Mooresville Tomorrow Comprehensive Plan Looking Four-Wards into the Future
Adopted September 21, 2026
2040
Acknowledgements Board of Commissioners Chris Carney, Mayor Eddie Dingler, Ward 1 William Aven, Ward 2 Frank Owens, Ward 3 Dana Tucker, Ward 4 Eddie Karriker, At-Large Gary West, At-Large
Town Planning Board Steve McGlothlin, Chair Greg Peretz Laura Temple Richard Poore Mikko Red Arrow Wendy Smith Michael Cole Jeremy Katz Jeffrey Mack
Town Administration Tracey Jerome, Town Manager Ron Campurciani, Assistant Town Manager Kelly Strickland, Assistant Town Manager Ryan Rase, Assistant Town Manager
Town Planning and Community Development Department James Coley, Director Ashley Lattin, Planner 3
Community Advisory Committee Amanda Byrum Bill Thunberg Billie Berry Chris Carney Doug Johnson Eric Wood Gary Applegate Gary West Greg Peretz Jason Gardner Jeff James Jenn Bosser Jon Aldridge Kim Atkins Kirk Ballard Michael Mock Randy DuTeau Richard Beck Steve Mcglothlin Tim David Tommy DeWeese William Aven
Consultant Team City Explained, Inc. Nealon Planning, PLLC Arnett Muldrow & Associates, LLC Green Heron Planning, LLC
Table of Contents Preface
1
Introduction
7
Our Planning Process
21
General Growth Framework
27
Supporting Infrastructure
105
Town-Wide Concepts
111
Town Policies & Recommendations
135
Action Plan
145
Our Challenge The Town of Mooresville experienced a development boom since the previous comprehensive plan was adopted in 2019. In fact, the Town’s population jumped nearly 30% for a three-year period (2020 to 2022) and earned it the title of fastest-growing suburban community in the United States (Go Banking Rates Research, 2024). Rapid growth and development — at least at its current pace and in its current form — is thought to be unsustainable for a longer time period and threatens the Town’s charm, high quality-of-life, and supporting infrastructure. Different interests and curiosities in Mooresville as a location to move to, and to share in the Town’s “charmed lifestyle”, will continue so long as land remains available to develop. This is evident in the number of development applications already approved, but not yet built, in the planning area that could literally add tens of thousands of new residents and employees to the area in a short time period (see the section entitled “Community Growth Considerations” in Chapter 3 for more information on committed development in Mooresville). The recent development boom witnessed by residents, and the potential to grow significantly more in the future, has elicited different, sometimes strong, opinions about new development and the benefits or consequences it brings to the community. Nonetheless, from the beginning, there has been a shared concern amongst residents that the Town will someday overwhelm itself and look like anywhere else if growth continues without strong guidance and influence from Town officials.
standalone apartment complexes in the planning area). A balance between competing interests — looking for shared wins between conservation, development, infrastructure, and town character topics — is a stated goal for this planning process. Expectations are high for new or expanded policies, maps, design criteria, and decision tools in the new plan to address the community’s development concerns. The purpose of the Mooresville Tomorrow comprehensive plan is to organize big ideas and ensure energies are moving in the same direction. It allows the opportunity to prioritize outcomes and balance needs within a single document. It moves the community to “intended outcomes” and “coordinated efforts” for the future. The recommendations presented in the document are grounded in community engagement, data analysis, and best practices learned from peer cities and towns throughout the United States. The general framework presented in the comprehensive plan is suggestive, but should remain largely consistent over time to ensure Town decisions and investments are complementary. The comprehensive plan should be implemented in follow-up master plans, feasibility studies, ordinances, and budgets that occur over many years. These efforts should hone the vision and big ideas presented in the comprehensive plan into more specific rules, requirements, initiatives, or investments needed to guide future growth, development, and conservation interests.
Town officials have been working recently to reposition certain development pressures in the community (e.g., effectively eliminating new
1
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
Preface
A Shared Vision for Mooresville The Town of Mooresville is a welcoming and inclusive community where residents are proud to call home. People are drawn to its historic downtown, thriving neighborhoods, abundance of open space, innovative and prosperous businesses, different home choices, and access to Lake Norman. The growing community works to ensure Mooresville remains inclusive and accessible to all.
The Town will accommodate growth and development in a manner that retains and improves upon the unique and diverse community character of Mooresville. It will continue to support, promote, and act towards creating a community grounded in civility, diverse development patterns, environmental stewardship, and well-maintained supporting infrastructure.
Mooresville offers “a little of everything” from the old to the new and the small to the big — rural landscapes, natural open space, thriving suburbs and walkable neighborhoods, local businesses, large employment centers, community-serving activity centers, and a historic downtown. The eclectic mix of environments offers access to shopping, restaurants, and a wide range of activities. In less than thirty minutes, residents can drive through rolling pastoral hills, visit local businesses in the historic downtown, work in a world-class office or industrial center, enjoy access to a large deep-water lake, or visit a wellmaintained public park.
Commitments to renew, reinvest, or rebuild targeted areas of the Town’s planning area will be balanced with its abilities to provide the infrastructure needed to support it in a timely and fiscally responsible manner. Ultimately, the comprehensive plan’s relevance will be measured by its implementation, so we challenge ourselves, and our partners, to make this vision a reality.
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
2
Top Fifteen Initiatives Summarized from the Plan Evaluate future opportunities presented to the Town in the context of an overarching goal to create a self-sustaining community in the future. — Chapter 6, Policy 1.3 Adopt design and development standards that enhance community appearance, activate public spaces, and maintain a unique sense of place for Mooresville. — Chapter 6, Policy 2.1 Influence the design and layout of new neighborhoods, districts, or activity centers in Mooresville as a means to increase residents’ physical activity levels, maintain mental health, and improve overall well-being. — Chapter 6, Policy 1.9 Emphasize public spaces as a unifying feature when contemplating new development or redevelopment projects. — Chapter 6, Policy 2.3 Support housing diversity in the community, including different home types and sizes intermingled in close proximity, as a means to attract greater demographic diversity in the community (i.e., age, income level, culture, and race). — Chapter 6, Policy 3.1 Develop standards that protect open space as a meaningful component of new development, including, but not limited to, natural areas, forests, floodplains, parks, plazas, squares, or greenways. — Chapter 6, Policy 4.1
3
Mooresville Tomorrow 2040 Comprehensive Plan
The Town and its partners should identify opportunities that increase the type, number, and location of civic and culturally-important spaces in the community. — Chapter 6, Policy 6.4 Think about new or expanded infrastructure needs to serve future residents when reviewing development applications. Sometimes new development or redevelopment will afford the opportunity to request land or building space for new community facilities. If appropriate, the Town may ask development applicants to consider some of these needs in their site concept plans. — Chapter 6, Policy 6.2 Recognize the different needs and conditions acknowledged in the comprehensive plan for three development conditions observed in Mooresville: greenfield development, infill development, and redevelopment. Evaluate and decide if certain rules and requirements should vary by development conditions for different topics including, but not limited to, permitted land uses and densities, adjacent site compatibility, building height and setbacks, buffers, environmental stewardship, open space preservation, parking, adaptive reuse, and new infrastructure provisions. — Chapter 6, Policy 1.2 Place responsibilities on the development applicant to demonstrate their compliance with the rules, requirements, targets, maps, and thresholds expressed in the Mooresville Tomorrow comprehensive plan. Require each development
Adopted September 21, 2026
Preface application include statements for how the development program, site layout, building densities or intensities, open space features, etc. proposed for a property meet the intentions of the comprehensive plan. — Chapter 6, Policy 1.10 Program Town resources to review and revise, as needed, rules and requirements in the (1) Town of Mooresville Unified Development Ordinance, (2) Town of Mooresville Land Development Standards Manual, (3) Town of Mooresville Capital Improvements Plan, (4) Town of Mooresville Annual Budget, and (5) various town master plans or feasibility studies to implement the policies and recommendations presented in the Mooresville Tomorrow comprehensive plan.
Work with landowners, businesses, and state or local economic development organizations to find the resources needed to increase the number and location of site-ready properties for future industrial, business, or office growth. — Chapter 6, Policy 7.1 Promote transparent and inclusive engagement, and safeguard two-way communication channels with all stakeholders as a means to make wellinformed decisions. — Chapter 6, Policy 8.5
— Chapter 6, Policy 1.2 Convene a UDO Task Force immediately after the comprehensive plan is adopted, which will work with the Town Board of Commissioners and Planning and Community Development Department staff to implement policies and recommendations in the document. — Chapter 6, Policy 1.12 Implement recommendations from the Mooresville Mobility Plan to improve the Town’s transportation system, including: (1) a complete and connected street network, (2) complete street design principles, (3) mobility hubs serving multiple travel modes, and (4) an interconnected bicycle and pedestrian network. — Chapter 6, Policy 5.1
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
4
User’s Guide for the Document The comprehensive plan belongs to the community and reflects the collective voices that contributed to the engagement efforts held during the plan’s creation. Everyone should be a champion of the plan even if they do not unanimously agree with all of the ideas in the document. The comprehensive plan presents a vision for the future in broad strokes and it will be an ongoing, community-driven process to determine how it is specifically enacted. People are encouraged to read the entire document to fully understand the Town’s position on specific topics for the planning area. Six thoughts are summarized below — a simple user’s guide — to contemplate while reading the plan.
Trust the Process Transparency was most important for the planning process. Engagement events and activities were thoughtful, intentional, equitable, and transparent. The planning process was a collaborative effort between Town staff, a community advisory committee, partner organizations, and the hired consultant. The community engagement program for the plan provided in-depth quantitative and qualitive feedback that served as a basis for key recommendations in the document.
Commitment to the Plan The comprehensive plan is the culmination of many months of community education and engagement efforts. The volume of feedback produced a spectrum of ideas and opinions, not all of which are represented in the document due to a natural distillation process during the planning process. Generally speaking, there are three reasons an idea may not have been included in the document — (1) there was
5
Mooresville Tomorrow 2040 Comprehensive Plan
disagreement on a topic and a decision was made to go with the consensus of the community, (2) the idea was tested and deemed to be impractical or in conflict with greater principles stated in the plan, or (3) because there simply was not enough room to include all of the big ideas contributed by the community, or they may be better utilized in the implementation phase of the plan. What is important is that there should be something in this plan for every Mooresville community member to be excited about.
Know Your Role As a member of the Mooresville community your role is to work together to bring the ideals, values, and vision in this plan into reality. Participation is important — even if you were not able to participate during the planning process itself, your role as a champion for the plan begins now. The coming years will present ample opportunity to be involved in the more finegrained, fine-tuning aspects of the plan which will give greater clarity to how the community should be moving forward as a collective.
Join the Team Town officials and staff may be at the helm for future implementation efforts, but realistically, the community should consider themselves a critical part of the team offering both local expertise and additional on-call capacity. As different components of the plan are enacted it will become increasingly important for the community to stay involved and participate in what may be challenging discussions.
Adopted September 21, 2026
Preface When and Where Some of the big ideas in the comprehensive plan may seem ambitious because frankly they are ambitious. While the plan continues to move the dial on many of the ideas and recommendations that were presented in the previous comprehensive plan, and embraces their continued progress, there are some new ideas in the Mooresville Tomorrow comprehensive plan that may provide for transformative change (significant infill development or redevelopment) in the coming years. As daunting as it may seem, it will not happen overnight. Some changes may happen in the next few years, but others may take decades. The success of the comprehensive plan will be measured by how ideas are implemented over time taking into consideration the changing makeup of the local market and the community.
