Skip to main content

Emma Pilkington

Page 1

MAUNGAWHAU

UPTOWN RECREATION CENTRE

AKIRAHO STREET

SYLVAN AVE E

MAUNGAWHAU TRAIN STATION

URBAN TRAIL

GROUND FLOOR PLAN 1:200 @A3

FOSTERING RELATIONSHIPS THROUGH HEALTH AND FITNESS My project ‘Uptown Recreation Centre’ is set in Uptown, Tamaki Makaurau, a common passage way for Aucklanders travelling in and out of the city. URC is located on the corner of Akiraho Street and Mount Eden Road. The site is adjacent to Maungawhau Train Station, a flood prone area identified within Uptown. The form of the ‘URC’ is inspired by the natural topography of a Maunga, which can be showcased from key view shafts from the site. The Kaupapa of my project is a Community Sports and Recreation Centre that has a flexible and dynamic program. The URC will work in conjunction with the 6 Uptown Pillars to promote physical activity through the individual programmes: Swimming Pool, Multi-Functional Basketball Court, Gym, Dance Studio, Community Meeting Spaces and Athlete Accommodation. The program aids as a hub of sanctuary and enjoyment which promotes growth through health and fitness. The project aims to create synergy and foster relationships for community members regardless of age, culture and gender. Fabricating a healthy social concourse for the city, placed in close connection to the central pedestrian way.

UPTOWN CENTRE RECREATION MAUNGAWHAU MAUNGA TRAIN STATION

The Uptown Recreation Centre will be an energy positive building that contributes to the transformative regeneration agenda for Uptown now and in 100 years’ time. Ecologically the project aims to mitigate how energy and water is used and collected on site to create a closed loop system. The project is designed with a combination of biobased materials such as engineered timber and recycled materials from existing buildings. The vertical timber cladding and high stud height, blends into the landscape and responds to key features of the existing villas which stood onsite before this project.

URBAN TRAIL PERSPECTIVE


PARTI DIAGRAM void APARTMENT SUITES

LOBBY

down LIFT

THIRD FLOOR PLAN 1:200 @A3

UNISEX TOILETS

REFRESH / CAFE

down CLIMBING BRIDGE

down

MEETING ROOM

VOID

BASKETBALL MEZZ / SEATING

MEETING ROOM

BASKETBALL COURT

SWIMMING POOL PERSPECTIVE

down

FOYER MEETING ROOM

MEETING ROOM

VOID

VOID

BREAKOUT

down

UNISEX TOILETS

BASKETBALL COURT PERSPECTIVE

SECOND FLOOR PLAN 1:200 @A3

MATERIALS PALLETTE

MOUNT EDEN ROAD

FIRST FLOOR PLAN 1:200 @A3


rafters over CLT with 300mm Gutex Multitherm breathable wood fibre insulation between to meet minimum 0.11 W/m2K treated timber battens and counter battens to create a 50mm cavity to roof and wall

barge board

perimeter soffit vent Soffit Lining

Pro Clima Solitex Fronta Quattro breather membrane - overlaps sealed with Pro Clima Tescon Invis

CLT structural floor panel to structural engineers design with exposed internal finish

grey line denotes downpipe within cavity, external cladding to this area should be easiliy removable to allow for maintenance

wax based end grain sealant to all exposed edges of CLT

FLOOR DETAILS ARE REPEATED FROM 1ST TO 3RD. TYPICAL DETAILS

treated timber battens and counter battens to create a minimum 50mm cavity, where insulation is not able to support a secondary batten layer should be included within the insulation

160mm Gutex Multitherm breathable wood fibre insulation to meet minimum 0.18 W/m2K u-value CLT structural wall panel to structural engineers design with exposed internal finish with joints taped using Tescon Vana Tape

Pro Clima Solitex Fronta Quattro breather membrane - overlaps sealed with Pro Clima Tescon Invis joints taped using Tescon Vana Tape

galvanised fixings to structural engineers details

open state cavity barrier for ventilated cavities, continued through insulation where combustible

floating floor comprised of dense boards and acoustic insulation, depth to suit acoustic requirements and conceal fixing brackets if exposed CLT structural floor panel to structural engineers design with exposed internal finish wax based end grain sealant to all exposed edges of CLT tongue and groove timber cladding

