CONSTRUCTION

GREENBERG CONSTRUCTION

MAKING YOUR VISION A REALITY PROJECTS WIH A PURPOSE

B E S T

O F

INSIDE

CONSTRUCTION ON THE GOVERNOR’S MANSION T H E

B E S T

I S S U E

1


04 R.D. LAWRENCE HIGH-PROFILE PROJECTEXPERTISE IN ILLINOIS

44 GREENBERG CONSTRUCTION TURNING DREAMS INTO REALITY

76 KSW CONSTRUCTION YOUR COMMERCIAL CONSTRUCTION COMPANY

98 MB WESTERN

05 44

TEXAS-SIZED SUCCESS STORY IN SPECIALTY CONTRACTING

106 ORION INTERIORS, INC SPECIALIZING IN FAST TRACK RETAIL CARPENTRY

122 TALCOTT CONSTRUCTION 3 GENERATIONS OF QUALITY CONSTRUCTION

2

9


96

CONSTRUCTION

76 106 122 3


R.D. LAWRENCE:

HIGH-PROFILE P EXPERTISE IN IL

Articles4 written by Ken Lambert and Ariana Jennell


CONSTRUCTION

PROJECT LLINOIS

5 Governor’s Mansion


6


CONSTRUCTION

Governor’s Mansion - Front7 View


When asked what sets RD Lawrence

key component of the firm’s portfolio. Most

Construction apart from its competitors John

impressively, every job was completed in a

Goetz, civil engineer and president, was

timely manner with everyone walking away

quick to credit the company’s management

satisfied- and impressed. They keep their

of its employees and its clients.

jobs local, operating in a 50 mile radius of Springfield (Illinois), which means they have

“It’s about treating people right,” said Goetz.

to be flexible in what they are able to deliver.

“It’s people that make the difference.”

A key aspect of keeping these jobs rolling in is the diversity that RD Lawrence brings to

Seeing the level of success that RD

the table. They have completed commercial,

Lawrence has had it seems that this mindset

industrial, educational, medical, religious, and

has certainly been paying off. In the past

specialty projects.

9 years they have done 12 major projects, plus a myriad of smaller ones that are still a

8

Governor’s Mansion - Exterior


CONSTRUCTION

9


“It’s about treating people right,” said Goetz. “It’s people that make the difference.”

10

Construction on the Governor’s Mansion


CONSTRUCTION Their portfolio may be filled with many

says about their work. “Because if you don’t

different kinds of jobs, but something that

take care of the client someone else will.”

they all have in common is the level of involvement every step of the way. The team

Repeat business is what every company

usually remains around 50 employees in the

strives for, which is why RD Lawrence

field and 7 plus in the office. No matter the

places so much emphasis on keeping

size of the project communication is always

their clients happy. One area where they

top priority between the company and its

are consistently finding success is in work

clients. In design-build ventures especially,

for the State Illinois. In the late 80’s they

keeping the owners in the loop and dealing

completed an interior dome restoration for

with details as they come keeps things

the State Capitol building. Their work won

running smoothly and makes sure that

them AIA Award and was featured in the

everything gets completed properly.

local paper for being “the best expenditure of state money ever”.

“Do it right the first time is my motto,” Goetz

11 Construction on the Governor’s Mansion


Another project that they completed for the state was the State Capitol Hearing Room, which was originally the supreme Court Room in 1868 before the Supreme Court got their own building. This was a $1.7 million restoration job that involved a lot of historic preservation while also bringing it up to today’s standards. A large part of those standards was making it more accessible to those with disabilities. Due to the nature of the work it was a high priority job and RD Lawrence was one of 3 selected bidders. In the end they were chosen because of being counted among the best of the best in the area. The project included substantial new woodwork and historic millwork, and all along the focus was to make the modern upgrades in keeping with the historic base level. The ceiling of the building is known as one of the most ornate ceiling in the capitol, which RD Lawrence didn’t have to touch, but they did have to bring in doors to match that level of grandeur. They brought in 12 foot high doors that were a historic match to the ceiling’s aesthetics. Even with the all the changes and challenges within the project it was completed on schedule in 2016. 12


