No. 10 - 2013
Q-STAR ENERGY
page 1-7
Q-STAR Stars
page 8
Q-STAR Energy Denmark Stormgade 99 • DK-6700 Esbjerg Tel.: + 45 75 45 63 22 Mail: q-star@q-star.dk
Q-STAR Energy NorWAY Nøstetorget 5 • N-5011 Bergen Tel.: + 47 55 31 20 22 Mail: q-star@q-star.dk The two owners, Henrik Hansen and Niels Orla Rasmussen
Oil, gas and wind represent three strong business areas NEW EMPLOYMENTS for Q-STAR ENERGY A/S Q-STAR ENERGY Poland ul. Gdañska 27 • 85-005 Bydgoszcz Tel.: +48 52 321 40 10 Mail: aw@q-star.pl
www.q-star.COM
tain Denmark’s actual position as an oil-producing country. Thus we think that the oil and gas sector will continue to have great potential for many years to come, and being a company in the energy sector, we will of course aim to While oil and gas can be considered as develop proportionally to the challeng”old” energy types, wind energy may es and tasks in this sector. well be considered as a ”new” energy In virtue of our position as a company type, which is still in strong progress. However, this does not indicate that oil with ISO, OHSAS, NORSOK and and gas are headed off the market – it Achilles certifications, we have been is, on the contrary, important to main- able to benefit considerably from our Energy has now been Q-STAR ENERGY’s line of business for 20 years, and during the past four years wind energy has become a natural part hereof.
Mette Frandsen Personnel and projects, Wind
experience from the oil and gas sector and bring many of our strengths in this area into play in the wind industry. The wind industry is an extremely interesting line of business, and we put a lot of effort into securing a leading position in this market. Therefore, we intend to spend the resources required to achieve a position among the most important players in the wind industry, and we look forward to competing nationally as well as internationally in this market.
Q-STAR ENERGY A/S co-operates with DAT in the air Q-STAR ENERGY makes frequent use of the pattern of travel offered by DAT.
Aleksandra Rybarska HR assistant, Poland
Since our start-up 20 years ago, DAT has been one of our most important business partners as regards the flying of staff to the western part of Norway. It will be interesting to see, which new routes the future may bring. Q-STAR ENERGY in co-operation with DAT
Safety and quality
Safety in the Norwegian sector Safety in the We have recently been certified ac- These certifications contribute to Danish sector
Niels Orla Rasmussen
Q-STAR ENERGY focus on customer satisfaction After 20 years in the oil and energy sector we are today certified in accordance with ISO 9001 and OHSAS 18001 as well as NORSOK S006, category lV, which has resulted in a fundamentally great emphasis on the significance of HMS work and the importance of education and precision during our daily routines. This appears to be an increasing trend according to our customer satisfaction surveys.
cording to NORSOK S-006, category lV, which is a Norwegian standard that describes the methodology for evaluation and follow-up of the supplier’s HMS control systems. The NORSOK S-006, category lV, certification means that Q-STAR ENERGY A/S is now certified/approved in the following areas: • ISO 9001:2008, Quality Management System • OHSAS 18001:2008, Occupational Health and Safety Zone with a crowned smiley • NORSOK S-006, category lV, HMS working environment management system • Achilles JQS Qualification
qualifying us a supplier to existing In the Danish offshore sector and future clients and ensuring that we live up to their demands and ex- the safety work has continued with emphasis on the Incidentpectations. The Norwegian focus points throughout the year have been: •A lways and at any time secure yourself during height work •A lways secure tools and equipment when working at heights •A lways use the correct protective devices •A lways prevent or stop unsafe activity •A lways remember that an unsafe second may result in accidents
Free campaign based on five safety obligations: I recognise that we are all vulnerable
I intervene, if I observe unsafe actions or conditions
I work with a valid work permit, when necessary
With a background in good values and routines, Q-STAR ENERGY is currently able to match any task within our specialty both onshore and offshore.
I assess risks before and after the execution of the work
The year of 2013 was characterized by a relatively high level of activity that will increase in 2014. Thanks to our good and loyal employees, Q-STAR ENERGY will be ready to deal with future tasks.
I take responsibility for my/my colleagues’ safety and health
Niels Orla Rasmussen, Managing director
Teddy Hansen on the deck of Piranema
Resources department In the resources department we cooperate closely with our personnel and project managers from various departments. Our goal is to find qualified employees for the individual projects in the company. In all the cases, where it is possible to transfer our own personnel from one project to another, this will be prioritised.
