Skip to main content

Specification Magazine November 2026

Page 1

www.specificationonline.co.uk ll www.letstalkspecification.co.uk

November 2026

This month’s features: Sector Reports: • Offsite Construction • Education & Student Accommodation

Features: • Doors, Windows, Entrance Systems & Rooflights • Glass, Glazing, Blinds, Louvres & Solar Control

Engineered for Every Stage of the Building’s Water Supply

• Safety Security & Fire Protection • Heating & Ventilation

Magazine

SPECIFICATION


ATTEND OUR CERTIFIED CPD SEMINAR

An Informative Guide to Render Solutions

FASSAREND System

A general introduction into specifying and using rendered finishes. A comprehensive overview of modern render systems Explores the differences between mineral, silicone, acrylic and lime-based finishes Addresses substrate compatibility, performance characteristics, and best-practice detailing

“Thanks very much for coming over to present the CPD today, it was a big success. We were all very impressed by both the presentation and by Fassa Bortolo’s products and services.” Ian Law, Mullally Architecture and Design

2026 CPD SEMINARS

BDA Agrément

Attend an independently certified CPD seminar arranged and hosted by Fassa Bortolo. • An Informative Guide to Render Solutions

• A Guide to Modern Lime Render Systems

• Solutions for Render in Very Severe Locations

• Essential Guide to External Wall Insulation

• Render Systems for Timber Frame Construction

• A Guide to Subfloor Preparation

BOOK NOW! Enquiry 1

Email info.fassauk@fassabortolo.com or call 01684 218 305


Welcome

Welcome Digital toolkit aims to strengthen high-rise building safety

B

SR has launched a free toolkit designed to support principal accountable persons overseeing more than 13,000 high-rise residential buildings across England.

This centralised resource will help duty holders fulfil their statutory duties under the Building Safety Act, protecting structural and fire safety for hundreds of thousands of residents. The new managing building safety toolkit at Building safety toolkit – Making Buildings Safer is targeted to more than 4,000 principal accountable persons (PAPs). The PAPs hold a critical, statutory role under the Building Safety Act. These duty holders are responsible for ensuring a building’s fire and structural safety is properly managed. This safeguards buildings and the lives of hundreds of thousands of residents across England. The toolkit has been developed to help PAPs, especially those in resident managed buildings, navigate their complex duties and uphold the highest building safety standards. Charlie Pugsley, Acting Chief Executive Officer of the Building Safety Regulator, said: “This managing building safety toolkit represents a significant step forward in our efforts to support principal accountable persons, especially those in thousands of resident managed buildings across England. “By centralising resources, training opportunities and links to guidance we are supporting duty holders to more effectively manage the complex, but essential requirements of the Building Safety Act. Whether it is preparing a Safety Case Report, planning for remediation work on an existing building or engaging with residents, this resource helps to ensure that building safety remains the top priority for both BSR and thousands of our high-rise communities.” The launch of this digital resource is part of BSR’s commitment to keeping building safety information current, accessible and useful. It follows BSR’s recent announcement that it plans to introduce a more proportionate and targeted approach for future higher-risk building assessments. That plan also includes the offer of greater support to resident-led principal accountable persons. Regular updates are planned over the coming months to add new resources to the toolkit as the building safety regime continues to evolve.

Paul Groves || Group Editor Enquiry 2

3


WARRANTY

FD30

(AVAILABLE)

EXPERT SUPPORT

Extractable track

Runners tested to 100,000 cycles

No need to break into the wall to remove the track

That’s approximately 25 years of use!

Quick-click easy-fit frame

1.2mm galvanised steel specially formed profiles

Quick and easy to assemble and install

Strong & robust

Use standard building materials Fits standard CLS and metal C-shaped stud. Uses standard 12.5mm plasterboard.

Comes with a specially designed jamb kit

Self-centering floor guide Fits in seconds

Discover our full range of quality, competitively priced products at www.eclisse.co.uk

Perfecting Pocket Doors for more than 35 years www.eclisse.co.uk | 0333 577 0828 Enquiry 3


November 2026

Magazine

SPECIFICATION

14

Contents

www.specificationonline.co.uk ll www.letstalkspecification.co.uk

26

This month’s features: Sector Reports: • Offsite Construction • Education & Student Accommodation

Features: • Doors, Windows, Entrance Systems & Rooflights • Glass, Glazing, Blinds, Louvres & Solar Control

• Safety Security & Fire Protection • Heating & Ventilation

Engineered for Every Stage of the Building’s Water Supply

Engineered for Every Stage of the Building’s Water Supply

News 6 Latest News

Polypipe Building Services has developed two purpose-built product systems, MecFlow Fusion and MecFlow Press, to cover the full journey of a building's water supply, from basement and plant room through risers and runouts to individual apartments.

12 Project

Each is engineered for a specific stage of that journey, but both share a common design philosophy - robustness without unnecessary complexity on site, and both replace the corrosion, scale build-up and weight of traditional pipework with material formulations engineered to remove these risks at source.

20 News

15 News 18 Front Cover Spotlight

Sector Reports 23 Offsite Construction 27 Education & Student Accommodation

36

Enquiry - 12

TSP Media Ltd, Grosvenor House, Central Park, Telford, TF2 9TW T: 01952 234000 E: info@tspmedia.co.uk www.tspmedia.co.uk

Follow us @MySpecNews

Features in Focus 31 Doors, Windows, Entrance Systems & Rooflights 38 Glass, Glazing, Blinds, Louvres & Solar Control

55 Products in Focus 52 News & Developments

42 Safety Security & Fire Protection

54 Roofing, Cladding & Insulation

51 Heating & Ventilation

55 Floors & Walls

5


News

Measuring sustainability consistently is the next challenge for construction Sustainability has moved from a niche consideration to a mainstream expectation across the built environment and most professionals agree on what it takes. Delivering sustainability consistently, project after project, is proving much harder. That's the central finding in the NBS Sustainable Futures Report 2026: The state of sustainability across the construction lifecycle, by NBS (part of Hubexo), a leading specification and product information platform for the construction industry. This is the fifth edition of the NBS report, in association with Royal Institute of British Architects (RIBA), which has provided an industry benchmark for evolving views and opinions from those working within the built environment over the past decade, providing insight into sustainability attitudes and tracking how the industry’s approach is changing. Dr Lee Jones, Head of Sustainability at Hubexo, said: " The conversation around sustainable construction is evolving. Awareness of embodied carbon, lifecycle assessment and Environmental Product Declarations has grown. But many organisations are still building the skills, processes and data they need to measure their impacts and track progress, and the gap between ambition and implementation is still clear.

"Decisions made early on and during design stage have a profound influence on how a building performs, which is why a rigorous specification is important for sustainable outcomes. But specification is only as good as the data behind it. “The industry needs to work more closely than ever, to ensure project teams have transparent, verified product information. The industry is at different stages and there's no single fix. Progress depends on better information, more consistent measurement and closer collaboration.” Dr. Stephen Hamil, Innovation Director at Hubexo said: "Our Sustainable Futures study tracks how those designing and specifying buildings, alongside the manufacturers supplying the products and materials, are responding to the sustainability challenge. "What's clear is that the conversation has moved on. Those making specification decisions increasingly understand what more sustainable choices look like, while manufacturers recognise the need to provide the products, information and evidence to support them. “The challenge now is turning that understanding into action. We know much of what needs to be done - the next step is to see more of the industry actually doing it."

GOLDBECK completes landmark “Hive” facility GOLDBECK has completed “The Hive”, a new amenity building at DP World London Gateway logistics hub in Stanford-le-Hope, Essex. The company delivered the scheme as a central meeting point for the businesses on site and the surrounding community. The facility provides a mix of office accommodation, shared workspaces and food and beverage areas, alongside breakout zones designed to encourage interaction and collaboration.

Ceremony marks opening of new school A ribbon cutting ceremony has been held at the Orchard View Primary Academy in Aylesbury to celebrate the new school’s opening. The event on Friday 23rd October saw several of the school’s pupils and teachers join representatives from Buckinghamshire Council, Morgan Sindall, and Inspiring Futures Partnership Trust, for a special event. On the day, the new school’s staff gave a welcoming address, with a performance by pupils and a time capsule buried before the ribbon was cut. Orchard View Primary Academy is a two form-entry, 420-place primary school with a 60-place nursey, 12-place SEND provision, and multipurpose outdoor spaces. The school’s design means that it can be expanded in the future for a capacity of 630 pupils.

6

To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card


Enquiry 4


News

Search for 'top 10' biggest strategic investment sites across country Tens of thousands of jobs and up to £2 billion in private investment over time will be targeted across the UK, as our regions are backed with a £700 million package of support to help drive reindustrialisation. The Strategic Sites Accelerator will deploy around £700 million alongside expert support to help unlock up to 10 major industrial and commercial sites across the country, helping some of the UK’s most promising investment opportunities get off the ground. The Accelerator will focus on commercially viable sites with strong investor demand, where government backing can help overcome the barriers stopping development from moving ahead. It will tackle the key barriers holding back high-potential sites that could support Britain’s reindustrialisation. That includes everything from access to finance, grid connections, and planning constraints, removing the blockers

that can cool would-be investors. The Accelerator will support sites in a range of ways, from loans and equity and targeted grant funding to technical expertise, bringing government, local partners and developers together to tackle specific barriers. Chancellor of the Exchequer John Healey said: “Local leaders know their communities best. Only by trusting them with real power and resources will we see change. “This £700 million package is helping break down the barriers to local growth, so people can feel the benefits of a growing economy and love where they live.” Business Secretary Jonathan Reynolds said: “Britain’s potential is everywhere, but we hear the same old arguments all too often – outdated infrastructure, insufficient access to finance, and problems with planning. “These are barriers that hold back investment, block new jobs, and shackle

our potential, and we need to do more to empower our local leaders and help drive the growth their communities deserve and expect. “This programme will get the ball rolling for up to 10 of the UK’s most important potential sites, attract billions in investment, unlock tens of thousands of good-quality jobs in the years ahead, and bring good growth to every postcode.” The Accelerator is already engaging on potential sites in Glasgow, Burgess Hill and Sheffield with technical support and expertise, and will back our Mayors and local authorities with blended finance across the country. This includes exploring investment opportunities in Greater Manchester, West Yorkshire, West Midlands, South Yorkshire, Liverpool City Region, the North East, Glasgow City Region and Cardiff Capital Region – building on the National Wealth Fund’s strategic partnerships in these regions.

New stadium design for AC Milan and FC Internazionale Milano said: “Milano is a city shaped by makers, engineers, and restless ambition. From San Siro to La Scala, buildings act as epicentres of culture and entertainment. This project represents a remarkable opportunity to build upon San Siro’s legacy – channelling its powerful spirit to continue the story of AC Milan and FC Internazionale Milano. “As the centrepiece of a wider urban regeneration scheme, Generali Stadium will be a year-round destination and a state-of-the-art landmark, authentically and unmistakably Milano.”

AC Milan and FC Internazionale Milano have unveiled the design of their future home – Generali Stadium – conceived to carry the spirit of San Siro into a new era and become a new landmark for Milano.

football's most historic clubs, a new home for generations of supporters, and a destination designed to contribute to the cultural, economic, and urban development of the city.

Designed by Foster + Partners and MANICA, it is a bold architectural vision that sets a new standard for the live fan experience.

It is driven by a shared long-term vision from the clubs and their respective owners, RedBird Capital Partners and Oaktree, part of Brookfield’s credit platform. Norman Foster, Founder and Executive Chairman, Foster + Partners,

The project represents a long-term investment in the future of two of world

8


FASSAREND CYCLE

2A

KIWA BDA CERTIFIED

FOR ‘VERY SEVERE’ WIND-DRIVEN RAIN CONDITIONS IN THE UK

MS 20.2, FX 526, RX 561

MS 20.2, FX 526, PX 505

RENDERING ONTO MEDIUM DENSE BLOCKWORK (7.3 KN): RENDER + READY-TO-USE TOPCOAT

We are proud to announce that Kiwa BDA has certified Cycle 2A for ‘very severe’ wind-driven rain conditions in the UK. A basic application cycle with cement base coat render and painting. Choose your top coat colour from our Fassacolour TRENDS FOR EXTERIORS collection. BASE COAT KZ 35 ZOCCOLATURA SOLFATORESISTENTE

EXTRA MESH FASSANET MAXI

BASE COAT

PRIMER AND DECORATIVE COAT FX 526

RX 561

PX 505

OR

TO FIND OUT MORE about Fassa Bortolo and its range of render systems and building products. Visit www.fassabortolo.co.uk or call 01684 218 305 Enquiry 5


News

UK manufactured concrete bricks: supporting more sustainable specification

By supporting domestic manufacturing, specifiers can not only reduce transportrelated environmental impacts but also contribute to stronger local economies and a more resilient UK construction sector.

Jamie Gledhill, Technical Engineering Manager at Brett Landscaping and Building Products, explains the advantages of concrete bricks. As the construction industry continues its journey towards lower carbon development, greater resource efficiency and more responsible procurement, every material specified within a project is coming under increasing scrutiny. While much attention is understandably focused on operational energy performance, reducing the environmental impact of buildings also requires careful consideration of the materials used to construct them. In this context, UK manufactured concrete bricks are emerging as a practical solution that can help developers, architects and specifiers meet sustainability objectives without compromising on performance, aesthetics or buildability.

