Customer Russvik Kraft AS Year 2021 Total power 7.431 kW Machine sets 1 Pelton, 1 Francis
Scope of Delivery Troyer was commissioned by Nordkraft AS to build the “Nedre Russvik” and “Øvre Russvik” hydropower plant in December 2019. The delivery includes the installation and commissioning of the electromechanical equipment, the control system and the visualization system. Troyer has also been responsible for the mounting that was executed in cooperation with Bilfinger Norwasy AS. Both installations are located along the Russvik river, approximate 10 km east of Kjøpsvik in Narvik municipality and were put in operation in September 2021. In October 2021 the plants were transferred to Småkraft AS.
The importance of precision The plants are located in an isolated area with no overland communications. The material was delivered exclusively by sea: the production (located in Italy) and logistic transport have been efficiently organized.