2
3
4
MUNICIPAL CFC NAME: VEDANT KHEDEKAR
PCC
STAMP
SIGN:
GENERAL NOTES
BBC
A
3.00
B
FLUSHING
F
1. DO NOT SCALE THE DRAWINGS. ALL THE WRITTEN DIMENSIONS TO BE FOLLOWED. 2. ALL THE DIMENSIONS CHECKED ON THE SITE BY THE CONTRACTOR AND TO BE HIS/HER RESPONSIBILITY. 3. DRAWING ERROR AND OMMISS=ION TO BE REPORTED TO THE PROJECT MANAGER. 4. ALL DIMENSIONS AND LEVELS ARE UNFINISHED UNLESS OTHERWISE SPECIFIED. 5. ALL THE DIMENSIONS ARE IN METERS AND LEVELS IN METERS UNLESS OTHERWISE SPECIFIED. 6. AL DIMENSIONS ARE FROM UNIFISHIED TO UNFINISHED SURFACE. 7. BRICK MASONARY TO BE DONE IN ENGLISH BOND WITH 1: 6 CEMENT MORTAR UNLESS AND OTHERWISE SPECIFIED. 8. ALL INTERNAL PLASTER IS 15MM THK IN 1: 4 PROPORTION CEMENT MORTAR AND APPLIED IN SINGLE COAT. 9. ALL EXTERNAL PLASTER IS 25MM THK IN 1: 4 PROPORTION CEMENT MORTAR AND APPLIED IN DOUBLE COAT.
I
DOMESTIC
SCHEDULE FOR DOOR
3.00
SYMBOL
5.15
PCC COPING 230 THK. PARAPET WALL
TERRACE LEVEL 18.90M LVL
SPECIFICATION
NOS.
SIZES
REMARKS
D1
TIMBER PANELED SINGLE LEAF, VENEER FINISH WITH MELAMINE POLISH
1000 X 2100
D2
1 HR. FIRE RATING, TIMBER PANELED DOOR
1000 X 2100
STAIRCASE
D3
TIMBER PANELED SINGLE LEAF, VENEER FINISH WITH MELAMINE POLISH
1100 X 2100
SUPERMARKET
D4
TIMBER PANELED DOUBLE LEAF, VENEER FINISH WITH MELAMINE POLISH
1400 X 2100
ROOMS
D5
TIMBER PANELED DOUBLE LEAF, VENEER FINISH WITH MELAMINE POLISH
2000 X 2100
MULTIPURPOSE HALL
D6
TIMBER PANELED SINGLE LEAF WITH OIL PAINT FINISH
600 X 2100
TOILET ENTRY
TOILET
250 THK. WATER PROOFING ON TERRACE RISER-180 MM W1
W1
W1
W1
W1
W1
W1
SCHEDULE FOR WINDOW
STAIRCASE
W3
0.65
82
83
84
86
87
88
89
90
W2 F1 C2 S1
TERRACE 10.14M X 6.77M
W1
W1
W1
W1
W1
0.65
1.300
STAIRACASE
W1
62
63
64
68
69
70
F1
F2
65 F3
THIRD LEVEL
11.40M LVL
W1
W1
W1
W1
STAIRCASE
W3
2.15
0.65
1.300
1.300
42
43
44
45
46
47
48
49
TOILET, LOBBY
ALL ROOMS
20 MM. THK WATER PROOFING AGENT SCREEDING, 100MM. BB COBA LAID TO SLOPE, 20MM. SCREEDING, 6 MM. ANTI SKID CERAMIC TILES OF SIZE 30 CM. X 30CM
TOILET, LOBBY
20 MM. THK 1:2:4 SCREEDING, MARBONITE TILES OF SIZE 30CM. X 30CM.
STAIRCASE
ALL ROOMS
TOILET, LOBBY
SCHEDULE FOR SKIRTING
W1 F1 C1 S1
40
ALL ROOMS, TOILETS, LOBBY, BALCONY,STAIRACASE
20 MM. THK PLASTER, 6 MM. 100 MM WIDTH WHITE RED GRAINITE SKIRTING
COUNSELING ROOM 10.14M X 6.77M
SCHEDULE FOR DADO
D1
25CM.,DADO ABOVE KITCHEN PLATFORM TILL CEILING HEIGHT.
