Skip to main content

Vijay Nirman Brochure

Page 1

Over 25 years of multi-faceted quality construction expertise

ISO 9001 : 2008

A N I S O 9 0 0 1 : 2 0 0 8 C E R T I F I E D C O M PA N Y


A Strong Foundation Vijay Nirman Company was established in the year 1982 by Dr. S. Vijaya Kumar. The Company started its operations from Visakhapatnam, port city of Andhra Pradesh, India with construction of Industrial structures and Pile foundations. Over the years, Vijay Nirman Company has expanded into the fields of Marine Projects (Berths/Jetties), Power Projects, Roads & Bridges, Electrical Sub Stations, Residential & Commercial Buildings, Internal & External Electrification, Water Works etc. Vijay Nirman has also executed Silos & Chimneys involving slipform technology.

Vision & Mission “To be a leading player in construction by becoming a symbol of perfection through commitment to quality, service, time and cost. In furthering standards by Inspiring manpower to achieve the ultimate in finding solutions to the impossible via innovative, experimental means.”

Vijay Nirman has completed more than 350 projects to date, maintaining an arbitration-free record which speaks volumes about the importance attached to customer relationship. With its operations all over India and an Annual Turnover of Rs.450 crores (US$ 100 Million), Estimated for the year 2009-2010, Vijay Nirman is looking for a manifold increase in the near future. Its penchant for undertaking construction challenges and meeting them is well known. Be it power projects or bridges, residential complexes or harbours, Vijay Nirman has the ability to design & build to customer requirements without cost or time overruns, maintaining the highest standards of workmanship. What sets Vijay Nirman apart is the “GUTS OF STEEL” attitude and collective enthusiasm to achieve the impossible against all odds. Each individual of the Company, from the top downwards, is inspired by the passion to excel, lighted by the vision to lead and the will to achieve.

Core Competence l l l l l l l

Industrial/Defence Projects Marine Works Roads & Bridges Power Plants Buildings Material Handling Systems Water Supply & Electrical Works

Company Philosophy Perfection is what results from the balance between the unreal and real. The impossible and possible. The pyramid with its solid base rises upward to taper off at the peak. This is experience. An inverted pyramid (imagination) meets the regular pyramid with minimum surface area for contact. Yet, it seems to balance well with its apex pointed downward. This is commitment to Excellence, Quality, Time, Costs, and Perfection. This is the foundation of Vijay Nirman’s existence, consistent growth and success.


Key Personnel Dr. S. Vijaya Kumar, M.E (Structures), Ph.D Chairman & Managing Director

Dr. Vijaya Kumar established Vijay Nirman Company in the year 1982 and leads the Company from the front. He has nurtured the company on the tenets of professionalism, excellence and quality. He empowers the core team as well as employees with the twin mantras of freedom and trust.

A.V.V.V. Prasad (Vishnu), M.Sc Director Mr. Vishnu has over 30 years of experience in execution of more than 200 projects encompassing Pile Foundations, Bridges, Marine Works and Industrial Structures.

Y.V. Ramana, M.Tech (Geo Engg) Director Mr. Ramana has over 20 years of experience in executing more than 75 projects involving Marine works, Industrial, Infrastructure and Buildings Projects. Business development is his forte.

V. Ajay Kumar, B.Tech, MTM Director Mr. Ajay Kumar has done his Masters in Technical Management from Eastern Michigan University, USA and has over 5 years experience in Corporate Business Management and Strategic Planning.

A.S. Mahalle, B.E. Director - Projects Mr. Mahalle has over 30 years of experience in executing more than 75 projects in the fields of Marine Works, Power Plants, Cement & Steel Plants, Residential Buildings, Water Supply Projects etc.

B.S. Mandalika, B.E(Hons) Director - Technical Mr. Mandalika has over 4 decades of experience in Military Engineering Service. As Additional Director General, he was instrumental in execution of Avadi Tank Factory, Dry Docks, Marine Infrastructure etc.

Cmde (Retd) N. Krishna Rao, M.Tech.(Mech)

V. Prasada Rao, B.E. Director - Projects Mr. Prasada Rao has over 35 years of experience in construction industry in the fields of Structural Steel works, Jack up Barges, Floating Cranes, construction of Bridges, Pump Houses, Pipe Lines etc.