Changes considered for the comprehensive plan — whether initiated by the Town, property owner, developer, or member of the community — using the playbook mentality should be evaluated using a standardized approach (see the section entitled “Comprehensive Plan Compliance” in Chapter 1) to determine if they are in the best long-term interests of the Town and its residents, businesses, and property owners. A decision to deviate from the comprehensive plan using playbook-thinking should be well-documented and communicated to the public at the time the action is being taken (e.g., in a development application staff report, in a motion or discussion during official meetings, in a capital project assessment consistency statement, or in a justification report created to support a text or map amendment to the Mooresville Tomorrow comprehensive plan).
The Playbook Approach The Town should be able to take advantage of opportunities when they present themselves, so the comprehensive plan assumes a playbook approach to guide decision-making in the community. Some parts of the document — the shared vision statement and guiding principles — should remain consistent and keep Mooresville on a focused path to success. Other parts of the document — general policies, specific recommendations, intentional growth areas map, conservation and development map, development intensity map, focus area studies, and other supporting information — may need to evolve over time as conditions change that were not contemplated at the time the document was created.
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
6
Introduction The Mooresville Tomorrow comprehensive plan sets certain expectations and terms for future growth and development in the Town’s planning area. It sends a clear message to the community, adjoining governments, developers, conservation interests, and service providers about intended outcomes and increases the likelihood of shared successes in terms of public and private investments that reinforce the Town’s shared vision. Throughout the planning process the community was asked about what was most important to them and what aspects of the Town’s planning area were non-negotiable. Simply stated, what makes Mooresville, Mooresville? And how does the Town protect what is important now but continue to grow thoughtfully and intentionally in the future? The community expressed their thoughts and ideas during engagement and partnering opportunities hosted for the comprehensive plan. The comprehensive plan starts with a broad vision for the future and continues with maps and a policy framework that should guide local land use policies, development ordinances, capital improvement plans, annual budgets, the management of municipal services, and infrastructure planning by the Town and others. It also provides clear and concise direction for other Town plans, studies, and ordinances to follow in terms of planning context, guiding principles, mapped intentions, and identified goals and aspirations. Patience may be needed to realize some aspects of the comprehensive plan as it sets a long-term vision over an extended time period (2024 to 2040). Town officials should avoid “shortsighted” decisions to modify the comprehensive plan unless the reasons to change it are supported by Town staff, changing market
7
Mooresville Tomorrow 2040 Comprehensive Plan
conditions, or a grassroots initiative from the community.
Document Organization The document is divided into seven chapters: (1) Introduction, (2) Planning Process, (3) General Growth Framework, (4) Supporting Infrastructure, (5) Town-Wide Concepts, (6) Town Policies and Recommendations, and (7) Action Plan. Each chapter is grounded in the need to promote and protect a unifying character for the Town of Mooresville. A series of “book reports” were created during the planning process for the Mooresville Tomorrow comprehensive plan and published separately. The reports document baseline conditions and capture emerging trends for the community. Copies are available from the Mooresville Planning and Community Development Department Some chapters of the comprehensive plan may incorporate other Town plans or studies by reference. These documents, as amended, should have the same standing and authority provided under Chapter 160D of the North Carolina General Statutes and the Town’s Unified Development Ordinance (UDO) as if they were physically included in the Mooresville Tomorrow comprehensive plan. More information about the comprehensive plan and its relationship to other Town documents is presented later in Chapter 1.
Emphasis on Community Character Early ideas in the planning process for the Mooresville Tomorrow comprehensive plan helped reprioritize traditionally-siloed land use, development, open space, and infrastructure topics as contributing factors to community character. The emphasis on physical form and
Adopted September 21, 2026
Introduction
design considerations over simple land use and density criteria (demand) or available infrastructure capacity (supply) for determining the Town’s best path forward is a foundational element of the new comprehensive plan. The chapters that follow focus on identifying, preserving, and perpetuating desirable development patterns in the community, while also making deliberate changes to areas that do not meet the community’s expectations for character or sense of place. Policies and recommendations in the document strategically accommodate future growth and change while preserving and enhancing the qualities and characteristics that make the Town a desirable place to live, work, learn, and play. They aim to enhance the Town’s downtown, neighborhoods, activity centers, and public spaces with an attractive mix of uses and amenities that expand the local economy, enhance social interaction, protect environmental resources, instill a unique sense of place, and improve the overall qualityof-life for residents. Ideas about community character extend to all chapters of the comprehensive plan and together reinforce a shared vision for a positive community image that creates functional, aesthetically appealing, and people-oriented places.
Preface | Introduction | Planning Process | Framework | Infrastructure | Concepts | Policies | Action Plan
8
An Inflection Point for the Town
The preferred approach to planning in Mooresville acknowledges the need to support three different development conditions simultaneously in the same comprehensive plan — greenfield development, infill development, and redevelopment — based on changing growth pressures in the planning area. It also recognizes the need to be flexible in some topic areas included in the comprehensive plan to accommodate different development conditions in the same community. The three development conditions used to foster more flexibility in the comprehensive plan are defined below.
Greenfield Development Example
The planning area for Mooresville is large and experiencing different growth pressures at the same time. For some areas, the landscape is natural (vacant) and new development is influenced by the size of, or proximity to, the infrastructure needed to support it. In other areas, the community may be reaching an inflection point in terms of growth and development, where limited land supply, declining properties, changing market conditions, or new land uses and their associated buildings or spaces could favor different patterns or intensities of development in the future. Infill Development – the development of underutilized or vacant land within previouslydeveloped areas. Infill development typically takes place in urban or semi-urban areas and is in keeping with the form, massing, and other applicable zoning requirements of adjacent buildings. Development considerations for this condition are most sensitive to preferred land uses and densities, adjacent site compatibility, parking or building setback requirements, and existing infrastructure capacity.
Development considerations for this condition are most sensitive to permitted land uses and densities, adjacent site buffers, environmental stewardship, open space preservation, and new infrastructure investments.
9
Mooresville Tomorrow 2040 Comprehensive Plan
Infill Development Example
Greenfield Development – the development of a parcel or an area of land that was previously vacant. Such land is referred to as a greenfield, and may be in a rural, suburban, or urban context; however, it most often applies to land that was previously a natural or agricultural area.
Redevelopment – the redevelopment of land that was previously developed. It may involve the incorporation of existing buildings and
Adopted September 21, 2026
Introduction
Redevelopment Development Example (Before) Redevelopment Development Example (After)
infrastructure or it may be a completely new development put in place of a previous development. Development considerations for this condition are most sensitive to preferred land uses and densities (especially a mix of uses and densities in activity centers), adjacent site compatibility, parking or setback requirements, changing property values, existing infrastructure capacity, and the potential for adaptive reuse of existing buildings.
The Intentional Growth Areas Map presented in Chapter 3 clarifies the boundaries for all three development conditions contemplated for the planning area. Policies and recommendations presented in Chapters 5 and 6 are sensitive to the different needs for a specific development condition. Focus area studies in Chapter 3 present illustrative concepts that convey how different strategies or recommendations in the comprehensive plan may be applied for specific development conditions.
Preface | Introduction | Planning Process | Framework | Infrastructure | Concepts | Policies | Action Plan
10
Enabling Legislation for Local Comprehensive Plans in North Carolina
by the local planning board. Future zoning amendments considered by the local government must include a statement of consistency with the adopted comprehensive plan; however, the statement is advisory in nature and not subject to judicial review.
Chapter 160D of the North Carolina General Statutes requires local governments reasonably maintain a comprehensive plan for the jurisdiction to exercise their authority to adopt and enforce zoning regulations. The comprehensive plan should present goals, policies, and programs intended to guide existing and future physical, social, and economic considerations — which may be influenced, in part, by growth, development, or conservation measures enacted in the jurisdiction (N.C.G.S. 160D-501, Section A1).
Local Planning Jurisdiction
The term “reasonably maintain” is not defined in the General Statutes; however, professional practice for comprehensive plans recommends comprehensive plan updates every five to ten years. The frequency of comprehensive plan updates may be influenced by the rate of growth or change in a community, or the influence of outside forces in and around the region where the jurisdiction is located. The previous version of the Town of Mooresville Comprehensive Plan, formally known as the One Mooresville comprehensive plan, was adopted in 2019. The General Statute does not require specific elements or chapters in the comprehensive plan. Nonetheless, topic areas to address are suggested in N.C.G.S. 160D-501(b): preferred growth and development patterns, supporting infrastructure needs, housing choices, recreation and open space opportunities, natural resource protection, historic-scenic-cultural resource preservation, and actions, items, or programs to implement the comprehensive plan. Comprehensive plans in North Carolina are adopted as a legislative action by the local governing board after a recommendation is made
11
Mooresville Tomorrow 2040 Comprehensive Plan
The planning area for the comprehensive plan includes the Mooresville Corporate Limits plus the Town’s extraterritorial jurisdiction and an area of influence identified to represent areas where the Town has influence but no formal authority. The full planning area, represented by the three sub-geographies mentioned, extends from the Rowan-Iredell County line on the east, Mecklenburg-Iredell County line and the Davidson Annexation Boundary on the south, Lake Norman on the west, and the Troutman Annexation Boundary on the north. A map of the full planning area is presented on page twelve of the document. The full planning area is consistent with the boundaries used for the previous comprehensive plan. Mooresville Corporate Limits The Corporate Limits of Mooresville represents the boundaries of the Town identified on the official map maintained in the office of the Town Clerk (the area shaded in tan on the map). The boundaries may be enlarged by annexation of property or diminished by exclusion of contiguous property by the North Carolina General Assembly. The subject property is assigned a Town zoning district effective immediately at the time of annexation. Residents living inside the corporate limits are empowered to vote for local officials and pay additional taxes for Town services.
Adopted September 21, 2026
▲
Preface | Introduction | Planning Process | Framework | Infrastructure | Concepts | Policies | Action Plan
Introduction
Map 1-1: Local Planning Jurisdiction
12
Mooresville Extraterritorial Jurisdiction The State of North Carolina grants cities and Towns extraterritorial jurisdiction (ETJ) for areas outside corporate limits that are expected to be inside corporate limits sometime in the future. It is intended to allow for smoother transitions from county to Town services and makes areas of the county subject to the Town’s zoning and subdivision rules, requirements, and regulations. All cities and towns in North Carolina may exercise extraterritorial jurisdiction for one mile from corporate limits (the area shaded in gray and hatched on the map). The Town of Mooresville may accept property outside of its corporate limits into the ETJ if it is released by the Iredell County Board of Commissioners at the request of the Town or the property owner. Acceptance of the property into the ETJ requires the approval of the Town’s Board of Commissioners. Once property is released into the ETJ, the Mooresville Planning and Community Development Department works with the property owner to assign a Town zoning district. Most property within the original one-mile ETJ granted years ago has been annexed over time, which reduces the size of the current ETJ in comparison to the Town’s corporate limits. Town officials have requested a policy-initiated expansion to the ETJ ― generally extending one mile from the current corporate limits ― from Iredell County in recent years. County officials have denied such requests to this point, deferring to the property-by-property (owner-initiated) approach used more commonly. This is one reason why there have been more town annexation requests (versus ETJ expansion requests) in recent years. The annexation process skips a request for ETJ and assigns a Town zoning district to the property immediately.