One of the key advantages of concrete bricks lies in the way they are produced. Unlike traditional clay bricks, which require firing in kilns at extremely high temperatures for extended periods, concrete bricks are manufactured using a curing process. This approach typically demands significantly less energy during production, helping to reduce the embodied carbon associated with the finished product. As embodied carbon becomes an increasingly important consideration within planning, specification and whole-life carbon assessments, materials that require less energy to manufacture are becoming more attractive across the built environment. However, sustainability extends far beyond the factory floor. The location of manufacturing and the resilience of supply chains are also playing a growing role in material selection. UK manufactured concrete bricks offer a distinct advantage by reducing transport distances and limiting the emissions associated with moving products around the country. Local production can also help mitigate the risks associated with lengthy international supply chains, providing greater certainty around lead times and availability. For contractors and developers working to demanding construction programmes, reliable access to materials is increasingly valuable. Delays in product availability can have significant implications for both project costs and completion schedules.

10

Another important sustainability consideration is material efficiency. Modern concrete brick manufacturing processes deliver highly consistent products with excellent dimensional accuracy. This consistency can help reduce waste during construction, minimise the need for cutting and remedial work, and support more efficient installation on site. Small reductions in waste across large developments can result in significant environmental and commercial benefits over the course of a project. Of course, true sustainability must also consider performance over the entire lifespan of a building. A product that lasts for decades without requiring significant maintenance, repair or replacement will often provide greater environmental benefit than one with a higher maintenance burden. Concrete bricks have a proven track record of durability and weather resistance across a wide range of applications. Their ability to maintain both appearance and performance over time contributes to longer building lifespans and reduced lifecycle costs. For specifiers, this combination of robustness, reliability and low maintenance aligns closely with the industry's growing emphasis on whole-life value rather than simply upfront cost. As whole-life carbon assessments become increasingly common, the durability of construction materials is becoming an essential part of sustainability decision-making. Importantly, modern concrete bricks are available in a broad range of colours, textures and finishes, providing architects with the design flexibility required for contemporary developments. This means sustainability does not have to come at the expense of aesthetics, enabling projects to achieve both environmental and architectural ambitions.

To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card


Enquiry 6


Project

Project: The Buttermarket, Redruth Architect: Architectural Thread Suppliers: Hunter Douglas; Method; PCA; CHPK Oseng-Rees Reflection Ltd.

Transforming an old Buttermarket into a fully accessible and welcoming venue Architectural Thread has secured the 2026 RIBA Conservation Award and the Stephen Lawrence Prize for a heritage-led project that regenerates neglected Grade II listed historic buildings and a market courtyard.

T

he Buttermarket is a heritage-led regeneration of five Grade II-listed buildings around a central courtyard in Redruth, Cornwall, part of the Redruth Conservation Area and the Cornwall and West Devon Mining World Heritage Site. Originally built in 1825 as a market for agricultural trade, the site had become neglected after years of unsympathetic additions and decline.

and the introduction of a contemporary market hall, the scheme has restored the site’s architectural character, reinstated historic views, and embraced a philosophy of minimal intervention. Reclaimed materials and matching historic features reflect its legacy of adaptation. The project also included innovative use of bespoke 100% recycled materials and achieved outstanding sustainable credentials.

Acquired in 2017 by Redruth Revival CIC, the project aimed to safeguard the site’s cultural significance and revive it as a vibrant hub for local enterprise. Through careful conservation, selective demolition,

Now home to flexible workspaces, food units, and a first-floor gallery, the Buttermarket fosters economic and cultural activity through accessible, affordable spaces for food entrepreneurs, artists, small businesses, and community events— offering a sustainable model for community-led regeneration in the heart of Redruth. To reduce embodied carbon, the project prioritised reclaimed materials, as illustrated in the enclosed drawing. Overall, upfront embodied carbon for the project is 267.41 kg CO2/m² exceeding LETI’s 2030 design targets. Recycled and reused materials were

12

chosen to conserve the embodied energy and craftsmanship held within the building. The project included a single new facade, to complete the fourth side of the courtyard. Originally designed as a slate hung wall inspired by local Cornish architecture, the facade didn’t need insulating due to the heating strategy. This opened up opportunities for a more playful design. Bespoke 100% recycled glass shingles were developed with a material scientist and artist. This innovative material had never been used externally before - it was tested to ensure it was suitable and was found to behave like ceramic. Compared to traditional float glass, using lower kiln temperatures during manufacture reduced the material’s embodied carbon by 80% and fresh water consumption by 99.9%. “Rather than impose novelty, the architects have uncovered what was already latent: flexibility, adaptability, and collective ownership,” said Sam Goss, RIBA South West & Wessex Jury Chair. Redruth Revival were keen to demonstrate that older buildings can be made more sustainable, an ambition that will be executed by using renewable energy sources. >>

To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card


THE LEADING PRECAST FRAME MANUFACTURER ACROSS THE UK & IRELAND

O’Reilly Precast delivers high-quality full-frame and insulated facade wall panel solutions designed to accelerate construction programmes. Our offsite-manufactured systems enable rapid installation, reduced site labour, and consistent, factory-controlled quality across projects throughout the UK and Ireland. Designed and manufactured in-house, our approach is built around one dedicated team focused on your project, with the flexibility to adapt as plans change.

Enquiry 7

OREILLYPRECAST.COM

Talk to our precast team about accelerating your next build

0121 630 3472 sales@oreillyprecast.com oreillyprecast


Project >> PV and solar thermal panels are being considered for the building. These energyefficient heating systems will be flexible and tenant-controlled. In the communal spaces, solar gain will be maximised – this is a passive building design that takes advantage of the heat energy from solar radiation, either through windows or the fabric of the building. Where possible, Redruth Revival are also planning on harvesting rainwater – rather than letting it flow back down the drains, rainwater is collected from the roof and redirected to a tank, ready to be recycled. In 2019, the Architectural Heritage Fund supported Redruth Revival with a Project Viability Grant of £6,919 to undertake a feasibility study focusing on building condition, services, and a review of the design and development constraints.

This year, a Project Development Grant of £59,850 has been awarded from the Transforming Places Through Heritage scheme that is helping to fund professional fees to progress the project through RIBA stage 4. The refurbishment of the Buttermarket is a wonderful example of how older buildings can be made more sustainable with renewable energy sources and passive design. Once restored, the complex will become an energy-efficient hub, benefitting both the Redruth community and the environment. Ross Williams, Director of Redruth Revival CIC, said: “Throughout the different stages of

this project, we have continuously been keen to show how heritage buildings can be made more sustainable. We hope that the implementation of renewable energy sources at the Buttermarket will lessen the building’s impact on the environment, while also inspiring others to consider how they can improve on their heritage project’s approach to sustainability.”

14

To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card


News

GARADOR’S ONLINE DOOR BUILDER It’s never been easier to find your perfect garage door Quick and easy to use, it will seamlessly take you through every stage of selection with great visuals and total clarity. Whether you want an Up & Over, Sectional, Roller or Side Hinged door, every detail is clearly itemised right down to colours and finishes, handles and operators. Garador’s Door Builder also includes easy options and upgrades.

See your new garage door in place Add a picture of the project or house, and you can then see your chosen garage door in place. With a few clicks, you can try different designs and colours to ensure the perfect final choice.

TRY IT NOW… simply visit www.garador.co.uk or call Garador’s friendly customer service on 01935 443 700 Enquiry 8

Enquiry 9

15


News

Next level precast: Moving beyond components to building solutions Digital design allows construction teams to coordinate buildings with remarkable precision before work begins on site. But a perfectly coordinated model is only the starting point. The real test is how the building comes together.

F

or precast construction, that means looking beyond individual panels, beams or columns to consider the complete building solution: how elements connect, how interfaces are managed and how manufacturing decisions affect installation. O’Reilly Precast’s Architectural Wall Panel (AWP) system reflects this shift. Its factorymanufactured insulated sandwich panels combine structure, insulation and an external façade in one coordinated system. Where a brick finish is specified, natural clay bricks can be cast directly into the concrete, creating an integral finish rather than a separately fixed or bonded layer. Yet the real value extends beyond what the finished panel looks like.

16

It is also the principle behind Design for Manufacture and Assembly (DfMA). Designing for offsite production is not simply about standardising components. It means understanding how they will be manufactured, transported, lifted, connected and assembled in the real conditions of a construction project. The aim is not to eliminate every variable. It is to identify the important ones early and design around them.

Window openings, sills, vents, parapets, balcony interfaces and wall-to-floor connections all have to work with the wider building. Resolving these details before manufacture can reduce the number of decisions left to site teams under programme pressure.

For architects and engineers, this provides an opportunity to coordinate technical details and interfaces sooner. For contractors, it can improve clarity around installation, sequencing and site activity. For manufacturers, it creates the opportunity to apply practical knowledge where it has the greatest influence.

This is why early collaboration is critical. When precast specialists engage while designs are still developing, project teams can address panelisation, tolerances, connections, lifting, transport and installation sequencing before decisions become difficult to change.

O’Reilly Precast’s AWP system has achieved Kiwa BDA Agrément and NSAI Agrément certification, providing independent technical assessment alongside this coordinated approach to design and delivery. The wider opportunity for precast is clear. The industry can move

beyond supplying isolated components towards delivering more complete, factorymanufactured building solutions, with greater quality control and fewer unresolved interfaces arriving on site. Successful offsite construction depends on treating design, manufacture and installation as one continuous process. Because the measure of a good model is not how perfectly everything fits on screen. It is how well the building works when it reaches site. Planning your next project? Engage with O’Reilly Precast early to explore how our offsite concrete solutions can support your design and construction requirements. Visit www.oreillyprecast.com. O’Reilly Precast – Enquiry 10

To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card


Luxlite®

Frameless rooflight technology bringing natural light into homes

Made to measure sizes up to 3m wide Portrait or Landscape orientation Fixed and opening options, opening up to 300mm for ventilation Innovative flashing apron Frameless internal design

Enquiry 11

25

Rooflight

Years of Expertise

0116 497 1249 sales@roof-maker.co.uk

www.roof-maker.co.uk


Front Cover Spotlight

Two systems – delivering one end-to-end water supply solution from plant room to apartment Specifiers working on commercial and high-rise projects face a familiar challenge: sourcing a water supply solution that performs consistently from the plant room to the riser and on to the final apartment outlet, without switching between barely compatible products along the way. Polypipe Building Services addresses this with two purpose-built product systems, MecFlow Fusion and MecFlow Press.

T

ogether, the two systems are designed to cover the full journey of a building's water supply, from basement and plant room through risers and runouts to individual apartments. Each is engineered for a specific stage of that journey, but both share a common design philosophy robustness without unnecessary complexity on site, and both replace the corrosion, scale build-up and weight of traditional pipework with material formulations engineered to remove these risks at source. MecFlow Fusion is designed to meet the demanding conditions of plantroom, riser, header and runout installations. Available from 20mm to 315mm, it uses a PP-RCT composition reinforced with microfibre mesh for added mechanical strength, along with an antimicrobial additive. Unlike steel, its corrosion-free material formulation inhibits the magnetite build-up that clogs valves and coats heat exchangers on heating systems, and its lower thermal conductivity reduces the heat loss rigid metal pipework allows along the run. MecFlow Fusion was specifically developed for boosted cold water, low temperature hot water, chilled water and heating applications, and is tested to achieve a fire classification rating of B-s1, d0.

18

Joints are created by socket, saddle and butt welding together with electrofusion couplers, all producing homogenous joints certified to BS EN ISO 15874 with WRAS approval. The system is also available through the Polypipe Advantage service, offering bespoke design, tailored prefabrication, delivery and technical support to streamline installation. At the other end of the system, MecFlow Press is designed for branch, runout and apartment-level installations where flexibility and ease of handling are key considerations. This multi-layer composite pipe, available from 16mm to 50mm, comprises inner and outer layers of polyethylene around a flexible core of butt-welded aluminium. It is fully oxygen-tight, offers low thermal expansion and delivers strong flow rates for potable, hot and cold plumbing and heating applications, while its lighter weight compared with traditional materials eases handling and reduces structural loading on risers. MecFlow Press uses press-fit jointing via flow-optimised fittings, each featuring a stainless-steel sleeve with a tool guide for precise pressing and extra-wide visual inspection windows to

ensure correct pipe insertion. MecFlow Press fittings also incorporate a ‘leak-before-press’ test function to confirm that joints are correctly pressed before full pressurisation. The system is certified to BS EN ISO 21003 and carries WRAS approval. Alongside technical support, the range is backed by Environmental Product Declarations (EPDs), giving specifiers a clear view of the environmental credentials behind each component. Consistency of water supply performance throughout the whole building is critical for today’s commercial construction projects, MecFlow Supply Systems from Polypipe Building Services deliver a single to solution and point of accountability from source to outlet. Polypipe Building Services – Enquiry 12


We know that commercial construction projects demand tough standards. So we’ve expanded our MecFlow Supply Systems range to offer a durable and comprehensive riser to branch solution. From mains to tap, our multi-layer MecFlow Fusion and MecFlow Press products are available in pipe diameters from 16mm to 315mm. Meeting high standards needn’t be a tough decision – choose MecFlow Supply Systems. Visit www.polypipebuildingservices.com/mecflow

Enquiry 13


News

Achieving maximum building envelope efficiency with Armatherm™ Striving for net zero? Structural thermal break manufacturer Armatherm™ can support architects, specifiers and designers to make sure that buildings are constructed with maximum efficiency in mind. Armatherm™ Z girt: another innovative, thermally broken cladding support connection solution. It prevents excessive heat flow and the potential condensation problems otherwise associated with thermal bridging. It is ideal for cladding and building façades.