CONSTRUCTION

13 Construction on the Governor’s Mansion


14


CONSTRUCTION A major project that has been undertaken

step away. The project is on track to be

this year is the Governor’s Mansion. Since

completed in May of 2018 and has been a

RD Lawrence was able to deliver on the

10 million dollar venture. Goetz says that he

additions to State Hearing Room it makes

owes their success thus far to the dedication

sense that they were considered to restore

his team has had throughout, meeting every

the largest Governor’s mansion in the

week with the owners and design team

country, which is a 49,000 square foot

in order to keep everyone in the loop and

building.

content with the progress.

Originally they were 1 of 6 finalists bidding for the project, but when they were beat out by a different low-bidder they had to

Construction on the Governor’s Mansion 15


16


CONSTRUCTION

Construction on the Governor’s Mansion 17


Construction on the Front of the Governor’s Mansion


20


CONSTRUCTION

Construction on the Front of the Governor’s Mansion

Construction on the Interior of the Governor’s Mansion 21


TRUSTED NAME IN

FOR MORE TH 22


CONSTRUCTION

N CONSTRUCTION

HAN 45 YEARS 23


“Do it right the first time is my motto,” Goetz says about their work. “Because if you don’t take care of the client someone else will.”

24


CONSTRUCTION

25 Governor’s Mansion Staircase Under Construction


Given the assorted number of clients in their history, a question is how to adjust safety procedures for each situation. RD Lawrence is know for putting safety first; they have been acknowledged every year by AGC (Associated General Contractors) on both a local and national level. They make sure to take care of their employees, and one way is by being a union contractor. They also put training first and make sure that every field employee has been through an apprenticeship and had access to full safety training. By keeping their workers happy they foster a healthy work environment that not only helps maintain existing staff, but also helps to grow the trade industry in the region. They recruit from the outside, but they also want to help their current employees along in their own career paths. RD Lawrence looks to the future by helping their existing project managers understand the importance of client relationships, and they are constantly grooming workers for future management positions.

26


CONSTRUCTION

27 Construction on the Fireplace of the Governor’s Mansion


Governor’s Mansion staircase Under Construction 28


CONSTRUCTION

Governor’s Mansion Interior Under Construction 29


30


CONSTRUCTION

Governor’s Mansion - Interior

31


32

Governor’s Mansion - Interior


CONSTRUCTION

Governor’s Mansion - Interior

33


34


CONSTRUCTION

35 Train Station Under Construction


Train Station - Exterior

36

Train Station - Exterior


CONSTRUCTION

Train Station37Jobsite


“WE DON’T WANT TO BE THE BIGG

“WE WANT TO

38


CONSTRUCTION

GEST CONTRACTOR,” GOETZ SAYS

BE THE BEST.”

Train Station -39Interior


40


CONSTRUCTION

Train Station Under Construction 41


“We don’t want to be the biggest contractor,” Goetz says. “We want to be the best.” For Goetz, this means having his arms around every aspect of the company. He firmly believes in knowing the company’s limitations, so that is why there is such a focus on staying local and taking on the projects that he knows RD Lawrence can handle. Attention to detail is what earned their reputation for excellence, and Goetz wants to continue that proud tradition. They have been a trusted name in construction for over 45 years, and he wants them to continue to keep that pillar of trust standing for many years to come. However, prior to Commencing Construction the owner and selected C.M. Mutually decided to parts ways. R.D Lawrence was asked to submit. A proposal for this entire project. One of three bidders R.D Lawrence was selected to undertake the mansion and site renovation as pricing came 1M lower than anticipated.

