COMMERCIAL
THE TRUEBECK PLEDGE
Build with a genuine passion + seek possibilities. Pioneer ideas that improve industry practices & elevate standards. Work to give the best possible service, quality & value, while making the journey fun and memorable. TRUEBECK CONSTRUCTION
RAISE THE BAR.
ABOUT US
CORE VALUES
Truebeck is a general contractor defined by safety,
Courageously, make ideas reality.
quality, partnership, and values. Founded by Sean
Project success. Every time. No excuses.
Truesdale and David Becker in 2007, Truebeck
If it’s not the best, it simply won’t do.
quickly established a reputation for excellence
We win as a team, and high-five a lot.
through a commitment to best-in-class service,
Don’t do what’s easy, do what’s right. And hustle.
innovation, and high performance.
Business and life are all about people.
EMPLOYEE COUNT
ANNUAL REVENUE
600+ $800M
“
Truebeck has always exhibited integrity, reliability, and fairness. The quality of their work, attention to detail and commitment to excellence is visible daily.
OFFICE LOCATIONS
SEATTLE PORTLAND
YEARS IN OPERATION
19
MARKET SECTORS
Civic/Community
SACRAMENTO
Commercial Education Healthcare
SAN FRANCISCO
Housing
SAN MATEO
Life Science
Aaron Holm, Trammell Crow Company
Interiors Mass Timber Mission Critical Mixed-use
SERVICES
ALTERNATIVE DELIVERY METHODS /// CONSTRUCTION TECHNOLOGY + INNOVATION /// CONSTRUCTION MANAGEMENT /// DESIGN-BUILD /// INTEGRATED PROJECT DELIVERY /// MEP EXPERTISE /// PRECONSTRUCTION /// QUALITY CONTROL /// SAFETY MANAGEMENT /// SELF-PERFORM /// SUSTAINABLE CONSTRUCTION NOTABLE FIRM AWARDS
[left to right] Best Places to Work San Francisco Business Times (2013, 2014, 2017-2026) /// Top 100 Contractors ENR ///
California Voluntary Protection Program (Cal/VPP) Designation Cal/OSHA /// Top 100 Contractors ENR ///
Excellence in Innovation Procore Groundbreaker Awards 2022 // IIDA Award winner for multiple projects
QUALIFICATIONS + EXPERIENCE
Apple, Inc. Apple Park Campus CUPER TINO, C A
PROJECT DESCRIPTION
SIZE
Work included several concurrent projects, including:
1,130,000sf (Buildings); 779,000sf (Parking Garage); 176 acres (Sitework)
»
»
»
615,000sf Tantau Corporate Office Campus: state-of-the-art high-performance office and R&D facilities, and 16-acre sitework redevelopment. 240,000sf Visitor Center: three-story subterranean parking garage with an above grade visitor center, including exhibition space. 175,000sf Steve Jobs Theater: 1,000- seat theater including structural glass and a carbon-fiber roof structure spanning 150 feet.
»
100,000sf Wellness & Fitness Center: fitness studios, training areas, and wellness center.
»
779,000sf Parking Structure: five-story, 1,740-stall podium parking structure with below grade level.
»
176-acre Sitework: outdoor dining, 24,000 new trees/bushes; water features, new underground utility infrastructure, and an 8,000sf transit center.
TRUEBECK CONSTRUCTION
CONSTRUCTION COST
$1.5 billion PROJECT ARCHITECT
Foster + Partners KEY FEATURES / AWARDS + CERTIFICATIONS
Net-zero energy; LEED Platinum
QUALIFICATIONS + EXPERIENCE
Meta MPK 22 Office Building & Parking Garage MENLO PAR K , C A
PROJECT DESCRIPTION
SIZE
Built to prioritize community connection, employee collaboration, and modern environmental sustainability, MPK 22 consists of a 457,000sf fourstory office building and 570,000sf eight-story, 1,750-stall parking garage with one level partially below grade, and includes design-build MEP and exterior glass systems. The LEED Platinum project includes collaborative office space, conference areas, four full-service cafeterias and serveries, and integrated rooftop park. Additional features include a 700-foot long expansive central atrium serving as the structural heart of the office, maximizing natural light and integrating various interior floor plans; interconnected sky bridges; and elevated foundations to account for long-term sea-level rise.