M. Vamsidhar, MBA Director - Projects Mr. Vamsidhar has over 18 years of experience in construction of Roads & Bridges, High- Rise Buildings etc.

V V Sudhakar Roy, B.Tech Director - Projects Mr. Roy has over 25 years of experience in International Contract management, Project planning and execution in Power and Bulk Material Handling Projects.

Director - Projects He has more than 32 years of experience in Indian Navy and had executed various industrial projects. As DDG-DGNP, he had handled Marine Infrastructure and equipments. He is a recipient of Nausena medal from the President of India.

3


Col.(Retd)

Mr H.R. Manjanath, B.E. Vice President Heretired as Chief Engineer from TCE after 25 years of service. He has more than 44 years of experience in various industrial projects and was instrumental in the execution of 7 Hydro power projects.

B. Rajendra Prasad, L.C.E. General Manager - Projects He has over 30 years experience in Industrial & Residential Structures, Power Plants etc.

P. Ram Babu, B.E. Vice President - Projects He has over 30 years experience in execution of infrastructure & residential projects. Ramesh Kumar Kamboj, A.M.I.E Vice President - Projects He has over 26 years of experience in Highways (rigid & flexible pavements), Bridges and Track Works. He had worked for 15 years in IRCON International. M. Subba Rao, B.Com, FCA. Vice President - Internal Audit He has 32 years experience in Corporate Finance, Accounts and Auditing. He has international experience of more than 5 years. T.S. Pradyumna, M.Com Vice President - Finance He has over 28 years experience in Finance and Accounting and has significantly contributed towards the growth of the Company since inception. Cmde(Retd) S.P.R. Reddy, MSc, Master in Management Studies

Vice President - HR & Admn. He has over 35 years experience in the Indian Navy and has commanded a number of Ships and Units in the Service. He was awarded the Nausena Medal (NM) and Vishist Seva Medal (VSM) by the President of India. G. Satyanarayana, M.Tech General Manager - Projects He has over 28 years experience in erection& commissioning of Turbines (Gas & Hydraulic), Generators, Hydro Mechanical Works for Power Projects, fabrication & erection of Material Handling Systems (Coal & Ore). E.S. Pattabhiraman, B.E., M.I.E General Manager - Technical He has over 40 years of experience in execution of projects encompassing Industrial, Residential & Commercial Structures. Worked overseas for 30 years.

4

C. Shankar Rao, B.E(Mech) General Manager - Equipment Division He has served with Corps of EME and has over 32 years of experience in mechanical maintenance of Aviation Turbines, Helicopters, Tanks & Guns, Generators, vehicles, Communication, Construction and Earthmoving Equipments.

S. Kumar Raja, B Tech, M.B.A. President - Finance He has experience of over 34 yrs of which 10 years in production in large manufacturing sectors like ECIL and TRF and 24 years as Industrial Finance specialist in Syndicate Bank and ING Vysya Bank. He had also headed large branches of Banks.

Sushil Kumar, B.E. General Manager - Projects He has experience of over 20 years in Construction of Industrial & Residential Structures. Thomas Jacob, L.C.E. General Manager - Projects He has over 30 years of experience in Construction of Industrial & Residential Structures. V.C. Sitharamaiah, B.Sc (Eng) General Manager - Projects He has over 22 years of experience in Pile Foundations, Infrastructure, Industrial & Residential Projects. P. Rajagopal, L.C.E., B.Sc (Civil Eng.) General Manager - Projects He has over 20 years of experience in Infrastructure, Industrial & Residential Projects. Cdr. (Retd.) M.H. Rahman, B.E General Manager-Projects He has served Indian Navy for 20 years and has total experience of more than 30 years in Technical, Logistics & Infrastructure projects. K. Ramesh, B.E General Manager-Projects He has over 26 years of experience in Infrastructure projects. Vijay Nirman has a vast number of experienced and skilled persons as under: Directors & Vice Presidents General Managers/DGMs Project Managers Managers/Senior Executives Engineers Supervisors Foremen Technicians/Operators/Technical staff Stores/Purchas Assistants Office Support staff Others

