EDUCATION SEP 2018 - TILL NOW
Architectural Engineering Ain Shams University
EXPERIENCE AUG 01, 2021 - AUG 29, 2021
(ASU) Engineering Consultancy Center - ECC Internship
SEP 04, 2021 - OCT 09, 2021
AbdulRahman Al-Naim Consultant Office - ACE Internship
COMPUTER SKILLS CAD/RENDER
3DS MAX|AUTOCAD|SKETCHUP| VRAY|LUMION
ADOBE
PHOTOSHOP
MS OFFICE
WORD|POWERPOINT|EXCEL
LANGUAGES ENGLISH
ADVANCED
ARABIC
MOTHER TONGUE
_______ 02
YUSUF EMAD ussef195@gmail.com | 01283802263
CONTENTS 2022
| GOLDMARK’S REAL ESTATE HQ
04
2021
| HSBC BANK HQ
04
2020
| CULTURAL COMPLEX IN FATIMID CAIRO
04
2020
| HSBC BANK HQ WORKING DRAWINGS
04
_______ 03
2022|Senior 1|2nd Semester|GOLDMARK GOLDMARK HQ
GOLDMARK HQ A Smart Sytems Design Project which focuses mainly on the comfort of the users of the space and luxury to clients.
_______ 04
Main Street Shot
2022|Senior 1|2nd Semester|GOLDMARK GOLDMARK HQ
MasterPlan
_______ 05
2022|Senior 1|2nd Semester|GOLDMARK GOLDMARK HQ
NORTH ELEVATION VERTICAL LOUVRES
EAST|WEST ELEVATIONS SCREENS
SOUTH ELEVATION HORIZONTAL LOUVRES
_______ 06
FACADE TREATMENTS TO AVOID GLARE
2022|Senior 1|2nd Semester|GOLDMARK GOLDMARK HQ
SOLAR POWER CAPTURED AND STORED IN BATTERIES IN BASEMENT LEVEL THE DISTRIBUTED AGAIN TO THE DIFFERENT DISTRIBUTION BOARDS IN THE BUILDING SAVING POWER CONSUMPTION AND OPERATION COST..
SMART SYSTEMS
_______ 07
2022|Senior 1|2nd Semester|GOLDMARK GOLDMARK HQ
_______ 08
2022|Senior 1|2nd Semester|GOLDMARK GOLDMARK HQ
Reception Hall Interior
_______ 09
2021|Junior|2nd Semester| HSBC Bank HQ
HSBC Bank HQ | Al-Alamein
Building Type Design Studio Project Which focused on reflec From the Slogan of HSBC «Together We Thrive» The form i The Concept of unity also appears in th by repeating an element changing it in a region with some parameter
_______ 10
2021|Junior|2nd Semester| HSBC Bank HQ
cting the Identity of the Company on the mass of the building is devided into smaller masses united to make the building he designs of the commercials of HSBC rs kept to achieve unity like linearity, Direction, Horizontality, Color.... etc.
Main Shot
_______ 11
2021|Junior|2nd Semester| HSBC Bank HQ
_______ 12
Ground Floor Plan
2021|Junior|2nd Semester| HSBC Bank HQ
First Floor Plan
_______ 13
2021|Junior|2nd Semester| HSBC Bank HQ 1
2
ARC402
3
4
5
6
A3
7
66.25 6.00
60.2
6.00
6.00 7.97
6.00
2.34
0.60
0.60
2.34
9.61
3.66
2.34
