Trout River Release Agent Tank Installation Guide

Page 1

RELEASE AGENT TANK Installation

Luke Hierlihy luke@troutriverindustries.ca


Page |1

Contents Safety ................................................................................................................................................2 Tools and supplies needed .................................................................................................................3 Mark mounting holes .........................................................................................................................4 Drill holes ..........................................................................................................................................4 Fasten tank ........................................................................................................................................5 Plumb tank ........................................................................................................................................6 Contact us .........................................................................................................................................7


Page |2

Safety The Trout River Trailer is not “just a trailer”, it is also a powerful machine with various mechanisms that could be potentially dangerous, the following are some general safety rules pertaining to trout river trailers: • • • • • •

• •

Never enter trailer with conveyor in operation When conveyor is running be sure to keep all body parts, clothing, etc. clear of inspection doors, conveyor belt, or any other moving parts; failure to do so could result in serious injury Be aware of the tailgate position, and stand clear when opening or closing When trailer is unloading be sure to stand clear of the rear of the trailer, as to not get injured from load exiting the tub Ladder is designed for a maximum of 250 pounds; do not exceed this limit. Top ladder rung is not meant to be a step, it is only there as a “hand-hold”; do not use as a step Trailer hydraulic system is designed to run in access of 2500 psi, this amount of pressure could be very dangerous; always take care when connecting hydraulic lines, that it is done properly, and replace any damaged hydraulic components immediately. Always be sure system pressure is relieved before maintenance o Always connect return line first and disconnect last Air system can also be dangerous, be aware of air lines, that they are not damaged, and relieve system pressure before maintenance When working on the trailer, be sure all power systems are disconnected, unless otherwise instructed or needed, always be aware of present dangers


Page |3

Tools and supplies needed • • • • • • • • •

3\8” Synflex (approx. 6 ft) 2pc 9/16” wrenches Marker Drill 3/8 drill bit Knife to cut Synflex 3/8” x 2” bolts with 2 washers and 1 lock nut per bolt 3/8” x 1 ¼” bolts with 2 washers and 1 lock nut per bolt 2 pc 1”x3” rubber to place between tank and mounts


Page |4

Mark mounting holes • •

Set release agent tank bracket on each leg of the ladder the ladder, and position the edge of the bracket 6” from the ladder tubing Use a marker to mark through the tank brackets, onto the ladder support arms

6”

Drill holes •

Drill holes through the center of the marks through the ladder tubing, using the drill, and 3/8 drill bit


Page |5

Fasten tank • •

•

Using the 3/8” x 2” bolts, nuts, and washers, bolt tank brackets through drilled holes, but do not tighten Using the 3/8” x 1 ¼” bolts, nuts, and washers, bolt tank to the brackets, with the pieces of 1x3 rubber between tank and brackets as shown in Figure 1 o The rubber is there as a damper, to reduce vibrations Once tank is installed to brackets, all bolts can be tightened

Figure 1

Figure 2


Page |6

Plumb tank •

• • • •

Run 3/8” Synflex from unused port underneath trailer, behind the air control box (Figure 1) o Plug must be removed before provided fitting is installed o Drain air tanks before removing plug, as this is opening the air system. If system is not drained of pressure injury may occur! Cut Synflex to length, then run into the check valve (Figure 2) Tighten both air fittings Add loom, and secure line with “P clamp” (Figure 3) Process is complete (Figure 4)

Connect here Connect here

Figure 1 Figure 3

Figure 2 Figure 4


Page |7

Contact us

I hope you found this helpful. For any questions regarding this procedure, or to request a different procedure, please contact me.

Luke Hierlihy Dealer support Representative luke@troutriverindustries.ca 902-853-1614 Troutriverindustries.ca