Skip to main content

EN - Troyer - Image

Page 1

EN

Reliability beyond tomorrow.


RELIABILITY.


Thinking of the future – from today beyond tomorrow “Reliability beyond tomorrow”. Using this guiding principle, our company has specialised in the building of water turbines and power plants whose high levels of reliability and quality ensure they will endure beyond tomorrow. Our aim is not just to fulfil the requirements placed on us, but to continually set international benchmarks with technically outstanding products. The knowledge and experience of 80 years of power plant construction, with over 390 references and more than 400 MW of installed capacity are the best guarantors for our role as a technological pioneer. For us, innovation goes hand in hand with sustainability. Our plants reduce the ecological footprint and thus have an active role in preventing climate change. As a family business we have also set ourselves the goals of a commitment to the common good and an active improvement in the quality of life of our fellow human beings.

No sustainability without profitability: long-term economic efficiency in energy production requires knowledge of the complete lifecycle of the infrastructure. Here we have the advantage of offering a complete range of bespoke, efficient and environmentally friendly systems. With us on the road to a sustainable future.

»Respect for the environment, the long view as regards energy and experience in the construction of turbines and power plants are the foundations on which we build.«


One for all.


Mechanics

Service & Maintenance

Engineering

Automation

Software Development

Quality from water catchment to grid connections Our wide portfolio of products and services covers the entire working cycle of hydroelectric plants of all sizes and functions. We offer full, individual support for each power plant, from comprehensive advice and planning, project engineering and complete construction through to regular maintenance services. The plant components used are mainly manufactured by ourselves and are distinguished by their durability, quality and individual suitability to customer needs. Pelton, Francis and Kaplan turbines, full electromechanical equipment and standalone automation solutions mean a total concept integrating all components. When purchasing additional items such as generators, we work only with manufacturers that we can vouch for with a clear conscience. Whether for new buildings, overhaul work or increasing the efficiency of existing plants, we employ our full experience and our specialist knowledge of all areas of power plant construction in order to ensure the best possible success for each project. ISO 9001 and 14001 certifications and, from 2013, OHSAS 18001 and ISO 3834 all provide proof of the quality of our work.

Electrotechnics


Yesterday.


Valentin Troyer built many electromechanical measuring instruments himself in order to be able to work innovatively, accurately and efficiently.


At the beginning was the vision of an individual pioneer In 1934, 27-year old Valentin Troyer resolved to make use of his solid knowledge of electrical engineering in his own company: he founded the “Elektromechanische Werkstätte Valentin Troyer” in Vipiteno, South Tyrol. From the outset his special passion was the construction of power plants. He developed his own regulation procedures, simplified the construction of turbines and thus laid the cornerstone of our enterprise that still remains: craftsmanlike precision and the latest technology in symbiosis with current practice.

Troyer SpA today employs more than 130 staff and is firmly in the hands of the third generation of the family. The expertise handed down from generation to generation is internationally acknowledged and appreciated. Troyer has made a particularly outstanding name for itself in the field of electrical engineering with its leading regulation technologies for hydroelectric power plants. Our vision for the future is to use advanced technologies to ensure the supply of environmentally compatible energy for future generations.


Committed to tradition – oriented to the future Mission. We want to create model solutions for hydropower production and local energy distribution through our outstanding service, high technical levels and craftsmanlike commitment.

2012

Troyer SpA has over 130 employees

2011

Takeover of the business by the third generation: Simone Bressan, Norbert and Stefan Troyer

2010

Turbinenbau Troyer Srl company becomes Troyer SpA

2005 2004

Supply of the first turbine with an output of over 5 MW

Heinrich Brunner leaves the Troyer company after 39 years as the longest serving staff member to date

2001 2000

SOA, ISO 9001 and ISO 14001 certification

Occupation of 50 employees 1993

Takeover of the business by Maria Luise, Herbert and Ernst Troyer

1984 1983

Building of the first power plant with an output of over 1.000 kW

Design of the first computercontrolled power plant

1979

First overseas order, from Ethiopia

1968

Building of the first power plant with an output of over 100 kW

1954

Son Herbert joins the company, followed by daughter Maria Luise and son Ernst Troyer

1942

Supply of the first hydroelectric power plant

1934

Establishment of “Elektromechanische Werkstätte Valentin Troyer”


EVOLUTION.


Development – but not at any price Progress for us means more than mere technological innovation. Innovative products and solutions give equal consideration to their effects on people, society and the environment. In this sense, the values of sustainability and environmental compatibility have always had the highest priority in our enterprise. Clean power production from water is not just a challenge, but also an obligation on society as a whole that we have consciously set ourselves to ensure that following generations too will enjoy an environment that is worth living in. Sustainable progress for us means above all learning from practice in order to apply this in practice. We listen to the experiences of our customers when developing and manufacturing our products. Only in this way are we able to react to individual orders with solutions that are both effective and comprehensive: solutions that offer our customers crucial advantages such as efficiency, durability, environmental friendliness and economic viability.

»The best plant is of no use if its planning ignores the needs of everyday life.«


REFERENCES.


The first choice when reliability and confidence are at stake Impressions of our work and our great flexibility in realising special wishes, from difficult individual tasks right up to a coherent overall project.

»Quality and economic efficiency for us go hand in hand. They pay off for you and of course also for us, because they ensure you are a contented customer.«


REINBACH. Delivery, assembly and commissioning for Tauferer Elektrowerk SpA of the power plant’s entire electromechanical equipment. Two four-nozzle Pelton turbines with a total flow rate of 4.800 l/s over a height of 416 metres. Maximum total output: 16.738 kW Completed: 2008

RASIMBACH. Delivery, assembly and commissioning for ESTL Konsortial GmbH of the power plant’s entire electromechanical equipment. Two two-nozzle Pelton turbines with a total flow rate of 1.150 l/s over a height of 445 metres. Maximum total output: 4.290 kW Completed: 2011

RABENSTEIN. Delivery, assembly and commissioning for E-Werk Rabenstein Konsortial GmbH of the power plant’s entire electromechanical equipment. One fournozzle Pelton and two Francis turbines with a total flow rate of 3.000 l/s over a height of 130 metres. Maximum total output: 2.650 kW Completed: 2011

PLUNGER. Delivery, assembly and commissioning for Plunger L. & Sohn SpA realized of the power plant’s entire electromechanical equipment including planning and construction supervision. Two vertical Kaplan spiral turbines with a total flow rate of 18.000 l/s over a height of 16.5 metres. Maximum total output: 2.544 kW Completed: 2010 PASSEIER. Delivery, assembly and commissioning for Enerpass Konsortial GmbH of the electrotechnical plant including protective technology and connection to the 130 KV switchgear. Two six-nozzle Pelton turbines with a total flow rate of 12.000 l/s over a height of 251 metres. Maximum total output: 25.148 kW Completed: 2008

OBERMATT. Delivery, assembly and commissioning for EWL (Energie Wasser Luzern) of the power plant’s mechanical equipment including the turbine governor. One four-nozzle Pelton turbine with a flow rate of 3.024 l/s over a height of 309 metres. Maximum output: 7.833 kW Completed: 2012


Energy from water – flexible and strong, reliable and innovative, like the cornerstones of our business philosophy.


Reliability beyond tomorrow.

Troyer SpA Via Karl v. Etzel 2 I-39049 Vipiteno

Tel. +39 0472 765 195 Fax +39 0472 766 356 www.troyer.it / info@troyer.it


Turn static files into dynamic content formats.

Create a flipbook
EN - Troyer - Image by Troyer - Issuu