W 1
W 1 1.82
4.00
3.05
4.25
5.82
13 12
21
CW6
20
3.05
23.88
ARC401
0.2
19
3.66
6.00
2.34
18
2.34
W 1
2.34
6.00 3.66
17
1.72
2.34
16
3.66
W 1
A
6.00 3.66
15
2.34
14
3.66
11
22
10
9.04
0.60
7.82
1
32
4.00
2
31
3.05
3
30
3.05
4
29
CW6
5
Open Plan Office GF 24
28
0.35
6
W 1
27
0.95
7
26
8.00
8
2.21
25
2.34
24
4.00
23
9
6.00 1.45
34
33
35
37
36
38
40
9.1
3.82
D 5
1.90
CW6
1.90
3.05
3.05
4.00
1.42
1.10
W 1
39
2.26 15.75
2.34
0.60
1.40
4.00
0.95
0.35
6.00
B
2.21
1.99
0.55
0.35
0.90
W 1
1.99
1.90
D 5 1.90
CW6
4.00
3.05
4.00
3.05
4.81
8.00
2.34
0.81
6.00 1.45
2.34
3.05
3.05
4.00
2.21
W 1
CW6
4.00
1.45
0.25
1.00
0.40
6.00
C
8.00
2.34
CW6
6.30
CW1
0.60
6.30
8.00
4.40
0.56
0.81
D
1.90
W 1
3.00
3.76
1.00
0.70
6.00 1.76
Slope 1/10
0.60 0.60
1.14
E
64.25
1
2
3
4
5
6
7
8
9
10
11
12
2.00
1.83
ARC301
1.14
1.80
D 2
13 14 15
17 18
3.88
3.75
7.75
8.00
16
D 1
19 20 21 22 23 24
2.00
2.18
25
40
39
36
35
34
33
32
31
30
29
28
27
26
0.25
2.00
8.00
0.20 2.58
11.75
6
5
4
3
2
0.15 1.00
Emergency Stairs GF 022.01
3.44 0.31 1.50
3.50
16
J
17
6.65 18
19
20
21
22
23
24
25
26
27
28
29
30
D 3
0.37 2.09
1.00 0.72
1.00
0.93
D 4
Mechanical Room GF 03
7.82
2.58
1.00
2.75
Toilets GF 05
1.65 2.80
0.23
Printing & Archive GF 06
0.090.69 0.31 0.69 0.31 0.69 0.22 1.68 4.68
D 4 0.17
3.80
0.89
CW3 6.90
2.01
6.00
0.12
1.90
1.62
D 6
D 4
1
D 5
14.41 2.47
0.65
7
D 4
1.22
8
2.59
9
1.00
10
1.90
1.21
0.37
11
1.26
1.68 0.04 0.79 0.05
D 4
12
1.68
1.62
13
1.65
0.77
14
1.50
15
4.68 0.090.69 0.31 0.69 0.31 0.69 0.22
0.88
3.44
0.29 0.80
0.15 1.00
3.32
I
Electrical Room GF 04 2.80
1.00
8.44
1.05
1.20
0.80
4.50
3.76
0.440.320.45
1.05
1.20
0.57
0.80 0.34
9.73
H
0.20 0.69 2.58
0.20
0.20
2.00
0.20
2.00
2.00
15.88
0.20 2.00
0.20 2.52
0.20
2.00
7.40
Customer Services GF 07
2.00
0.20
0.20
0.20 2.01 0.20 2.00
0.76
0.76
1.96
2.00
2.00
Main Banking Hall GF 01
7.40
2.34
11.75
0.20
0.20 2.00 0.20
CW2
CW2 8.00
3.66
39.75
7.40
7.40
8.00
40.25
G
W 1
2.34 2.10
2.22
1.45
15.88
0.25
W 1
38 37
F
10.82 6.00
3.80 6.00
5.05
0.95
CW4 0.89
6.00
5.05
5.05
1.4
CW4 0.95
6.00
5.05
1.40
6.00
0.2
66.25
1
_______ 14
ARC402
2
3
4
5
6
7
A3
2021|Junior|2nd Semester| HSBC Bank HQ
304
7'
8
9
10
11
12
25 6.00
6.00
2.34
2.97
6.00
6.00
11.86
2.00
6.82
W 1
D 4
1.00
1.26
1.21
0.27
24
23
22
21
20
19
18
11
12
13
A
1.50
16
3.32
0.31 3.44 6
7
8
9
10
14
15
0.80 0.29 2.91
A'
1.05
1.65
8.80
5
1.20
3.76
3.57
4.50
4
0.12 0.88 0.12
3