T

hermal bridging poses a significant challenge in construction projects. It allows energy to escape from and enter a building, which compromises thermal efficiency and brings with it a whole host of other issues. To help prevent this, Armatherm™ offers a range of solutions that have low thermal conductivity and high strength and are designed to prevent thermal bridging. These solutions minimise energy loss, providing a cost-effective and reliable solution. The Armatherm™ range includes: Armatherm™ 500: a high strength, thermoset polyurethane manufactured in several densities. It is ideal for foundations, parapets and more.

20

Armatherm™ FRR: an innovative material that provides a combination of low thermal conductivity and high compressive strength. It has been used in hundreds of structural steel framing connections transferring load in moment and shear conditions. It is ideal for interior and exterior steelwork, concrete and roof penetrations.

The Armatherm™ team will also recommend the best thermal break materials and identify where they will be required to combat thermal bridging. To explore the full range of thermal break solutions, visit www.armatherm.co.uk/ thermal-break-materials/ or speak to Armatherm™’s expert team via www.armatherm.co.uk/contact-us/ Armatherm – Enquiry 14

Armatherm™ also offers a design service, collaborating with architects, specifiers and designers from the project’s conception. This ensures that thermal breaks are integrated into the initial designs. By addressing potential thermal bridging points at the earlier stages, architects can make informed decisions that optimise energy efficiency, without compromising on functionality or aesthetics.

To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card


armatherm.co.uk

THERMAL BRIDGING SOLUTIONS Armatherm™ is a leading supplier of thermal break materials for the construction industry. We help architects, engineers and contractors tackle thermal bridging with products that combine low thermal conductivity and high strength. Designed and tested for load-bearing applications, Armatherm™ solutions effectively reduce or prevent thermal bridging.

Enquiry 15


News

Future proofing new housing developments through flood-resilient design National housing delivery is a topic that currently dominates our headlines, as well as the conversation in Westminster. To lower the waiting lists for social housing and to extend home ownership to more people, planning policies are frequently reviewed, and new targeted promises are made to rapidly build new housing and infrastructure for the UK’s growing population.

W

hat’s more, the UK’s existing housing infrastructure wasn’t designed for the changing climate realities we face today. The Environment Agency warns that 6 million properties in the UK are at risk of flooding as El Niño causes wet and windy conditions in the months ahead of us. The lesson for new build developments is clear. Beyond building homes and amenities quickly, climate resilience must be built in from the start, considering future populations and conditions to ensure developments remain safe and functional for generations to come.

Getting the basics better As the first stage in an integrated water management strategy, Wavin’s Osma range of gutter rainwater systems handles up to 30% more rainwater to comparable systems. Each of the six gutter profile systems come with extra wide seals to mitigate thermal expansion and reduce incidents of overspill with higher front edge profiles. Capturing rainwater and channelling it away from the home is only half the challenge. Once water has been directed safely from the roof, there needs to be somewhere for peak flows to actually go. The next layer of protection That’s where Sustainable Drainage Systems (SuDS) can play a key role in slowing and storing water to help developments better manage rainfall before it enters overloaded drainage networks.

Why water management infrastructure must be prioritised Traditional drainage approaches are often designed to remove water from site as quickly as possible, but as extreme weather events become more common, that strategy alone is not enough to deliver adequate flood protection to people and places. It costs a staggering £30,000, on average, to resolve the damage to a flooded house. Not to mention the risk of stormwater overloading sewers and spreading disease. This means every minute counts to ensure water is managed, from the moment it touches roofs and roads, in order to minimise flood risks resiliently. New developments must be designed with infrastructure that works harder to protect communities in the future.

22

For example, Wavin’s AquaCell NG system uses modular underground units to create attenuation tanks. These structures temporarily store excess stormwater before releasing it at a controlled rate, either infiltrating naturally into the ground or to the available sewer network. When we change our focus from seeing water as a waste product to seeing it as a resource that we can store and control, SuDS bring a range of benefits for biodiversity within communities. This methodology utilises natural drainage processes by encouraging natural evaporation and filtering water through vegetation. Managing runoff quality is equally important alongside water quantity. Wavin's Certaro Lamella HDS supports the treatment of surface water runoff by removing fine sediment and associated

pollutants before it reaches downstream drainage systems, helping to improve water quality and protect infrastructure performance over the long term. The same vegetation that supports biodiversity also cools urban areas during heatwaves and improves air quality for residents. Taking action on flooding resilience Protecting housing developments from increasing flood risk means considering water management holistically and by planning for extreme, worst-case scenarios. New developments present a unique opportunity to embed resilience from the outset, ensuring water management isn’t a reactive measure once new rainfall patterns emerge. Minimising flood damage lies in slowing water down before it reaches the sewer network, and SuDS are designed to do exactly that by managing rainfall close to where it falls. Effective flood resilience requires every stage of water management to work together to keep homes safe, maintain clear footpaths, reduce transport disruptions and safeguard critical utilities. Switching the priority from quick drainage to secure water storage delivers benefits that extend beyond flood protection to support community wellbeing and environmental quality. For more information on Wavin’s urban climate-resilient solutions, visit https://wavin. com/gb/solutions/urban-climate-resilience Wavin – Enquiry 16


Offsite Construction

Integrity. Transparency. Trust. The secret to a successful partnership “For more than 25 years, I have partnered with Glidevale Protect. Their honesty, integrity and transparency around data and certification have helped build a strong, collaborative and long-standing relationship that I continue to rely on.” Dave Thacker, Head of Innovation, The Innovation Hub

By offering a full added value package of technical support and third-party certification for its reflective wall membranes, Glidevale Protect has helped The Innovation Hub deliver sustainable and thermally efficient timber frame homes for Morro Partnerships. Read more on page 26.

www.glidevaleprotect.com/itt Enquiry 17


Offsite Construction

A catalyst for city’s regenerative ambitions The Sloane Robinson Building, home to the University of Bristol’s Temple Quarter Enterprise Campus (TQEC), is its most significant development. Designed by Feilden Clegg Bradley Studios it makes use of offsite and modular construction methods to transform a seven-acre former Royal Mail site beside Brunel’s Grade I-listed Temple Meads station into a civic centre for learning, research, innovation and engagement. •

Low-Embodied Carbon Concrete: More than 90% of the concrete volume used low-embodied carbon mixes (saving ~25% in emissions), structured around a 7.5m x 7.5m grid and concrete slab system that cut upfront emissions by roughly 50%.

A publicly accessible Exchange Hall forms the civic heart of the building, providing a welcoming space for meetings, events and engagement between the University and the wider city. Whilst dedicated civic areas, including food and dining spaces, terraces and courtyards provide places to meet, learn and collaborate.

T

his project transforms a long-derelict site into a new centre for learning, research and innovation and civic engagement, redefining one of Bristol's most prominent gateways. The 38,500 m² building accommodates 4,600 students, 650 staff, three schools and three research institutes. Teaching spaces, laboratories, a Design Factory, Maker Space, offices and social areas surround winter gardens and atria. TQEC will act as a catalyst for the wider 135-hectare regeneration of Bristol Temple Quarter,

24

which aims to deliver 10,000 new homes, 22,000 new jobs and a £1.6 billion annual boost to the regional economy. Contractor Sir Robert McAlpine utilised offsite and prefabricated components during the construction of the landmark scheme. These included: • Cladding Panels: Over 1,200 unitised cladding panels were manufactured offsite and installed on the exterior. • Precast Panels: 370 precast concrete panels were prefabricated and delivered to the site for structural assembly.

The Bristol Innovations Zone will connect the University with businesses to advance quantum, AI, semiconductors, cyber, advanced materials and engineering biology, supporting Bristol’s growing innovation economy. New pedestrian and cycling routes link Temple Meads with the Floating Harbour and east Bristol, while a generous public realm extends university life into the city and creates spaces for shared civic use. Professor Judith Squires, Deputy ViceChancellor and University Lead for the Temple Quarter Enterprise Campus, explained: “It is already helping to strengthen our connections with Bristol and the wider region, while creating an environment that is sustainable, inclusive and future-focused.”


Offsite Construction

Ambitious and sustainable Supporting the University’s ambitions for sustainability, innovation and civic engagement, the car-free campus connects directly to the new Temple Meads station entrance and Bristol’s low-carbon heat network. One of the first UK buildings designed to export server waste heat into a citywide network, it also achieved a 25% reduction in embodied carbon through collaborative redesign. Around 40% of material deliveries came from within 30 miles, while demolition materials from the former sorting office were reused to raise the ground level. The architecture combines transparency, adaptability and long-term urban integration. Glazed façades reflect the city and sky by day, while illuminated interiors reveal the activity within at night, creating an active civic presence. Led by Grant Associates, the landscape transforms the post-industrial site into a green gateway, reconnecting the University with the River Avon and wider city. A tree grove, biodiverse planting, rain gardens and

vertical landscaping bring nature into the site, while University Square and riverside spaces provide places to meet, study and gather. Sir Robert McAlpine worked with its supply chain to embrace off-site prefabrication as much as possible. “By engaging extensively with our mechanical and electrical contractor, NG Bailey, during the PCSA period, we were able to tackle design challenges head on and utilise their fabrication capabilities,” said a spokesperson. “As a result, much of their work came to site ready to be installed while

also meeting the architect’s aesthetic vision once in place. “More than 1,200 unitised cladding panels were installed, along with 370 precast concrete panels to clad the frame at ground level. Even the statement yellow staircases have been fabricated off-site by local contractor, Taunton Fabrications. Estimates into the benefits of prefabrication show a saving of approximately 50,000 hours of labour on site, which has helped secure our programme and maximised quality on the project.”

25


Offsite Construction

U-value calculations with confidence. Glidevale Protect’s main philosophy is to provide these details in a clear and transparent manner which gives timber frame manufacturers like The Innovation Hub confidence in its products and their performance. Glidevale Protect’s robust product quality system via batch referencing and availability of digital BIM objects also allows all products to be easily tracked and traceable right through the golden thread of building information on every project. For Dave, the real value at The Innovation Hub lies in the honesty and clarity behind the technical data which allows them to make informed decisions and deliver timber frame homes that meet the highest standards of thermal performance and build quality.

The secret to a successful supplier partnership? Trust. Glidevale Protect is proud to support The Innovation Hub in its goal to deliver sustainable and thermally efficient timber frame homes for Morro Partnerships.

F

or Dave Thacker, Head of Innovation at The Innovation Hub and an experienced specialist within the timber frame industry, quality products only tell half of the story – the true value is trust – trust in the data, certification, technical support, with integrity and transparency behind every decision. Technical expertise The purpose of The Innovation Hub, a dedicated 9,000 sq ft timber frame manufacturing facility based in Leicester and set up in 2024 for housing developer the Morro Group, is to constantly innovate and improve its offering for customers. With thermal performance high on the agenda following the launch of the new Future Homes Standard, the use of structural timber construction comes sharply into focus. Glidevale Protect’s TF200 Thermo reflective external wall membrane plays a key role in maximising the energy efficiency of delivered homes and adds value to the final timber frame structures built by The Innovation Hub. Timber frame manufacturers like The Innovation Hub rely on the expertise of key supply chain partners to make sure the most appropriate products are specified and installed correctly to deliver the required

26

performance. Dave Thacker comments: “Over the 25 years I have been working with Glidevale Protect, the technical support has always been there. They have never failed to deliver on the questions that we’ve asked and the support that we’ve needed in the field to prove any detail.” Certified products Declaration of performance via third party certification demonstrates that product test data has been independently verified and is therefore suitable for use in specific applications and can be used within wall

Dave Thacker, Head of Innovation at The Innovation Hub

Collaboration After working together for well over two decades, the relationship between Glidevale Protect and Dave Thacker continues to evolve. It’s a true collaboration - a partnership defined by cooperation, shared goals and mutual respect with the partnership now established with Dave and his team at The Innovation Hub since the business’ inception. Working with Dave over the years has led to Glidevale Protect providing additional support, for example in supplying a specific colour matched wall membrane, and more recently, co-branding the Protect TF200 Thermo membrane for The Innovation Hub, whilst still retaining the all-important high levels of aged thermal resistance. Commercially, it’s also an ideal way for this relatively new timber frame manufacturer brand to boost its visibility on site. For Glidevale Protect - quality, honesty, integrity and transparency remain at the heart of its business ethos and its positive relationship with The Innovation Hub proves that the most important link in any supply chain is trust. To find out more, visit www.glidevaleprotect.com/itt, call +44 (0)161 905 5700, or email info@glidevaleprotect.com. Follow Glidevale Protect on LinkedIn. Glidevale Protect – Enquiry 18


Education & Student Accommodation

Creating resilient, highperformance educational environments Educational environments place unique demands on building specification. Architects must balance durability, safety and acoustic performance with the need to deliver flexible spaces that support teaching and learning.

F

rom classrooms and corridors to sports halls and communal areas, every element of the building must be capable of withstanding intensive daily use while maintaining performance over the long term. It is this combination of requirements that makes fermacell® fibre gypsum boards an increasingly popular choice for education projects.

The robust composition of fermacell® fibre gypsum boards makes them particularly well suited to schools, colleges and universities, where walls are regularly subjected to knocks, bumps and impact damage. Their exceptionally dense construction provides outstanding durability, helping to reduce maintenance requirements and extend the lifespan of internal partitions.

boards deliver strong fire performance to support compliance with stringent building requirements. Single-layer partition systems can achieve fire resistance ratings of up to EI60 at heights of up to 15 metres, enabling architects to deliver robust compartmentation strategies without compromising on space efficiency. Acoustic comfort is equally critical within modern learning environments. The practical benefits extend beyond performance. With a dead load hanging capability of up to 150kg per linear metre without additional pattressing, fixtures such as whiteboards, shelving, lockers and teaching equipment can be fixed directly to the wall. This provides greater design flexibility while simplifying installation and reducing the need for supplementary materials.