13
Mooresville Tomorrow 2040 Comprehensive Plan
Residents living inside the ETJ may not vote for Town officials that enforce local zoning and subdivision rules, requirements, and regulations on their property. Given Mooresville’s irregular Corporate Limits, its one-mile ETJ is not easily described by metes and bounds. Though it is depicted graphically in maps presented in the document, users wishing to determine specific applicability are urged to contact the Town’s Planning and Community Development Department for the most current map or online map service. Mooresville Area of Influence The Mooresville Area of Influence represents an irregular shape and size of land that surrounds both the Town’s corporate limits and its extraterritorial jurisdiction. It is believed the Town has significant influence in the area of influence even though it does not have formal authority or direct control to make decisions in the area. In some North Carolina communities, this may be called a future urban services area because, in theory, the Town would be best suited to extend certain infrastructure or services to these areas, if needed, in the future.
Adopted September 21, 2026
Introduction
What Influences Growth and Development in Mooresville? The Mooresville Tomorrow comprehensive plan prepares the community for how and when development might take place and what it should look like when completed. It also serves as the primary source of guidance for the Board of Commissioners when deciding rezoning requests, and for the Planning Board and Town staff when making recommendations related to rezoning requests. Developers should reference the comprehensive plan for initial guidance when exploring the development potential of a property. Development in Mooresville — patterns, types, and intensities — is generally influenced by five growth factors: (1) market demand; (2) local economies and growth outlooks; (3) property owners’ willingness to participate; (4) government regulations and policies; and (5) the availability and capacity of infrastructure. These factors have some influence over each other, and can change over time, which affects the location and type of development that is experienced in the community. Market Demand, Available Capital, and Developer Interests The demand for different development types, patterns, and intensities is generally established by future buyers or renters attracted to the area — and their purchasing power — that occupy spaces and pay different price points. Developers and private parties decide where and when to pursue a project based upon several considerations, including their own interests, market demand, available financing, and the probability of success. Private land development is financed by banks and other institutions who establish the
minimum lending criteria (and are often conservative or cautious by nature). These organizations must have reasonable confidence that a project will succeed before funding it. The Local Economy and Growth Outlook Future development is directly influenced by the strength and resilience of the local and regional economies, whereby the private sector takes into consideration projected employment and population, and the general demographics of an area before investing in new development projects. Willing Property Owners Property owners in Mooresville decide whether land becomes available to develop and redevelop, or if land becomes available to acquire for permanent open space. New growth in the community is generally the result of property owners’ interests in either selling property — whether to developers or conservation groups — or developing the land themselves. Government Regulations and Policies Development may be promoted or restricted through government regulations or policies that keep growth in alignment with the community’s overarching vision. This may be achieved through zoning and land development controls; environmental policies, programs, and protections; or through the administration of regulations by local land use boards or professional staff. Regulations and zoning restrictions may control permitted uses on a parcel, allowances for height and density, and design standards. While the government has a
Preface | Introduction | Planning Process | Framework | Infrastructure | Concepts | Policies | Action Plan
14
crucial role in development, it is limited to working within the regulations available and cannot restrict or promote a project beyond the limitations provided through its ordinances, regulations, procedures, and laws. Available Infrastructure Capacity The delivery and location of available infrastructure capacity is an important component for development projects. If the capacity is not available, some projects must wait until new capacity is added from either government or third-party service providers. There are opportunities, in some cases, for developers to fund certain on-site or off-site infrastructure investments themselves to unlock available capacity and have greater control over their project timeline. Joint-funding agreements can be utilized by governments and third-party service providers to reimburse developers for expediting infrastructure projects that serve the larger community. Local governments in North Carolina are not allowed to collect development impact fees in their jurisdictions unless they are specifically authorized to do so by the North Carolina General Assembly (this is not the case for the Town of Mooresville). Some infrastructure in the Town’s planning area is provided by outside agencies or organizations (e.g., Iredell County, Iredell-Statesville School District, Mooresville Graded School District, or the NCDOT). These service providers, to varying degrees, may be more or less reactive — versus proactive — in providing new or expanded infrastructure to meet the needs of the planning area. The Town is limited in its abilities to prioritize or fund infrastructure improvements that are the responsibility of other service providers, which has caused frustration in the past for some Town residents.
15
Mooresville Tomorrow 2040 Comprehensive Plan
Town Library of Plans and Ordinances Broad policies and recommendations in the comprehensive plan are implemented in moredetailed plans, studies, ordinances, or budgets that follow comprehensive plan adoption. Each document should refine the big ideas and concepts presented in the comprehensive plan using specific rules, requirements, or initiatives needed to create greater predictability and intended outcomes in the community. A description of plans and studies with a relationship to the comprehensive plan is provided below. It is assumed the rules, requirements, and standards presented in these documents will implement the maps and broad policies and recommendations presented in the comprehensive plan. All the documents described below are assumed to work together to guide future growth, conservation, character, or development decisions in the Town’s planning area. The Town of Mooresville Unified Development Ordinance (UDO) combines traditional zoning and subdivision rules and requirements, site design guidelines, sign regulations, watershed and floodplain protection measures, downtown historic district regulations, and other types of development regulations into a single document. It generally implements broad policies and recommendations in the comprehensive plan in greater detail, and transitions from recommendations in the comprehensive plan to laws in the UDO. Updates to the Town’s UDO should consider the preferred community character and future land uses summarized in the comprehensive plan, which may include new zoning districts or design requirements to implement intended outcomes expressed in the comprehensive plan.
Adopted September 21, 2026
▲ The Town of Mooresville Land Development Standards Manual supplements the UDO and provides specific information to ensure new development is designed and constructed in accordance with minimum Town standards. An update to the manual and its standard details should consider the preferred community character and future land uses summarized in the comprehensive plan and the level of information needed in the document to help ensure streets and stormwater features are classified and designed to reinforce an intended character, sense of place, or preferred mode of travel. The Town of Mooresville Annual Adopted Budget includes capital project funds identified to guide future financial decision-making and the coordination of major public investments in Town infrastructure. The capital project lists should be consistent with, and implement, recommendations from the comprehensive plan.
Introduction
Figure 1: Influence of the Town’s Comprehensive Plan on Other Local Plans, Studies, and Ordinances
Updates to the annual budget should consider recommendations and official maps in the comprehensive plan, and adjust, as necessary, the funding and timing of capital projects to support the type, location, pattern, and intensity of development envisioned on the (1) Intentional Growth Areas Map, (2) Conservation and Development Map, and (3) Development Change and Intensity Map. The Town of Mooresville Comprehensive Recreation and Parks Master Plan was updated in 2024 and provides a framework for future park and recreation planning to meet the needs of a growing community. It includes a recreation needs assessment, list of goals and recommendations, and an implementation plan to improve and expand services to Town residents.
Preface | Introduction | Planning Process | Framework | Infrastructure | Concepts | Policies | Action Plan
16
The parks and recreation master plan is incorporated into the comprehensive plan by reference. The needs, recommendations, and implementation plan presented in the master plan, in their entirety, should have the same standing and authority provided under Chapter 160D of the North Carolina General Statutes and the Town’s Unified Development Ordinance as if they were physically included in the comprehensive plan.
The Mooresville Downtown Master Plan, completed in 2009, provides a framework for safeguarding the Town’s iconic downtown and its adjacent neighborhoods. It includes a set of planning principles, a master plan, place-based recommendations, and an implementation plan.
The Mooresville Mobility Plan was updated in 2025 and provides a framework for future transportation planning (auto, bus, bicycle, and pedestrian) to meet the needs of a growing community. It includes a transportation needs assessment, list of goals and recommendations, system-level maps, and specific projects to improve and expand services to Town residents.
An update to the master plan should be completed in the future, which considers an expanded study area, and more, stronger, connections between downtown and adjacent neighborhoods, to reinforce the preferred community character, future land uses, and development intensities summarized in the comprehensive plan.
The mobility plan is incorporated into the comprehensive plan by reference. The needs, recommendations, maps, and projects presented in the plan, in their entirety, should have the same standing and authority provided under Chapter 160D of the North Carolina General Statutes and the Town’s Unified Development Ordinance as if they were physically included in the comprehensive plan.
Immediate recommendations for the downtown and its surrounding neighborhoods in the comprehensive plan should supplement the existing Mooresville Downtown Master Plan. An amendment to remove certain provisions or recommendations in the comprehensive plan may be appropriate once an update to the master plan is complete (to avoid redundancy).
The Town of Mooresville Water and Wastewater Comprehensive Master Plan was updated in 2021 and provides an assessment of existing conditions (treatment plants and collection/distribution systems), forecasted demand to meet future year needs, general expansion or inter-basin transfer alternatives, and a recommended capital improvements plan. The water and wastewater master plan is incorporated into the comprehensive plan by reference. The needs, recommendations, and implementation plan presented in the master plan, in their entirety, should have the same standing and authority provided under Chapter 160D of the North Carolina General Statutes and
17
Mooresville Tomorrow 2040 Comprehensive Plan
the Town’s Unified Development Ordinance as if they were physically included in the comprehensive plan.
Different small area plans may be prepared by Town staff or their hired consultants sometime in the future, which will provide more detailed information for a specific geography within the Town’s planning area. Upon adoption of a small area plan, the Conservation and Development Map or Development Change and Intensity Map in the comprehensive plan should be amended, as needed, to be consistent with the small area plan. The small area plan should also be referenced formally in the comprehensive plan (via a text amendment) to strengthen its findings and recommendations.
Adopted September 21, 2026
One or more Town actions may require a comprehensive plan compliance determination that compares the action, investment, or decision under consideration against the shared vision, principles, maps, policies, or recommendations presented in the Mooresville Tomorrow comprehensive plan to determine if there is, or is not, support in the document for the item under consideration. A determination is most often presented in a Town staff report, grant application, or monitoring report.
Comprehensive Plan Map Amendment It may also be appropriate to propose amendments to maps presented in the comprehensive plan as a response to changing conditions: physical-driven, policy-driven, or market-driven. In these cases, the sponsor of the map amendment should evaluate consistency as follows: •
Map amendments should be generally consistent with the shared vision statement, guiding principles, policies, and recommendations presented in the comprehensive plan, or the broader goals, actions, or aspirations presented in the Town’s Strategic Plan 2025.
•
An amendment to the Conservation and Development Map or Development Change and Intensity Map should not be in conflict with the big picture ideas and growth concepts presented in the Intentional Growth Areas Map.
•
An amendment to the supporting infrastructure maps in other Town plans and studies referenced in Chapter 4 should be reasonable to meet the demands for service generated by the preferred development types, locations, patterns, and intensities presented on the Conservation and Development Map or the Development Change and Intensity Map.
•
Changes to the Intentional Growth Areas Map should be avoided between full updates to the comprehensive plan performed every five to ten years unless new infrastructure is provided to the service area.
Below are a few examples of actions in the Town that should be informed by the comprehensive plan. Some of these actions may require a formal comprehensive plan consistency statement presented as a guide for the decisionmaking process.