42


CONSTRUCTION

Train Station Under Construction

43


GREENBERG CONSTRUCTION

TURNING DREAM INTO REALITY

Photographer: Boaz Meiri Photography 44


CONSTRUCTION

MS

45 Belmont


46


CONSTRUCTION

47 Belmont


When a company owner discusses their

principles, which is why the residential

business it is easy to tell what they value

construction company has earned its great

in their work. Whether it is pride in their

success.

accomplishments or the way that it has grown; it becomes clear not only what the

Based in California, Greenberg has found

company is about, but also what the owners

itself growing steadily over the past 11

themselves value. When Maor Greenberg

years of operation. With one office in Bay

describes Greenberg Development and

Area., and another in L.A, Greenberg has

Construction Inc you see that he is a man

been strengthening its client base- typically

that values honesty and respect above all

working within a 50 mile radius from an

else, and brings that into his everyday work.

office. By keeping their work local they have been able to really show their commitment

By instilling that drive in his company he

to their customers.

gets all of his team to value those same

48

Belmont


CONSTRUCTION

49 Belmont


“It’s about having clients trust you from A to Z, “ Maor Greenberg., “We want them to be as stress free as possible, because that means we are doing our job right.”

50

Belmont


CONSTRUCTION

The work that the company focuses on is

“It’s about having our clients trust you from A

residential new construction and remodeling.

to Z”...”We want them to be as street free as

This includes: room additions, home

possible because that means we are doing

improvement; complete home remodeling

our job right” - Maor Greenberg

and kitchen & bathroom remodeling, green

Due to the environment that Greenberg

energy projects, solar installation.. No

fosters, client and team communication is

matter the size of the project being taken

considered the number one priority. Keeping

on they know that what they are building

clients informed so they know exactly what

is someone’s home, so making the client’s

is happening helps the project run smoother.

vision a reality is always the focus.

51


Greenberg makes sure that weekly meetings and chat groups take place so everyone is kept up to date every step of the way. Respecting both the customers and the tradespeople ensures that everyone feels valued. This keeps both clients and workers coming back for future projects. Greenberg believes that the customers need to know how much they are appreciated, but so do all his team members. This emphasis on creating a comfortable and competent work environment means that each level of the company feels that they are important, from the managers to the laborers and assistants. Everyone on site knows that working smart and safe is vital. They have OSHA-certified managers and keep project safety equipment on hand at every job site. Maor, and Luis wanting there team to feel as if it isn’t just the company project, but their own personal project. “We want our team to feel more like a second home,” states Luis Alaniz. “It is because of how we treat them that they are proud to carry the brand of the company.”

52


CONSTRUCTION

53 Belmont


54

Palo Alto - Construction


CONSTRUCTION Along with the relationships they build,

This particular home was taken from 1,480

Greenberg has also been building some

square feet to 3,167 square feet. A large

impressive projects. A recently completed

portion of the foundation stayed intact, but

home in Belmont California, located on Muir

about 95% of the house had to be taken

St., was brought from a 2,093 square ft.

down. This degree of change from the

house to 3,350 square ft. Greenberg worked

existing home made communication very

alongside architect Dan Hruby from Visualize

important, which is why Greenberg was

It Built to make sure that the unique design

the perfect fit. By working with the existing

concept was brought to life in a way that

foundation, and making sure the design

made the client happy and Greenberg proud.

team and customer where on the same page

Another project that was recently completed

along the way, Greenberg completed the

was in Redwood City.

project in just 8 months.

Palo Alto - Construction 55


56


CONSTRUCTION

Palo Alto - Construction 57


WE ARE COMMIT

YOUR VISION


TTED TO MAKING

N A REALITY

Palo Alto - Construction


60


CONSTRUCTION

Palo Alto - Construction

Palo Alto - Construction 61


62


CONSTRUCTION

Palo Alto - Construction 63


One of the current challenging project’s that Greenberg Construction has taken on is building a 4,400 sqft custom home in Palo Alto. Due to the extremely tight space that the property is located on, Greenberg has had to make sure to employ every precaution possible in order to keep on schedule, while avoiding damage to any of the surrounding homes during construction. This included installing protective shoring all along the lot lines- making sure not to undermine neighboring homes & pools. They were able to finish the 1800 square foot basement in 2 ½ months, and plan on finishing the major home project within a year. The dedication to satisfying the customer’s timeline while also making sure everything is done correctly is top priority. Greenberg likes to be involved in the regional construction community. By being a part of trade organizations like NARI, U.S. Green Building Council, CBIA, and National Association of Home Builders, they are able to improve their company and their network.