Special assign- Focus on core ment in Brazil values in re-
We are also involved in an untraditional job in Brazil on a cylindrical, floating platform named Piranema. Due to the generation of wastewater, when oil is extracted from the underground, this wastewater has to be purified in accordance with new environmental protection standards. Therefore, one of our electricians, Teddy Hansen, has been sent off to install cables and connect a water purification plant. Teddy assists O & J Energy, which is part of a project based on building a small water purification unit in Esbjerg and transporting it to the rig by ship. Teddy started at the end of October and he describes the experience as very positive – a lot of cables and cable trays are conducted and installed, the weather is good (30-35 degrees) and there is a lot of meat on the menu. It is, however, difficult to communicate with the local people. Luckily, there are also a couple of Norwegian workers, who are much easier to talk with.
cruitment cases
During recruitments and interviews the resources department endeavours to communicate the right information about safety and behaviour and to inculcate the company’s core values into each employee.
An increased Meet your collevel of activity league before requires a close departure co-operation In case of large projects the redepartment has attempted with the inter- sources to gather both new and long-standing ested parties employees before departure in order
In expectation of an increased level to introduce and identify experienced of activity in the oil, gas and wind in- and newly started employees with a dustry in the next few years, the re- possible need of start-up assistance. sources department has spent much time on informing job centres, trade unions etc. in Denmark about professional requirements as well as personal skills, so that both job-seekers and job centres are prepared to train appropriate people for future jobs in our line of business. Job fair in Odense
Further education on the schedule
Course participants in a helicopter simulator.
2
Our skilled employees are aware that further education is a continuous issue. Our clients demand that we highlight further education of staff. This message is also conveyed to newly appointed employees and relevant applicants.
NORWAY Onshore Kårstø
Activity in various plants During 2013 we have carried out some maintenance work and modifications of Statoil’s Kårstø plant, where the work was performed by staff from our Danish as well as our Polish division. Also this time we provided scaffolders and surface and insulation workers to carry out the annual maintenance projects at a methanol plant in Tjeldbergodden.
Tjeldbergodden
Last summer some Q-STAR ENERGY staff formed part of the regular daily operation at Stord. The staff was attached to the transport department and mainly took care of rig and crane work. Last but not least we provided surface workers and scaffolders for Kollsnes and Sture.
NORWAY Offshore Oseberg Feltsenter
Setup project at Oseberg Feltsenter and HAP at Ekofisk
The first quarter of 2013 included a large setup project at Oseberg Feltsenter, where our employees were responsible for the setup of dwelling and living rooms. During the summer we were engaged in the high activity period (HAP) at Ekofisk, where approx. 100 employees carried out various jobs. Additionally, we have continuously been stationed at Statfjord A, B and C as well
Ekofisk
as Kvitebjørn until November plus several other installations both in the south and in the north. At the end of the year the demand was concentrated on our insulators for various installations. We prepare for progress in 2014 and expect to get jobs at Snorre A at the end of 2013 during a HAP period of 7-8 months. Furthermore, we have been notified of 5-6 more HAP-periods in the Norwegian sector in 2014.
Q-STAR ENERGY Poland
The plant in Kårstø
Polish teams in Norway in 2013 In 2013 employees from Q-STAR ENERGY POLAND participated in various exciting onshore projects in Norway. For these projects we provided staff specializing in surface treatment, Chartek, metallisation etc. At the AKER Kvaerner shipyard in Verdal our Polish painters continued the work from 2012. The work consisted of abrasive blasting and metallisation of
approx. 60,000 m2 platform frames, internal platform positioners and various tanks. Concurrently, we also performed blasting and metallisation of windmill flanges and bolts. The project took place during a period from June 2012 to September 2013. Approx. 30 employees from Q-STAR ENERGY POLAND took part in the project under the guidance of
two foremen from Q-STAR ENERGY, Denmark. Furthermore, we provided a strong metallisation team to carry out rust proofing in two projects: Clair Ridge (maker of grid structures for buildings/ building tower trusses) and NSO Wind Project (builder of towers for wind farms).
3
Aleksandra Rybarska in the office in Bydgoszcz
New employee in Bydgoszcz Since April 2013 our new HR assistant Aleksandra Rybarska has been employed in our Polish division in Bydgoszcz. It is her job to recruit new employees and update the staff database. There is no doubt that Aleksandra enjoys working with people, as she always appears smiling at work.
Q-STAR ENERGY 1993 Q-STAR A/S FORMATIOMNPHAOSFIS ON DANISH
- MAIN E AGEMENT AND PROJECT MANOFFSHORE INDUSTRY NORWEGIAN NS IN NORWAY WITH DIVISIO. AND DENMARK
1999
Q-STAR A/S MOVES INTO THE OFFICES IN STORMGADE 99, ESBJERG.
ACHILLES CERTIFICATI O
ear
urs/y 100.000 ho
1993
1997
2003
1999
2002
2003
N.