KITCHEN
D2
20 MM. THK WATER PROOFING AGENT MIXED PLASTER, 6 MM. IVORY WHITE CERAMIC TILES OF SIZE 20 CM. X 20 CM
TOILET
SECOND LEVEL 7.80M LVL 3.48
0.500
41
ALL ROOMS
23 MM. THK 1:2:4 PLASTER, 2 COATS OF WHITE WASH, 2 COATS OF PRIMER, 2 COATS OF WHITE EXTERIOR PAINT
20 MM. THK 1:2:4 SCREEDING, 25 MM WHITE MARBLE TILES OF SIZE 60CM. X 60CM., GRADE-2 POLISHING, 1MM. WHITE CEMENT GROUT.
10 MM. THK 1:1:2 PLASTER, 2 COATS OF WHITE WASH
C2
MIDLANDING
W2 F3 C2 S2
3.300
W1
12 MM. THK PLASTER, 2 COATS OF WHITE WASH, 1 COAT OF 5 MM. P.O.P. PUTTY, 2 COATS OF PRIMER, 2 COATS OF WHITE DISTEMPER.
10 MM. THK 1:1:2 PLASTER, 2 COATS OF WHITE WASH, 1 COAT OF 5 MM. P.O.P. PUTTY, 2 COATS OF PRIMER, 2 COATS OF WHITE DISTEMPER WITH 30CM P.O.P FALSE CEILING
RISER-180 MM W1
TOILETS
SCHEDULE FOR CEILING
C1
W1
600 X 900
SCHEDULE FOR FLOOR FINISH
3.45
0.500
1.300
2.15
67
61
ALL ROOMS
1000 X 2200
W2
MIDLANDING
W2 F3 C2 S2
REMARKS
2000 X 2100
DOUBLE SHUTTER SLIDING, FULLY GLAZED GRANITE FRAMED ALUMINIUM PANELLED WINDOW
W1
STAIRCASE
W3
3.300
W1
SIZES
MARBLE FRAMED, GLASS LOUVERED ALUMINIUM PANELLED WINDOW THREE SHUTTER SLIDING, FULLY GLAZED, GRANITE FRAMED ALUMINIUM PANELLED WINDOW
W3
FOURTH LEVEL 15.00M LVL
RISER-180 MM W1
SPECIFICATION
W1 W2
SCHEDULE FOR WALL FINISH
3.48
81
85
SYMBOL NOS.
MIDLANDING
W2 F3 C2 S2
RISER-180 MM W1
W1
W1
W1
W1
W1
STAIRCASE
W3
2.15
0.65
1.300
1.300
23
25
26
27
28
29
30
W1 F1 C1 S1
KEY PLAN AT 1:500
CAFE 10.7M X 6.77M FIRST LEVEL 4.20M LVL 3.45
0.500
21
22
24
W2
MIDLANDING
W2 F3 C2 S2
3.300
W1
C
RISER-180 MM W1
W1
W1
W1
W1
STAIRCASE
W1
6
0.500
1.300
1.300
2.15
D1
1
2
3
4
W2
MIDLANDING
W2 F3 C2 S2
3.300
W1
7
8
9
10 W1 F1 C1 S1 D1
5
D3
KITCHEN 6.7M X 3.5M
PLINTH LEVEL 0.75M LVL B
D
FINISHED GR LEVEL 0.15M LVL
A
+00.15
UP
UP
+00.10 +00.00
DATE:
DWG NO.
REVI NO:
STATUS:
BRICK
DRAWING NAME:
SCALE: 1:50
SECTION BB
RCC
PROJECT NAME:
MUNICIPAL CFC RACHANA SANSAD ACADEMY OF ARCH.