0.450.320.44
9.10
ARC401
1.50
3.44
2
1.00 4 0.15
3.44
1.00
17
3.50
25
6.57
1
Mechanical Room GF 21
0.22 0.69 0.31 0.69 0.31 0.690.09 4.68
1.21
26
1.20
B
0.55
1.00 0.15
1.00
0.72
1.62
3.35
3.74
27
1.05
0.27
D 4
1.00
28
2.80
0.57
1.00
1.68
0.37
4.61
13
4 D
2.09
2.47
29
D
1.65
0.93
Cafetria GF 23
0.15
D 4
6 D
30
Emergency Stairs GF 19
0.34 0.80
1.68
Seminar Room GF 23
Electrical Room 2.80 1.65GF 20 1.00
1.62
1.22 0.65 1.00
2.75 2.58
4 D
7.82
7.82
GF 05 Toilets
D 3
0.32
4.68 0.22 0.69 0.31 0.69 0.31 0.690.09
3.32
1.68
0.88
4 D
7.93
1.11
4.50
3.62
2.34
0.80
1.04
0.77
1.80
5.88
0.88
2.34
0.050.790.04
W 1 1.74
6.00
2.34
1.00
27
5.99
9.77
D 5
0.34
1.90
0.21
CW5
6.30
8.00
1.70 6.30
23.88 19.88
19.91
CW5
C
20.00
16.38
15.88
MultiPurpose Hall GF 17
4.00
0.25
Open Plan Office GF 18
1.70
11.88
17.88
3.05
6.30
1.90
23.87
8.00
30.00
13.98
6.30
35.76
3.05
CW6
1.70
1.70
D
4.00
W 1
6.30
CW5
3.05
8.00
2.08
E 5.75
2.34
8.08
W 1
1.95
1.90
1.90
D 5
1.90
1.90
1.33
7.95
0.24
0.48
11.88 1.45
0.89
CW6
64.25
2.34
6.30
0.70
5.88 1.45
W 1
A303
0.63
11.75
1.85
E'
0.05
8.00
PROJECT
D 1
13.64
0.63
11.95
1.85
Employees Entrance GF 16
16.01
F NORTH & KEY PLAN PLAN NORTH
9.68
TRUE NORTH
0.60
1.29
0.48
0.06 0.06
W 1 0.48 0.47
2.88
2.34 2.88
W 1
0.06
0.07
0.15
2.34 2.88
0.27
0.15 1.00
D 4
2.00
1.00
1.73
D 4
1.00
1.73
0.15 1.00
8.00
Customer Vault GF 14
1.73
D 4
2.00
4.09 5.72
Office GF 12
3.94
3.94 0.15 1.00
2.00
4 1.00
4.49
6.73
1.73
Office GF 11
G
D
0.63
1.18
7.82
D 4
1.00
Office GF 10
3.94
2.00 0.20
3.94 0.15 1.00
7.75
2.00
Office GF 09
4.49
D 6
0.54
0.15
Entrance & Lounges GF 08
1.18
1.04
W 1
2.34 2.88
5.24
8.00
1.80
6.73
0.20 0.70
0.60
2.34
Security GF 15
2.85
2.85
W 1
D 2 0.95
W 1
2.34
5.72
3.94
4.06
1.00
D 4
0.56
1.00 0.09
0.21
5.94
5.82
1.00
1.79
3.82
2.45
0.20
12.06
15.75
D 4
1.00
DESCRIPTION
DATE
APR.
Customer Vault GF 13 7.72
7.71
6.56
6.78
Rev.
REVISIONS Rev.
5.72
5.82
Customer Services Back Oficces GF 07
ISSUE BLOCK
H
4.09
8.00
18.37
0.63
17.16
1.00
D 4
0.09 1.00
6 D
1.18
ASU FEDA 4th Year Architecture
0.19
17.25
MANGEMENT BLOCK
0.65
CW4
0
4.77
27
5.04
0.78
CW4 0.80
6.00
4.02
5.05
0.95
CW4 0.95
6.00
5.03
5.05
0.59
D 4
0.15 1.00
5.05
0.25 1.00
DWG FILE NAME 40.50
43
302
1.90 0.25
2.34
2.45
0.70
6.00 1.76
DWG BY:
Youssef Emad Naguib
J
5.05
DRAWING NAME:
6.78
6.00
Ground Floor Plan
6.00
SCALE: DATE:
7'
8
9
10
2
SHEET TITLE BLOCK
CW4 0.98
6.00
SEC:
CHECKED BY:
11
12
Working Drawings | Ground Floor
202
Ground Floor Plan 0
2
1:100 10/1/2022
DRAWING REFERENCE NO.: 4
ARC 202
_______ 15
2021|Junior|2nd Semester| HSBC Bank HQ
1.20
1.20
1.78
1.81
1.20
1.20
1.78
1.80
1.78
1.20
1.20
6
1.88
1.16
1.20
1.78
7
0.80
1.21
1.21
1.21
1.21
2.11
0.90
0.90
5
0.90
A
4
2.11
3
0.90
2
0.90
1
1.21 1.21
1.21 1.21
2.42
GBT@4.2
1.21
2.42
1.21
Open Plan Office GF 24
1.21
2.42
1.21
1.21
GBT@4.2
EXT
1.80
1.78
0.80
GBT@4.2
0.62
1.20
GB@4.2
0.62
1.20
GB@4.2 1.21
1.21
GB@4.2
1.21
1.98
1.21
1.21
2.28
1.21
1.21 1.21
GBT@4.2
B
2.42
GB@4.2
2.42
GB@4.2
1.21
GB@4.2
1.21
1.21
1.21
GBT@4.2
1.21
EXT
1.78
1.20
1.20
1
2.42
1.21
1.21
2.11
0.90
1.07
1.21
1.21
GBT@4.2
2.42
GB
0.90
1.21
2.42
1.21
1.21
C
D
4.10
GB@4.2
1.52
1.52
1.45
1.52
1.52
2.00
GB@4.2
EXT
E 6.60
0.60
1.20
2.01
2.40
2.53
OWB@5.2
2.65
2.55
1.50
1.50
2.85
1.20
Side Diffuser Side Diffuser
1.20
GB@4.2
OWS@4.2
GB@4.2
5.30
OWS@4.2 2.85
0.83
Side Diffuser
1.57
GB@4.2
GB@4.0
GB@4.2
1.50
8.85
1.50
2.85
AS@4.2
AS@4.2 1.77
1.47
1.20
1.26 3.75
0.93 0.94
HVAC Room GF 03
2.00
Transformer Room GF 03
GB@4.2
3
4
0.91 1.21
2.12
0.91 2.12
1.21
1.21 1.21
2.42
1.21
2.42
1.21
2.70
1.21 0.76
0.76
GBT@4.2
5
0.90
1.20
1.20
1.20
1.21
0.88
GB@4.2
GBT@4.2
GBT
2.42
0.92
GB@4.2
2.42
0.94 3.84 6.47
1.19 0.80
0.90
0.93
AS@4.2
0.60
1.29
0.60
2
GB@4.2 0.44
EXT
1.21
0.90
2.70 1.89
1
0.55
EXT
J
_______ 16
2.00
1.21
GB@4.2
GB@4.2
I
1.21
GB@4.2
1.21
Electrical Room (MDP,EMDP, UPS) GF 04
GB@4.2
1.19
0.91
0.30
AS@4.2
2.00
0.91
0.59 0.60
2.00
0.84
0.89
Emergency Stairs GF 02
1.80
1.00 1.24
GB@4.0
Side Diffuser
1.21
Side Diffuser
1.31
H
Side Diffuser
1.21
Side Diffuser
0.90
0.80
Side Diffuser
5.46 0.76
EXT
GB@4.2 4.32
0.62
Side Diffuser
AS@4.2
2.40
4.67
0.75
0.76
0.90
2.40
AS@4.2
0.99
2.40
1.20
5.47
1.20
1.20
1.20
1.20
6
1.20
1.20
1.21
1.20
0.93
1.20
1.50
1.20
OWS@4.2
2.24
2.25
1.20 0.84
AS@4.2
1.50
3.00
GB@4.2
Main Banking Hall GF 01
1.50
3.00
OWS@4.2
AS@4.2
8.85
3.00 1.77
1.22 1.18 1.35
1.20
1.22 1.18 1.35
GB@4.2
2.40
1.50
AS@4.2
1.20
1.22 1.18 1.35
OWS@4.2
2.85
AS@4.2
AS@4.2
1.20
GB@4.2
1.18
1.18 1.22 1.18
1.44
1.16
GBT@7.8
1.20
1.26
1.20
1.35
1.26
1.20
1.18
1.18
0.51
2.40
1.20
1.22
1.26
1.20
1.20
2.40
1.20
1.18
1.26
1.20
1.18
2.40
1.20
Side Diffuser
31.81
0.60
1.20
1.35
1.26
2.40
2.59
G
OWS@5.2
2.01
2.40
1.20
F
OWB@5.2
OWB@5.2 OWS@5.2
1.20
7
1.20
2021|Junior|2nd Semester| HSBC Bank HQ 7'