64


CONSTRUCTION

65 Alto Palo


66


CONSTRUCTION

67 City Redwood


These organizations provide the chance

sure they don’t impact the environment

to learn new techniques, create contacts

in a harmful way. When doing demo work

with new vendors for discounts or better

on a house they save and recycle certain

services for clients, and the provide

materials so they aren’t dumping what can

training in the latest developments in the

be reused. If Greenberg has to buy lumber

construction arena. On a larger scale,

they make sure to support companies that

Greenberg Development and Construction

plant a tree for every one that they cut down.

Inc is interested in contributing positively to the planet. They are dedicated to their

Along with their recycling and donating

GOGREEN Energy Efficient Products

initiatives they also try to encourage clients

and Services because they want to make

to use energy efficient products (EnergyStar,

68


CONSTRUCTION

Redwood City

Redwood City

etc.) while observing the budget that the

to establish long-lasting relationships with

customer has in mind. This way the planet is

customers and exceed their expectations

protected, but so are the interests of those

by gaining their trust through exceptional

that they are working with.The main goal of

performance by every member of the

Greenberg Development and Construction

construction team. These long lasting

is to have everyone walk away satisfied. The

relationships, coupled with forward-thinking

home needs to meet the customer’s needs,

environmental strides, ensures that the

but it also needs to match the standards that

legacy of Greenberg Development and

Greenberg sets for itself.

Construction Inc will carry on for many years to come.

The company was founded on the pledge 69


70

Redwood City


CONSTRUCTION

Redwood City

71


Redwood City

72


CONSTRUCTION

73 City Redwood


74


CONSTRUCTION

75 City Redwood


KSW CONSTRUCTION

YOUR COMMERC CONSTRUCTION

76


CONSTRUCTION

CIAL COMPANY

77


78


CONSTRUCTION Brothers Dean and Doug Slaby grew up in the construction business, and now are operating a very successful commercial & industrial general contracting firm in southern Wisconsin. This trait is not uncommon in the construction industry, as we often speak to constructive executives who began in high school with a hard hat and a wheelbarrow.

79


80


CONSTRUCTION

81


Doug and Dean worked together off and

Doug Slaby, KSW’s Vice President who

on through their careers, and then in 2005

handles the majority of the day to day

established KSW Construction- focusing

operations, says the company has built a

on the commercial, industrial, and office

good core group of employees. The general

sectors. “We work well together; we both

contractor employs between 28-30 people,

focus on different aspects of the company

to manage its $20 million annual revenue

and we may do things a bit differently, but in

(via an average project size of between

the end it has been a great success. I value

$500k - $2 million).

his abilities,” explains KSW President Dean Slaby. Dean recently received his commercial

Both Doug and Dean admit that it is easier

real estate brokers license, which has helped

to hold onto a good employee than try to

the company with their clients/owners in

replace said person if they leave. KSW is

several ways- including site/pad selection.

just like most other contracting companies in 2017- struggling somewhat to have

Dean and Doug both admit that they are not

enough quality personnel (employees and

the first ones on a new technology craze

subcontractors) in order to meet its project

or fad, however they do use the practical

obligations and schedules.

softwares and technologies that can help

That core group of workers is treated with

them on a week to week basis.

respect, and is expected to act respectfully and with the company’s interest in mind.

These include Cloud access and storage for all Plans and Specs, Masterbuilder

Doug does not micro-manage his personnel.

estimating and accounting software, as well

Dean states it quite clearly, “We hire them

as installing livestreaming cameras on some

and compensate them as professionals in

projects. Dean comments, “We do implement

their field, and we expect them to act as

livestream cameras on projects with owners

such,”. That strategy has paid off thus far

that are out of state. Our client feels more

for KSW.

comfortable, while our project management team can also access the video. We find it can be helpful.”