SECTIONS36
A
B
F
H
PCC
NAME: VEDANT KHEDEKAR SIGN:
BBC
STAMP
3RD YEAR B. ARCH. ROLL NO. 1721
3RD YEAR B. ARCH. ROLL NO. 1721
A
+28.300M C17
C
E
D
G
F
H
I
CHAJJA ABOVE
10 +28.375M C15 9
B
W1
W1
W1
W1
W1
W1
W1
0.60
0.60
0.60
0.60
0.60
0.60
0.60
D6
D6
D6
D6
D6
D6
10
C16 450X800
C15 450X800 5.26
W3
C14 450X800
W2
2.70
T.S
0.87
C17 450X600
3.70
9
EQ EQ EQ EQ EQ EQ EQ EQ EQ
4
+18.300M C10,C11
2.12
2.54
D2
1.17
2.00
SW5
SW5
2.22
SW1
0.54
0.76
0.74
0.76
SW4
LIFT 1
LIFT 1 0.74
0.76 0.88
C12 450X800
SW3
7
CAFE 10.70M X 6.77M LVL +4.35M
SW7
SW2
LIFT 1
W1 F1 C1 S1
C13 450X600
6 5
C11 450X600
4
6.40
0.37
+21.200M C12,C13
0.20 2.70
T.S.
0.53
6 5
+21.850M SW 8, 9, 10
0.53
+24.003M SW 5,6,7
EQ EQ EQ EQ EQ EQ EQ EQ EQ
D1
2.38
7
T.S.
19 18 17 16 15 14 13 12 11
W2 F3 C2 S2
0.80 D1
6.40
0.80
MIDLANDING
7.93
2.95
TOILET L
STAIRCASE 2.95
0.950
RISER-180 MM TOILET M
8
1 2 3 4 5 6 7 8 9 10
3.03
3.65
2.70
2.00
+28.200M C14, C16
2.00
8
UP
D4
T.S. 6.15
W1 F1 C1 S1
C10 450X600
3.36
PUBLIC PLAZA 13.5M X 11.7M LVL +4.35M
+14.300M C7,C8,C9
2
+07.300M C4,C5,C6
1
+03.400M C1, C2,C3
6.47
3
6.47
C9 450X600
6.36
C8 450X600
6.35
C7 450X600
C4 450X600
C5 450X600
C6 450X600
2 EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ
T.S.
FOB 0.00M Y
1
6.9
3
BRICK
RCC
+21.225M C11, C13, C17
PCC
BBC
I
H +15.590M SW4
+14.225M C3, C6, C9, C10, C16
F
G +14.305M SWA
+12.800M SW3
E
B
D +11.300M SW2
+07.225M C2, C5, C8, C15
A
C +09.634M SW1
+00.225M C1, C4, C7, C12, C14
FOB 0.00M X
UP
FIRST FLOOR ARCHITECTURAL PLAN37
2.4 EQ
EQ
EQ
EQ
EQ
EQ
2.9
EQ
EQ
2.9
4
UP
4
UP 10.44
D2
230 x 350 MM RCC COLUMN
10.44
20MM EXTERNAL PLASTER
D2
5.410
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
T.S
0.67
EQ
EQ
+2.4M
2.00
0.025
+2.4M
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
10MM THK BASEDIA PLATE 50MM HOLLOW STAINLESS
STEEL HANDRAIL
MIDLANDING
19 18 17 16 15 14 13 12 11 EQ
25MM THK KOTA STONE TREAD 50MM DIA20MM HOLLOW STAINLESS NOSING STEEL HANDRAIL
0.20
0.025
EQ
10MM GROOVES FOR GRIP
MIDLANDING
19 18 17 16 15 14 13 12 11 EQ
20MM NOSING
W2 F3 C2 LVL +02.55M S2
0.05
0.025
LVL +00.75M
25MM THK KOTA STONE TREAD
W2 F3 C2 S2
0.05
0.20
LVL +00.75M
12MM INTERNAL PLASTER
10MM GROOVES FOR GRIP
1 2 3 4 5 6 7 8 9 10 0.025
D RISER AN
15MM THK BLUE KOTA STONE SKIRTING
1 2 3 4 5 6 7 8 9 10
UP
12MM INTERNAL PLASTER PLASTER 20MM EXTERNAL 15MM THK BLUE KOTA 230MM BRICKSTONE WALL SKIRTING
4.46
EQ
EQ
4.46
EQ
EQ
7.29
0.6
EQ
7.29
EQ
0.67
2.00
UP
0.6
230MM BRICK 230 xWALL 350 MM RCC COLUMN
T.S
5.410
10MM THK BASE PLATE
LVL +02.55M
D FIXING
EQ
1.20
2.00
D2
SW5
1.20
D2
SW5
SW5
PLAN OF STAIRCASE
SW7 2.00
SW5
SW7
SCALE: 1:25
PLAN OF STAIRCASE
25MM THK KOTA STONE FLOORING
SCALE: 1:25
15MM THK KOTA STONE SKIRTING 40MM THK SCREEDING 20MM THK EXTERNAL WALL PLASTER
25MM THK KOTA STONE FLOORING
FIRST FLOOR LEVEL
15MM THK KOTA STONE SKIRTING 40MM THK SCREEDING
