Sed fact sheet1

Page 1

DON’T GO WITH THE FLOW STOCKTON

Goodwin Dam L AU STAN I S

S R IV

ER

MODESTO

TUO

AL

Don Pedro Reservoir / Dam La Grange Dam LU M N E R I V E R

TURLOCK

IF O

ANAL TA C NDO ME TADUC T DEL QU E IA A

C

California’s Bay-Delta Plan is a water quality plan created by the State Water Resources Control Board (SWRCB). The stated purpose of the plan is to set water quality objectives and define how those objectives are to be implemented.

New Melones Reservoir / Dam

San Joaquin Delta

RN

CE M ER SAN

MERCED QUI

J

OA

N RIVE R

THE IMPACTS Under this proposal 2015 would’ve looked like this:

D RIV

ER

Phase 1 of the plan seeks to require 40 percent unimpaired flow to be released downstream within the Tuolumne River and two other San Joaquin River tributaries February through June annually for alleged environmental benefit. Unfortunately for Modesto Irrigation District (MID) and Turlock Irrigation District (TID),McSwain this means Dam using existing or potential stored water from Don Pedro Reservoir to satisfy the state’s demands. What’s worse, the plan calls for a new annual requirement of MID and TID to store a large amount of water in Don Pedro Reservoir for fish, which further limits our water storage flexibility and delivery capabilities.

without considering the impacts of proposed water storage requirements for fish

$1.6 billion $167 million $330 million 6,576 jobs

$ in economic output loss

Groundwater sustainability in jeopardy

farm-gate revenue loss Domestic water supply threatened

in labor income loss

would’ve been lost Hydropower less economical


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.