8
9
10
11
Electric System Legend
12 NO.
Symbol
DESCRIPTION
1
DUPLEX SOCKET 220 V, 2P+E, 16 / 20 A 1.2M FROM FINISH LEVEL
2
DUPLEX SOCKET CONNECTED TO UPS 220 V, 2P+E, 16 / 20 A FROM FINISH LEVEL
3
QUAD SOCKET CONNECTED TO 220 V, 2P+E, 16 / 20 A FROM FINISH LEVEL
4
Telephone Outlet
5
DATA Outlet
6
Single light switch 1.5M FROM FINISH LEVEL
7
Triple light switch 1.5M FROM FINISH LEVEL
8
MAIN DISTRIBUTION BOARD
-V
0.60 0.60
6.47
0.60
GB@4.2
AS@4.2
AS@4.2
1.80
B
1.68
1.98
1.21
1.98
1.21
1.98
1.21
1.20
0.84
1.58
1.37
0.99
0.51
GB@4.2
GBT@4.2
1.15 3.06
SOUND SYSTEM 50*120 CM
Symbol
1.20
1.20
1.20
3
GB@LVL
4
OWS@LVL
5
OWB@LVL OAK WOOD BOARD
2.24
3.40
1.20
1.68
2.42 1.21 1.20
0.60 0.60
1.20
1.20
WATER SPRINKLER 4M RADIUS SMOKE DETECTOR
4
BEAM DETECTOR
5
FIRE CABINET
6
FIRE ALARM
1.20
3.02
1.20
1.58
0.84
0.93
1.20
0.99
D
DESCRIPTION
FR 1
Hantle ATMs 1700W 7″ high-resolution color LCD
2
FR 2
EKINTOP RECEPTION DESK 0.7*4.4 M
3
D 2
DOUBLE LEAF GLASS DOOR 2.55*1.9 M
4
D 5
SINGLE LEAF DOOR 2.55*1 M
1.21
1.68
Symbol
1
NOTE
1.21
AS@4.2
1.37
GBT@4.2
2.42
GB@4.2
0.84
FURNITURE Legend NO.
0.51
GB@4.2
ALL LEVES MENTIONED FROM FLOOR FINISH LEVEL
1.21
2.42
OWS@4.2
E
2.92
1.21
3.75
Side Diffuser
resuffiD ediS
1.21
0.93
resuffiD ediS
3.07 3.02
DESCRIPTION SIDE WATER SPRINKLER 8 M RANGE , 6M SPREAD
3
2.42
0.49
1.21
0.66
OWS@4.2
0.54 0.66
2.88
Symbol
2
GB@4.2
GBT@4.2
1.80
0.63
resuffiD ediS
GB@4.2
3.35
1.21 1.21
Side Diffuser
1.67
PILASTER
1
1.21 3.10
1.20
1.47
0.60 0.60
1.20
OAK WOOD STRIPS 5CM THICK
OWS@4.2
AS@4.2 0.99
GYPSUM BOARDS
P@LVL
NO.
0.49
6.40
1.20
GB@4.2
2.42 3.63
1.21
1.20
SUSPENDED ALUMINUM SHEETS
GBT@LVL GYPSUM BOARD TILES 60*60 CM
FireFighting System Legend
1.21
MultiPurpose Hall0.66 1.20 1.21 0.62 11.37 GF 17
AS@4.2 1.20
DESCRIPTION
AS@LVL
2
C
1.21
1.20
1.20
AS@4.2
1.20
2.42 1.21 1.21 1.21
RETURN GRILL 50*120 CM
5
OWS@4.2
resuffiD ediS
1.21 1.21 1.21
2.42 1.21 1.21 1.21
4
2.42 1.20
EXT
Side Diffuser
1.30
RETURN GRILL 60*60 CM
FINISHES Legend
1.21
0.93
4.20 2.42
2.42 1.21 1.21 1.21 1.21 1.21
SUPPLY GRILL 60*60CM
3
6
2.40
1.21
DESCRIPTION Side diffuser 60*60 cm
Side Diffuser
2
1.21
1.21 0.84
GB@4.2
Side Diffuser
1.29
Symbol
1
1.21
0.93
GB@4.2
Open Plan Office GF 18
CEILING CONCEALED DOWNLIGHT 40*80 CM 220V 20W
NO.
2.42
1.20
EXT
AS@4.2
1.20
0.99
GBT@4.2
0.62
GBT@4.2
0.62 0.63
0.90
1.21
1.21
B@4.2
4
HVAC & Sound System Legend
1.80
1.80
1.21
1.21
GBT@4.2
0.62 1.20
2.11
0.90
1.20
1.21
1.21
1.98
1.21
1.98
0.62
GBT@4.2
1.78
2.11
0.90
1.89
CEILING CONCEALED DOWNLIGHT 30*240 CM 220V 20W
GB@4.2
1.21
1.21 0.62
GBT@4.2
1.20
CEILING CONCEALED DOWNLIGHT 60*60 CM 220V 20W
3
1
1.20
1.80
DESCRIPTION CEILING CONCEALED DOWNLIGHT D60 CM 220V 20W
2
NO.
GB@4.2 0.84
1.80
1.21
1.98
1.21
1.98
1.80
GB@4.2
EXT
1.20
Emergency Stairs GF 19
EXT
1.80
GBT@4.2
A'
Symbol
1
1.40
GBT@4.2
GB@4.2
1.78
1.89
0.60
EXT
1.48
Lighting System Legend NO.