84


CONSTRUCTION

The best marketing strategy often comes down to doing a great job. “We have a lot of repeat customers, and that has been a key to our success. We partner with a few developers in the area, and in the same waywe look at our relationships with our regular subcontractors as partners,” notes Dean. Included in their successful run over the past couple of years is their largest single project yet- a 4-story Hyatt Place hotel in Verona (WI), complete with restaurant/lounge and an attractive courtyard with gas firepit. KSW does a lot of business with many national chains, such as: Hyatt, Pet Supplies Plus, Budget Blinds, Great Clips, Verizon Wireless, and The North Face, Café Zupas, Toppers Pizza, Buffalo Wild Wings, Noodles, Freshii, Pets Supplies Plus. In each project, the construction team uses its 3-step project plan: (excerpted from company website)

85


86


CONSTRUCTION

87


STAGE 1:

DESIGN WITH YOUR VISION IN MIND

STAGE 2: BIDDING PROCESS

STAGE 3: CONSTRUCTION

88


CONSTRUCTION

89


The Result: Projects completed on time

a good reputation (and profit) is what KSW

and within budget, reflecting the personal

exceeds at. “Our Willy Street Apartments

style and personality of your business, while

project was a 4-story mixed use building

meeting the needs of your company and

with 28 units. The timeframe on that one

customers.

was very tight, but we were able to get it completed in less than 9 months, even with

Each project is a little different, and they

the harsh Wisconsin winter,� details Doug.

each come with their own challenges. But

Being in the Madison area, many sites also

overcoming those challenges to still retain

have a very high water table to contend

90


CONSTRUCTION

with- as was the case on the $6 million

Some recent awards from another stellar

Weir Minerals project. Where a portion

project include the InBusiness Magazine

of the project was to install a test pit in

Commercial Design Award, and the

their existing facilities 12 feet below the

Project of Distinction- Silver Award, for

water table. “The Weir job was especially

The Graduate Hotel.

challenging, as the company operations were open and ongoing throughout the

As most noteworthy general contractors

construction process.”

show in 2017, safety is and must be a priority. “We want all our employees to go 91


home at night to their families,�.

already have a fairly diversified competency

KSW participates in the safety monitoring

in projects and sectors, and they may be

program via ABC (Associated Builders &

willing to step outside of their comfort zone a

Contractors), and also pays for a 3rd party

little further- if the right opportunity presents

safety inspection company to perform

itself. Most importantly, Dean and Doug

regular and unexpected site visits to their

wants KSW to continue to be known as a

projects. This tactic keeps everyone alert,

quality contractor and partner who is good

and prevents possible unsafe practices.

at what they do. In setting this as a goal, the revenue, profits, and industry awards are

This established contractor expects much of the same over the next 3-5 years. They

likely to continue as a natural result.


CONSTRUCTION

93


94


CONSTRUCTION

95


BUILDING

SINCE

96


CONSTRUCTION

G TRUST

E 1989 97


MB WESTERN:

A TEXAS-SIZED S IN SPECIALTY CON

Serving the needs of private industry, municipal, state, and federal construction in the Gulf Coast area 98


CONSTRUCTION

SUCCESS STORY NTRACTING

USCG Houston Marine Reconstruction – CDM, Inc. 99


In order to be a success in your industry it is

driving, concrete work, marine construction

important to be aware of your strengths and

and diving. President Steve Bosley also

implement them. A company that knows how

mentions that their in-house design

to do precisely that is MB Western Industrial

assistance has helped them procure

Contracting. Founded in 1989, this Houston

several projects. One of the practices that

based corporation has been finding its niche

earns MB Western Industrial’s $8-12 million

and delivering on every project since

yearly revenue is focusing on the size of

Day One.

projects and fitting it with the size of the company. A key part of their business is

They are known for providing competitive

making sure that they are giving a job their

contracting on industrial construction and

full attention without stretching themselves

maintenance, while also specializing in pile

too thin. Maintaining that specialized market place position (within industrial and marine construction) has helped to grow their reputation and continuously bring in repeat business. Once a company works with MB Western Industrial they find themselves coming back to them for further needs on future projects. One of the projects that has earned MB Western Industrial this status is their reconstruction project for Dock 14. This job for Port of Texas City was MB’s largest bulkhead project to date. It involved three years of preliminary work revolving around finding the most economical method to go

Raw Water Intake System – MWH Constructors

about the reconstruction.