+4.35M
20MM THK EXTERNAL WALL PLASTER 2.57
50MM DIA HOLLOW STAINLESS STEEL HANDRAIL
BASE PLACE 20MM THK 50MM DIA HOLLOW STAINLESS STEEL HANDRAIL
FIRST FLOOR LEVEL
300MM TREAD, 25MM THK BLUE KOTA STONE
8MM GROOVE
2.57
2.21
+4.35M
10MM GROOVES FOR 15MM THK KOTA STONE SKIRTING
W2 F3 C2 S2
50MM DIA HOLLOW STAINLESS STEEL HANDRAIL 25 MM THK SCREEDING
20MM NOSING
+2.55M 7
150MM RISER, 15MM THK BLUE KOTA STONE
2.21 7
15MM THK KOTA STONE SKIRTING 25MM THK KOTA STONE TREAD 25MM THKTHK KOTA STONE FLOORING 25MM MORTAR
15MM THK KOTA STONE RISER
25 MM THK SCREEDING
RCC STAIRCASE SLAB
RCC MIDLANDING SLAB
12MM THK INTERNAL PLASTER
230 x 350 MM RCC COLUMN
230 MM THK12MM BRICK INTERNAL WALL
+0.75M
25MM THK KOTA STONE TREAD
2.24
3.3
12MM INTERNAL PLASTER 15MM THK BLUE KOTA STONE SKIRTING GROUND FLOOR LEVEL +0.75M 50MM DIA HOLLOW STAINLESS STEEL HANDRAIL BASE PLACE 20MM THK
25MM THK KOTA STONE TREAD
300MMSECTION TREAD, 25MMOF THKSTAIRCASE BLUE KOTA STONE
20MM NOSING
SCALE: 1:25
10MM GROOVES FOR GRIP
4.46 7.29
W2 F3 C2 S2
50MM DIA HOLLOW STAINLESS20MM NOSING STEEL HANDRAIL 150MM RISER, 15MM THK BLUE KOTA STONE
ANDING
STORAGE DETAIL A RISER AND TRADE DETAIL
15MM THK KOTA STONE RISER 25 MM THK SCREEDING
SCALE-1:5
12MM THK INTERNAL PLASTER
10MM THK STEEL PLATE FOR FIXING THE STEEL POST TO THE WALL
SCALE: 1:25
SYMBOL
12MM DIA SCREW
RCC STAIRCASE SLAB
12MM INTERNAL PLASTER
DETAIL A RISER AND TRADE DETAIL
IRTING 2.00
DETAIL B
SCALE-1:5
STAIRCASE DETAILS-
50MM DIA HOLLOW STAINLESS STEEL HANDRAIL
SW7
SCHEDULE FOR DOOR
25MM THK MORTAR
SECTION OF STAIRCASE
RCC STAIRCASE SLAB
300MM TREAD, 25MM THK BLUE KOTA STONE 10MM THK STEEL BASE PLATE 20 MM BOLTS 150MM RISER, 15MM THK BLUE KOTA STONE
FIXI
GENERAL NOTES
300 x 600 MM EXTERNAL PLINTH BEAM
1. DO NOT SCALE THE DRAWINGS. ALL THE WRITTEN DIMENSIO BE FOLLOWED. 230 MM THK BRICK 2. WALL ALL THE DIMENSIONS CHECKED ON THE SITE BY THE CONTRACTOR AND TO BE HIS/HER RESPONSIBILITY. INSI 8MM GROOVE 3. DRAWING ERROR AND OMMISS=ION TO BE REPORTED TO T 50MM DIA HOLLOW STAINLESSPROJECT STEEL HANDRAIL MANAGER. 4. ALL DIMENSIONS AND LEVELS ARE UNFINISHED UNLESS OTHERWISE SPECIFIED. 5. ALL THE DIMENSIONS ARE IN METERS AND LEVELS IN METE 230MM THK BRICK WALL UNLESS OTHERWISE SPECIFIED. 300MM TREAD, 25MM THK BLUE KOTA STONE 6. AL DIMENSIONS ARE FROM UNIFISHIED TO UNFINISHED SUR 300 x 600 MM EXTERNAL PLINTH BEAM 12MM THK INTERNAL PLASTER 7. BRICK MASONARY TO BE DONE IN ENGLISH BOND WITH 1: 6 CEMENT MORTAR UNLESS AND OTHERWISE SPECIFIED. 10MM THK STEEL BASE PLATE 50MM DIA HOLLOW STAINLESS STEEL HANDRAIL 8. ALL INTERNAL PLASTER IS 15MM THK IN 1: 4 PROPORTION WINDOW CP 20 MM BOLTS MORTAR AND APPLIED IN SINGLE COAT. 25MM DIA STEEL POST FIXED TO THE WALL 9. ALL EXTERNAL PLASTER IS 25MM THK IN 1: 4 PROPORTION MORTAR AND APPLIED IN DOUBLE COAT. 150MM RISER, 15MM THK BLUECEMENT KOTA STONE