200
1997/98
TURN-KEY CONTRACTOR OF THE GLASS CONTRA S - ACCOMPLISHMENT GANGWAYS IN GARDAM CT FOR ALL 32 PASSENGER OEN AIRPORT IN OSLO . 200.000 ho
urs/year
ISING OF MASTS 70 KM HIGH VOLTAGE - RA. INSTALLATION OF IN THE SUNDSRØLL AREAAND FOR APPROX. TELEPHONY AND BROADBROMSÅS, OSLO. 2000 APARTMENTS IN
02ER A/S 20 TAR MANPOW
TRACT N Q-S O C T S R I F OBTAINS THEISH SECTOR FROM IN THE DAN AINTENANCE OF MÆRSK (M LATFORMS). OFFSHORE P
/year
hours 300.000 4
200
ISO 9001 CERTIFICATI
TIMELINE 1993-2013
005
05
ION.
2009AT THE
SALES TARGETED BOTH WIND INDUSTRY FSHORE. ONSHORE AND OF A SPECIALTY ROPE ACCESS AS ECTOR. IN THE DANISH S /year 400.000 hours
2012
ESTABLISHED IN DANIS AS WELL AS FOREIGN H ONSHORE WIND INSTALLATION PROJECT S. 600.000 hours
/year
FORGERS/ AS A SPE WELDERS THE DANIS CIALTY IN H SECTOR .
2009
2010
2012
2010
Valid m nt Syste
fy to certi This is
FORMATION OF THE INDEPENDE COMPANY Q-ST NT ENERGY POLAND AR .
Manageme that the
from
6.28
2013.0 Valid
until
6.28
2016.0
A/S ENERGY Q-STARade 99 Stormg00 Esbjerg DK-67 Vat no.
of
2013
fied DS certi
since
6.28
2013.0
ents in
08
fulfils
152876
irem the requ
NORSOK
IV 03 kat
S-006:20
cate
Certifi 012025
e d certificat - og Win of the Oil-, Gas ple for nt Peo Comptery in Norway Indust is
e The scop
2013
500.000 ho
Falkdirector Nielsging
urs/year
Mana
A/S ficering DS Certi j 6 d KollegieveCharlottenlun DK 2920 ark Denm
to be idered correcte is cons to the certificat with regard t of the ish text case of doub in The Engl binding lation legally the trans ness of
of 2 Page 1
NORSOK CERTIFICATI O 700.000
5
N.
hours/ye ar
AIM: 900.000 hours/ YEAR
2014
DANISH SECTOR
Atlantic Labrador remains at Tyra East
Tyra East
As regards the existing accommodation platforms, Atlantic Labrador will remain at Tyra East until 2015, after which it will be relocated temporarily to Dan B for a period of six months. On December 1st. 2013 Atlantic Amsterdam is relocated
A year with many projects and few bunk beds
from Tyra West 2013 to Dan F for a period of two years. We expect that everything will go according to plans and look forward to sending off even more skilled Q-STAR ENERGY employees to work in the Danish sector in 2014.
Our welders are off to a good start
modations are expected to be ready on the accommodation ship Seafox 5 that is scheduled to arrive at Tyra South East at the beginning of January 2014 for a period of three months and then relocated to Tyra West until the end of 2015. Furthermore, Projects have queued up during the year, Gorm will presumably be equipped with for which reason 2014 and 2015 will most a new accommodation rig around April likely be very busy. The first new accom- 2014 for a period of two years. After a prolonged ”grounding” period the Superpuma helicopters were airborne again in August. Thus the helicopter schedule is working again with the capacity to shuttle between the platforms.
At the moment some of our forgers are doing TIG smo welding certification, but normally electrode and TIG black welding is in demand. With the arrival of Seafox in January 2014, we also expect to provide more forgers for offshore work in Denmark. We now have forgers with hot work permits for robotic welding, and they have subse-
quently worked with robotic pipe welding in connection with the bridge reinforcement of Tyra West. Till now the project has progressed very positively, for which our men deserve a lot of credit. We intend to provide forgers for other types of work. We have already sent off the first welder and anticipate feedback with excitement.