AS@4.2
GB@4.2
2
0.44 0.60
0.93
1.35
Sattelite Room 03 0.60 0.60 GF 1.20
1.21
1.21
GBT@4.2
3.84 0.94
GB@4.2
0.89
0.90
0.92
0.90
1.21 0.60
0.94
1.29
HVAC Room GF 03 GBT@4.2
1.21
0.60 0.60
Seminar Room GF 230.60 1.20
Surveillance CAMERA 120 DEGREE ANGLE
A
EXT
0.70
0.60 1.20
AS@4.2
1.17
1.17
1.21
GBT@4.2
1.21
1.14
0.60 0.60
0.90
0.90
0.91
0.60 0.60
0.30
0.90
1.20
1.21
0.60 0.60
1.21
1.14
0.90
9
0.90
0.90
GB@4.2
EXT
1.00
2.50
3.65
GB@4.2 1.30
4.00
1.00
2.75
E'
1.30
AS@4.2 2.54
OWS@4.2
2.50
Employees Entrance 4.00 GF 16
1.30
GB@4.2 1.00
3.65
PROJECT
OWS@4.2 1.00
2.75
1.30 9.10
AS@4.2 2.54
2.50
1.30
OWS@4.2
3.65
OWS@4.2
GB@4.2 1.00
4.00
1.00
2.75
1.30
AS@4.2 2.54
2.50
OWS@4.2 1.30
F
3.65
4.00
NORTH & KEY PLAN
OWS@4.2
GB@4.2 1.00
1.00
2.75
TRUE NORTH PLAN NORTH
2.09
AS@4.2
GB@4.2 1
1.72
3
4
5
6
3.50 8.80
1.05
4.50 3.57
3.76
0.34 0.80 0.450.320.44 0.80 0.29
1.65
1.20
1.05
0.80
1.50
3.32
0.31 3.44 1.50
ARC401
A'
0.12 0.88 0.12
14 15
1.20
B
0.55
1.00
0.77
3.32
3.44
1.22
1.62 0.65
0.88
0.88
3.44
A
17 16
7.93
11 12 13
3.62
7.82
0.05 0.79 0.04
1.62 0.37
36
35
34
33
40
39
38
37
15.75
5.99
CW5
6.30
0.34
0.21
8.00
D 5 1.90
6.30
0.60
20 19 18
10
11.88
4.81
3.05
3.05
CW6
1.70
1.70
0.40
2.21 0.25
2.34
C
4.00
1.00
1.45
6.30
8.00
6.30
CW5
20.00
23.88
MultiPurpose Hall GF 17
16.38
15.88
Open Plan Office GF 18
19.88
CW6
19.91
3.05
3.76
1.90 0.25
2.34
W 1
4.00
0.70 1.00
1.76
1.70
0.25 3.05
D
2.08
CW5
6.30
2.34
0.60
W 1
8.00
1.45
6.30
0.70
6.30
8.00
6.30
5.88
5
6
9
10 11 12
31 30 29
7
8
28 27 26
1.45
5.75
2.34
8.08
W 1
1.95
1.90
1.90
D 5
1.90
7.95
1.33
4
1.90
64.25
0.48 3
11.75
0.63
2.00
1.83
2
0.24
1.80
E 11.88
1
0.89
CW6
D 2
0.60 0.60
1.14
1.14
3.05
Slope 1/10
E
64.25
1.08
4.40
CW6
1.70
1.90
W 1
4.00
0.70
2.34
0.56
0.81
1.76
E'
19
1.85
11.95
F
1.73
0.15 1.00
D 4
2.00
1.00
1.73
0.15 1.00
D 4
2.00
0.07
2.34 2.88
1.00
1.73
0.15 1.00
8.00 2.34
0.56
Security GF 15 1.04
1.18
1.18
4.49
G
D
D 6
0.63
1.004
4.09 5.72
4.49
Customer Vault GF 14
1.73
D 4
2.00
0.15
0.15
0.54
Office GF 12
8.00
D 4
W 1
0.06
2.34 2.88
Office GF 11
7.82
0.15 1.00
0.27 1.00
W 1 0.48 0.47
2.88
Office GF 10
W 1
2.34
3.94
4.06
5.72
2.85
2.85 0.06 0.06