25MM THK MORTAR
10MM THK BASE PLATE
+02.55M
38
OUTSID
PLASTER
8MM GROOVE
230MM BRICK WALL
10MM GROOVES FOR GRIP
WIN
25 MM THK SCREEDING
+2.55M
3.3
2.24
W2 F3 C2 S2 STORAGE
20MM EXTERNAL PLASTER 0.67
WINDOW SECT
RCC MIDLANDING SLAB
8MM GROOVE
GROUND FLOOR LEVEL
T.S
GRIP
25MM THK KOTA STONE FLOORING
DETAIL C FIXING OF HANDRAIL SCALE-1:5 FIXING OF HANDRAIL TO WALL SCALE-1:5
NOS.
SPECIFICATION
SIZES
REM
TIMBER PANELED SINGLE LEAF, VENEER FINISH WITH MELAMINE POLISH
1000 X 2100
D2
1 HR. FIRE RATING, TIMBER PANELED DOOR
1000 X 2100
STA
D3
TIMBER PANELED SINGLE LEAF, VENEER FINISH WITH MELAMINE POLISH
1100 X 2100
SUPE
D4
TIMBER PANELED DOUBLE LEAF, VENEER FINISH WITH MELAMINE POLISH
1400 X 2100
D5
TIMBER PANELED DOUBLE LEAF, VENEER FINISH WITH MELAMINE POLISH
2000 X 2100
D6
TIMBER PANELED SINGLE LEAF WITH OIL PAINT FINISH
600 X 2100
D1
TOILE
R
MULTI H
TO
SCHEDULE FOR WINDOW 20MM THK EXTERNAL PLASTER SYMBOL NOS.
200MM DIA WATTA
18MM THK GRANITE
SPECIFICATION
SIZES
REM
W1
THREE SHUTTER SLIDING, FULLY GLAZED, GRANITE FRAMED ALUMINIUM PANELLED WINDOW
2000 X 2100
ALL
W2
MARBLE FRAMED, GLASS LOUVERED ALUMINIUM PANELLED WINDOW
600 X 900
TOIL
W3
DOUBLE SHUTTER SLIDING, FULLY GLAZED GRANITE FRAMED ALUMINIUM PANELLED WINDOW
1000 X 2200
230 x 150MM THK RCC LINTEL
5.5MM THK CLEAR GLASS
SCHEDULE FOR WALL FINISH
STAIR
TOILET DETAILS39
5. DOCUMENTING DOYAPADA. DOCUMENTATION PROJECT SEM IV SITE - DOYAPADA, PALGHAR. YEAR- 2018-2019
BRIEF-
The documentation aims towards studying and documenting the village doyapada, part of villages of wehelpada group about their lifestyle, architecture, housing typologies. Apart from these aspects this documentation focuses on the aspects such as their believes, response towards the climate changes and the vegetation that can be found. It was presented in the form of 2d and 3d architectural drawings along with physical models and installations representing the gathered information. 41
INTRODUCTION42
HOUSE 143
SITE PLAN-
PART AXONOMETRIC VIEW44
HOUSE 245
6. THE CITYSCRAPER, THE ANCHOR. COMPETITION ENTRY SITE - MARINE DRIVE, MUMBAI. YEAR- 2020-2021
BRIEF-
In this project, the design of the skyscraper springs from the rising issues in the city and many other urban issues that continuously persist. The participants are asked to design a skyscraper that not only contributes to the urban fabric but also to the city and the people around it. A skyscraper acts as a distinctive landmark, stamping its imprint on the urban fabric where no common man can afford to live. It focuses of skyscraper being designed as stems to a city made to grow the economy, environmental conditions, social and cultural well-being. 47
1.The form lies on a plot abutting the marine drive road and is set back eastward giving a wide expanse on the windward direction with building occupying half of the plot acreage.