457,000sf (Office); 570,000sf (Parking Garage)
Sitework, landscaping, and utility infrastructure work was incorporated in phases. The project also includes a public park, offsite work, and the abatement and demolition of five existing buildings. TRUEBECK CONSTRUCTION
CONSTRUCTION COST
$600 million PROJECT ARCHITECT
Gehry Partners KEY FEATURES / AWARDS + CERTIFICATIONS
World-renowned architect; LEED Platinum; Lean delivery; Expansive rooftop park system
QUALIFICATIONS + EXPERIENCE
Uber Mission Bay Corporate Campus Headquarters SAN FR ANCISCO, C A
PROJECT DESCRIPTION
SIZE
New global headquarters for Uber consists of 12-story and seven-story buildings connected by two glass-enclosed sky bridges. The steel and concrete structure project was delivered using design-assist MEP and facade systems. The exterior facade systems feature unique, one-of-a-kind systems comprised of glass, metal, and wood assemblies. The project includes a green roof with an urban farm component and extensive courtyard landscaping. Truebeck also completed the 415,000sf high-end office interiors build-out, including 2,000+ work stations, executive spaces, assembly and communal spaces, full cafeteria on 2nd floor of 1515 building, child care facility with exterior play yard in 1455 building, extensive A/V throughout, and signature “Commons” space–a multi-story, glass-enclosed network of atriums and open staircases. Achieved LEED Gold and WELL Silver, which is the leading tool for advancing health and well-being in buildings globally and improves health and human experience through design.
450,000sf
TRUEBECK CONSTRUCTION
CONSTRUCTION COST
$561 million PROJECT ARCHITECT
SHoP Architects (Core & Shell); RMW Architecture & Interiors (Interiors) KEY FEATURES / AWARDS + CERTIFICATIONS
LEED Gold; WELL Silver; Illuminating Engineering Society Illumination Merit Award; Interior Design Best of Year Tech Office Award; Cal/OSHA California Voluntary Protection Program (Cal/VPP) Designation; Self-perform concrete; Design-assist MEP and facade
QUALIFICATIONS + EXPERIENCE
County of San Mateo 500 County Center (COB3) R EDWOOD CIT Y, C A
PROJECT DESCRIPTION
SIZE
The new San Mateo County Government Center headquarters will stand as a testament to environmental stewardship and provide benefits for generations. The iconic structure will be the first Net Zero Energy, LEED Platinum, mass timber civic building in the nation. Configured in an H-shape, the five-story structure consists of a mass timber, glulam, and CLT deck structure. The building incorporates two generous public plazas, flexible office space, a gym, café, multi-purpose rooms, and board chambers for the San Mateo County Board of Supervisors.
208,000sf (Building); 368,000sf (Parking Structure)
The interior features exposed wood, while the facade complements with copper anodized aluminum panels alongside sizable glass segments, inviting natural light throughout the building. COB3 will utilize the power produced by solar arrays on the seven-story parking structure. The parking structure includes 1,200 stalls, 124 EV chargers, and will meet the needs of COB3 and other facilities in the County Government Center. TRUEBECK CONSTRUCTION
CONSTRUCTION COST
$235 million PROJECT ARCHITECT
Skidmore Owings & Merrill (Building) Watry Design (Parking Structure) KEY FEATURES / AWARDS + CERTIFICATIONS
LEED Platinum; Net Zero Energy; Mass timber; Cross-laminated timber; Design-build; Silicon Valley Business Journal 2024 Structures Award for Public/ Civic Project; ENR California 2024 Regional Best Projects for Best Government/Public Building; ENR California Best Projects for Excellence in Sustainability; Self-performed concrete; Self-performed crosslaminated timber
QUALIFICATIONS + EXPERIENCE
Second Harvest of Silicon Valley Food Distribution Facility SAN JOSE , C A
PROJECT DESCRIPTION
SIZE
Second Harvest of Silicon Valley is committed to doing whatever it takes to end hunger in our community. That means distributing nutritious food to nearly every neighborhood in Silicon Valley. This newly expanded state-of-the-art facility supports their ongoing effort to serve food and grocery products to nearly 500,000 people every month in the community with food-sorting areas, freezer/refrigeration/ambient storage facilities with CO2 refrigeration, a clean room for dry food packaging and distribution, and events and volunteer mixed-use space. Project features also include offices, secured lobby, 20 loading docks, and parking for over 450 vehicles. This facility will be used to receive, store, process, and distribute food throughout the Bay Area for communities in need. Project included archaeological resources for monitoring remains encountered in soil.
280,000sf
TRUEBECK CONSTRUCTION
CONSTRUCTION COST
Confidential per Client PROJECT ARCHITECT
Leo A. Daly KEY FEATURES / AWARDS + CERTIFICATIONS
Self-performed concrete: completed six major concrete pours, all delivering flatness results that greatly exceed industry standards–initial pour achieved a flatness (FF) score of 87, which falls within the “super flat” category.
QUALIFICATIONS + EXPERIENCE
MDY Properties Thirty75 Tech Office Development SANTA CL AR A , C A
PROJECT DESCRIPTION
SIZE
Located near the intersection of Scott Boulevard & San Tomas expressway, the office development provides approximately 224,000sf of first-class office space on six levels. Included with the office tower will be structured and below-grade parking totaling 308,000sf for approximately 800 cars, including 40+ electric vehicle stations. An outdoor plaza area will be located between the 140,000sf parking garage and northern wing of the office building. The office tower development will help anchor all business in the general area into a unified corporate center. The development consists of two new building structures. The primary building is an office facility occupying the north and east portions of the site. The office facility is six stories and is arranged as two wings. The project intends to advance a green “Miesian” approach to design, which is both minimalistic and modern, while exceeding all sustainability standards.