Comprehensive Plan Text Amendment From time to time, it may be appropriate to propose changes to the text presented in the Mooresville Tomorrow comprehensive plan. For example, new information available in future years may generate a need to refine the language used for a specific policy or recommendation. In these cases, the sponsor of a text amendment to the comprehensive plan should evaluate consistency of the proposed change with the shared vision statement presented in the plan synopsis and the guiding principles presented in Chapter 3. The sponsor should also evaluate consistency of the proposed change against the broader goals, actions, or aspirations presented in the Town’s Strategic Plan 2025. Changes to the shared vision statement and guiding principles presented in the plan should be avoided between full updates to the comprehensive plan performed every five to ten years.
Introduction
Comprehensive Plan Compliance
Preface | Introduction | Planning Process | Framework | Infrastructure | Concepts | Policies | Action Plan
18
Development Application, Rezoning State law requires a statement of consistency and reasonableness with the comprehensive plan to accompany a rezoning application. Applicants are advised to prepare a statement of consistency with the comprehensive plan as a part of their rezoning application submittal, which will be reviewed by the Town during their formal review of the application.
be made as to why the map should be changed. •
The request should consider the maps, recommendations, and best practices presented in the master plans and feasibility studies for supporting infrastructure referenced in Chapter 4, and incorporate features or facilities presented in them as a component of the proposed rezoning condition (e.g., accommodate a greenway or trail corridor on the site if one is proposed as part of the Mooresville Mobility Plan).
•
The request should demonstrate through a narrative in the zoning application how the change implements one or more of the town-wide planning concepts presented in Chapter 5. The applicant may elect to include an analysis, figures, or maps to accompany the narrative if it benefits the presentation of information.
•
The request should identify specific policies and recommendations in Chapter 6 that are positively impacted by the zoning change. It should also acknowledge instances where the spirit and implementation of the policies and recommendations presented in Chapter 6 may be negatively impacted by the proposed change.
An applicant for a rezoning request should implement items presented in the comprehensive plan as follows: •
•
19
The request should further the Town’s commitment to the shared vision statement and guiding principles presented in the comprehensive plan, recognizing that strict compliance with all nine principles simultaneously may necessitate a choice or prioritization of different principles. A narrative in the zoning application should explain how the proposal furthers the vision statement and nine principles. While balancing competing interests, it is the intent of the comprehensive plan and its guiding principles to protect the health, safety, welfare, and prosperity of the community in all of its decision-making. The request should be consistent with the big picture ideas and growth concepts presented in the Intentional Growth Areas Map.
•
The request should be consistent with the character typology category presented in the Conservation and Development Map for the site location. If not, a justification should be made as to why the map should be changed.
•
The request should be consistent with the development intensity level presented in the Development Change and Intensity Map for the site location. If not, a justification should
Mooresville Tomorrow 2040 Comprehensive Plan
Town staff should prepare an independent evaluation of the rezoning application using the same criteria presented in the bullets above. The Planning and Community Development Director may elect to hire an independent third-party reviewer (consultant) to complete the evaluation if it deems it appropriate and in the best interests of the Town.
Development Application: Other Other development applications considered by the Town may require a statement of consistency with the comprehensive plan. If required by Town
Adopted September 21, 2026
Introduction
regulations, the applicant should demonstrate compliance with the comprehensive plan in a similar manner to the bullets presented previously for a rezoning application. The Town acknowledges that only a subset of the considerations presented for a rezoning application may apply to a specific development application category. Schedules and forms provided by the Town for different development applications should clarify requirements to determine comprehensive plan consistency, as appropriate. Town staff should prepare an independent evaluation of the development application using the same criteria imposed on the applicant. The Planning and Community Development Director may elect to hire an independent third-party reviewer (consultant) to complete the evaluation if it deems it appropriate and in the best interests of the Town.
Grant Application A grant application may benefit from demonstrating compliance with the Town’s comprehensive plan, citing specific examples for how grant funds received may help implement specific policies or recommendations in the document.
Capital Improvements Plan, Candidate Project Assessment A statement of comprehensive plan consistency for capital projects considered for the Town’s Capital Improvements Plan (CIP) would reinforce a direct connection between land use and development (i.e., demand for services) and the infrastructure needed to support it (i.e., services supplied). Preparing this information during updates to the CIP should inform the prioritization process for the Town’s Board of Commissioners.
Preface | Introduction | Planning Process | Framework | Infrastructure | Concepts | Policies | Action Plan
20
Our Planning Process The Town of Mooresville hosted several rounds of public engagement over a twenty-two-month planning period to support the new comprehensive plan, January 2024 to October 2025. The engagement team offered a Community Ideas Exchange Workshop series, maintained an online engagement hub, attended various pop-up and Town board events, hosted a Growth Choices Workshop series and launched a corresponding online survey, facilitated a Draft Recommendations Workshop series, and participated in the plan adoption process. Input received from the community throughout the planning process was used to generate big ideas, refine concepts, and make recommendations for the document. A summary of the input received from larger events held during the planning process (in multiple documents) is available from the Town’s Planning and Community Development Department.
Stakeholder Interviews The project team for the new comprehensive plan met with twenty-nine stakeholder groups (forty-four individuals), including Town officials, community advocates, faith leaders, school officials, developers, real estate and design professionals, conservation interests, local historians, various advocacy groups, Town staff, and representatives for the adjoining towns and counties. The purpose of each stakeholder interview was to listen and learn from local experts that have intimate knowledge about different strengths, weaknesses, and opportunities in the community. Input from the stakeholder interviews was used to (1) identify important topics to address in the new comprehensive plan, and (2) influence future initiatives or events held during the planning
21
Mooresville Tomorrow 2040 Comprehensive Plan
process. Team members also participated in driving and walking tours during this time to observe firsthand existing conditions in the community.
Community Advisory Committee A community advisory committee was appointed by the Town’s Board of Commissioners to be a sounding board for the new comprehensive plan. Input from the committee was used to verify data; identify key planning themes; create a vision, guiding principles, and maps for guiding future growth; and review draft deliverables. Membership on the committee included elected officials, business owners, developers, design professionals, interested citizens, and representatives of local boards, commissions and organizations. The committee met five times over eighteen months to complete its work.
Community Ideas Exchange Workshop A Community Ideas Exchange Workshop (CIEW) series was held early in the planning process to formally announce the project’s kickoff. The four-meeting series included a main event held at the Charles Mack Citizen Center and three smaller (duplicate) events held in the three other town wards. Repeating the event in all four town wards broadened opportunities for community engagement in the planning process. The events were all drop-in style and used different hands-on activities to collect information from the participants. Stations around the room focused on a town vision and guiding principles, community character,
Adopted September 21, 2026
Community Workshops
148
participants
108
Pop Up Meetings Two Bring Your Own Question Events
53
participants
participants
Site Visits
16
5
Members
Meetings
44
Stakeholder Interviews
5
Draft Document Comments
199 Registered Participants
175
Policy-Maker Meetings
Project Surveys
83
7,579
Advisory Committee
Formal Conservations
Community Conservations
www.mooresville-tomorrow.com
Mooresville Day
Community Ideas Growth Choices Draft Plan Exchange Series Workshop Series Workshop Series
4
Website
Planning Process
One event per Town ward was held for each workshop series.
Project Contributions
595
179
137
Engagement Dashboard Surveys
Growth Choices Sticky Note Comments
Growth Choices Online Surveys
853 Document Downloads
economic development, transportation, open space, home and neighborhood choices, and best practices to consider from outside Mooresville.
summarized and combined with the same slide deck shared with plan participants.
Sticker dots, poker chips, play money, string, surveys, photos, and sticky notes used to collect participants’ thoughts and opinions at the stations. The input received was summarized in a slide deck and shared with plan participants via the online engagement hub.
The Town created an interactive online engagement hub for the new comprehensive plan, which served as a one-stop-shop for twenty-four-hour access to project information, schedules, events and engagement opportunities, background information, project resources, and draft project documents created throughout the planning process. Site visits were monitored and community input was referred to throughout the twenty-two-month planning period.
An online version of the CIEW was also created to mimic the stations used at the in-person events. The online version of the workshop was open for four weeks following the in-person events. Input from the virtual CIEW was
Online Engagement Hub
Preface | Introduction | Planning Process | Framework | Infrastructure | Concepts | Policies | Action Plan
22
Pop-Up Events A series of pop-up events were held in the community to create awareness for the new comprehensive plan and seek input from groups traditionally under-represented in a planning process. Project team members staffed a booth at the Town’s Mooresville Day event, hosted multiple “bring your own question” events at local breweries, and facilitated a meeting with the Mooresville Youth Council. The input received at these events was summarized as meeting notes and referred to while writing the plan document.
Community Conservations Initiative A community conservations initiative was launched by the project team to provide families, friends, neighbors, and colleagues with a host toolkit (meeting in a box) and the opportunity to hold an independent conversation about the Town’s challenges and opportunities for the future. The informal nature of the engagement opportunity made the planning process more accessible to some community members and expanded the range and depth of input received for writing the plan document. A summary of each meeting was sent to the project team for the new comprehensive plan. Meeting notes were referred to both while developing alternative growth scenarios for testing (see Growth Choices Workshop) and while writing the plan document.
Growth Choices Workshop and Online Survey A Growth Choices Workshop (GCW) series was held at the midpoint of the planning process to present five alternative growth and development scenarios contemplated for the Town’s planning area, which were influenced in large part by the
23
Mooresville Tomorrow 2040 Comprehensive Plan
input received earlier in the planning process. The four-meeting series included a main event held at the Charles Mack Citizen Center and three smaller (duplicate) events held in the three other town wards. Repeating the event in all four town wards broadened opportunities for community engagement in the planning process. The events were all drop-in style and presented information at six stations using large presentation boards (i.e., one per scenario plus a side-by-side comparison). Initial reactions to the five scenarios were recorded using sticky notes provided underneath the posters presented at each of the stations. Early thoughts from workshop participants provided answers to four prompting questions: (1) What do you like about each scenario? (2) What do you dislike about each scenario? (3) What changes could be made to improve each scenario? (4) What topics highlighted in each scenario would you like to learn more about? An online survey was also released after the GCW main event. It used ESRI StoryMap technology to organize maps, videos, and text that helped residents visualize the alternative growth and development scenarios. The information was presented in multiple tabs accessible via the banner at the top of the page in the online survey. Participants could click on red box buttons (links) throughout the site to start videos or download information linked to the site. The online survey was open for three weeks following the in-person events. Input from the online survey was summarized in two documents that were shared with plan participants via the online engagement hub.
Adopted September 21, 2026
project team members throughout the planning process.
A Draft Recommendations Workshop (DRW) series was held near the end of the planning process to kick off a public review of the draft Mooresville Tomorrow comprehensive plan. The three-meeting series included a main event held at the Charles Mack Citizen Center and two smaller (duplicate) events held in two other town wards. Repeating the event in different town wards broadened opportunities for community engagement in the planning process.
A community engagement dashboard was created specifically for the comprehensive plan to track participation and compare it back to the Town’s demographic profile. The dashboard included several community indicators that described the mix of residents living in Mooresville today, including by town ward, gender, age, race or ethnicity, education level, homeownership status, household income, and the number of years lived in town. Existing information (2023) for the indicators was collected from Claritas, a proprietary database that draws from the U.S. Census Bureau. It was used over simple census data to pull data specific to Town limits and the four town wards within it.
