Skip to main content

Architect Vaibhav Parab_Portfolio

Page 1


PORTFOLIO ARCHITECTURE

AR.VAIBHAV PARAB

Disclaimer

This portfolio showcases architectural projects I have contributed to between 2021 and 2025. All Designs, Drawings, and Visualizations included reflect my role in the respective projects, whether in Design Development, Technical Detailing, or Project Coordination. Certain elements may be modified or redrawn for presentation purposes. Confidential and proprietary information has been omitted in accordance with professional and contractual obligations.

Ar. Vaibhav Mahesh Parab, IGBC AP

Architect with a strong background in Architecture, Urban Design, and Transit Infrastructure projects in India. Over the course of my career, I have contributed to a diverse range of projects where I honed my skills in Designing and Planning large-scale Architectural Projects. My expertise extends to creating Efficient Urban Spaces, with a focus on enhancing the functionality and aesthetics.

Education : Bachelor of Architecture (Ranked First at College level in Final Year Design Dissertation)

College : Samyak Sankalpa College of Architecture, Kalyan

Other Training : Building Information Modeling (BIM) in Revit

: Indian Green Building Council Accredited Professional (IGBC AP)

Employment Record : i. Architect (Trainee)

Padeco India Pvt. Ltd.

Duration: 08 Months

ii. Associate Architect

House of Kashtee

Duration: 03 Years 08 Months

Satation Area Traffic Improvement Scheme (SATIS) at Ambernath

Railway Station

Navi Mumbai Metro Line 01

SATIS- Ambernath

(Station Area Traffic Imrpovement Scheme)

3.84 Acre Master Plan

G+3 Mixed Use Building of 31,600 Sqm

Client: MMRDA

S. S. DUSTBIN

S. S. BENCH

CIRCULAR S. S. BOLLARDS

LEGEND WARNING & MANDATORY SIGNAGE BOARD

INFORMATORY SIGNAGE BOARD

STREET NAME SIGNAGE BOARD

JUNCTION NAME SIGNAGE BOARD

PLASTIC SPRING PARKING POSTS

RAMP

BOOM BARRIER

SPEED BUMPS

CORNER CONVEX MIRROR

DOOB GRASS

MURRAYA PANICULATA SHRUB

KERB STONE LINE

STAMPED CONCRETE FOOTPATH

PQC ROAD

EXISTING TREE

TREES TO RELOCATED

PARKINGMULTISTOREY

AUTORICKSHAWSTAND

LEGEND

S. S. DUSTBIN

S. S. BENCH

CIRCULAR S. S. BOLLARDS

WARNING & MANDATORY SIGNAGE BOARD

INFORMATORY SIGNAGE BOARD

STREET NAME SIGNAGE BOARD

JUNCTION NAME SIGNAGE BOARD

PLASTIC SPRING PARKING POSTS

RAMP

BOOM BARRIER

SPEED BUMPS

CORNER CONVEX MIRROR

DOOB GRASS

MURRAYA PANICULATA SHRUB

KERB STONE LINE

STAMPED CONCRETE FOOTPATH

PQC ROAD

EXISTING TREE

TREES TO RELOCATED

*Actual Photograph

Navi Mumbai Metro Line 01

Detailed Design of One Terminal Station and Five Typical Metro Stations

Client: CIDCO

General Consultant: Maha Metro

Ground Level Plan

Concourse Level Plan

1. DO NOT SCALE THE DRAWING, FOLLOW ONLY FIGURED DIMENSIONS.

2. ALL DIMENSIONS GIVEN IN THIS DRAWING ARE IN MILLIMETERS UNLESS NOTED OTHERWISE.

3. ALL DIMENSIONS TO BE VERIFIED ON SITE AND APPROVED BY THE SITE ENGINEER.

4. ANY DISCREPANCY OR AMBIGUITY IN THE DRAWINGS SHOULD IMMEDIATELY BE BROUGHT TO NOTICE OF THE ARCHITECT.

5. ALL DRAWINGS SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, PLUMBING, MECHANICAL AND ELECTRICAL DRAWINGS.

TO PENDHAR

6. THIS DRAWING IS THE COPYRIGHT OF HOUSE OF KASHTEE, NAVI MUMBAI AND MUST NOT BE RETAINED, COPIED OR USED WITHOUT THEIR AUTHORITY.

LEVELS, FOOTPATHS, DROP OFF AND OTHER GROUND FACILITIES ARE INDICATIVE, REFER GROUND DEVELOPMENT DRAWINGS FOR DETAILS.