Wind Cabling during a project in Kopsa, Finland
Installation of shell towers in the northern part of Finland Kopsa Wind Farm is situated south of Oulu in the northern part of Finland and consists of seven 144 m Siemens 3.0DD wind turbines. Shell towers are a relatively new installation method for wind turbines, which supersedes the traditional pipe tower. One of the advantages of shell towers is the fact that the tower itself does not require any special transport, as all parts are delivered separately and assembled
Shell tower installation
Onshore wind installation project at Haiger in Germany Haiger Wind Farm in Germany was one of Q-STAR ENERGY’s first onshore wind installation projects outside Denmark. 15 of our technicians assisted during the installation of five Siemens
2.3DD wind turbines. This was our first project with a shell tower installation. The weather was a great challenge for both machines and technicians due to several days of fog and heavy snow.
marketing & EXHIBITIONS
on site. Another detail is the possibility of obtaining wider foundations and larger hub heights. However, the installation of shell towers requires a good deal of extra workers on site, and at its peak more than 50 employees from Q-STAR ENERGY were linked to the project. In addition to the installation, our fitters carried out the cabling and the mechanical finishing and assisted during the commissioning and 500-hour-service of the wind turbines.
Henrik Sauer and Carl Philip Østergaard at approx. 65 metres altitude
Photo shoot at 65 meters altitude
OTD fair in Stavanger
TFZ safety conference in Esbjerg
Hi13 - Wind Energy
OTD fair in Stavanger
Esbjerg Energy Day
OWIB in Esbjerg Musikhus
6
In connection with a marketing project three of our rope access workers were introduced to the flexibility of working in a rope on windmill blades at 65 metres altitude. The project also gave Mette and Maja from the office the chance to try their strength in mill climbing.
Maja at the top of the mill
SUPERIOR, STAR, GOLD AND SILVER DIPLOMAS TO Q-STAR ENERGY EMPLOYEES
Simon Broberg Grønvold, 5.000 hours
Henrik Sauer, 5.000 hours
25.000 timer
Jan Kristensen, 10.000 hours
Laurits Larsen, 10.000 hours
Lorenz Fisher, 10.000 hours
Marian Krzewinski, 20.000 hours
25.000 timer
Børge Heiden, 25.000 hours
Torben Hansen, 25.000 hours
5.000 hours
Simon Broberg Grønvold
Poul Henning Nørskov
Thomas Gottfredsen
Jan Hammild
Henrik Larsen
Just Løkke
Kenneth Werner Jensen
Bo Madsen
Michael Petersen
Jesper Høegh Gjættermann
Henrik Sauer
Roland Sass Juliussen
René Krøjberg Andersen
Jacob Søren Ejrnæs
Poul Svendsen
Rudi Bo Larsen
Tonny Karlsen
Peter F. B. Andresen
Jon Dahl Andersen
Thomas E. Jensen
Morten Clausen
Jørgen Michael Pedersen
Claus Falsig Nielsen
Brian Dannerfjord
Torben Uhre Madsen
Bent Christian Jensen
Christian Lykke Mortensen
10.000 hours
Jimmi Jessen
Terji Larsen
Kim Mørch Koust
15.000 hours
Carsten Hendriksen
Michael Hansen
Laurits Larsen
Joe Poulsen
Bjarne Damberg
Kenneth Holm
Torben Torbensen
Peter Mejer
Martin Thinnesen
Sten Rysholt Pedersen
20.000 hours
Behnam Jalili
Kenneth Svensson
Erling Petersen
Marian Krzewinski
Ole Jakobsen
Peter Badsberg
Lorenz Fischer
Kim Møller
Tommy Jørgensen
Carl Ejner Kaj Larsen
25.000 hours
Thomas Lysholm Christensen
Tom Christensen
Morten Vestergård Pedersen
Børge Heiden
Peter Pajhede
Villy Andersen
Karsten Lund
Torben Hansen
Hans Peter Svendsen
Allan Lykkebøe Stapelfeld
Poul Svendsen
Jan Brink Lorenzen
7
Q-STAR ENERGY SUPPORTS SPIRITED CLUBS
Shark mini floorball
Esbjerg Tennisklub, 1. hold damer
Sponsorship, Esbjerg Skøjteklub
Team Danmark Oldboys
Four sponsorships, Esbjerg Svømmeklub
Sponsorship, Klub Tarp
Sponsorship, Maria Toft
Sponsorship, Esbjerg Ishockey Klub
Sponsorship, tennis tournament
Sponsor of Esbjerg Tennisklub
Sponsor of EFB
Medarbejder ativiteter
Sent in by Lars Strøm
Sent in by Nicki V. Sørensen.
Photo competition - two winners
20TH ANNIVERSARY
Sponsorship, Henrik Østergaard
Pia Nielsen's 20th anniversary
West Coast Run 2013
Esbjerg “Vestkystløbet”
The local race Vestkystløbet 2013 broke all In 2013 our employees sent in a lot of good photos from their individual workplaces, and we managed to arrange two records with the participation of fully 100 photo competitions. In the first competition the winner of a dinner for two was Lars Strøm, while Nicki Vangsgaard signed up runners. It is always a pleasure to meet employees and their families. Sørensen was the winner of the second competition. 8