Total

17 18 36 61 238 426 30 565 80 94 176 1741


l Western Transport Corridor TumkurHaveri NH4 project of NHAI for TDM infrastructure Pvt. Ltd., Malaysia during the period: 2003-2006 involving Major & Minor bridges. l Construction of Rail Bridge across Lakshmanteertha River in MysoreHassan Section for Southern Railways during the period 2000-2001. l Construction of Rail Bridge of length 600 metres across River Pennaiyar at Melpattambakkam for IRCON International Ltd. Period: 1999-2000. l Construction of Road Over Bridge near Pakur Station in Jharkand for Konkan Railway Corporation. Period: 2003-2004 l Construction of super structure for Metropolitan Transport Project (railways), Madras of MRTS Phase-II in TirumalaiVelachery section. Period: 1999-2001. l Design & Construction of ROB, Viaduct & approach road work in Nandurbar city on SURAT–TALOBA road for MSRDCNHAI. Period: 2004-2008.

R&B Development Corporation of Kerala Ltd. Period: 2002-2004. l Main Carriageway construction of Elevated Highway of Hosur road. l Widening of 2 lane to 4 lane divided carriage way configuration Dhule to Pimpalgaon section of NH-3 in the state of Maharashtra for Soma Enterprises Ltd. l Bridges, Underpasses & ROBs for four laning & strengthening of existing 2 lane of Tindivanam – Ulundurpet section of NH-45 in Tamilnadu for GMR Projects Pvt. Ltd., NHAI. l Construction of two grade separators and eight other structures for Taj Corridor, Agra for JAIPRAKASH Associates. (ongoing Project) l Construction of major bridge at Ennore Creek near Chennai for Rites Ltd. (Ongoing Project) l Karul

l Construction of ROB at Bekal, Kerala for

5


6


7


Vijay Nirman has executed several Residential, Administrative and Commercial Buildings.

Major Projects: l Construction of new building for Electronics factory, Bharat Electronics Ltd., Bangalore. Period: 1993-1995.

l Construction of Riverside Mall for MARG constructions Ltd. in Chennai. (Ongoing Project).

l Expansion of Chinnaswamy Cricket Stadium & Building of office space for Karnataka Cricket Association, Bangalore. RCC Seating, Structural steel cantilevered roof. Period: Phase I: 19951996. Phase II: 1997-1998.

l Construction of independent Villas at 'Cloud-9' Bommasandra, Hosur Road, Bangalore for M/S Nu-Tech Prasiddhi Properties. (ongoing project)

l Provision of new buildings for Light/MTO Diesel repair facility at Naval Dockyard, Visakhapatnam. Period: 2001-2003.

l Construction of Sea Valley Resorts - a multiplex and Hotel in Visakhapatnam. (ongoing project)

l “HIGH IQ” luxury apartments called ATRIA TOWERS in Bangalore designed by SAA-Singapore during 1998. Three Blocks, 16 floors with swimming pool, club house, etc.

l Construction of ESIC Medical College at Sanath Nagar Hyderabad for UP Rakiya Nirman Nigam Limited. Cost of the Project Rs 389.41 Crores (Ongoing Project).

l Construction of “ROYAL LEGEND” a high rise building of 11 blocks at Bommanahalli, Bangalore. Period: 2005-2008. l Provision of Regional Training Centre and allied services at Bangalore for CCE (R&D). Period 1994-1995.

8

l Construction of Chalukya Holiday Resorts at Bangalore (ongoing project)


Gangavaram Port

Major Projects: l Construction of Wagon Tippler & other facilities for handling Iron Ore and Coal at Gangavaram Port, Visakhapatnam for Gangavaram Port Ltd. l Expansion of Alumina Handling facilities at NALCO’s port facility at Visakhapatnam. Period: 1998- 2001.

l Civil & Structural works for Ammonia Tank Foundation & related facilities for Coromandel Fertilisers Ltd., Visakhapatnam during the year 1998. l Civil & Structural works for Solid Material Handling System at Bharat Oman Refinery Ltd, Bina for B.H.E.L (Ongoing Project)

l Construction of Atmospheric storage tank & Handling facilities at Kakinada for Godavari Fertilisers & Chemicals Ltd. Period: 1998-1999.