For high-traffic educational settings, 75mm stud partitions can achieve severe duty classification and withstand crowd loads of up to 2kN, providing reassurance that spaces can perform under demanding conditions. Safety remains a key consideration in educational design, and fermacell® fibre gypsum

Excessive noise can affect concentration, communication and overall educational outcomes. Fermacell™ systems can achieve acoustic ratings of up to 54dB Rw in single-layer constructions, helping to minimise sound transfer between classrooms and creating quieter, more productive teaching spaces.

For project teams, fermacell® fibre gypsum boards also offer programme advantages. Its multifunctional properties reduce installation stages, while boards can be installed before the building envelope is fully watertight, helping accelerate construction programmes and keeping education projects on schedule. Combined with a 20-year impact warranty and proven suitability for sports halls and activity spaces, fermacell® fibre gypsum boards deliver a complete solution for architects seeking resilient, efficient and future-ready educational buildings. fermacell® – Enquiry 19

27


Education & Student Accommodation

Frameclad: Delivering a Lesson in Net Zero Construction Turning Net Zero targets into high-performing buildings requires more than ambition. It demands the right combination of design, engineering, manufacturing and material innovation. At the new Plasyfelin Primary School in Caerphilly, Frameclad is putting its advanced ECO-LSF technology into practice on a landmark Net Zero school. “After significant time and research, we are proud to give our clients an even more sustainable option,” says Nik Teagle, Joint Managing Director at Frameclad. “Taking it up another level and remaining competitive has taken time, but we are extremely proud that projects using ECO-LSF are now underway.” ECO-LSF: the future of sustainable construction For Frameclad, ECO-LSF represents more than a new product. It is a practical response to the changing demands of construction. “We are proud to support the objectives of the DfE’s new Education Estates Strategy and its recent fundamental shift in how education buildings are designed, delivered and managed,” adds Martin Jamieson, Joint Managing Director, Frameclad.

B

eing delivered by BAM Construction within the grounds of the existing school, the new facility will accommodate 420 pupils, alongside enhanced nursery and integrated childcare provision. Sporting facilities will also be available to pupils and the wider community, creating a multi-purpose education and community asset. Plasyfelin Primary School – a flagship development Work officially began in September 2025 on the £23 million replacement for Plasyfelin Primary – Caerphilly County Borough Council’s first Net Zero school. Jointly funded by the council and Welsh Government through the Sustainable Communities for Learning Programme, the project represents a significant investment in the future of education provision and the delivery of high-performance, sustainable public buildings. Appointed by BAM Construction, Frameclad designed, engineered and manufactured the ECO-LSF infill system for the project. Developed as a more environmentally sustainable alternative to conventional light steel framing, ECO-LSF is manufactured from 100% recycled steel using Electric Arc Furnace (EAF) technology powered by renewable energy. Significantly lower carbon emissions ECO-LSF can achieve up to 70% lower carbon emissions compared with traditional steelmaking processes. Importantly, however,

28

the environmental credentials do not come at the expense of performance. ECOLSF retains the strength, durability, safety and fire performance expected from a modern light steel frame system, demonstrating that lower-carbon construction does not have to mean compromising on technical requirements. This is particularly relevant to public-sector projects such as Plasyfelin, where environmental ambition must sit alongside demanding requirements for safety, quality, programme certainty, reduced maintenance and enhanced long-term performance. ECO-LSF: a material bank for a circular future Steel is a material bank, retaining its value through repeated cycles of recovery, reuse and recycling. ECO-LSF maximises this inherent circularity, using 100% recycled scrap steel to reduce reliance on virgin materials and move construction from ‘take, make, dispose’ approach to a circular model, reuse, recycle, repeat. For Frameclad, it is also the next step in an established commitment to sustainability. Its conventional steel has historically contained around 60% recycled content, but the development of ECO-LSF was driven by the need to go further.

“The strategy is about much more than replacing ageing buildings – it is about creating resilient, sustainable and highperforming education spaces that deliver long-term value for pupils, communities and the public purse. Our ECO-LSF system demonstrates how innovation in construction can help turn those Net Zero ambitions into reality. Construction Partners • MAIN CONTRACTOR: BAM Construction • PLANNING: The Urbanists • DESIGN: Arcadis • ENGINEERING: AECOM • ECOLOGY: SLR Consulting To read the full Plasyfelin Primary School case study, visit www.frameclad.com and head to projects. Frameclad – Enquiry 20

To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card


Education & Student Accommodation

Meeting DfE Guidelines: Why Flooring Specification Matters in Education By David Collins-Lafferty, Marketing Manager, Gerflor UK & Ireland

F

looring plays a critical role in the performance, safety and longevity of education environments. From classrooms and corridors to specialist labs and sports halls, every area within a school must meet specific demands. To support this, the Department for Education (DfE) sets clear guidelines to ensure flooring solutions are safe, durable, hygienic and fit for purpose.

David Collins-Lafferty, Marketing Manager, Gerflor UK & Ireland

Understanding and applying these guidelines is essential for architects, contractors and specifiers involved in education projects. More than just a compliance exercise, DfE guidance helps shape environments that support student wellbeing, improve safety and deliver long-term value. Understanding DfE Flooring Guidance The DfE provides detailed recommendations for school design and construction, including flooring performance, through frameworks such as CF21 and CF25. These guidelines are designed to ensure that materials used across education settings meet consistent standards, regardless of project size or type. At its core, the DfE guidance outlines that flooring must be: • Durable enough to withstand heavy use • Safe underfoot, with appropriate slip resistance

• •

Easy to clean and maintain Suitable for the specific function of each space

Importantly, the guidance reinforces that there is no one-size-fits-all solution. Instead, different areas within a school require different flooring types, each selected based on how the space is used. Gerflor – Enquiry 21

Whitgift School, London

COVER EVERY INCH OF THE HALL. It’s...Where Champions Play. Taraflex® is the most widely specified indoor sports surface in the world. Its’ unique construction and technical performance is unrivalled, it has been fitted at every Olympic Games since 1976. Taraflex® delivers optimum safety and comfort for all users, and is widely recognised and installed in the education sectors. Over 8 million pupils everyday enjoy the benefits of Taraflex® sports flooring. Did you know that Gerflor also have other flooring solutions for any education and leisure facility, including Safety Flooring, Linoleum, Carpets & Rubber Tiles? Best sellers are in stock now for fast delivery.

CONTACT US FOR FURTHER INFORMATION +44 (0) 1625 428 922 contractuk@gerflor.com www.gerflor.co.uk

Enquiry 22

29


Education & Student Accommodation

Altro delivers vibrant and inclusive learning environment A package of Altro flooring has been used to transform learning spaces and create a welcoming and inclusive environment at a diverse educational site in Hull.

W

inifred Holtby Academy and Tweendykes School share a big, lively campus that brings together mainstream classes, breakout spaces, and areas designed for students with special educational needs.

corridors reduced noise transference in echoey spaces. Altro Illustra was fitted on stairs for slip resistance.

versatile, hard-wearing safety floor for general purpose areas. The phased replacement programme covered an estimated 2,000sqm footprint, ensuring minimal impact on staff and students while transforming the learning environment. All works were carried out during school holidays to minimise disruption.

A collaborative approach between installer Hull Flooring, Altro and the school resulted in a range of high-quality flooring solutions tailored to each area’s needs.

Award-winning Altro Wood Comfort is great in noisy environments providing 14dB noise reduction plus comfort underfoot. Stylish, functional and design-led Altro Illustra safety flooring has enhanced sustained slip resistance, making it great for busy areas.

Altro Wood Comfort, Altro Orchestra, and Altro Walkway were used to enhance corridors and the atrium with natural style and safety, while Altro Wood Comfort in

Altro Orchestra provides 15dB sound reduction and comfort underfoot in a wide range of colours and five designs. Award-winning Altro Walkway 20 is a

Modumax mk4 boilers installed at university

Attention to detail sees successful AVCL installation

Hamworthy Heating has supplied its latest range of Modumax mk4 floor standing boilers to the University of Huddersfield, as part of an ongoing investment in improving efficiency and sustainability.

Sean Dawson, Managing Director of the Hull Flooring Co Ltd, said: “The school was really pleased that the project was installed on time and provided the look and feel they wanted.” Altro – Enquiry 23

The 7500m2 roof of a new Passivhaus-standard school in the Highlands, north of Inverness, was successfully integrated into the airtight building fabric thanks to the specialist contractor’s attention to detail working with Proctor Group’s Profoil 861 membrane. MetalTech Group’s roofing and cladding division had the responsibility of installing the roof at the new £72 million Tain Campus.

The chosen system includes a two stack configuration with a total output of 294 kW for the Queen Street plantroom, together with a three stack of 762 kW serving the Laura Annie Willson building. “By making full use of the available space, we were able to achieve a total output of 762 kW within a compact footprint, which is often difficult to achieve in commercial applications”, explains Bob Smith, Hamworthy Heating. Hamworthy Heating – Enquiry 24

A critical part of the installation was the detailing needed to achieve an airtight seal between the external wall construction and the roof ’s air and vapour control layer (AVCL). Proctor Group’s Wraptite® air barrier featured in the offsite- manufactured external wall panels, but that was undertaken separately to the roofing contract. However, MetalTech Group installed the aluminium cladding. Profoil 861 is a heavyweight, reinforced AVCL. Its aluminium foil core makes it highly resistant to water vapour, and is protected on both faces by polyethylene for corrosive situations such as chlorine in swimming pools. Proctor Group attended the project at an early stage and provided a site observation report. They looked at the airtightness of some of the external and internal corner details, and assessed the compatibility of some of the non-Proctor Group tapes used. A. Proctor Group – Enquiry 25

30

To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card


Doors, Windows, Entrance Systems & Rooflights

New Best Practice Guide unveiled to boost safety The Door & Hardware Federation (DHF) has published a new best practice guide for its members on BS 8214:2026, helping industry professionals understand the key changes introduced by the latest edition of the standard. DHF is highlighting the importance of understanding the latest requirements surrounding fire resisting and smoke control doors.

DHF DHF

of fire doors, with all work supported by appropriate evidence and record keeping, and relevant information provided to the client in accordance with current legislation.

P

ublished by BSI in March 2026, BS 8214:2026 replaces BS 8214:2016 and is a significant revision to the standard. While the previous edition focused on timber door assemblies, the new standard has widened its scope to cover fire resisting and smoke control doors across a range of construction types, including timber, steel, aluminium and composite doors. The changes reflect the importance of taking a holistic approach to fire door performance, with the standard emphasising that a fire door must be considered as a complete system, rather than simply a door leaf. The performance of the door depends on the compatibility of its components, as well as correct installation, inspection, maintenance

“The introduction of BS 8214:2026 is an important development for everyone involved with fire resisting and smoke control doors,” explains DHF’s Senior Training and Compliance Officer, Steve Hill. “Our new Best Practice Guide is intended to help DHF members understand the changes and ensure that the right processes are followed when specifying, installing, inspecting and maintaining fire doors.” and appropriate repairs throughout its service life. DHF’s new Best Practice Guide provides members with an overview of the revised standard and highlights key considerations for those involved throughout the life cycle of a fire door. The objective of BS 8214:2026 is to ensure that fire resisting and smoke control doors of all materials perform as intended throughout their service life. The guidance highlights the importance of working to a specification provided by a source with overall responsibility for the building, ensuring that all other requirements are taken into account. It also stresses the need to ensure the competency of everyone involved in the installation, inspection and maintenance

A fundamental principle of BS 8214:2026 is that a fire door should be considered as a complete system rather than simply a door leaf. Its performance relies on the compatibility of its components, together with correct installation, regular maintenance and suitable repairs. With Fire Door Safety Week highlighting the vital role that fire doors play in protecting life and property, DHF is encouraging members involved in fire door activities to familiarise themselves with the new standard and review their existing procedures, particularly around specification, installation, inspection, maintenance and supporting documentation. >>

31


Doors, Windows, Entrance Systems & Rooflights

Build to meet climate change For those of us not fortunate enough to have air conditioning, the past few weeks of high temperatures have made even the simplest of activities – such as sleeping – a challenge. Alex Hill, Managing Director at Whitecode Consulting asks what can the construction industry do to combat these rising temperatures through building design?