3. The structure standing tall is spined by two edge cores on its shorter spans and third on rear facade. these cores guide the design ideologies of open open and slendercolumned volumes inside.
5. The slabs from each floor are projected outward in a predetermined pattern to merge blur adjacent program boundaries, shade the structure and increase the interaction bwetween terraces.
FORM DEVELOPMENT48
2. The form is a result of layering a sequence of realms; public, semi and private, bottom to top. it considerably rises above the structures in its context, as an ‘Anchor’.
4. The facade abutting the central core of column free public program is scooped out to form a series of green interaction voids, articulating the front elevation and breaking the monotomy.
6. the setback area towards the main road is landscaped and designed to provide a gathering and pause point for the masses. This city park is the most public realm of the structure.
The form of THE ANCHOR is a subliminal manifestation of its name, marking the point of coincidence for the social economic, enviromnmental and urban fabric of its context. Form enables the periodic projects to create an identity that binds the layers of building.
EXPLODED AXONOMETRIC PUBLIC REALM49
Hmmm...museum or shopping ? better yet the open cafe.
VIEW OF THE ATRIUM-
VIEW OF THE PUBLIC PLAZA50
SECTIONAL VIEW 1-
SECTIONAL VIEW 251
7. DREAM HOUSE, OCEAN PEARL . COMPETITION ENTRY SITE - NAYAMA, MALDIVES. YEAR- 2019-2020 52
53
SITE DRAWINGS AND SKETCHES SHOWING THE LIFESTYLE
SITE SECTION
VILLAGE VIEW
8. TINY LIBRARY, SAMVAD. COMPETITION ENTRY SITE - DOYAPADA, PALGHAR. YEAR- 2018-2019 54
55
SECTIONS AND CLIMATE R
9. THE LITTLE BIG LOO, VZ. COMPETITION ENTRY SITE - DHARAVI, MUMBAI. YEAR- 2019-2020 56
MATERIA
RESPONSE CLIMATE-
AL PALETTE-
57
VIEW OF LOUNGE ON FIRST FLOOR-
10. INTERIOR DESIGN. INTERIOR DESIGN SEM VII SITE - LONAVLA YEAR- 2020-2021 58
VIEW OF BEDROOM-
BRIEF-
Reconnecting with nature has been shown to offer a wealth of mental and physical benefits, not to mention the sheer enjoyment of being surrounded by beautiful scenery can bring. The project aims towards creating a abode for a group of friends (all couples) which would take them as close to nature as possible while staying in a protected abode. They would love to observe the stars and hear the sounds in the jungle at night. 59
VIEW OF PATHWAY-
11. LANDSCAPE DESIGN. LANDSCAPE DESIGNING - SEM V SITE - _____ YEAR- 2019-2020 60
VIEW OF POND-
BRIEF-
The brief aims towards creating a setting for a photography studio for a photographer. The idea was to create a setting which will keep on changing and will give photographer more and more views and frames that he can capture with change in seasons. hence flower beds, ponds are given which will attract different insects, birds which a photographer can definitely enjoy. 61
THANK YOU VEDANT KHEDEKAR Email : vedantk17@aoamumbai.in Contact no. : +91 7066983727
62