The events were all drop-in style. Poster-size enlargements of key pages from the draft plan document were presented on the walls of the meeting space, and participants were asked to provide feedback via a sticky-note survey (things they liked, things they disliked, and things they questioned) and dot-voting exercise (positive or negative reactions to important statements in the document). Feedback from the community influenced revisions to the draft document before starting the formal adoption process.
Policy-Maker Briefings Town staff and their consultants interacted with the Town’s Board of Commissioners throughout the planning process at work sessions and public hearings. The events were used to provide project briefings and seek input during key milestones of the planning process. Feedback from Town board members influenced important steps in the planning process and topics or concepts presented in draft project documents.
Community Engagement Dashboard The Town’s community engagement strategy for the new comprehensive plan sought to make equity and accessibility priorities, and to ensure residents and stakeholders in all four town wards (and beyond) had the opportunity to engage with
Planning Process
Draft Recommendations Workshop
Participants for all in-person and virtual engagement events held for the comprehensive plan were asked to complete a brief survey, which was used by the project team to measure participation levels against the community indicators across single events and the projectas-a-whole. The survey was voluntary and not required to participate in a specific event. Tracking participation within the planning process (who and when) provided the project team with the opportunity to update its approach for future engagement events in real time to target under-represented groups in the process. For example, extra pop-up events in downtown breweries were scheduled to raise participation levels for certain demographic categories. The advertising strategy for later workshop events in the process was also changed — using the Town’s existing email and telephone alert system — to broaden participation more in line with town-wide demographics.
Preface | Introduction | Planning Process | Framework | Infrastructure | Concepts | Policies | Action Plan
24
25
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
Planning Process Preface | Introduction | Planning Process | Framework | Infrastructure | Concepts | Policies | Action Plan
26
Introduction Chapter 3 is organized as a framework that defines the important characteristics of a strong and lasting legacy for the Town built over time. It includes a set of guiding principles, which set broad targets for shaping the Town’s future, and statements on community size and character that unify a position and philosophy for guiding growth, conservation, and design efforts in the Town’s planning area. Three maps presented in the chapter depict preferred development types, locations, patterns, and intensities for the planning area, which should inform decisions in the future about locating and sizing supporting infrastructure (see Chapter 4). The diversified development strategy presented in this chapter respects the Town’s identity and brand while being opportunistic and embracing change if it furthers the community’s shared vision for the future. Managing decisions in accordance with the framework should result in a higher quality of life for residents, a larger and more diverse local economy, an increase in connected open space, more home choices for residents of all ages, and a more productive tax base.
27
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
Framework
Guiding Principles Nine guiding principles are presented in the comprehensive plan to expand upon the shared vision statement presented earlier. The principles are critical to preserving and enhancing a high quality-of-life for residents and to position Town leaders well for the future as markets, technologies, and demographics may change over time. The guiding principles were created to (1) embrace new opportunities for the Town, (2) be precise about stated preferences and intended outcomes, and (3) reflect statements heard from residents during the planning process. The means by which the Town achieves the community’s broad goals may evolve over time, but the guiding principles themselves should endure for generations. Changes to policies or direction considered for the Town’s planning area should be evaluated against both the shared vision statement and the guiding principles to
determine if they are in the best long-term interests of Mooresville. Development applications made within the Town should explain in writing how their development program, site design, amenities provided, etc. further the guiding principles presented in the document. One guiding principle is no more important than the others, rather they are all interrelated and interdependent acting as an organizing element for the Mooresville Tomorrow comprehensive plan. The Town’s Board of Commissioners recognizes that opportunities in the future may bring into conflict full and simultaneous implementation of the nine principles and necessitate a choice or prioritization between them. While balancing competing interests, it is the intent of the comprehensive plan and its guiding principles to protect the health, safety, welfare, and prosperity of the community in all decision-making.
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
28
No. 1 — Planned and Orderly Growth Encourage a mix of land uses and development intensities in accordance with the General Growth Framework that promotes economic development, sense of place, social interaction, community-building, and the efficient use of Town facilities and services. Emphasize the development of unique activity centers in the community that vary in scale, use, size, and intensity. Also, proactively plan for the neighborhoods, corridors, and public spaces between activity centers that make the entire community more vibrant and connected. Prioritize infill development of under-utilized properties, and redevelopment of declining buildings or properties, in Mooresville to be more compact as a town and more efficient with Town resources. Be flexible, when needed, to optimize Town functions or preserve Town character, history, culture, or stated preferences. Acknowledge increased densities and intensities, and a mix of residential and nonresidential uses, are needed in the Town to accommodate compact development patterns.
No. 2 — Town Character and Authenticity Celebrate a distinct brand and sense of place for the Town that is uniquely Mooresville, while still tapping into the talent and creativity of the people that shape it ― residents, business owners, property owners, Town officials, developers, and planning or design professionals ― to keep things relevant and authentic. Emphasize community character and high-quality design ideas for buildings, streets, gateways, public spaces, parking lots, signs, and landscaping that make Mooresville distinct from surrounding communities. Remember the interplay between land use, transportation, open space, housing, economic, and infrastructure decisions for making the Town a more livable and memorable place. Prioritize the spaces around and between buildings for different place-making initiatives, which adds visual interest to an area, attracts outdoor activities, and creates emotional connections between people and places. Ensure place-making initiatives in Mooresville emphasize walkable environments, open spaces, and active-living. Use Town investments in public spaces to leverage greater private investment nearby in terms of building use, scale, placement, materials, and indoor/outdoor activation.
29
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
Framework
No. 3 — Home and Neighborhood Choices Dynamic neighborhoods in Mooresville should be places that provide an exceptional quality-of life, attainable and diverse housing options, and connections to neighborhood-serving uses like community gardens, parks, schools, neighborhood commercial areas, or mixed-use activity centers. Neighborhoods should organize lots around a continuous and connected system of open space that represents a prominent feature of the development. Neighborhoods should be treated as the “connective tissue” between destinations, and provide a place for social interaction, and foster connections between residents, that together create a source of pride and belonging in the community. Positive actions, routines, or experiences in a Mooresville neighborhood should lead to a willingness of residents to stay and put down roots in the community.
No. 4 — Life Outdoors Create a comprehensive, continuous, and coordinated open space network for the Town that promotes new parks and recreation centers, provides greater access to both active and passive uses, and provides interesting gathering places for residents, employees, and visitors in different parts of the community. The size, location, and design of open space in the community should support a resource hierarchy — townwide parks, community parks, neighborhood parks, and public spaces in different activity centers designed as plazas, cafes, or attractive streets for walking. Increase the quality and quantity of physical connections, emphasizing public access, to Lake Norman from different areas of the community. Safeguard the Town’s natural resources as critical elements of an open space network, including lakes, streams, wetlands, woodlands, trails, agricultural lands, and tree canopy. Protect natural open space as a means to manage stormwater runoff, provide trail linkages, protect water quality, and celebrate nature as a centerpiece of the Town’s unique identity and sense of place. Capitalize upon connections to open space and natural areas throughout greater Iredell, Mecklenburg, and Rowan Counties, and work with partners in the greater Metrolina region to increase system size, connections, and cohesiveness.
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
30
No. 5 — Community in Motion Provide a transportation system that is safe and reliable for moving people and goods throughout the community by vehicle, bus, train, bicycle, or walking. Equal emphasis on land use (demand), transportation (supply), and design (character) topics in the Town’s transportation and land use decision-making processes should improve the overall efficiency of a multi-modal transportation system. Build a transportation system that favors walkable, complete streets; a connected network of streets, bicycle lanes, sidewalks, and greenways; mobility hubs for bringing travel modes together; and place-making principles important to creating notable neighborhoods, districts, and activity centers throughout the community. Recognize the special needs of children, seniors, runners, bikers, and families when planning for an effective transportation system. Work with the Town’s transportation partners to build a more efficient and multimodal regional transportation system.
No. 6 — Community Facilities and Services Continue to improve quality-of-life for all residents of Mooresville by maintaining and expanding facilities and services to meet current and future demands ― including water, sewer, roads, parks, police, emergency medical services, and fire ― while ensuring elected officials are good stewards in allocating finances toward Townprovided services that promote compact development patterns and a high quality-oflife for Town residents. Prioritize infrastructure investments that support more compact and efficient development patterns presented in the General Growth Framework and maintain a strong partnership with private developers or outside service providers to ensure infrastructure capacity is available to support intended growth and development depicted in the framework’s three-map series. Emphasize coordination between different Town departments to add new or expanded infrastructure in the community and prioritize the implementation of capital projects in the Town’s various infrastructure plans and studies to keep pace with future demands.
31
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
Framework
No. 7 — Economic Vitality Create a competitive advantage for economic development in Mooresville based on place-making, which promotes, in part, high-quality and desirable places to live, work, and visit as a means to attract top-level businesses and their employees. Investments that make the Town a more dynamic place also create a stronger local economy that appeals to a wide range of skilled and educated workers. Position Mooresville as a “center of excellence” for advanced manufacturing, medical, and corporate office jobs in the region. Future investments to support economic development should realize financial benefits for Town residents by seeking to diversify the economy, improve the tax base, promote economic development and investment, support the needs of local shops and businesses, and advocate for housing and educational choices that lead to greater economic sustainability.
No. 8 — Livable Town Promote a welcoming town for residents, businesses, and visitors that recognizes not everyone starts from the same place and that intentional and unintentional barriers exist in peoples' daily lives. Promote access to opportunities and resources for all residents and businesses when making Town decisions, targeting Town investments, or programming community outreach or events. Increase the awareness of Town resources and opportunities for engagement — especially for those traditionally under-represented in a Town process or activity.
No. 9 — Long-Term Financial Security Remain a town dedicated to delivering excellent municipal services to the community in a financially-responsible manner. Incorporate best practices into all aspects of the Town’s financial management, including long-term financial planning, predictive forecasting, and finding alternative funding sources and partnerships to implement desired outcomes. Maintain an excellent bond rating for the Town while making investments in the community. Promote a comprehensive development portfolio for the community that balances the Town’s residential to non-residential tax base, while requiring high-quality design, features, and elements in new development that help increase its value capture (tax base) potential.
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
32
Community Growth Considerations The Town’s ability to maximize its opportunities and minimize its challenges for the future are shaped, in part, by (1) land made available to accommodate new uses and associated buildings and spaces, (2) the Town’s support for a variety of development types, locations, patterns, and intensities in different areas of the community, and (3) the type, size, and location of supporting infrastructure. Growth potential for the Town’s planning area was calculated using information from (1) a market assessment completed to support the Mooresville Tomorrow comprehensive plan, (2) socioeconomic data created for the Charlotte Region Transportation Planning Organization’s 2055 Metropolitan Transportation Plan, and (3) data generated for the scenario planning initiative (especially the committed development inventory) completed to support the comprehensive plan (i.e., Scenario D). Data from these sources was compiled and summarized for population, housing units, employees, and non-residential square feet. Generally speaking, Mooresville is in a very strong market and the challenge for the Town will be managing opportunities in terms of what best improves residents’ quality-of-life and creates a stronger, more sustainable economy. It is reasonable to assume Mooresville will remain a desirable place to be so long as investable development rights are afforded to private property owners and future development sufficiently protects the character of the community that makes it desirable.
square feet of retail development; 437,886 square feet of office development; 3,018,028 square feet of industrial development; 6,511 new single-family detached homes; 2,447 new townhomes; and 5,246 new apartments. Along with this growth comes the need for supporting infrastructure, such as schools, parks, utilities, and transportation investments. The type, location, timing, and capacity of infrastructure in the community will be critical to local initiatives to manage the amount of growth and development that will — or will not — occur in Mooresville. Concentrating new growth in targeted areas should maximize the benefits of infrastructure improvements and potentially change some behaviors related to how residents interact with nearby development. Strong market demand anticipated through 2040 also puts Town officials in a position of strength when evaluating new development proposals and increases their influence on the use, design, and character of new development built in the community. The time is right for the Town to demand what they want in terms of future (re)development and ensure that individual projects in the Town reinforce the shared vision, guiding principles, and important themes presented in the comprehensive plan.