ADSA

“The prevention of overheating requires a passive cooling and ‘fabric first’ approach, whether that’s the limiting of solar gain through external shading and optimal window sizing, adhering to the aforementioned Part O regulations, or enhancing natural crossventilation for secure night-purging and daytime cooling,” he explained. “Modern homes are typically heavily insulated and incredibly airtight to retain winter heat, meaning west- and south-facing windows receiving excessive sunlight can quickly make these properties uncomfortable for occupants. >> Do not stand still in downturn Businesses that continue to invest in innovation, people and market visibility during periods of economic uncertainty will emerge stronger than those that retreat, according to the Automatic Door Suppliers Association (ADSA). As organisations across the construction supply chain continue to navigate inflationary pressures, delayed investment decisions, skills shortages and evolving regulatory requirements, ADSA is encouraging the entrance systems sector to view challenging market conditions as an opportunity to innovate, strengthen customer relationships and prepare for future growth. In a new thought leadership feature, ‘Growing Through Downturn – Leadership, Innovation and Opportunity in Challenging Markets’, ADSA Managing Director Ken Price explores how manufacturers, installers and suppliers can build resilience by focusing on long-term strategy rather than short-term pressures. The feature examines a number of key themes shaping the sector, including the shift from selling products to delivering integrated solutions, the importance of investing in organisational culture and professional competence, and how customer insight can drive product development and innovation. Ken Price said: "Growth doesn't stop during difficult periods. It simply requires a different approach. The businesses that emerge strongest are often those that continue to invest, adapt and focus on delivering genuine value to customers." The article challenges businesses to resist the temptation to reduce marketing activity during periods of economic uncertainty, arguing that maintaining

32

Whitecode Consulting

visibility, demonstrating expertise and providing industry leadership become even more important when customers are more selective and competition for projects intensifies. Ken added: "One of the biggest mistakes organisations can make is disappearing from view when conditions become more difficult. Visibility creates confidence. Confidence creates opportunity.” The discussion will continue in an upcoming episode of ADSA's Tech Talk podcast, where Ken will be joined by a panel of industry leaders to explore the opportunities and challenges facing the entrance systems sector, sharing practical insight into how businesses can build resilience and drive sustainable growth in an uncertain market.

External shading, such as vertical louvres, folding awnings or shutters should therefore be incorporated into the building design to block solar radiation before it is able to strike the glass. Furthermore, architects and designers should look to utilise brise-soleils or deep eaves and ensure glazing limits comply with Approved Document O. “With average temperatures rising across the UK, allowing hot air to escape and cooler air to enter domestic properties is paramount – especially at night. Wherever possible, building layouts should be oriented to capture prevailing winds, with windows positioned on opposite sides of rooms to enable a breeze to pass through. For ground-floor properties, lockable grilles, window shutters or secure restrictors should be incorporated into the design to enable windows to be left safely open overnight without security risks.”

To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card


Scan to find out more

Scan to find out more

Others make products, we make it personal. Manufacturing our globally trusted daylight and ventilation solutions for industrial, commercial and public buildings is only part of our strength. The other is our people. Whose unwavering dedication, personal service and support to our customers guarantees that every product specified, manufactured and installed will deliver lasting benefits and high performance for years to come.

National Survey Service: Our bespoke survey software ensures precise results and costs

Products available from stock or custom-made with quick lead times

In-house technical support team providing guidance off and on site veluxcommercial.co.uk

Enquiry 26

sales@veluxcommercial.co.uk

+44 1670 354157


Doors, Windows, Entrance Systems & Rooflights

Senior and ASSA ABLOY join forces with two new commercial door lock systems Senior Architectural Systems has further strengthened its relationship with ASSA ABLOY with the introduction of two new lock options for its SPD150 aluminium commercial door, both tested to PAS 24:2022+A1:2024, to deliver a more secure, versatile and seamlessly integrated solution for demanding commercial environments.

T

he move marks a significant step forward in the ongoing collaboration between the two brands following ASSA ABLOY’s acquisition of Senior in 2025, bringing together proven expertise in aluminium door system performance and access control innovation. Since its introduction in 2025, Senior’s SPD150 aluminium commercial door has quickly established itself as a durable, high-performance solution for demanding commercial projects. The integration of ASSA ABLOY’s ES8100 V Lock to create the SPDVL locking system is set to build on this reliable performance even further by delivering a fully integrated and concealed access control solution which not only strengthens security but also improves design flexibility and operational functionality. The new SPDVL locking system has been designed to integrate entirely within the door and framing system to provide a dual action, non rebated, high usage door solution suitable for both single and double door applications. A key advantage of this approach is that the locking system does not encroach on the clear opening

34

width, ensuring maximum accessibility and compliance in high-traffic environments. The concealed nature of the system also delivers a cleaner architectural finish. Senior has also developed a new option for projects that feature its SPD150 commercial door as an outward opening single door by incorporating the power of ASSA ABLOY’S 281 Series Direct Pull Electromagnetic Lock to create the new SPDML locking system. Featuring two high holding force magnetic locks housed within a specially engineered dual maglock slam post, the SPDML locking system is compatible with all standard Senior thermal framing mullions, helping reduce the need for bespoke detailing and supporting consistent installation across multiple door sets. To maintain the required holding force of the magnetic locks, Senior can supply handed mounting plates, along with guidance to ensure the correct version is selected for the door handing on each project. This helps minimise installation errors and ensures the locking system performs as intended. As the slam post extends across the internal door stile and the standard push location becomes

partially obstructed, Senior has also introduced the SPWMF18 push plate, providing a clear and accessible surface for applying opening force. The push plate can be supplied in any colour to meet individual project requirements. The introduction of these new lock options reflects the growing alignment between Senior and ASSA ABLOY as the two companies continue to combine their strengths in aluminium fenestration and access control technology. By integrating ASSA ABLOY’s proven locking systems directly into the SPD150 door and wider façade interfaces, Senior is expanding the capability of its commercial door range and offering customers a more coordinated, secure and installation friendly solution for high traffic environments. For further information, to request the updated manuals, or to discuss project requirements, please visit www.seniorarchitectural.co.uk or search for Senior Architectural Systems on LinkedIn, Instagram and Facebook. Senior Architectural Systems – Enquiry 27

To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card


Doors, Windows, Entrance Systems & Rooflights

Flexible interiors start with the doors A well-designed interior should feel effortless to use. Yet a single door swing can influence where furniture sits, how people move and whether adjoining rooms can work comfortably together. For architects, developers and designers, the door deserves a place in the conversation while the layout is still taking shape.

P

ocket doors offer a practical way to introduce that flexibility. Sliding into a concealed wall pocket, they remove the swing arc of a hinged door and allow spaces to be connected or divided as needed. A kitchen and dining room can open up for entertaining, while a study can be closed off during the working day. For developers, this creates an opportunity to improve how a layout functions within the available footprint. For designers, it offers greater freedom to arrange furniture and maintain clear sightlines. The benefit is especially tangible where several doorways meet or floor space is limited. Start with the wall Successful specification begins with the space around the opening. Consider the required clear passage, the overall frame dimensions, finished wall thickness and finished floor level. Allow room for the pocket and coordinate switches, sockets and other services before the partition design is finalised. These decisions help the door become an integral part of the scheme. The desired finish also matters. ECLISSE Classic pocket door systems suit interiors with visible jambs and architraves, while the Syntesis Flush Collection offers an architrave-free approach for a more continuous wall finish.

Glass options can maintain a visual connection and allow light to pass between adjoining spaces when the door is closed. Define what privacy means Visual separation and acoustic privacy are different requirements. Where reducing sound transfer is part of the brief, specify a system designed for that purpose and review the complete assembly. The ECLISSE Classic Acoustic Pocket Door System combines a dedicated acoustic door panel with magnetic closure and perimeter sealing components. Its performance depends on the specified components and correct installation; it should be assessed alongside the surrounding partition and the project's acoustic requirements.

Think beyond the finished photograph Long-term usability deserves the same attention as appearance. ECLISSE's extractable pocket door track allows removal without breaking into the wall, providing access should it be needed. At ECLISSE, we help specifiers explore the options with technical information, CAD drawings, BIM objects and NBS specifications. Involving the team early helps align the chosen system with the layout, finish and performance brief. A door is used every day. Considering it early can make a lasting difference to how the whole space works. Discover more at www.eclisse.co.uk. ECLISSE – Enquiry 28

35


Doors, Windows, Entrance Systems & Rooflights

Supporting SAP assessments at design stage Colin Wells, Head of Technical at Keylite Roof Windows (Keylite), discusses how closer collaboration between manufacturers and SAP assessors can bridge the gap between product design and compliance.

K

eylite understand that SAP assessors face challenges in balancing increasing energy performance requirements with complex design and technical variables, especially when products are not designed with energy assessments in mind. One of the biggest challenges is the heavy reliance on standardised, verified data to calculate a home’s energy performance. When manufacturers fail to design and test products with SAP frameworks in mind, gaps in the required technical data can occur.

Assessors can spend considerable time gathering the correct data, which can significantly delay the overall housebuilding process, particularly if the same problem affects multiple plots on a development.

the insulated upstand, ModuLite is designed to minimise cold bridging between the frame and roof structure, providing a single Psi value for the installation junction to help account for heat loss at this point.

Traditional apex dormers present significant challenges for SAP assessments due to the need for detailed geometric, thermal and regulatory calculations.

The system offers SAP assessors four Psi junctions totalling 6.5 linear metres (based on Keylite 06 sized roof windows). This is a 74 per cent reduction in linear junction length compared with traditional dormers. With one overall U-value of 1.27 W/m2K (for a 04 sized roof window) and 1.26 W/m2K (for a 06 sized roof window) along with an 8 per cent reduction in thermal bridging compared to standard GRP dormers, ModuLite can deliver a 2-2.5 per cent improvement in assessments.

Where a standard roof window has four linear junctions to consider, a dormer window has multiple, more complex junctions, each with its own linear thermal transmittance (Psi) value. These must be accurately assessed to account for potential thermal bridging. If dormer footprints exceed 20 per cent of the roof room’s total floor area, assessors must model the dormer separately. Should the assessor not have the precise certified technical data from the manufacturer, they may need to use government default values, making compliance much more challenging. Keylite’s ModuLite system is designed to operate as a standardised, single-source component, incorporating a highly insulated timber upstand rather than a complex multielement build. ModuLite is treated as a single proprietary component and allows Keylite to provide pre-calculated, certified U-values for complete configurations. Along with Keylite’s patented Integrated Expanding Thermal Collar as standard on every roof window, and

36

ModuLite’s benefits can give housebuilders greater flexibility when optimising the wider building specification. SAP assessors can increase design air pressure from 4 to 4.5 and relax floor U-values from 0.11 to 0.14, potentially saving developers £5 per m2. Ultimately, by designing products with the SAP assessment process in mind, manufacturers can streamline assessments and help accelerate the overall housebuilding process. To learn more about Keylite’s ModuLite system visit www.keyliteroofwindows.com/modulite. Keylite Roof Windows – Enquiry 29


Doors, Windows, Entrance Systems & Rooflights

FUHR supports Jack Aluminium heritage door development Carl F Groupco has supported a successful PAS 24 security test for Jack Aluminium’s new SD70 heritage door system, working closely with the Jack Aluminium technical team and FUHR to provide a multipoint locking solution tailored to the requirements of the system.

T

he collaboration brought together Carl F Groupco’s role as a key FUHR distributor, technical support provided by FUHR and Jack Aluminium’s system design knowledge. The aim was to ensure the hardware met the performance, functionality and security requirements needed for successful testing. The project centred on the integration of FUHR’s multisafe 856 lever-operated door lock, featuring four mushroom rollers with hardened steel cams. Its lever-operation functionality allows the option of standard or heritage style lever handles. The 65mm backset door lock features serrations to allow for shootbolt extensions for taller doors or added security.

Solarlux launches Avario glazed extension range Solarlux has launched Avario, a new range of glazed extensions designed to create light-filled living spaces for year-round use.

Due to the specific design of the SD70 heritage door system, the locking solution needed to work behind the floating mullion. Early-stage prototyping was therefore used to confirm fit, operation and suitability within the door system before moving into final sampling and testing. Matt Brown, Regional Sales Manager at Carl F Groupco, worked closely with Paul Balfe, Business Development Manager at FUHR, to develop prototype keeps and underplates using 3D printed parts. These samples

allowed the teams to check fit and function quickly to validate the concept before moving into final stage sampling and testing. FUHR supplied the gearing, product samples, fit-and-function support and 3D modelling files, allowing the hardware to be accurately demonstrated within the system. FUHR – Enquiry 30

Opening the door to better energy performance As the next phase of the Future Homes and Buildings Standards approaches, TORMAX is urging architects, specifiers and building owners to consider the contribution entrance systems can make to the energy performance of commercial buildings.

Available in three configurations – Avario Smart, Pro and Cube – the range combines flexible opening options, co-ordinated architectural detailing and high levels of thermal insulation. Last month's launch coincided with the opening of Solarlux’s new UK showroom in Welwyn Garden City, where architects, designers and homeowners can experience the systems first-hand. Designed and manufactured in Germany, Avario is now available through Solarlux’s specialist UK partner network.

Amendments to England’s Building Regulations put energy efficiency and reducing greenhouse gas emissions firmly at the centre of building design. Published in March 2026, the changes supporting the Future Homes and Buildings Standards include a revised Approved Document L for buildings other than dwellings, due to come into effect from 24th March 2027 for relevant nonhigher-risk building work.

Solarlux – Enquiry 31

While the regulations do not specifically require energy-efficient automatic doors, the direction of travel is clear: building performance is increasingly considered as a whole, with designers and building owners paying closer attention to how individual elements contribute to energy use and carbon emissions. “As the industry prepares for the next stage of the Building Regulations, it’s worth looking beyond the major building systems and considering the performance of elements that interact with them,” says Simon Roberts, MD at TORMAX UK. “The way an entrance is designed, controlled and operated can have a bearing on how effectively the building maintains its internal environment.” TORMAX – Enquiry 32

37


Glass, Glazing, Blinds, Louvres & Solar Control

Toughened glass solutions from Fire Glass

Dedicated in-house manufacturing, specialist CNC processing and nationwide supply for projects of all sizes. Our in-house manufacturing capabilities enable us to support bespoke specifications, partitioning projects, commercial fit-outs and large-scale requirements, while maintaining control over key stages of production. Toughened glass undergoes a controlled heating and rapid cooling process, creating a product approximately four to five times stronger than ordinary annealed glass of equivalent thickness. But our capabilities extend beyond toughening.