CONSTRUCTION The damage to the site was caused by an explosion in 1947, so finding a practical and sustainable solution to fixing all aspects of the damage was important to both MB and the owner of Dock 14. After reworking the budget multiple times MB’s team was able to come up with a solution that not only satisfied the vision that the owner had, but it brought the budget down to much lower than originally expected.

Reconstruction of Dock 14 – Port of Texas City 101


Installation of Raw Water Intake Manifold Lake Granbury - AES Wolf Hollow Plant

Another project that challenged MB Western

sure they had the right level of expertise

Industrial was one completed for USCG

involved for every aspect. The result for the

(U.S. Coast Guard) -Houston. Hurricane Rita

bulkhead was new steel sheet pilings being

had destroyed part of the existing timber

driven with new cast-in-place concrete caps

docks, which meant that the damaged

to complete the repairs. MBW also built a

materials had to be removed and replaced in

new armor wall which extended 10 feet

many areas with larger concrete structures.

underwater. In the end it came together

This particular job involved using many types

successfully, and the Coast Guard was

of construction materials and methods,

satisfied with this mission-sensitive project.

which meant that the company had to make 102


CONSTRUCTION

Installation of Raw Water Intake Manifold Lake Granbury - AES Wolf Hollow Plant

Considering the longstanding success of

on industrial work and grow their amount of

the company, the obvious question is what

resources (upgrading cranes, etc), instead

comes next? MB Western Industrial wants

of size. By improving their skills MB Western

to continue to work in their niche and grow

will continue to do what it does best.

the volume of work, but not the scope. Their goal is to not stretch themselves too thin, but rather focus on keeping up to their standards. The answer to what comes next is to focus 103


Providing all types of industrial and heavy engineering construction, specializing in pile driving, concrete, marine construction and diving.

104


CONSTRUCTION

Your True Project Partner Skyline Steel is a premier steel foundation supplier with a worldwide network of manufacturing and stocking locations.

Proud to be a Project Partner of MB Western Industrial Contracting skylinesteel.com | 888.450.4330

105

© 2017 Skyline Steel, LLC. Skyline Steel is a wholly-owned subsidiary of Nucor Corporation, the largest producer of steel in the United States.


ORION INTERIORS, INC:

SPECIALIZING IN RETAIL CARPENTR

106


CONSTRUCTION

FAST TRACK RY

American Girl – 107 New York


108


CONSTRUCTION

American Girl – 109 New York


Carving out your corner of a particular market is never easy, but when you decide to excel in your field and put your mind to the task it can be possible. No one knows this more than Orion Interiors, Inc. Established in 2007 and opening in Northern Jersey and the five boroughs of New York City, Orion is a full service union carpentry contractor that is always associated with execution and skill. “The systems are in place for us to be Successful” Jan-Michael McClintic, project manager at Orion. “Companies want to work with us because they trust us and know the job will get done because of our track record.” Orion’s portfolio speaks for itself. They keep their projects diverse and work with many brand name companies. These jobs range from fast track retail to banks, office fitouts, restaurants and hospitals. Orion relies on history to show what they can do, which is why 95% of their business is generated by the relationships that they have formed. Their stellar reputation is based on the fact that they are known to give not only accurate estimates, but fair ones. 110


CONSTRUCTION

American Girl – New York 111


One of the companies that has built such a

restaurant and hair salon. One of the biggest

repertoire with Orion is American Girl. Orion

challenges to the assignment was the

worked on their flagship store in Times

location. Orion makes it a point to be diligent

Square, an impressive 40,000 square foot

about scheduling, and the logistics of being

building dubbed the “store of the future�.

in Time Square is always an obstacle.

With its huge ceiling and modern aesthetics,

However, Orion knew what they were up

it was a high end retail finish project in every

against and came prepared. The forward

sense of the term. This job showcases the

thinking and planning that Orion prides

talents of Orion Interiors because it was

themselves is what allowed them to finish

not only a retail space, but also included a

the store on time.