Strong interest and market demand in Mooresville are evident in the amount of committed development noted in the planning area. As of July 2024, the Town is expected to see significant growth in the near-term: 643,421
33
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
Framework Growth potential for the Mooresville planning area (town limits + extraterritorial jurisdiction + area of influence) was calculated using information from the Town’s committed development inventory, the market assessment completed for the Mooresville Tomorrow comprehensive plan, and socioeconomic data created for the Charlotte Region Transportation Planning Organization’s 2055 Metropolitan Transportation Plan. The committed development inventory was assumed to build out completely in the first ten years of the planning horizon, 2024 to 2034. Growth for the last six years of the planning horizon, 2035 to 2040, was forecasted using a four-percent annual growth rate for all development categories.
Population Projections for the Planning Area
Dwelling Unit Projections for the Planning Area
Employment Projections for the Planning Area
(2024)
97,888
(2024)
37,319
(2024)
53,374
(2040)
144,222
(2040)
57,114
(2040)
67,071
(Change)
+46,334
(Change)
+19,795
(Change)
+13,697
Retail Development Square Foot Projections for the Planning Area
Office Development Square Foot Projections for the Planning Area
Industrial Development Square Feet Projections for the Planning Area *
(2024)
9,348,800
(2024)
4,458,750
(2024)
5,475,150
(2040)
10,378,274
(2040)
5,609,368
(2040)
10,303,995
(Change)
+1,029,474
(Change)
+1,150,618
(Change)
+4,828,845
* = includes manufacturing, warehouses, and flex space businesses
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
34
Three-Map Series The chapter includes three maps that should guide future decisions about conservation and development in the community: (1) the Intentional Growth Areas Map, (2) the Conservation and Development Map, and (3) the Development Change and Intensity Map. All three maps should be used in a series when contemplating the future of a parcel or area as described below.
Step 1: Intentional Growth Areas Map (IGAM) The Intentional Growth Areas Map (IGAM) establishes clear expectations for residents, elected officials, developers, landowners, and infrastructure providers regarding the level of change and development anticipated for the area over a sixteen-year planning horizon. Developers and property owners should consult with staff and use the map as a general guide before making major investment decisions, and infrastructure service providers should consult the map when evaluating the timing and magnitude of their investments to meet future demands in their service areas. Town residents should consult the map to understand a general level of development activity (or change) intended for different parts of the community sometime in the future.
Step 2: Conservation and Development Map (CDM) The Conservation and Development Map (CDM) delineates preferred development types, locations, patterns, and styles for the planning area assuming complete build-out of the community. Fourteen place type categories and four activity center categories are used on the map to describe intended outcomes. Some
35
Mooresville Tomorrow 2040 Comprehensive Plan
categories assigned to the map represent existing conditions observed in the planning area, while others describe more aspirational development conditions not prevalent in the community today but desirable in the future. The information presented on the CDM is more refined compared to the IGAM, noting preferences for new parks and open space, residential neighborhoods, retail and employment centers, and several types of mixed-use activity centers, corridors, and neighborhoods. Further expectations for the place types are presented in different crosswalks (matrices) presented on pages 63 through 80 and relate to (1) residential building types, (2) non-residential building types, (3) block size and patterns, and (4) open space or natural resource features. Developers and property owners should consult the map to confirm desirable (supportable) development outcomes before making major investment decisions. Town residents should consult the map to understand what is generally intended for vacant or declining properties in the community if or when a developer or property owner decides to make an investment.
Step 3: Development Change and Intensity Map (DCIM) The Development Change and Intensity Map (DCIM) is a companion to the IGAM and CDM, and presents preferred development levels or intensities for different parts of the community. Seven development intensity categories are represented on the DCIM: level zero (open space), level one (rural preservation areas), level two (existing suburban), level three (modest infill), level four (small-scale mixed-use), level five (modest-scale mixed use), and level six (intense-scale mixed use). One development category or activity center category presented on the CDM may be represented by two or more
Adopted September 21, 2026
▲
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
Framework
General Process for Applying the Three-Map Series to a Parcel or Area
36
development intensity levels on the DCIM because of where different properties are located in the community. The depiction of all seven categories on the map sets general expectations for the level of development intensity or activity anticipated throughout the community. Developers and property owners should consult the DCIM to confirm desirable (supportable) development intensities before making major investment decisions. Town residents should consult the map to understand what is intended for vacant or declining properties in the community if or when a developer or property owner decides to make an investment.
Intentional Growth Areas Map The Intentional Growth Areas Map (IGAM) should guide broad growth decisions, infrastructure investments, infill development and redevelopment initiatives, open space protection, and general Town policy revisions. The map offers the means to efficiently organize and illustrate a hierarchy of growth and conservation priorities for Town leaders. Adherence to the IGAM will (1) facilitate the convergence of public and private decisionmaking processes, (2) leverage Town resources with other public and private investment dollars, (3) manage the amount and timing of new infrastructure required to support future development while avoiding sprawl, (4) implement a Town-wide strategy for identifying and securing open space, and (5) enhance the Town’s influence in future development decisions that directly impact the quality-of-life for all residents in the area.
success with exception only for (1) economic development opportunities of state or regional significance that were not anticipated at the time the comprehensive plan was adopted, or (2) significant infrastructure investments or commitments. The categories assigned to the map serve as a guide for encouraging and directing open spaces and intended growth areas within the community. Categories assigned to the map were influenced by various factors, including environmental qualities, cultural significance, growth projections, available infrastructure, and previously developed centers, corridors, and neighborhoods. The IGAM presents seven high-level initiatives: areas to protect, areas to preserve (including two subcategories), areas to enhance (including two subcategories), areas to start new, and areas to transform. Each initiative is accompanied by a general objective, important considerations, and targeted treatments to facilitate progress. The map and category descriptions establish expectations for residents, elected officials, developers, landowners, and infrastructure providers regarding the level of change and development intensity anticipated for the area over the sixteen-year planning horizon. The IGAM also presents two infrastructure investment area categories for the sixteen-year planning horizon: a primary growth area and secondary growth area. Each category is described in general terms for the type, intent, and priority of investments in infrastructure that should be considered to keep pace with future growth and development patterns. The investment area boundaries presented in the comprehensive plan should be used by others to update the different infrastructure maps presented in other Town documents (see Chapter 4).
The IGAM should remain consistent and maintain a clear direction towards the Town’s
37
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
Framework
Map 3-1: Intentional Growth Areas Map
▲
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
38
Areas to Protect (Land Conservation) Areas to Protect safeguard floodplains, wetlands, permanent conservation areas, environmentally-sensitive lands, or other open spaces from future subdivision or development, and provide meaningful opportunities to link residents with nature. Future development is limited in these locations to protect open space, natural areas, and rural viewsheds in the community with the exception of farms, passive park-related activities, and cross-town trails or greenways.
Areas to Preserve (Rural Landscapes) The first category of Areas to Preserve — rural landscapes — includes working farms, homes on very large lots scattered throughout the countryside, and small rural crossroads. A minimalist infrastructure investment strategy acknowledges many responsibilities to live in these areas are borne by private landowners as a trade-off for the opportunity to live in a more rural-setting.
Areas to Preserve (Existing Development to Remain) The second category of Areas to Preserve — existing development to remain — includes active parks, neighborhoods, schools, shopping centers, employment centers, or industrial parks that are not anticipated to change significantly in the future. Small, tactical improvements may be contemplated in these areas — primarily in the right-of-way or other public or quasi-public spaces — if it is determined to improve the quality-of-life for people that live, work, shop, or visit these areas.
Areas to Enhance (Infill Development, Reinforcement)
39
Mooresville Tomorrow 2040 Comprehensive Plan
The first category of Areas to Enhance — infill development, reinforcement — includes smallto medium-size parcels in previously-settled areas of community that are anticipated to develop in a manner that complement existing buildings and the surrounding environment. Investment or reinvestment in these areas is assumed to be in-keeping with the land uses, densities, location, character, and views from surrounding development. New uses or buildings would not vary widely from what exists in the immediate area today (i.e., more of the same should be expected).
Areas to Enhance (Infill Development, Changing Trends) The second category of Areas to Enhance — infill development, changing trends — includes previously-developed neighborhoods, centers, and corridors that are now stable, but should consider small-to-medium improvements to keep up with changing economics, technologies, consumer preferences, or age-related wear and tear. These areas are not likely to witness wholesale redevelopment in the future, but could benefit from limited infill development or precise, tactical improvements capable of enhancing the quality-of-life for the people that inhabit those areas. Infill development this category may support new land uses, buildings, or spaces, any of which should complement the uses, densities, location, character, and views from surrounding development (i.e., small changes to an area may be expected). Areas under this category may also include opportunities to introduce new choices to live in and experience the community — including, but not limited to, “missing middle” home choices such as townhouses, duplexes, triplexes, or quadplexes — and accessory dwelling units in close proximity to existing single-family detached homes.
Adopted September 21, 2026
Framework Deeds, covenants, or restrictions in some neighborhoods may preclude outright certain ideas for infill development contemplated by a property owner. Infill development in retail and employment enhancement areas should provide jobs and services for nearby residents and the larger community.
Areas to Start New (Greenfield Development)
Areas to Start New provide opportunities to be forward-thinking about a vision for conservation and development in large, undeveloped areas that are, or may be reasonably soon, served by municipal Town services. The size of single undeveloped parcels, or the adjacency of several smaller undeveloped parcels in the same area, provides the opportunity to plan for a mix of uses or densities that create new, energized activity areas, neighborhoods, or corridors. The reimagined areas may support new employment
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
40
centers, shopping centers, entertainment areas, large recreation complexes, or neighborhoods.
Areas to Transform (Redevelopment) Areas to Transform provide opportunities to reimagine Mooresville’s future, and introduce energized activity centers or corridors that provide key locations for new employment centers, shopping centers, entertainment areas, and upper story or adjacent residential units in appropriate locations. The designation is used primarily to transform more suburban, autooriented developed areas into walkable activity centers or corridors with a mix of uses, public spaces, and development densities. Areas to Transform require more deliberate planning and phasing to keep existing businesses viable during the period of change. Once complete, redeveloped areas have the potential to serve as new and reinvigorated activity centers or corridors visited by the whole of Mooresville.
Target Investment Areas Primary Growth Area (Town Limits) The primary growth area for the comprehensive plan includes land inside existing Town Limits — or land annexed into Town Limits sometime in the future — that helps accommodate growth projected for the sixteen-year planning horizon, 2024 to 2040. The entire area should be a highpriority for new or improved infrastructure constructed in the future, whether by the Town, private developers, or their service partners. New or expanded infrastructure in the primary growth area should provide new capacity in existing service areas to keep pace with infill development or redevelopment envisioned on the Conservation and Development Map, which are intended to enrich the mix of land uses in close proximity and make efficient use of existing infrastructure in the area.