6.73
W 1
2.34 2.88
Office GF 09
3.94
0.48
3.94
1.29
3.94
0.60
Entrance & Lounges GF 08
3.94
15.88
0.20 0.69
0.20 0.70
1.80 5.24
2.00
2.00
0.60
0.20
2.00
0.20
0.20
2.00
0.95
7.75
2.00
15.88
0.20
D 4
5.82
W 1
D 2
Customer Services GF 07
2.00
2.00
1.00 0.09
0.20
8.00
1.00 0.21
2.00
5.94
6.73
2.10 0.20
1.96
0.20
0.20 2.01 2.00
0.20
0.76
0.76
7.40
7.40
8.00
CW2
1.00
1.79
6.00
14.41
6 D 18.37
D 4
0.63
17.16
17.25
1.00
0.12
1.90
0.09 1.00
D 5
1.18
1.90
1.21
D 4
1.00
H
4.09 5.72
5.82
Toilets GF 05
Customer Vault GF 13
6.56
8.00
6.78
Customer Services Back Oficces GF 07
Printing & Archive GF 06
7.72
7.82
D 4
7.71
0.72
2.47
0.93
2.58
1.00
0.88
2.75
0.090.69 0.31 0.69 0.31 0.69 0.22 1.68 4.68
2.01
15.75
0.37 2.09
1.00
1.26
D 4
1.62
Mechanical Room GF 03
0.77
3.44
1.68
1.68
D 6 1.65 2.80
0.23
D 3
4.68
1.65
D 4
0.15 1.00
Emergency Stairs GF 022.01
D 4
40.50 0.17
3.80
10.82 6.00
3.80
0.89
6.00
5.05
0.95
CW4 0.89
6.00
5.05
5.05
1.43
5.05
CW4 0.95
6.00
0.65
CW4
5.05
1.40
6.00
4.77
0.27
5.04
0.78
CW4 0.80
6.00
4.87
5.05
0.95
CW4 0.95
6.00
5.03
5.05
0.59
D 4
0.15 1.00
1
30
6.90
0.25 1.00
3
1.00
0.57 2
28 29
0.04 0.79 0.05
4
0.65
5
1.62
6
25 26 27
1.22
7
2.59
8
22 23 24
0.80
1.05
3.76 4.50
3.44 9
6.65 19 20 21
0.37
17 18
0.090.69 0.31 0.69 0.31 0.69 0.22
2.80
D 4
12 11 10
1.50
14 13
0.31
16
3.32
15
Electrical Room GF 04
0.15 1.00
1.00
8.44
1.05
1.20
1.00
0.29 0.80 0.440.320.45 0.80 0.34
1.20
I
J
0.19
11.75 9.73
H
2.45
2.58
2.58
2.52
3.82
2.45
0.20
0.20
0.20
0.20
12.06
Sattelite Room GF 03
CW3
OWS@4.2
2.34
11.75
2.00
2.00
Main Banking Hall GF 01
0.20
GB@4.2
3.66
9.68
2.22 0.20 2.00 0.20
CW2
3.50
1.50
W 1
2.34
2.00
0.25
7.40
7.40
8.00
40.25
1.45
16.01
W 1
0.25
34 33 32
39.75
2.00
0.63
2.00
2.18
25
13.64
24
AS@4.2
OWS@4.2
Employees Entrance GF 16
23
39 38 37 36 35
F
1.50
0.69
8.00
1.85 0.05
D 1
18
3.88
3.75
7.75
8.00
17
D 1
22
J
CW4 0.98
6.00
5.05
6.78
6.00
6.00
66.25
1
ARC402
2
3
4
5
6
7
A302
7'
8
9
10
11
12
P@4.9
1.20
1.20
1.20
1.20
2.00 2.42
1.21
1.20
1.20
DESCRIPTION
DATE
APR.
1.99
Customer Vault GF 13
1.20
P@4.9
GBT@4.2
1.20
1.20
1.20
MANGEMENT BLOCK
1.97
2.42
GBT@4.2
1.14
Rev.
REVISIONS Rev.