112


CONSTRUCTION

American Girl – New York

American Girl – New York

Another example of Orion’s dedication

Orion implement to obtain this level

to scheduling is their work with the

of achievement in their relationships?

Cheesecake Factory. Their store in

According to Mr. McClintic it all comes down

Rockaway New Jersey was the fastest built

to communication.

store in the company’s history. With only ten weeks for drywall Orion was able to

“We rely heavily on communication,

deliver not only a well done project, but beat

“McClintic states. “The team factory is of

production records for their client.

upmost importance. That is why we always hold morning meetings in order to establish

The question is, what practices does

milestones and tasks for the day ahead.” 113


American Girl – New York

American Girl – New York 114


CONSTRUCTION

American Girl – New York

American Girl – New York

American Girl – New York 115


" We Deliver" Distributors of the finest building materialsServing the entire East Coast

1.800.4.MARJAM 116

- DRYWALL - ACOUSTICAL PANELS - LUMBER - WOOD & METAL STUDS - TOOLS - FLOORING - ADHESIVES - DOORS - WINDOWS - INSULATION - SIDING - ROOFING - EIFS - FRP PANELS - JANITORIAL - LADDERS - SCAFFOLDING - CABINETRY - MOULDINGS & TRIMS - LAMINATES - SKYLIGHTS - WATERPROOFING - WALL SYSTEMS

WWW.MARJAM.COM


CONSTRUCTION

Cheesecake Factory – Elmhurst, NY

These morning meetings give the day a

which is why every foreman has an iPad

direct focus and make sure that everyone is

that is equipped with programs that give

very clear about their directives for the day.

live updates. They use in-house software

A large part of what aids in communication

and programs plus well-known tools, like

when they are in the field is the technology

Bluebeam and Bluebook, to help foster the

that Orion implements. There are 170

team atmosphere.

field employees that need to be aware of the status of the project at all times, 117


FULL SERV

CARPENTRY C

118


CONSTRUCTION

VICE UNION

CONTRACTOR

“The systems are in place for us to be Successful” Jan-Michael McClintic 119 NY Cheesecake Factory – Elmhurst,


Cheesecake Factory – Elmhurst, NY

Driving efficiency through technology is a

Looking to the future for Orion Interiors they

major theme in Orion’s business model, as

hope to expand with the market. If the work

is the emphasis on team. By supporting

is there then they intend to follow it, but

individuals through training and making

the focus is on margin and not necessarily

sure that everyone is on the right job for

revenue. The main goal is to keep the same

themselves, it leads to success on both a

flow of work, but to progress upon what

small and large scale level.

they’ve done. So long as they are always improving, they are always growing.

120


CONSTRUCTION

121


TALCOTT CONSTRUCTION:

3 GENERATIONS O QUALITY CONSTRU 122


CONSTRUCTION

OF UCTION 123


124


CONSTRUCTION

125 GYM Interior


Floor Plan A key part of being a successful company

to adapt when they need to. Aaron Perry

is being able to grow while also maintaining

recently took over the business and has

your position in the marketplace. One

been focusing on rebranding, but his main

company that can truly attest to this fact

goal is keeping what has contributed

is Talcott Construction, which is counted

to Talcott Construction’s success- and

as one of the best construction companies

expanding on it.