NORTH - SOUTH SECTION 1:200 @A3 treated timber battens and counter battens to create a minimum 50mm cavity, where insulation is not able to support a secondary batten layer should be included within the insulation

CLT structural wall panel to structural engineers design with joints taped using Tescon Vana Tape 160mm Gutex Multitherm breathable wood fibre insulation to meet minimum 0.18 W/m2K u-value

Pro Clima Solitex Fronta Quattro breather membrane - overlaps sealed with Pro Clima Tescon Invis tongue and groove timber cladding

service zone created between timber battens

open state cavity barrier for ventilated cavities, continued through insulation where combustible

plasterboard lining with skim finish wax based end grain sealant to all exposed edges of openings

insect mesh to base of ventilated cavity breather membrane returned into window opening and lapped and sealed with window using Extoseal Encors Tape

timber window cill

breather membrane returned into window opening and lapped and sealed with window using Extoseal Encors Tape

FLOOR DETAILS ARE REPEATED FROM 1ST TO 3RD. TYPICAL DETAILS

Pro Clima Solitex Fronta Quattro breather membrane - overlaps sealed with Pro Clima Tescon Invis

160mm Gutex Multitherm breathable wood fibre insulation to meet minimum 0.18 W/m2K u-value

treated timber battens and counter battens to create a minimum 50mm cavity, where insulation is not able to support a secondary batten layer should be included within the insulation

CLT structural wall panel to structural engineers design with joints taped using Tescon Vana Tape service zone created between timber battens with plasterboard lining and skim finish

tongue and groove timber cladding

galvanised fixing brackets to structural engineers details wax based end grain sealant with dpc below floor finish to suit project damp proof membrane above cast in situ concrete slab to structural engineers design

dpm lapped at least 50mm down the slab edge damp proof course min. 150mm above external ground level insect mesh to base of ventilated cavity 150mm min

brick plinth finish to external leaf of foundation wall

WEST - EAST SECTION 1:200 @A3

rigid xps insulation to cavity of foundation wall

reinforced concrete footing to structural engineers design

FACADE DETAIL 1:50@A3

rigid insulation to meet minimum 0.13 W/m2K on membranes as required 140mm lightweight thermally efficient blockwork strip foundation to structural engineer design

(BY OTHERS) TOP COPING PRIMARY SUPPORT STRUCTURE SUPPORT STRUCTURE (HILTI HELPING HAND SYSTEM OR SIMILAR) WATERPROOF BACKING BOARD (12MM VERSAPANEL ECO SHEET)

REAR DRAINAGE LAYER (4.5MM GEOTEXTILE DRAINAGE LAYER) LINE OF RISER FLASHING

RAIL CARRIER SYSTEM (26MM ALUMINIUM RAIL TO SUIT MODULAR PANELS)

PANEL BOX (STANDARD PANEL MODULE 600x450x62MM) GROWING MEDIUM (GRODAN) CAPILLARY BREAKS (GEOCOMPOSITE DRAINAGE LAYER)

DRIPLINE (16MM DIAMETER PRESSURE COMPENSATED DRIPLINE) DRIPLINE COVER STRIPS (RIGID PVC EXTRUSION COVER STRIP)

EAST ELEVATION 1:200 @A3

REAR DRAINAGE LAYER (DRAIN INTO GUTTER)

FFL

GUTTER (114MM WIDE PVC GUTTER)

GREEN WALL DETAIL 1:5@A3

SUMMER SOLSTICE WINTER SOLSTICE

SOLAR ENERGY

INVERTER

ECO POWER TREADMILL AND BIKES

BATTERY

POWER

RAIN WATER HARVESTED

TANK 3 X 50,000L

PUMP PLANT ROOM

SINKS ,SHOWERS, LAUNDRIES

SECONDARY PUMP PLANT ROOM

GREY WATER TREATMENT PLANT

GREY WATER

TOILETS

BLACK WATER

ECO FRIENDLY SEPTIC TANK

OVERFLOW GARDEN IRRIGATION

FUNCTIONAL SYSTEMS DIAGRAM 1:200 @A3


Turn static files into dynamic content formats.

Create a flipbook
Emma Pilkington by UptownAKL - Issuu