W

hen it comes to modern construction, strength, safety and versatility are essential. From commercial fit-outs and office partitions to glazed doors and architectural interiors, toughened glass plays an important role in creating functional, safe and visually appealing spaces. At Fire Glass, we understand that delivering the right glass solution requires more than product availability. It takes manufacturing expertise, specialist processing capabilities and the capacity to support projects of all sizes. That's why our dedicated in-house toughening plant is an important part of our specialist glass offering. Dedicated manufacturing. Specialist capabilities. With our own dedicated toughening plant, Fire Glass manufactures toughened safety glass for a wide range of commercial and architectural applications.

38

Using specialist CNC machinery, we can process glass to meet individual project requirements, including precision cutting, drilling, notches, cut-outs and shaped panels. Combined with polished edges and other finishing options, this allows us to manufacture bespoke glass solutions to suit a variety of applications. All cutting, drilling and shaping is completed before the toughening process. From bespoke requirements to large-scale supply Every project has different demands. A commercial office fit-out may require multiple toughened glass panels for internal partitions, while a glazing contractor may need bespoke sizes, shaped panels or specific edge finishes. Other customers require a reliable, ongoing supply of toughened glass to support manufacturing and installation schedules. With dedicated manufacturing facilities and specialist processing capabilities, Fire Glass has the flexibility and capacity to support these varied requirements.

Local service. Nationwide strength. Our manufacturing capabilities are supported by an established network of branches across the UK. With locations in the Midlands, North, South, West and Scotland, we combine in-house manufacturing expertise with responsive local customer service. This nationwide infrastructure enables customers to access specialist glass manufacturing and processing capabilities through their local Fire Glass branch, supporting both individual projects and ongoing supply requirements. Your one-stop fire and safety glass shop While Fire Glass is recognised for its firerated glazing expertise, our product range extends far beyond fire protection. As a one-stop fire and safety glass supplier, we provide fire-rated, laminated, acoustic, toughened and silvered glass, alongside specialist processing and in-house manufacturing of insulated glass units (IGUs). By bringing multiple glass solutions together, we help customers simplify their supply chain while benefiting from specialist product knowledge, manufacturing capabilities and nationwide support. Multiple glass specifications. One glass supplier. FIRE GLASS Trust the experts. We protect what matters. https://www.fireglassuk.com/toughenedglass-enquiry/ Fire Glass – Enquiry 33

To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card


FIRE-RATED, LAMINATED, ACOUSTIC, TOUGHENED & MIRRORED GLASS

STRONGER BY DESIGN

TOUGHENED GLASS

STRENGTH. SAFETY. VERSATILITY. A HIGH-PERFORMANCE SOLUTION FOR MODERN CONSTRUCTION. Manufactured in-house at our dedicated toughening plant, our toughened glass is ideal for bespoke partitioning and commercial fit-outs. With nationwide branch support, we have the capacity to support large-scale projects and meet ongoing supply requirements.

NE STOP S GLAS SHOP

ENQUIRE

Enquiry 34

#WEPROTECTWHATMATTERS

WWW.FIREGLASSUK.COM

MIDLANDS 0121 667 9089

NORTH 0161 532 8371

SOUTH 01206 805 922

EAST 0121 667 9089

WEST 01174 528 800

SCOTLAND 0131 526 4141

INSTALLATION 0121 667 9089


Glass, Glazing, Blinds, Louvres & Solar Control

PYRAN® S fire resistant safety glass There are many benefits to fire rated glass aside from the architectural possibilities and use of natural light. Fire resistant glazing can offer a clear sight of fire to assist in safe evacuation and, compartmentalization of a building into safe havens, while maximising light penetration.

I

ncorporating specialist glazing also helps to maintain superior acoustic levels and impact safety – adding another layer of protection to individuals. SCHOTT PYRAN® S fire-resistant glass is superior to conventional safety glass for several reasons. Made from borosilicate, it shows stronger resistance to a range of temperature differentials, which offers the potential for larger panes with longer fire resistance times and reduced fracturing. The impressive technical qualities of PYRAN® are at the heart of its enduring appeal. The unique application of the float process to borosilicate glass creates a far superior product to conventional sodalime glasses, offering higher softening temperatures, higher viscosity and reduced risk of fracture. Fire ratings from 30 minutes up to 120 minutes in steel systems are achievable with SCHOTT PYRAN S.

40

Life-saving light transmission PYRAN® glazing retains outstanding transparency in extreme temperatures. This can be vital in the event of a fire, when visibility is challenged, and can be a lifesaver when evacuating a building. Meanwhile, high light transmission along with excellent colour reproduction mean that security can still be combined with attractive aesthetics. The chemical composition of the base glass means that the formation of NiS crystals is not possible, eliminating spontaneous fractures and the need to heat soak test the glass.

Enduring, popular and versatile PYRAN® has been a globally trusted safety glazing product for decades, and it’s likely you will have already benefitted from its protection in many areas of everyday life. Commonly found in airports, hotels, school, museums, offices and shopping centres around the world, its versatility means it’s found in doors, roofs, facades and partitions, as well as windows. For more information, visit: www.schott.com/uk SCHOTT Technical Glass Solutions – Enquiry 35


Pyroguard expands fire-rated façade portfolio

Designed for pitched and curved canopy roofing applications, Brett Martin’s Marlon Toploc panel glazing system is a highperformance solution.

Pyroguard has launched a new range of spandrel panels, expanding its portfolio of high-performance façade glazing products and giving access to a more comprehensive firerated façade offering from a single supplier.

Engineered with installers and specifiers in mind, the product offers a streamlined installation process, alongside reliable weather resistance, helping to ensure consistent performance. The system is suitable for cold curving on-site for added design flexibility, making it a popular option for sports venues. A highly versatile architectural glazing system, Marlon Toploc features modular polycarbonate panels designed with an integrated upright connection profile and Top Cap snap on connection profile. The thermally insulating multiwall panels offer excellent performance. Brett Martin – Enquiry 36

Designed to meet the changing needs of architects, façade consultants, contractors and specialist engineers, the new range provides an A2 reaction-to-fire, non-flammable solution for applications where fully fire-resistant spandrel panels are not required. The launch gives façade designers greater flexibility, enabling them to coordinate aesthetic requirements with the necessary performance criteria.

Glass, Glazing, Blinds, Louvres & Solar Control

Raise the roof with Brett Martin

Manufactured in the UK, the spandrel panels are available as single gel-filled laminates or as DGU (double glazed units) in a ‘shadow box’ style for enhanced aesthetics. They are available in three standard colours: white, anthracite grey and black, with other RAL colours available on request. The panels can also incorporate Low-E glass technology to support improved thermal performance requirements. Pyroguard’s new spandrel solution enables contractors to retain an existing framing system used in non-fire rated areas, while achieving the required A2 reaction-to-fire performance at the spandrel. This can provide a more cost-effective solution and facilitate better integration. The spandrel panels are manufactured to align with UK fire safety requirements, including the guidance set out in Approved Document B. Pyroguard – Enquiry 37

Can’t see the wood for the trees? Let us guide you. When the options seem endless, expert guidance makes all the difference. Navigate every decision with confidence with the help of our specialist team.

Connect With An Expert + 44 (0) 1379 685 300 salesuk@glazingvision.com

Enquiry 38

41


Safety Security & Fire Protection

Unicorn Voice Delivers Emergency PA for Residential Towers Project

Global voice alarm and audio safety specialists Vox Ignis, has supplied an Enhanced Public Address (EPA) system with integrated Emergency Voice Communications (EVC), to protect the residents of seven high rise buildings at Scholes Village, Wigan.

S

choles Village is a complex of residential towers, just outside the town centre. It is the subject of an upgrade programme to improve safety, integrity and wellbeing across seven towers and 700 apartments that will hugely benefit current and future residents. The EPA/EVC system is stand-alone (not connected to the fire alarm) and fully compliant with BS EN 50849:2017 and certified to EN54-16 by UL. It allows building managers, emergency services to alert apartments, floors and stairwells in any incident with recorded or live voice in their apartments and in common areas. It also delivers secure, resilient communication between incident managers and first responders in and incident; and allows occupants to call for help when requiring evacuation assistance using a disabled refuge system. The system installed is based on Vox Ignis’ EN54-16 Unicorn Voice PAVA system that unifies public address, voice alarm, fire telephone, disabled refuge, assistance alarm and visual alarm devices together in one system for the first time. Each of the towers at Scholes Village has a distributed, redundant, fault tolerant network of one master EPA panel with integrated fist microphone, fire telephone and three distributed EPA panels. The system features Vox Ignis’ touch screen system VoxOS, that shows the visual status of the system clearly and allows quick control and programming, and programmable Unicorn Buttons that allow pre-recorded messages to be sent to selected zones at the press of a button. Each panel delivers four power and output tuned speaker circuits and eight combined

42

The Unicorn Voice system has enabled us to use the EVCS, PA and Voice Alert functions it uniquely offers, to design and economically deploy a system that meets Wigan’s precise needs. fire telephone and disabled refuge lines. Over one thousand Vox Ignis speakers are installed across the project. In addition, over 160 Vox Ignis vandal-proof Type C outstations provide combined disabled refuge and fire telephone functions in the fire-protected stairwells. Councillor Susan Gambles, cabinet portfolio holder for housing at Wigan Council: “This investment is crucial to ensure the safety and wellbeing of our tenants and underlines our commitment to working with tenants to carry out much-needed improvements. We were delighted to work with Vox Ignis and their Unicorn Voice system to install a system customised to our precise needs.” Leeds-based Elite Audio Ltd supplied and commissioned the system, with installation managed by Fieldway. Dominic Carney, sales director of Elite Audio said: “The Unicorn Voice system has enabled us to use the EVCS, PA and Voice Alert functions it uniquely offers, to design and economically deploy a system that meets Wigan’s precise needs. As with all Vox Ignis products the performance and quality of the system is best in class and the touch screen control and programming

software makes configuration and control incredibly simple.” Jeremy Kirkup sales director at Vox Ignis said: “We’re delighted to be working with Wigan on this project. The features of Unicorn Voice and our approach to energy efficiency are impressing architects, consultants and specifiers across our markets. We designed it to be a system that takes a leap forward in quality and capability that meets the requirements of the modern built environment.” Vox Ignis is a global specialist in voice alarm, emergency voice communication, and assistance call systems. Designed and manufactured in the UK and sold under the Vox Ignis and leading OEM brands worldwide, its products amplify the safety of millions of people and buildings every day. For more information, visit www.vox-ignis.com, email info@vox-ignis.com or call +44(0)191 516 6030. Image: The Scholes Village complex in Wigan, protected by a Unicorn Voice Emergency PA from Vox Ignis. Vox Ignis – Enquiry 39

To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card


CASE MANAGEMENT Manage your housing portfolio simply and efficiently

IDENTIFY MANAGE

ANALYSE RECORD

COMMUNICATE

www.aico.co.uk Enquiry 40

Scan here to find out more about Case Management


Safety Security & Fire Protection

Structural smoke downstand joint sealing for Old Oak Common Station

Old Oak Common Station is being built as the interchange for HS2 as it enters London and is the largest subsurface station ever built in the UK. The precast concrete smoke downstands are an important part of the fire engineering strategy. station platforms. The distinctive curved, interlocking roof structure is also designed to allow fresh air to circulate naturally, with the smoke downstands fully integrated into this high-level architecture, as a sealed barrier to prevent smoke from descending into the passenger concourse and platform levels.

S

moke downstands in railway buildings and infrastructure terms are generally vertical, active fire and smoke barriers, designed to prevent the spread of fire and control smoke movement to protect escape routes. They extend downward from the ceiling to create compartments that can effectively trap hot smoke and toxic gases at a high level, especially for large, open spaces like station concourses, tunnels, and atria, allowing time for safe egress and protecting against further spread of fire and smoke. At Old Oak Common Station, the smoke downstands are essential for the safety and security of this massive 850m long underground "box" structure, which will house the six new 400m high-speed

44

Need specific jointing advice? Call: 01257 266696 or Email: sales@nccinaction.co.uk


The NCC Movement Joint specialists have supported the Old Oak Common project team all the way, from initial design office evaluation

Technically, in terms of Fire Integrity and Standards, the smoke downstand barrier must comply with BS EN 12101-1:2020 Smoke and heat control systems, plus TfL Fire Engineering Standards for sub-surface environments, and provide 120 minutes of integrity, or integrity and reduced heat transfer to allow for safe escape. The optimum solution was confirmed as the advanced Emseal Emshield DFR/WFR-CE fire resistant movement joint system was selected as the optimum solution.