41
Mooresville Tomorrow 2040 Comprehensive Plan
Secondary Growth Area The secondary growth area for the comprehensive plan includes land contiguous to Town Limits that could help accommodate growth projected for the sixteen-year planning horizon. Some areas on the map include smaller parcels anticipated to infill in a manner that complements existing buildings and their surrounding environment. Other areas on the map include large, undeveloped parcels that provide opportunities to be forward-thinking about a vision for conservation and development that includes a mix of uses or densities that create new, energized centers, corridors, or neighborhoods in the community. A portion of the secondary growth area is inside existing or planned utility service areas. These areas should be targeted for small- to large-scale infrastructure investments that keep properties economically-viable in the future. Town officials should advocate for new infrastructure projects that “upsize” for additional capacity and fill-in missing segments for important street, water, or sewer connections. Infrastructure investments that support economic development — new jobs or new sales tax revenue — in the secondary growth area should be a high priority. Infrastructure Investment Considerations Continued investment in either primary or secondary growth areas should maximize return on-investment potential for the Town by (1) minimizing utility expansion costs and (2) maximizing land productivity for private property owners that increases tax revenues for the Town. Investments made in the two categories should also offer several public-private partnerships to improve the public realm — the space between buildings — or add community facilities during the development entitlement process. Infrastructure investments in either area should keep pace with changing economics, evolving technologies, and aging-infrastructure.
Adopted September 21, 2026
Conservation and Development Map The Conservation and Development Map (CDM) depicts preferred development types, locations, patterns, and styles for the planning area assuming full build-out of the community. It also provides a physical framework to more effectively realize the shared vision statement and guiding principles presented in the comprehensive plan. Some recommendations for the CDM are bold, and set a long-term vision for a more diverse development portfolio in Mooresville that is (1) forward thinking, (2) focused on new or improved development activity centers, corridors, and neighborhoods, (3) promotes economic development, (4) mindful of supporting infrastructure, (5) aware of residents’ quality-of life, and (6) economicallyviable and financially sustainable for the Town. The CDM is largely implemented through the Town’s Unified Development Ordinance (UDO) and official Zoning Map. Some areas on the CDM reflect what currently exists today, some are more aspirational in nature, and others are a mix of what exists today and what could be in the future. The place type categories and activity center categories depicted on the CDM are described later in the chapter. They articulate how specific areas should develop in the future in keeping with the shared vision for the community.
The CDM and its place type and activity center categories serve as the foundation for near-term revisions to the Town’s UDO, which should ensure rules and regulations are consistent with the vision for conservation, character, and development presented in the comprehensive plan.
Framework
Advancing infrastructure investments in either area should be considered to incentivize investments by developers or private property owners. Specific projects should be considered that might transform these areas into more walkable and vibrant places, and consider opportunities to link neighborhoods to the different development activity centers.
Some activity centers envisioned for the CDM may take longer to implement compared to building more suburban-style residential neighborhoods or shopping centers. However, the benefits of these uses to safeguard and promote the long-term viability of Mooresville is worth the wait. In addition, build-out of the CDM is a long-term endeavor, whereby it may be several decades before all of the land in the Town’s planning area is developed, redeveloped, or preserved. Town officials should influence the timing, magnitude, and location of growth in the planning jurisdiction using local infrastructure investment policies, land use regulations, and partnerships with regional service providers. From time to time, revisions to the CDM may be needed to reflect new realities in the future. Changes considered to the map should be evaluated against the shared vision statement, guiding principles, and Intentional Growth Areas Map to determine if the Town’s best interests are improved because of the proposed change. Town officials should also evaluate proposed changes to the map using an “if-then-what-else” approach to decision-making, whereby potential ripple effects or unintended consequences associated with a proposed change are evaluated to see what else might be impacted as a result. For example, categories assigned in the CDM may need to be revised if the Town or their partners decide to support a major economic development decision, or if a regional or state agency programs improvements for the area not previously anticipated in the comprehensive plan.
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
42
Map 3-2: Conservation and Development Map
▲
previously anticipated in the comprehensive plan.
43
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
Place Type Descriptions Fourteen place type categories are depicted on the Conservation and Development Map. A description of each category is provided on the pages that follow. Information presented for each of the categories clarifies the Town’s intentions for properties in the planning area and enhances the utility of the Conservation and Development Map as a tool for decision-making.
The information presented is the first step in a series of actions required to influence preferred development or character considerations for the community. Town officials should reference this information when it makes amendments to the local UDO, various construction and design standard manuals, small area plans, topic specific master plans, or the capital improvement plan.
Framework
Amendments to the CDM should be considered automatic if the Town’s Board of Commissioners makes a zoning decision that is inconsistent with the map. In this case, the motion to make a zoning decision should be accompanied by the appropriate new place type category to assign on the CDM.
Revisions to each of the documents identified above will fine tune the big ideas and concepts presented in the comprehensive plan. New or updated documents should transform general policies and recommendations in the comprehensive plan into laws, standards, system maps, service plans, schedules, and capital projects that guide Town investments and hold developers accountable for delivering high quality projects that reinforce Mooresville’s expressed community character.
Site considerations related to topography, geology, environmental resources, tree canopy, cultural resources, historic preservation, or existing development on a site may be more important for influencing land use or development intensity criteria in a specific location than the general statements presented for each of the place type categories. These conditions should be considered during the review of a specific development application.
Building and Site Design Considerations The comprehensive plan presents four crosswalks (matrices) on pages 63 through 80 that establish clear relationships between place type categories and (1) residential building types, (2) non-residential building types, (3) block sizes and patterns, and (4) open space or natural resource features.
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
44
OS
Open Space Open space in Mooresville may be used for passive or active purposes. Passive Open Space (POS) Passive areas should be represented by undisturbed land protected from future subdivision or development by federal, state, county, or Town entities; homeowner associations; or by public, private, or nonprofit organizations. The areas may be preserved because of their outstanding natural beauty, environmental sensitivity, stormwater management benefits, historic or cultural significance, viewsheds, or the protection of wildlife management areas. Examples of passive open spaces in the Town’s planning area may include, but are not limited to, preservation or conservation easement areas, natural parks or preserves, cemeteries, large tree stands, or land dedicated as passive open space within residential neighborhoods, non-residential centers, or mixed-use areas.
45
Mooresville Tomorrow 2040 Comprehensive Plan
In more passive settings, open space land is generally represented by large or irregular shaped parcels that should not be subdivided. Active Open Space (AOS) Active open space in the Town’s planning area should be used for parks, playgrounds, athletic fields, golf courses, open-air sports complexes, amphitheaters, marinas, golf courses, greenways, or trails. Facilities may be operated by the Town, nonprofit organizations, or private sports clubs. The Town should continually evaluate opportunities for additional park land in the planning area during the review of new development applications; especially where public recreation open space is not prevalent or easily connected to surrounding development in the immediate area (i.e., west of I-77). In more active settings, parcel sizes may vary depending on use, ranging from small, informal parks or recreation areas included with other uses on a single parcel to large parcels dedicated solely for park or recreation uses.
Adopted September 21, 2026
Framework Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
46
RL
Rural Living This category describes land characterized by large lots and a high degree of separation between buildings. Homes and farms are scattered throughout the countryside and integrated into the landscape. Future development in rural living areas should be sensitive to existing natural resources including tree stands and natural drainage ways. Mass grading or tree clearing should be avoided to the maximum extent possible in rural areas. Farmland (FM) Farmland includes land actively used for commercial agriculture or forestry activities, including cultivated land, small-scale farms, timber harvest, horse farms, other livestock, or woodlands. Farms may include a primary residence, additional housing to support agricultural operations, and outbuildings associated with activities on the farm. While farms are primarily an agriculture category, conditional, accessory, or ancillary uses that support the economic viability of the farm may be considered for the property. These uses may include, but are not limited to, agritourism; special event venues; breweries; wineries; distilleries; education centers; or other activities that are directly connected to specific farm activities performed on the property. Rural Commercial Node (RCN) Small rural nodes of commercial activity — gas stations, convenience stores, nurseries, or restaurants — may exist sporadically along a rural highway or the intersection of two rural highways in the landscape. The purpose of the commercial node is to serve some daily needs of the surrounding rural population. The design and character of a rural commercial node should reinforce the surrounding rural landscape. Buildings should be small-scale and consistent
47
Mooresville Tomorrow 2040 Comprehensive Plan
with the historic design of crossroads in a rural community. Each commercial node should be unique, different, and complementary to the Town's nearby culture, history, and traditions. Conservation Neighborhood (CN) Some areas presently identified as Areas to Preserve (Rural Landscapes) on the Intentional Growth Areas Map may develop as a conservation neighborhood in the future. These neighborhoods preserve and protect environmental features, tree stands, meadows, steep topography, water bodies, or outstanding viewsheds on a site by closely clustering development together of varying lot sizes and densities. Their design responds to specific features on the site; however, goals to reallocate gross allowable densities into more compact development areas that minimize infrastructure investments and maximize large, meaningful, and continuous areas for permanent open space are encouraged. The neighborhoods are primarily residential, but may include limited civic, farm, or other small non-residential (commercial) uses. Rural Homestead (RH) Parcels of land that are generally large and irregularly-shaped with large front, rear, and side setbacks providing a high degree of separation between buildings on adjacent parcels. Homes are generally oriented toward an internal street or rural highways and have direct access via private roads or driveways. One or more outbuildings — barns, workshops, or large, detached garages — used by the homeowner and/or large fenced-in areas for pastures are common on the parcel.
Adopted September 21, 2026
Framework Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
48
RA
Residential Areas Residential areas in Mooresville historically include a limited number of home choices — single-family detached homes, townhomes, or apartments — on relatively uniform lot sizes in a single development or complex.
block or provide accessory dwelling units. Small blocks and a grid street network should support a well-connected, cohesive community. Back yards for each home should be larger than front yards to move homes closer to the street.
Single-Lot Residential (SLR)
New single-family neighborhoods or townhome communities should also include a comprehensive and connected network of open space throughout the site to accommodate small parks, gathering spaces, and community gardens; preserve large tree stands; and help manage stormwater run-off.
Individual lots created for single-family dwellings that are subdivided from larger parcels (often along a major road or highway). Lots may vary in size, shape, setback, or orientation on the same stretch of road (with higher variability in more rural areas). Homes are oriented toward the road or highway and have direct access to it through a private driveway. Some homes are setback great distances from the road. The level of consistency between homes in a series of lots created along the same road is more variable and may include one or more outbuildings on the property. Single-Family Neighborhood or Townhome Community (SN-TC) Homes in a single-family neighborhood or townhome community are traditionally oriented toward an internal street network with blocks that vary in size and shape, and front yards larger than back yards. Many of the streets in the neighborhood are unconnected and end in culde-sacs (with the exception of the historic neighborhoods adjacent to downtown). The external limits of some neighborhoods are used to separate (wall off) new development from existing development using berms, fences, exaggerated setbacks, or landscape buffers. New single-family neighborhoods or townhome communities are encouraged to include a range of home choices for the one housing type provided (i.e., lot size, house size, or price point). They may mix lot and house sizes on the same
49
Mooresville Tomorrow 2040 Comprehensive Plan
Multifamily Community (MFC) Living units in a multifamily community (apartment, condominium, or senior living) are traditionally stacked in large buildings with a relatively uniform housing type and density throughout. Buildings are oriented toward the interior of the site and may be focused on a central gathering place like a community pool or clubhouse. Communities are historically buffered from surrounding development by transitional uses or landscaped areas. Large surface parking lots, entrance gates, and limited street connectivity are also common in older multifamily communities. Aging multifamily communities in the Town’s planning area should contemplate redevelopment strategies that promote infill development and add more housing choices (small multi-plex buildings or townhomes), more open space, more bicycle and pedestrian facilities, and more resident amenities to the site. At least a portion of the site should be considered for commercial or office use during the site’s transformation. Streets near the edge of a complex or community should connect to other streets on adjacent properties. On-street parking created throughout the community could
Adopted September 21, 2026
Framework Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
50
reduce the size and location of required surface parking lots adjacent to buildings and provide opportunities to fill in with smaller housing types or increase open space between buildings.
townhome community should vary home types and lot sizes from more-dense (internal to the site) to less-dense (external to the site) to provide appropriate transitions.
