PREVIOUS FINDINGS





























































































GEOMETRY & EFFECT
Bridge adjusting with tension involved (loosening).
APPLICATION
Zig-Zag Iteration
The bridge folds in a zig-zag formation. This requires more joins in the bridge, as well as structural material to create the effect.
Folding Iteration
This iteration requires 3 identical structural components. Initially stacked on top of one another, to gradually fold out gaining access to walk across the bridge.
Tension Iteration
This iteration flows seamlessly through the use of tension. Using a tightening and loosening mechanism. The above method has been used in the design process. Represents freedom and clarity.
Chain Attachment
Tension System
Bridge Material Chains
Material Attachment
Chains