BORL - Bina for B.H.E.L

9


l 208 MW combined cycle power plant at Kakinada for Rolls-Royce Industrial Power (India) Ltd., involving 5-cell RCC cooling tower, water treatment facility, structural steel fabrication & erection for the Gas Turbine canopy & steam turbine hall, Reservoir liner protection etc. Period: 1996-1997. l 1x30MW captive power plant for Aryan Coal Benefications Pvt. Ltd. consisting of Turbine House, Boiler House, Control Room, Silos, Material Handling System, Crusher House, Water Treatment Plant, Cooling Tower etc. Period: 2005-2006.

l Captive power plant at Bhadrak, Randia for Ferro Alloy Corporation Ltd, Balasore. Period:1990-1992. l 30MW Diesel Power plant near Visakhapatnam for TATA PROJECTS LTD. l Captive power plant at Information Tech Park Ltd for TATA PROJECTS LTD, Bangalore during the period 1996-1997. l Civil Work of TC Building, Misc Building, Civil Foundation etc., for 1x50 mw Power Plant at Korba (C.G) for Spectrum coal & power limited.


S.No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Equipment Description Tower Cranes Crawler Cranes (18T to 70 T) Hydraulic Cranes (10 T to 12T ) Tower Hoist with Winch Hydraulic Pilling Rig Conventional Piling Rigs Batching Plant (20-30 Cum) Mini Batching Plant Concrete Mixer Transit Mixer Concrete Pump Weigh Batchers Boom Placer Hydraulic Excavator Front End Loader & Wheel Loader Earth Rammer Dumpers/Tippers/Trucks Trailors Survey Equipment (Total Station) Diesel Generators upto 625KVA Welding Rectifiers Submerged Arc Welding machine Electrical Pump Sets Motor Grader

Qty. 12 7 18 9 11 33 18 15 28 57 17 16 2 3 15 17 27 9 15 50 50 2 36 2

25

WMM Plant

1

26

Vibratory Soil Compactors

3

27

Asphalt Hot Mix Plant

1

28

Road Paver

2

29

Kerb Placing Machine

2

30

Pneumatic Tyre Roller

3


Financial Strengths TURNOVER Rs in Millions

10,000

9,000 8,000

7,500

4,000

2,704

3,000

2,521

2,000 1,000

812

869

2005-06

2006-07

E S T I M A T E D

5,000

5,000

P R O J E C T E D

6,000

P R O J E C T E D

7,000

0 2007-08

2008-09

2009-10

2010-11

2011-12

NETWORTH

PBDIT

Rs in Millions

2000

1921

Rs in Millions

1400

1397

1800 1200 1600

600 400 200

177

201

2005-06

2006-07

317

338

0 2007-08

2008-09

2009-10

800

676 600 400 200

252 65

360

82

P R O J E C T E D

800

E S T I M A T E D

792

P R O J E C T E D

1000

1030

1000

E S T I M A T E D

1200

P R O J E C T E D

1207

P R O J E C T E D

1400

0 2010-11

2011-12

2005-06

2006-07

2007-08

2008-09

2009-10

2010-11

2011-12


A N I S O 9 0 0 1 : 2 0 0 8 C E R T I F I E D C O M PA N Y

Head Office: 10-50-19, Soudamani, Siripuram, Vishakapatnam - 530 003. Andhra Pradesh, India. Ph: +91-891-2573380, 2575755; Fax: +91-891-2754046 vncvizag@vijaynirman.com

Hyderabad: 8-3-833/118, Kamalapuri Phase-1, Srinagar Colony, Hyderabad - 500 073. India Ph: +91-40-4201 5019 Tele/Fax: +91-40-2373 3890 vncplhyd@yahoo.com

Bangalore: #264, 4th Cross, RMV Extension, 2nd Stage, 2nd Block, Bangalore - 560 094. India Ph: +91-80-42682782 Fax: +91-80-42682760 vncblr83@hotmail.com

Nagpur: Plot No. 65, 1st Floor, R.P.T.S. Road, Surendra Nagar, Nagpur - 440 015, India Ph : +91-712-2236448 Fax : +91-712-2240787 vncngp@vijaynirman.com

www.vijaynirman.com

Delhi: C-009, AWHO, Vivek Vihar Sector 82, Noida-201301 Ph: +91-120-2417432 Tele/Fax: +91-120-2417313 vncdelhi@gmail.com


Turn static files into dynamic content formats.

Create a flipbook
Vijay Nirman Brochure by UV Communications - Issuu