224,000sf (Building); 308,000sf (Parking)
TRUEBECK CONSTRUCTION
CONSTRUCTION COST
$130 million PROJECT ARCHITECT
Verse Design Los Angeles
QUALIFICATIONS + EXPERIENCE
Shorenstein Market Square Campus SAN FR ANCISCO, C A
PROJECT DESCRIPTION
SIZE
Symbolizing San Francisco’s unique synergy of history and high tech, Market Square comprises two buildings and spans an entire block in the city’s Mid-Market area. The renovations transform two former retail warehouses into a thriving urban mixed-use campus and Class-A creative office space. Deemed an “urban game changer” by Architectural Record, this former home to X’s (formerly Twitter) headquarters includes over 70,000sf of retail space. Because of the location and historic nature of the Market Square block, special attention was required for the coordination of phasing, scheduling, and site logistics to ensure continuity of work and that there was no disruption to the adjacent businesses. This, in addition to the project’s location on a tight, congested, downtown site, were challenges the project team conquered in order to deliver this stateof-the-art facility. The project achieved LEED Gold and 1TENth was awarded ENR Best Project.
1,360,000sf
TRUEBECK CONSTRUCTION
CONSTRUCTION COST
$122 million PROJECT ARCHITECT
RMW Architecture & Interiors KEY FEATURES / AWARDS + CERTIFICATIONS
LEED Gold; ENR Best Project
QUALIFICATIONS + EXPERIENCE
Sand Hill Property Company Folded Wings Stanford Research Park at 3223 Hanover + JPMorgan Chase Build-out PALO ALTO, C A
PROJECT DESCRIPTION
SIZE
This state-of-the-art Class A office and R&D campus includes abatement and demolition of two existing buildings and soil remediation for excavation. Phased construction includes a 120,000sf two-story building and 80,000sf two-story building above a 75,000sf two-level, 360-stall underground parking garage. This LEED Gold campus includes a park-like setting with low impact on the environment, while also producing significant operating cost savings. With a large central courtyard, extensive balconies, and decks, the project reflects the evolution of the modern office environment to achieve greater employee productivity and retention.
200,000sf (Buildings); 110,000sf (Interiors); 75,000sf (Parking Garage)
The new 110,000sf financial technology headquarters build-out for JPMC houses over 1,000 employees. The new space creates an innovation hub featuring a modern workplace design with amenities that matter most to employees and state-of-the-art technology to increase collaboration.
INTERIOS BUILD- OUT
TRUEBECK CONSTRUCTION
CONSTRUCTION COST
$115 million PROJECT ARCHITECT
Form4 Architecture (Buildings & Parking Garage) and RMW Architecture & Interiors (Interiors) KEY FEATURES / AWARDS + CERTIFICATIONS
LEED Gold; Design-build MEPF; Silicon Valley Business Journal Structures Award for Architecture
QUALIFICATIONS + EXPERIENCE
Lane Partners 520 Almanor Office Building & Parking Structure SUNN Y VALE , C A
PROJECT DESCRIPTION
SIZE
New four-story warm shell office building designed to accommodate Class A office space for Nokia, including 16’ clear-height ceilings on the ground floor and 14’ clear-height ceilings on upper floors. The LEED Gold project includes a seven-level, 600-stall concrete parking structure with five levels above grade and two below, with 4,000sf of retail space on the ground floor. Comprehensive sitework includes 7,000sf of outdoor terrace space.
230,000sf
TRUEBECK CONSTRUCTION
CONSTRUCTION COST
$100 million PROJECT ARCHITECT
Korth Sunseri Hagey KEY FEATURES / AWARDS + CERTIFICATIONS
LEED Gold
QUALIFICATIONS + EXPERIENCE
The Sobrato Organization One Harrison SAN FR ANCISCO, C A
PROJECT DESCRIPTION
SIZE
Located on the waterfront, tenants will enjoy unparalleled water and bridge views, expansive ceiling heights, and indoor/outdoor connectivity at One Harrison. This historic renovation project includes a complete seismic retrofit, new expansive roof deck and balconies, new MEP systems throughout, new dedicated lobby with customized security, and elevator upgrades. The building, which was originally constructed in 1918, includes an exclusive parking garage and secured lot with 140+ stalls. The project also consists of the careful removal of several structural columns to improve the efficiency of the large floor plates.
200,000sf
TRUEBECK CONSTRUCTION
CONSTRUCTION COST
$25 million PROJECT ARCHITECT
Studios Architecture KEY FEATURES / AWARDS + CERTIFICATIONS
Historic renovation; Seismic retrofit
QUALIFICATIONS + EXPERIENCE
Portland Sacramento San Francisco San Mateo Seattle
MARKET SEC TOR