REFERENCE DRAWINGS: 1. GROUND TO CONCOURSE ENTRIESNMM1-CA01-JKIL-AR-01-EE01-001 TO 003

2. FLOORING DRAWINGS:

Finishing Details of Toilets

TOILETS CEILING PLAN

REFERENCE DRAWINGS

FOR GAD:-

NMM1-CA01-JKIL-AR-01-PL-001_R0 FINISHING DETAILS SECTIONS:-

NMM1-CA01-JKIL-AR-01-TOI-DT-002

NMM1-CA01-JKIL-AR-01-TOI-DT-003 BLOCKWORK DETAILS:NMM1-CA01-JKIL-AR-01-BW-001_R3

NMM1-CA01-JKIL-AR-01-BW-002_R3 FOR DOOR DETAILS:-

NM1-CA12-SMS-A-CD_00-D005(R0)(SHEETS-9) FOR WINDOW DETAILS :NMM1-CA02-PCL-A-CD-00-D001-R2(SHEETS-5) NMM1-CA02-PCL-A-WD-00-D001-R1(SHEETS-4)

Finishing Details of Excess Fares Office

REFERENCE DRAWINGS:

FINISHING DETAILS SECTIONS & ELEVATIONS

NMM1-CA01-JKIL-AR-01-EFO 2-DT-002

NMM1-CA01-JKIL-AR-01-EFO 2-DT-003

NMM1-CA01-JKIL-AR-01-EFO 2-DT-004 DOOR WINDOW DETAILS

NMM1-CA01-JKIL-AR-01-DW-027

NMM1-CA01-JKIL-AR-01-DW-028

BLOCKWORK DETAILS & CUTOUT LOCATION

NMM1-CA01-JKIL-AR-01-BW-001

NMM1-CA01-JKIL-AR-01-BW-002

REFER M.E.P. DRAWINGS FOR RACEWAY DETAILS

Fire Evacuation Drawings Prepared for Fire NOC

DIMENSIONS TO BE VERIFIED ON SITE AND APPROVED BY THE SITE ENGINEER. 4. ANY DISCREPANCY OR AMBIGUITY IN THE DRAWINGS SHOULD IMMEDIATELY BE BROUGHT TO NOTICE OF THE ARCHITECT.

5. ALL DRAWINGS SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, PLUMBING, MECHANICAL AND ELECTRICAL DRAWINGS.

6. THIS DRAWING IS THE COPYRIGHT OF HOUSE OF KASHTEE, NAVI MUMBAI AND MUST NOT BE RETAINED, COPIED OR USED WITHOUT THEIR AUTHORITY.

*Actual Photographs

Bank of Baroda Staff Quarters

G+18 Residential Building

Client: Bank of Baroda

PMC: Hindustam Steelworks Construction Limited

GROUND FLOOR PLAN

TYPICAL 7TH , 9TH, 11TH, 13TH, 15TH & 17TH FLOOR PLAN

TYPICAL 7TH , 9TH, 11TH, 13TH, 15TH & 17TH FLOOR PLAN

Redevelopment Project of Chhtrapati Shivaji Maharaj Terminus Station

General Arrangement Drawings (GAD) Architecture

Client: Railway Land Development Authority

Contractor: Alhuwalia Contracts India

Suburban Concourse 9.2M Level Plan

LB-01,LB-02,LB-03,LB-04, LC-01,LC-02,LC-03,LC-04 LD-01,LD-02,LD-03,LD-04 LE-01,LE-02,LE-03,LE-04, LG-01,LG-02,LG-03,LG-04.

9

7 2

CC-10,CC-11,CC-12, CC-14,CE-08,CE-08A,CE-09, CE-09A,CE-10,CG-08,CG-08A CG-09,CG-09A,CG-10,CG-11, CH-04,CH-05,CH-06,CH-07, CH-08,

CH-03,CC-13,CG-03,

X

X

6 CB-06,CB-07,CB-08,CB-09, CC-06,CC-07,CC-08,CC-09, CD-04,CD-05,CD-06,CD-07, CE-04,CE-05,CE-06,CE-07, CG-04,CG-05,CG-06,CG-07. 2200 X 450

CB-01,CB-02,CE-03,CC-05, CB-05,CD-02,CF-01,CH-01, CH-02,CH-03

8 CE-01A,CG-01A.

CB-03,CB-04,CC-03,CC-04, CD-01,CE-01,CE-1A, CG-01,CG-02.

X

X

SECONDARYGIRDER

SECONDARYGIRDER

SECONDARYGIRDER

SECONDARYGIRDER

SECONDARYGIRDER

SECONDARYGIRDER

SECONDARYGIRDER

SECONDARYGIRDER

SECONDARYGIRDER

SECONDARYGIRDER

PRIMARYGIRDER

SECONDARYGIRDER

SECONDARYGIRDER

PRIMARYGIRDER

SECONDARYGIRDER

SECONDARYGIRDER

SECONDARYGIRDER

PRIMARYGIRDER

SECONDARYGIRDER

SECONDARYGIRDER

SECONDARYGIRDER

PRIMARYGIRDER

SECONDARYGIRDER

SECONDARYGIRDER

SECONDARYGIRDER

SECONDARYGIRDER

SECONDARYGIRDER

SECONDARYGIRDER

SECONDARYGIRDER

SECONDARYGIRDER

Turn static files into dynamic content formats.

Create a flipbook
Architect Vaibhav Parab_Portfolio by Vaibhav Parab - Issuu