that Montana has to offer. Talcott has been providing general contracting and

The niche that Talcott Construction thrives

construction management services for

in is based mostly in larger value projects

over 3 generations, but they are not afraid

in both the public and private sectors. They

126


CONSTRUCTION

Fitness Center pride themselves on being able to deliver

a new culture of safety, so he brought on

on time and within budget, no matter the

the company’s 1st dedicated full time safety

extensiveness off the project. Emphasizing

professional. With this new initiative came

transparency on costs and fairness in pricing

a motto of an “infinite free environment�,

is what keeps customers happy and

which included a new environmental health

coming back. Along with making sure that

and safety plan. This plan highlights how

the experience for the customer is a positive

commitment to safety has to happen on an

one, it is also important that the workers feel

individual level, so every worker knows the

important and empowered. When Perry came

role that they play in their safety and that of

on board as president he wanted to foster

their coworkers. 127


128


CONSTRUCTION

129Hangar


PROVIDING GENERAL CONTRAC CONSTRUCTION M

SERVICES 130


CONSTRUCTION

CTING AND MANAGEMENT STEM131Exterior


132


CONSTRUCTION

STEM133Interior


134


CONSTRUCTION

STEM135Interior


Because of this focus on safety, Talcott

enticing considering the location. This river

Construction doesn’t hesitate to take extra

front development is partially built on what

precautions when prudent. A recent project

was once contaminated soil, but has steadily

that demanded such care was the C130

been replaced so this once uninhabitable

Maintenance Hangar & Fuel Cell Storage,

landscape will become somewhere people

which was completed in March 2017 for the

can live, work, and play.

Montana Air National Guard. When erecting the steel in the new building it became

Having places like the West Bank Landing

difficult for air traffic control to see the end

in its portfolio is part of what the goal for the

of the runway, so Talcott had to compensate

future of Talcott Construction is all about.

by working on one building at a time.

They have been around for 80 years, but they want to continue to be a part of the

By not being able to fully implement

local community and extend their reach even

construction on both sites the deadline

farther as they continue to grow. By making

was pushed out, but that didn’t dampen

their mark through projects and increasing

the excitement for the project. Talcott

the positive connotation that comes with

Construction lives for the challenge, and

their name, Talcott Construction looks

tackled the technical aspects of the building

forward to being a company that continues

with passion. The effort that was put into the

to thrive for many years to come.

remodel of the old site, as well as converting and repositioning of a new building, resulted in a beautiful finished project. Another equally exciting project that Talcott Construction has been a part of is the West Bank Landing. This mixed use development has involved everything from restaurants to hospitality to a health and wellness center. The goal with this particular project is to create a community, which is particularly 136

American Girl – New York


CONSTRUCTION

137


Benefits of Bluebeam RevuÂŽ Software

better understanding of systems.

Written By Bill Smith

addition, the overlay feature helps compare

1. Increased Value for Clients

changes, and has the ability to alter scales

ÂŽ

Bluebeam provides increased value to design teams and consultants during schematic design and design development. This includes helping to reduce design conflicts and finding potential trouble areas before construction even starts. Tools such as Bluebeam provide a familiar, but improved form of communication between project partners helping to offer turnkey solutions. Ultimately, clients gain benefits through a collaborative team approach, resulting in fewer RFIs and change orders, which ultimately save time and money.

2. Efficient Sequencing + Planning Planning that used to take hours of review with subcontractors can now be streamlined for sequencing and system coordination. For example, the software tools allow the team to review contract documents in conjunction with the 3D model for easy comparison and 138

Using color coding and other identification methods can assist in project planning for Project Managers and Superintendents. In old and new documents for potential on the fly to help facilitate sequencing between systems without having to do complicated drawing manipulations between software such as Revit, AutoCAD, Civil 3D & Tekla.

3. Easier Team Collaboration Another benefit important to the team Bluebeam provides is a collaborative environment for contractors, subcontractors, architects and engineers to more efficiently review documents. In a Bluebeam session, documents can be posted for the entire team to access simultaneously in a collaborative environment. This tool allows our team to complete design reviews in days, compared to a normal series of events that may have taken weeks which is a key component to delivering clients a turnkey approach. Bluebeam is also used during the punchlist process to more effectively communicate with subcontractors and


CONSTRUCTION design team members. These streamlined processes simplify the paper trail, tracks changes and ultimately results in saving time on the project schedule.

4. Document Interactivity & Information Systems The great applications for post-construction turnover make Bluebeam really stand apart from other documentation and information systems. Simply put, Bluebeam’s hyperlink functions are very simple, intuitive, & impactful. Through a simple digital dashboard, an interface can be created that allows clients an opportunity to access project documents in seconds in a very organized fashion. Dashboards are similar to a custom-built web page that acts as a portal to your project. While technology is a great asset to every project, providing intuitive tools for simple integration is key for operational use for the entire project team.