Emshield DFR/WFR is a CE marked system with EN1366-4, 240 mins (4-hours) fire integrity and thermal insulation certification that also: • Accommodates joint movement of +/- 50% i.e. A total movement capability of 100% • Joints that are 100% watertight and smoketight • Accommodates changes in direction in both the horizontal and vertical planes • Accommodates 3-dimensional movements including Shear, Vertical and lateral joint expansion/contraction • Excellent STC (Sound Transmission Coefficient) for acoustic barrier performance • High Thermal Insulation • No damaging mechanical fixings are required into the structure • Fast, cost-effective installation

right through to successful completion on site. NCC provided all necessary design data, CAD details and FEA (Finite Element Analysis), and assisted throughout the evaluation and testing, then practical installation training for the teams on site. There are many different applications for the Emshield DFR/WFR-CE Systems on

For more information please visit: www.nccmovementjoints.co.uk www.EmsealServices.co.uk

Safety Security & Fire Protection

As the preferred specialist fire protection contractors, Kilnbridge Fire Protection teams have been involved throughout the assessment and testing, including the production of the trial samples for fire testing, and then in the successful site installation of the Emseal Emshield systems, provided in a range of bespoke widths from 60 to 100mm.

many different horizontal and vertical joints in many different building and infrastructure projects, including high-rise and deep basement developments, multi-story car parks, tunnels, stations, airports, data centres, stadiums and arenas, as well as for secure nuclear and military facilities. NCC Movement Joints – Enquiry 41

45


Safety Security & Fire Protection

FIREFLY Span specified to help safeguard hospital expansion A £312m project for the expansion of clinical facilities and refurbishment of the A&E facilities at The Royal Shrewsbury Hospital is one of the first major construction contracts to make use of FIREFLY® Span, a high performance linear joint seal ideal for helping achieve effective compartmentation in a variety of construction settings. Complete Fire Solutions (NW) meanwhile is the Manchester based specialist sub-

contractor undertaking the installation of the one-hour intumescent fire seal across the whole element of the scheme. Site Manager Dewi Grundy, explained: “Our responsibilities on this project include executing all of the penetration seals and tasks like applying the intumescent paint protection to all of the new steels which have gone up, while I am currently also conducting a survey to see if there are any locations where we might need to install one of the FIREFLY® barrier systems. “During the survey for the protection of the various construction joints in the newly built walls, the use of Span was agreed upon and subsequently installed.” FIREFLY® Span combines flexibility of application with complete dependability, having been developed to prevent the spread of fire, smoke and even sound through construction joints in walls and floors for a full 60 minutes. TBA Protective Technologies – Enquiry 42

FastConvert upgrade transforms school’s life safety systems FastConvert, C-TEC’s ingenious conventional to addressable zone converter, has saved thousands of pounds on a school project. North Road Academy in Stoke-on-Trent, initially considered a complete replacement of its fire system. Wayne Riley, MD of W R Fire & Security, said: "We are very impressed with FastConvert - it is extremely innovative in terms of what it can do. "Against a full re-wire which would have added around £10,000 to the job or converting the remaining zones into loops, which would have cost an extra £3,000-£4,000 and a week's extra labour for two engineers, FastConvert was the clear winner.” C-TEC – Enquiry 43

Fire Block Louvre System

Fire Stopping Ventilation For Steel Doors

BS EN 1634-1:2014

40% Free air flow

VISIT US AT ZEROPLUS.CO.UK OR CALL US ON: 01785 282910

46

Enquiry 44 To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card


Fire Resistant Movement Joints No Stress with Emseal Solutions! • Fire Resistant with CE-marked 4-hour EI Fire Integrity • Watertight, Airtight, and Smoketight • Thermally and Acoustically Insulating • 100% Joint Movement Capability (+/- 50%)

Emseal Provides Unique Solutions

CE-marked, up to 4-hours EI fire integrity rated, in accordance with EN 1366-4. • ETA airtight, and smoketight, with no leaks (1200 Pa to EN 12154 and 12155). • Watertight, insulating (4-hours to EN 1366-4 / EN 10140-2), and acoustically insulating (sound • Thermally attenuation Rs.w >/= 54 to EN 10140-2 / EN 12999-1) joint movement capability to EN 1366-4 (+/- 50%), with 3-D movement, including shear & • 100% vertical, as well as expansion & contraction in joints from 12 to 100mm wide. where required, and suitable for both externally exposed and internal applications. • Trafficable potentially damaging mechanical fixings, or other invasive anchoring into the structure. • No • Quickly and easily installed with access from one side only, in new construction & refurbishment.

Major Projects Using Emseal Fire Resistant Joint Seals

Wembley Stadium

Old Oak Common Station (HS2 Interchange)

Manchester Airport

‘Watertight by Design’ with

Battersea Power Station

Olympia Redevelopment

Exclusively available from NCC Movement Joints Ltd With full technical support throughout the UK and ROI

UK/ROI: www.EmsealServices.co.uk North America: www.Emseal.com UK Office: 01257 266696

Sales@EmsealServices.co.uk

Enquiry 45

Castle Redevelopment Bristol


Safety Security & Fire Protection

Article by Luke Norcross-Evans, Product Development Executive

The Hidden dangers of Radon Most people rarely think about radon. This invisible, odourless noble gas cannot be detected without specialist equipment, yet it is estimated to cause around 1,100 deaths in the UK each year – around two-thirds of Great Britain's 2025 road deaths.

anticipated in 2027. Awaab’s Law requires social landlords to investigate and address specified hazards within defined timescales. Phase 1 focuses on damp and mould and emergency hazards. Some landlords already use environmental monitoring technologies, such as Aico’s HomeLINK, to identify higher-risk properties and intervene proactively.

G

rowing awareness and regulatory scrutiny mean housing providers face increasing pressure to manage radon.

An Invisible Killer Radon is a radioactive gas produced naturally as uranium in rocks and soil decays, particularly in areas with granite or shale. Levels vary across the country. Risk can be assessed using the UKHSA radon map or individual property tests. Radon can accumulate inside homes, particularly during winter, when heating draws air upwards from the ground and windows remain closed. Long-term exposure increases lung cancer risk. Cancer Research UK estimates around 5% of UK lung cancers are linked to radon; the risk is substantially higher for smokers. The average radon level in UK homes is around 20 Bq/m³. UKHSA sets an Action Level of 200 Bq/m³, above which remediation is recommended, and a Target Level of 100 Bq/m³ for preventative and remedial work. Remediation should also be considered between these thresholds.

48

How Housing Providers Are Managing Radon Single-use detectors are typically left in a property for three months before being sent to a certified laboratory for an average reading over the testing period. Continuous monitoring systems remain installed, providing ongoing readings, seasonal visibility and reducing repeated visits and detector use. Sensor quality matters: consumer-grade devices may not provide the accuracy, reliability or detail required for professional housing management. Where high levels are identified, landlords must reduce radon. A solution is a radon sump, which uses a fan to extract radon from beneath the building; other ventilation measures can also be used. Looking Towards Awaab’s Law Radon falls within the Radiation hazard category under the Housing Health and Safety Rating System (HHSRS) and is expected to be covered by Phase 3 of Awaab’s Law in England, currently

Although less immediately visible than damp or mould, publicly available risk data and air-quality sensors mean landlords may face growing expectations to demonstrate how they identify and manage radon. Landlords must also demonstrate that remediation has worked, traditionally by retesting with a separate detector after measures such as a radon sump are installed. The Benefits of Continuous Monitoring Continuous monitoring complements traditional testing by showing how radon levels change over time, rather than providing a single snapshot. It can help housing providers identify properties needing further investigation, support remediation decisions and provide ongoing evidence of whether interventions work. It can reduce contractor visits and support portfolio-wide management. As awareness and regulatory scrutiny increase, reliable radon data will be increasingly important. Continuous monitoring could help landlords move from periodic testing towards more informed, proactive management. For more information, visit www.aico.co.uk. Aico – Enquiry 46

To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card


Independently BBA Certified for Safe and Reliable Structural Roof Deck Construction

BBA CERTIFIED FOR STRUCTURAL ROOF DECKS

OTHER ROOFING APPLICATIONS

Multi-Purpose Sheathing | Bitumen Felt | Capping Recovery & Protection Board | Liquid Waterproofing Lead & Hard Metals | Single Layer Membranes | Sarking

FOR MORE INFORMATION VISIT

magply.co.uk

+44 (0) 1621 776 252

Enquiry 47

sales@magply.co.uk


Safety Security & Fire Protection

Unlocking new potential in OEM solutions With advances in high-performance design hardware, smart security, and a recent industry focus on safety, manufacturers have an opportunity to elevate their offerings and set industry benchmarks for quality and expectations.

T

hanks to key industry voices and the Building Safety Act with its resulting standards and frameworks, the built environment is beginning to evolve. Because of this gradual change and shifting expectations, OEM partnerships are becoming more important than ever. The sharing of expertise, technical collaboration and the supply of solutions that deliver genuine, longterm commercial value are needed more than ever to unlock future success. Barry Halpin, Commercial Director – OEM Solutions at Allegion UK, said: “OEM partnerships are becoming much more about technical collaboration and shared knowledge. Today’s OEM customers want strategic partners who supply more than just hardware. They want partners who support their success through trusted technical insight, flexible collaboration, and uncompromised quality.” As the industry rightly continues to shift toward complete traceability and accountability with the ‘Golden Thread’ of information, OEMs should partner with trusted hardware specialists who provide integrated, third-party test evidence and support.

Marmox on display at London Build 2026 Expo Insulation specialist, Marmox, will be displaying its range of products at London Build 2026 Expo at Excel on 25th and 26th November including flying the flag for a new Fireproof and sound absorbing product. The show involving some 350 exhibitors will be attended this year by an estimated 30,000 visitors. Marmox’s Marketing Manager, Grant Terry, commented: “The team on our stand will be there to show the extensive range and including for the first time our new 100mm x 600mm x 1200mm Multiboard. Despite a temporary lull in new house starts, there is still plenty of activity in the UK construction industry.” Marmox – Enquiry 49

Barry continued: “As industry standards are raised, this offers huge opportunities for our partners, because when an OEM can show clear product integrity, backed by full testing and transparent traceability, it raises their profile and the value of their offering from the perspective of specifiers and contractors.

“That’s why, at Allegion UK, we empower our partners with the technical expertise and certified solutions they need to lead the market, secure contracts, and build lasting customer trust.” Allegion – Enquiry 48

FIREFLY on display at London Build 2026 Expo At London Build 2026 Expo at Excel on 25th and 26th November, on Booth D99, TBA will display its flexible fire barrier systems such as Zeus and Titan Lite which provide compartmentation in commercial, industrial and other buildings across the country and has been steadily adding to the functionality and versatility of its passive fire protection range. Specialist fire contractors and other past customers will though, have recognised some of the primary materials used. The new FIREFLY® FB180 Raised Access Floor System, for instance makes extensive use of the company’s fully proven ablative batts to provide up to 240 minutes protection against the spread of flames within computer floors or even infrastructure projects like tunnels. Then up above, the lightweight Apollo Lite 30:30 has been repurposed to enhance compartmentation and smoke control across suspended ceilings. A wall showing the use of the recently launched Firefly VapourSafe® Membrane is a product which is specifically designed with modular and offsite construction in mind. Its lightweight, durable composition makes it easy to handle in factory conditions, while its Class A2-s1,d0 fire classification ensures compliance is built in to every panel before arriving onsite. TBA Protective Technologies – Enquiry 50

50

To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card


As heat networks continue to evolve, achieving long-term performance depends on more than efficient heat generation. The design and integration of the Heat Interface Unit (HIU) can have a major influence on return temperatures, commissioning and overall network efficiency. Using the Springfield Village development in Southwest London as a real-world case study, the CPD explores how HIU design decisions can influence the performance of an entire district heat network.

The session covers HIU performance at the interface, changing industry expectations, design challenges, commissioning and the role of performance data. It also explores how SATK32 Indirect and SATK22 Direct HIUs were used across the development, alongside MODBUS connectivity and technical support. Want to strengthen your understanding of HIU specification and heat network performance?

o help consultants, specifiers and engineers understand these challenges, Altecnic has launched a new CIBSEapproved CPD, Designing the HIU Interface for Heat Network Performance, available free through the Altecnic Academy.

Serving more than 1,200 homes alongside healthcare facilities, supported living accommodation and refurbished Grade II listed buildings, Springfield Village demonstrates the importance of selecting the right HIU approach for different building types and system requirements.

Boiler cascade delivers reliable heating

Nuaire and Monodraught strengthen relations

Three Evomax 2 commercial condensing boilers from Ideal Commercial Heating have been installed at Littlecote House Hotel in Berkshire, providing a modern, energyefficient heating solution for one of England’s most historic country house hotels.

Nuaire and Monodraught are strengthening their relationship as ventilation specialists within the Genuit Group with the launch of EC-Link, a new integration module - a single intelligent control and monitoring platform.

T

Engineering specialist J&B Hopkins selected three Evomax 2 120kW wall-mounted commercial condensing boilers operating in cascade, delivering a total output of 360kW to serve the historic section of the hotel. The boilers were installed on an Ideal Commercial Heating low-height frame and header kit, complete with preformed insulation kits and a low loss header. Evomax 2 combines high efficiency with flexible installation options. Ideal Commercial – Enquiry 52

Heating & Ventilation

Altecnic launches new CPD: Designing the HIU Interface for Heat Network Performance

Join the Altecnic Academy and complete the CPD free of charge. Altecnic – Enquiry 51

Developed initially with the education sector in mind, EC-Link provides the bridge between Nuaire’s EcoSmart Classic controls platform and Monodraught’s Acuity central monitoring and control system. It enables Nuaire and Monodraught ventilation equipment to be controlled and monitored as part of a coordinated, whole-building ventilation solution, giving customers live performance data such as runtime information, fault detection and energy monitoring, for greater visibility of how ventilation equipment is operating. Nuaire – Enquiry 53

Vectaire protects wet rooms The new MFCF100 Constant Flow fan, easy to fit in wall, ceiling, or window (using optional window kit), is an effective way of managing condensation. This dMEV delivers continuous, low-level ventilation, with an integral sensor which responds to changes in system pressure to ensure the selected airflow rate is maintained. Six trickle settings allow the correct airflow to be set for all applications, while the boost speed can be triggered for additional ventilation. They are IPX4 rated (SELV versions also available), and are available with timer and/or humidistat. Vectaire – Enquiry 54

51


News & Developments

New specifier’s guide to selecting pipework systems for heat networks GF Building Flow Solutions, a leading manufacturer of piping systems for hot and cold-water supply and heating and cooling, announces the launch of its new white paper, The specifier’s guide to selecting pipework systems for heat networks.