GB@4.2 2.00
GB@4.2
2.42 1.26
ISSUE BLOCK
0.52
1.21
2.42
1.21 1.20
1.20
H
2.12
0.91
1.99
1.21 1.20
1.20
0.73
1.60
1.21
2.42
1.21
1.21
1.20
1.30
EXT
2.42
GBT@4.2
2.42 1.20
1.30
2.12 1.21 1.21 1.21
1.21
2.42
1.21
GB@4.2
GBT@4.2
1.20
1.30
2.12
1.30
0.91
1.30 14.60
GB@4.2
1.21 1.21 1.21
1.20
9
2.91
1.90
9.77
21
1.21
1.30
2.12 1.21
2.12 2.42
1.20
8
20
1.21
1.30 EXT
2.42 1.20
9.10
13.98
16
1.21
1.30
1.21
1.30
Customer Services Back Oficces GF 07
T@4.2
7
ASU FEDA 4th Year Architecture 1.30
0.91
1.05
1.30
0.91
1.05
0.72
1.26
1.21
23.87
D 5 1.90
3.00
8.00
OWS@4.2
1.21
0.27
30.00
1.90
15
2.00
OWS@4.2
D 4
1.00
22 21
6.57
5
14
2.42
OWS@4.2
1.99
1.99
W 1
CW1
GBT@4.2 OWS@4.2
4 D
1.00 0.15
6
4
13
2.42
1.50
3.35
3.74
25 24 23
3
2
4.00
3.05
3.05
4.00
CW6
40
2.00
1.41 0.97 0.20
0.69
AS@4.2
0.27
D 4
1.00
28 27 26
1
D 4
1.00 0.15 2.80
3.82
3.05
4.00
2.21
W 1
30 29
Emergency Stairs GF 19
0.15
D 4
1.65
Mechanical Room GF 21
35.76
0.81
0.35
2.34
0.55
0.90
8.00
1.45
Electrical Room 2.80 1.65GF 20 1.00
6 D
0.22 0.69 0.31 0.69 0.31 0.690.09 4.68
6.00
D
0.88
2.11
1.20
1.20
2.00
1.20
1.20
1.20 1.20
2.00
0.47
1.65
1.50
1.00
9.13
1.10
1.42
D 5
1.90
CW6
1.90
0.35
0.95 3.05
4.00
4.61
2.26
W 1
6.82
D 3
2.00
0.32
4.68 0.22 0.69 0.31 0.69 0.31 0.690.09
2.75
1.68
6.00
C
4.00
1.42
2.34
1.68
1.68
17.88
ARC301
Office GF 12
GB@4.2 AS@4.2
4 D
6.00
0.77
0.77
0.77
0.77 1.20 1.20
0.88 0.24 0.76
0.69
EXT
4 D
Cafetria GF 23 2.47
1.40
6.00 2.00
1.11
4.50
Seminar Room GF 23
6.00
G
1.88 1.65 1.65
1.50
2.34
7.82
0.60
0.35
0.95
7.82
3.05
3.05
4.25
4.00
9.04
32
4.00
31
3.05
30
0.69
12
6.00
11.86
W 1 1.04
29
Entrance & Lounges GF 08 AS@4.2
11
6.00
2.34
1.80
GF 05 Toilets
28
8.00
27
3.05
26
4.00
7 6 5 4 3 2 1
6.00
B
Security GF 15
G
AS@4.2
10
6.00 2.97
2.34 5.88
9 8
25
Office GF 11
9
6.00 2.34
1.74
5.82
13 12 11 10
24
Office GF 10
8
0.27
W 1 1.82
1.00
6.00 9.61
W 1
0.57
2.34
1.00
2.34
3.66
0.93
3.66
W 1 2.34
Open Plan Office GF 24
2.58
6.00
2.34
3.66
23
CW6
0.72
0.60
0.60
6.00 3.66
2.21
W 1
1.00
2.34
6.00 2.34
2.09
2.34
3.66
W 1
2.34
1.45
19
CW6
18
3.66
W 1
ARC401
17
1.98
2.34
1.72
23.88
0.88
16
Office GF 09
7'
60.25 6.00
6.00 7.97
2.00
15
EXT
A304
7
66.25
6.00
P@4.9
14
1.50
2
ARC402
6.00
A
2.00
GB@4.00
22
1.20
21
1.20
20
1.70
DWG FILE NAME
0.52
DWG BY:
J
Youssef Emad Naguib
SEC:
2
CHECKED BY:
SHEET TITLE BLOCK DRAWING NAME:
Ceiling Plan - ELECTERICAL & HVAC SCALE:
1:100
DATE:
DRAWING REFERENCE NO.:
7'
8
9
10
11
12
Working Drawings | Ground Floor | Reflected Ceiling
_______ 17
2021|Junior|2nd Semester| HSBC Bank HQ
_______ 18
2021|Junior|2nd Semester| HSBC Bank HQ
Working Drawings | Banking Hall
_______ 19
2020|Junior|1nd Semester|Fattimid Fattimid Cairo Cultural Complex
Cultural Complex | Fattimid Cairo
Building Type Design Studio Project Which focused on reflec From the Slogan of HSBC «Together We Thrive» The form i The Concept of unity also appears in th by repeating an element changing it in a region with some parameter
_______ 20
2020|Junior|1nd Semester|Fattimid Fattimid Cairo Cultural Complex
cting the Identity of the Company on the mass of the building is devided into smaller masses united to make the building he designs of the commercials of HSBC rs kept to achieve unity like linearity, Direction, Horizontality, Color.... etc.
Main Shot
_______ 21