T

he paper provides an in-depth look at the decisions that shape the long-term performance, reliability and efficiency of modern heat networks. As the UK accelerates its transition to lowcarbon heating, heat networks play a critical role. Pipework is fundamental to the optimal performance of a heat network. Decisions on pipe sizing, insulation, carrier pipe materials, hydraulic design, installation and water quality can all affect system reliability, maintenance requirements, operating costs and the overall lifespan of the network. Sam Barker, Head of Commercial at GF, notes: "Heat networks will be central to the UK's net zero ambitions, and the industry needs to get the fundamentals right if the schemes are to

deliver on their promise. We are committed to sharing our expertise, supporting the sector with the knowledge needed to build efficient, reliable networks.Investing in the right pipework at the outset is essential to delivering efficient, reliable, cost effective and genuinely low-carbon heat networks." The guide brings together GF’s experience along with the CIBSE Code of Practice CP1, Heat Network Technical Standard, TS1 and the Heat Network Technical Assurance Scheme to provide a useful reference to experienced professionals and those new to the industry. Register to download your free copy today visit https://www.uponor.com/en-gb/ services/specifiers-guide-to-heat-networks George Fischer – Enquiry 55

Franke UK unveils Mythos 2gether

John Guest unites trusted plumbing and heating ranges

Franke UK has launched the premium Mythos 2gether Slide hob extractor with a patented automatic vent opening.

RWC is bringing its trusted plumbing and heating ranges together under the John Guest brand across the UK and EMEA.

The product, designed and manufactured by Franke together with its Air Expert Faber, sits at the pinnacle of Franke’s hob extractor portfolio. It is one of six new models being launched this year by Franke, offering retailers more design opportunities to integrate architectural presence and powerful extraction into contemporary living spaces. Winner of the prestigious Red Dot Design Award 2026, the Mythos 2gether Slide has been created for homeowners looking to achieve a clean, contemporary kitchen without compromising on performance. Franke UK – Enquiry 56

The move brings a broader range of solutions for domestic and commercial plumbing and heating applications under one trusted name, providing clearer access to products, technical information and support across the portfolio. As the portfolio has grown, customers may know individual ranges such as Speedfit, SharkBite, Underfloor, Reliance and MDPE Compression without always seeing the full breadth of solutions available across different jobs and applications. Bringing these solutions together under the John Guest brand responds to feedback from installers, specifiers, merchants and retailers, creating a more connected offer across the wider portfolio. Mike Riseley, RWC UK & Ireland Sales Director, said: “Our customers are increasingly working across complex projects and changing industry requirements. John Guest is already recognised for quality and trusted for engineering-led solutions, but as our offer has grown, we have an opportunity to make the full range of solutions easier to understand and access. Bringing our trusted ranges together under one John Guest brand makes that broader offer clearer, while customers can continue to rely on the products, support and expertise they know and trust.” John Guest – Enquiry 57

52

To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card


Roof Maker is celebrating a double shortlisting at the Build It Awards 2026, with two of its latest innovations recognised in the Best Cladding or Roofing Product category. As the market's first hinged-opening roof lantern, the Hinged Slimline® introduces a new approach to overhead ventilation. Its distinctive 40-degree roof angle and ultra-slim glazing profiles create an elegant architectural feature while maximising daylight and uninterrupted sky views.

L

aunched in 2026, the Hinged Slimline® Roof Lantern and Luxlite® Plus demonstrate the company's commitment to combining contemporary design, advanced engineering and practical functionality. Both products offer innovative solutions for bringing natural light and ventilation into modern homes.

Building on the awardwinning Luxlite® design, Luxlite® Plus brings a fully opening solution to pitched roofs with frameless internal aesthetics and impressive functionality. Powered by heavy-duty 3000N 24V DC push-rod actuators, the rooflight opens to almost 90 degrees, providing extensive ventilation and convenient roof access.

Proctor Air preserves heritage of traditional roof Modern ‘breathable’ membranes allow moisture vapour to pass out of the roof space. As an air permeable and low resistance (APLR) underlay, Proctor Air® also allows air to pass through it, ensuring air movement in the roof at the same time. Air movement is essential for preventing potential condensation risk in roof structures, but usually requires ventilation products to be installed at the eaves and/or ridge. This is a problem on heritage projects and listed buildings, as modern ventilation products risk spoiling the traditional appearance. Built in 1869, St Peter and St Paul Church is a valuable heritage asset to the village of Bessbrook, south Armagh. Extensive restoration work was carried out in the 1950s, but a condition report in 2017 revealed the building required major conservation works. To maintain the traditional appearance of the building and its roof finish, architects Consarc Conservation specified a roof build-up that included Proctor Air. Air permeability is particularly useful on a project like St Peter and St Paul Church, where insulation improvements were also made to the roof. New insulation can be installed in the roof to be as effective as possible, without worrying about whether it is blocking eaves vents.

News & Developments

Roof Maker celebrates double shortlisting at awards

Its wall-mounted remote control allows homeowners to adjust the opening effortlessly. Triple glazing comes as standard, with Ugvalues as low as 0.5 W/m²K. A thermally broken aluminium frame further helps minimise heat loss. Suitable for roof pitches between 16 and 75 degrees, Luxlite® Plus features a fully welded aluminium apron and integrated flashing for effective water management. Available in portrait and landscape configurations, it accommodates various roofing materials and architectural requirements. Both products feature Roof Maker's factorymanufactured Insulated Glass Units, backed by a market-leading 20-year unit seal warranty and an expected lifespan of up to 30 years. Roof Maker – Enquiry 58

Kingspan Insulated Panels and Eurobond achieve CCPI Assessment Mark Kingspan Insulated Panels and Euroclad Group are proud to share that five product sets have received the CCPI Mark, helping to provide specifiers and end users with greater confidence that the product information supplied is clear, accurate, accessible, up-to-date and unambiguous. The product sets include the Multideck range and Steel Frame System (SFS), and the Eurobond mineral fibre wall panel range (Europanel, Rockspan, Rainspan and Firemaster) Rockspan Roof & Firemaster Ceiling. The CCPI (Code for Construction Product Information) was established to help raise standards and increase trust in construction product information and marketing practices. Kingspan Insulated Panels – Enquiry 60

Overall, Proctor Air has made it possible to blend tradition and performance in the same roof restoration, supporting the conservation of heritage while making sure that St Peter and St Paul Church can serve its community for many more years. A. Proctor Group – Enquiry 59

53


Roofing, Cladding & Insulation

Cottage transformed into energy-efficient home An 18th century Grade II listed cottage in Cumbria has been transformed from an uninsulated, damp, draughty stone building into a comfortable, energyefficient home while carefully preserving its historic character through the use of natural building materials supplied by Ecological Building Systems.

F

rom an early stage, architect Bob O’Neil, Architect and Owner of O’Neil Architecture, worked closely with Ecological Building Systems and contractors Inca Construction to ensure the systems and materials specified would preserve its historic character, while improving comfort and energy performance. Ecological Building Systems recommended a system that combined breathable insulation materials with airtightness layers to manage uncontrolled air leakage without sealing the building in a way that would trap moisture.

To achieve this, an intelligent airtight vapour control membrane, Pro Clima Intello Plus, was selected because of its variable vapour resistance. This allows the membrane to respond to seasonal changes in humidity. For example, in winter it helps to prevent moisture from entering the building structure, while in warmer conditions it becomes more vapour open, allowing trapped moisture to safely disperse. Neil Turner, UK Technical Manager from Ecological Building Systems, said: “Our systems are widely specified for traditional solid wall homes that need to be upgraded to meet the latest Building Regulations requirements whilst allowing the property to breathe. “Our natural insulation and airtightness solutions were ideally suited to this project and are testament to just what can be achieved with a carefully planned renovation.”

ROCKWOOL Wall Systems achieves 50year life expectancy ROCKWOOL Wall Systems has announced that four selected stone wool external wall insulation render systems now have a 50-year assessed life expectancy under new Kiwa certification. Available for registered projects, the certification gives architects, specifiers, contractors and building owners additional evidence to support long-term façade decisions. For projects requiring a system life expectancy beyond the 30-year benchmark, these selected systems offer a 50-year assessed life expectancy—an additional 20 years, or a 66.7% increase. It covers masonry and direct-fix steel frame systems incorporating stone wool insulation with HECK 4S Silicone Render or A1 Mineral Render finishes.

Pro Clima Tescon Vana, a flexible airtightness tape, was used in combination with Pro Clima Intello membrane to seal overlaps and connections. Ecological Building Systems – Enquiry 61

Harmer Aluminium Roof Outlets: Trusted Solutions for Flat Roof Drainage Flat roof drainage is commonly project-specific, with different roof constructions, waterproofing systems, building designs, balconies and terraces, all requiring individually tailored solutions. Harmer Aluminium Roof Outlets from Alumasc have been developed to meet these varied requirements, across commercial, residential and public sector construction. Designed for use with in-situ concrete, timber and lightweight metal deck roof structures, the Harmer aluminium range is compatible with warm, cold and inverted roof constructions. The outlets connect to continuous waterproofing systems including single ply membranes, highperformance built-up felt, mastic asphalt, hot melt and liquidapplied, allowing consistency of drainage across a wide range of roofing applications.

ROCKWOOL Wall Systems – Enquiry 62

Harmer Aluminium Roof Outlets also support modern high-rise construction. An aluminium threaded spigot adaptor option provides an A1 fire-rated connection between threaded aluminium roof outlets and a wide variety of Alumasc aluminium downpipes and other systems. This creates a fully compatible non-combustible drainage solution, compliant with current fire safety requirements for high-rise construction, and also eliminates the need for mechanical joints within the concrete slab. Harmer Roof Outlets and Alumasc aluminium downpipes are both BBA approved powder coated, making the system A2-s1, d0 fire-rated. Products are A1 fire-rated if not painted. Alumasc Water Management Solutions – Enquiry 63

54

To make an enquiry – Go online: www.enquire2.com or post our: Free Reader Enquiry Card


Saint-Gobain Weber has launched its Tiling Heroes: a carefully selected lineup of must-have products designed to support tilers and contractors at every stage of their project, from preparation and protection through to fixing, grouting and finishing.

Floors & Walls

Heroes for every tiling mission

D

ifferent substrates, tile types, environments and project programmes all place different demands on an installation. Whether its accommodating movement, preparing difficult substrates, ensuring wet areas are fully waterproofed or completing jobs with tight timelines, selecting the right products is an important part of achieving a successful result and optimum finish. Weber’s technical team has identified the six premium products that will help professionals choose the right solution for whichever project challenge they face so that the installation process can run as smoothly and efficiently as possible. The Tiling Heroes range includes: a readymixed under-tile waterproofing system, webersys protect; a self-smoothing levelling compound, weberfloor flex; a standard set adhesive, weberset SPF; a strong adhesive for larger and heavier tiles, weberset plus; a rapid-set adhesive, weberset rapid

SPF; and flexible wall and floor tile grout, weberjoint premium. These products can be combined, depending on the particular project requirements, to create a complete tiling system. Caroline Rowley, business development director at Saint-Gobain Exterior Solutions, said: “At Weber, we appreciate that tilers

and contractors encounter a wide range of substrates, tile types and installation environments on a daily basis. In many cases, they’re not walking on to a simple installation project so feeling confident that the products they have on hand are ready for anything is of vital importance.” Saint-Gobain Weber – Enquiry 64

Setcrete 2K Pro serves up perfect subfloor finish

For when busy spaces need to be quiet

Setcrete 2K Pro floor levelling compound has served up the perfect subfloor surface for the installation of J2 Flooring LVT planks in a residential extension project.

Acoustic sheet vinyl flooring from IVC Commercial reduces noise and delivers durability for a wide range of commercial projects.

The builder also recommended that Setcrete Rapid Set DPM (damp proof membrane) was applied to the entire 65 m2 floor area to safeguard against potential subfloor moisture rising to the surface, where it could then attack water-based adhesive used to adhere LVT planks to the subfloor. Setcrete Rapid Set DPM is a two-part, solvent-free epoxy resin that is applied as a single coat and cures to a glossy black finish in around three hours. Setcrete – Enquiry 65

Get creative with Beauflor Transform any space into a canvas of imagination with Beauflor CREATE, which lets the floor become a showpiece of creativity. Through the Beauflor CREATE programme, Beauflor’s digital print technology can bring any design to the surface of high-quality sheet vinyl flooring. Unlike analogue printing that relies on fixed cylinders, digital printing lets Beauflor reproduce any visual down to the smallest detail with high-definition precision, giving full control over the look of the floor. The flexibility of Beauflor CREATE not only lets projects run wild with creative possibilities, but it also means a low minimum order quantity.

When your project needs a durable floor that can also deal with noise, IVC Commercial delivers. Reducing impact sound by up to 19dB and suitable for heavy traffic areas, these floors are ideal for use in education, healthcare, retail, hospitality and leisure, offices and more. For the busiest of spaces, Optimise 70 and Pionieer 70 feature a 0.7mm wear layer for exceptional durability. They come with an easy to maintain, stain and scuff resistant top layer that ensures they stay looking good for longer. IVC Commercial – Enquiry 67

Beauflor – Enquiry 66

55


Enquiry 68

For landscapes designed and engineered as one It’s got to be Marshalls

marshalls.co.uk


Turn static files into dynamic content formats.

Create a flipbook