Mixed-Density Neighborhood (MDN)
Non-Residential Buildings
New neighborhoods in the Town’s planning area are encouraged to provide several housing sizes and types ― single dwelling detached, duplex, triplex, quadplex, townhome, condominium, apartment, or senior living ― in the same neighborhood that provide a range of home choices (lot sizes, home types, and price points). Homes in a mixed-density neighborhood should be oriented toward a street or common open space with on-street parking in front of more dense housing options. Some neighborhoods may mix housing types on the same block or provide accessory dwelling units. Different building types should not be fully separated from each other (like pods) in a development. Neighborhoods should include a comprehensive and connected network of open space.
Neighborhoods of all types should be primarily residential in nature, but may include limited civic (church, school, or small community center) or neighborhood-supporting nonresidential uses. Non-residential uses may be presented in small-scale, standalone buildings or in vertically mixed-use buildings (e.g., livework units). Town policy currently prohibits new large, standalone apartment complexes in the planning area by requiring the placement of nonresidential development on the same site (mandating it be a mixed-use development).
A mixed-density neighborhood built adjacent to a conventional single-family neighborhood or
51
Mooresville Tomorrow 2040 Comprehensive Plan
Neighborhoods provide the rooftops needed near retail, office, or education destinations to make them more active and viable. They should be physically connected to nearby nonresidential destinations to promote walking and biking trips in the community.
Adopted September 21, 2026
Framework Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
52
II
Innovation and Institution
Industrial Center
This category describes land developed to support a building or complex of buildings that serve a public or private purpose, including, but not limited to, a library, public or private school, church, police station, fire station, public works complex, water tower, Town hall, museum, hospital, event centers, or other government- or mission-based services. The visual qualities of the buildings and their surrounding grounds reinforce a specific brand and design character for Mooresville. Many civic and institutional buildings in the community have become cherished landmarks.
This category describes land providing opportunities to concentrate employment clusters in the Town’s planning area. They support both large-scale, single-tenant industrial and warehouse buildings and smaller, multitenant industrial buildings that are clustered and may support and serve one another. Advanced manufacturing, biotechnology, automotive research, light manufacturing, warehouse, logistics, distribution, data centers, and research and development are targeted uses for industrial centers in Mooresville.
IC
Industrial areas should typically be buffered from surrounding development by tree preservation areas or landscaped areas with the type and size of the buffer a function of the activities being performed on the site. They should be located near major highways or railroad corridors. In large industrial centers, space should be reserved for athletic fields, walking trails, parks, or nature preserves that are accessible to employees and the public. Walking trails on a site should connect to the Town’s proposed greenway network when possible. Small retail buildings may be included in larger industrial centers to serve employees’ daily needs (e.g., dry cleaner, small restaurant, brewery, test kitchen, or convenience store).
53
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
Framework
BO
Business / Office Center Business and Office Centers in Mooresville serve the daily needs of surrounding residential neighborhoods, whether work, shopping, entertainment, or dining. These areas are generally located near high-volume roads and key intersections and are designed to be accessible primarily by automobile. Buildings are set back from the road behind large surface parking lots, with little-to-no street connectivity between adjacent shops or businesses. Common types of Business and Office Centers in Mooresville include single- or multi-tenant office buildings, multi-tenant strip centers, big box stores, and outparcel buildings near big box stores. Larger commercial properties may emphasize retail, dining, entertainment, hotel, and leisure uses in a single power center that draws visitors from Statesville, surrounding Iredell County, or northern Mecklenburg County.
Their proximity to neighborhoods requires that operations be low-intensity, unobtrusive, and at a scale and design compatible with nearby residential development. The design of a small retail center should transition effectively between residential and non-residential uses and should include safe and convenient pedestrian and bicycle access for nearby residents. Sites should minimize the impact of cut-through traffic on nearby neighborhood streets by orienting vehicle access and circulation away from the neighborhood.
New and redeveloped Business and Office Centers should include multiple buildings oriented toward a system of walkable internal streets. A central green and other public spaces throughout the development — pocket parks, public plazas, outdoor dining areas — encourage community gathering and people watching. Iconic building architecture and unified project development standards should reinforce a unique sense of place for the site. Cross-access between retail and office destinations should also be provided via internal roads with provisions for mobility access between buildings — or walkways through large buildings — that support a park-once mentality (or walk-to, biketo environment from surrounding residential neighborhoods). Parking lots on the site should be minimized to accommodate more open space for patrons. Smaller retail centers in Mooresville provide goods and services to nearby neighborhoods.
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
54
MU
Mixed-Use Areas This category describes land offering the opportunity to serve broader economic, entertainment, education, and housing needs in discernable mixed-use activity centers, mixeduse corridors, or mixed-use neighborhoods. Activity Center (MUAC) A mixed-use activity center concentrates development in a discernable center with small blocks, wide sidewalks, buildings close to the street, and public spaces throughout that signify the place as a hub for activity and community gatherings. Specific size, program, and design requirements for the four activity center categories depicted on the Conservation and Development Map are provided on pages 57 through 62 in the chapter. Corridor (MUC) In some cases, the mixed-use development form, pattern, and intensity described for an activity center may extend outward from a mixed-use area along one or more transportation corridors. A mixed-use corridor leading to a mixed-use activity center, or linking two or more activity centers together, should be considered a desirable condition in the community.
consistent walkable/bikeable environments for travelers in the corridor. Other mixed-use corridors in Mooresville are less developed and offer immediate opportunities to support mixed-use buildings and medium- to high density residential buildings. Stub-out streets should be provided in new development if adjacent land is vacant to create a secondary street network along the corridor that supports more localized trips. Consideration should also be given to ensure building heights, scale, and massing are compatible with existing development in the corridor or adjacent to the corridor. New (re)development of parcels in a mixed-use corridor should meet the Town’s goals for creating more walkable and bikeable streets in the community. Streetscape treatments ― street lights, street signs, street trees, sidewalks, bicycle facilities, traffic signals, sidewalks, or seating areas ― should be consistent along specific corridors, or at least for portions of corridors identified as districts, to reinforce unique experiences for visitors.
Some mixed-use corridors in Mooresville are developed as auto-oriented shopping centers, industrial parks, or residential neighborhoods with few vacant parcels left for infill development. Larger, deeper parcels in the developed corridors may allow for significant redevelopment in the future that supports mixeduse buildings and medium- to high density residential buildings. Smaller, shallower parcels in developed corridors may be less likely to redevelop as mixed-use buildings in the future and should emphasize improvements in their limited spaces that create more connected and
55
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
Larger mixed-use developments may include one or more mixed-density residential neighborhoods radiating out from a discernable development node for the activity center. The neighborhoods provide additional nearby home choices and encourage active living with a comprehensive and interconnected network of walkable streets leading back to the activity center. Residential neighborhoods within and adjacent to the activity center(s) are encouraged to offer different home types of varied lot sizes and a range of home choices. Neighborhoods should
mix home types, lot sizes, or home sizes on the same block or offer accessory dwelling units. Homes should be oriented toward streets or public open spaces with back yards larger than front yards. New neighborhoods should include a comprehensive and connected network of open space throughout the site to accommodate small parks, multiple gathering spaces, and community gardens, as well as environmental site design features to help manage stormwater runoff. Internal streets and open space throughout new mixed-use neighborhoods should connect to existing or future neighborhoods nearby to the maximum extent possible.
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
Framework
Neighborhood (MUN)
56
Activity Center Descriptions The Conservation and Development Map presents a number of activity centers for the planning horizon. Together, the activity centers fulfill a strategy to (1) infill development in and around downtown, (2) reinvest in aging shopping centers to become new mixed-use areas, and (3) promote purposeful and incremental expansion of Town infrastructure to areas destined to become large, mixed-use communities where residents might live, work, learn, shop, and play in close proximity. Limited resources to plan for and construct new infrastructure should be mindful of the growth target areas on the Intentional Growth Areas Map (IGAM). Infrastructure providers
outside of Mooresville are encouraged to prioritize investments in these areas to support future growth and development. A description of four distinct activity centers created for the Mooresville Tomorrow comprehensive plan — neighborhood activity center, community activity center, regional activity center, and downtown — are described on pages 57 through 62 in this chapter. Future activity centers depicted in Areas to Preserve (Rural Landscapes) on the IGAM are encouraged to remain rural until such time that infrastructure exists to support the highest and best use intended for the area on the Conservation and Development Map.
Neighborhood Activity Center (N) Neighborhood activity centers provide goods and services to surrounding neighborhoods at a limited scale. Their proximity to existing neighborhoods in some locations requires that commercial operations be low-intensity, unobtrusive, and at a scale and design compatible with nearby residential development. Businesses in the activity center are oriented toward an internal main street or public square that serves as a gathering space for patrons and visitors. The compact, walkable design of a Neighborhood Activity Center encourages pedestrian movements between buildings. Buildings on small blocks encourage active public spaces between buildings. Public spaces are sized and designed to be small gathering places for surrounding neighborhoods. Residential units or office space may be found above storefronts. For a larger Neighborhood Activity Center, homes surrounding the center of commercial development may offer several choices to live and experience the Activity
57
Mooresville Tomorrow 2040 Comprehensive Plan
Center — including but not limited to “missing middle” home choices and accessory dwelling units. The design of Neighborhood Activity Centers should transition effectively between residential and non-residential uses. Neighborhood Activity Centers should also maximize their connections to the Town’s open space network, including safe and convenient pedestrian and bicycle access to the centers from nearby neighborhoods. An Activity Center located along an existing or proposed longdistance greenway should incorporate trailoriented development principles into its overall design, including buildings oriented toward the greenway corridor, public or private spaces near the greenway corridor that accommodate trail users, and a network of secondary trails that connect into the primary greenway corridor. Amenities in a trail-oriented Activity Center ― bike parking, outdoor furniture, bike repair stations, and public art ― should also be incorporated into the overall design concept.
Adopted September 21, 2026
Framework Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
58
Community Activity Center (C) Community activity centers offer the opportunity to serve broader economic, entertainment, and housing needs in the community. Land uses and buildings on small blocks encourage active public spaces between buildings. Residential units or office space may be found above storefronts. Homes in and surrounding the center of development may offer several choices to live and experience the Activity Center — including, but not limited to, “missing middle” home choices and accessory dwelling units. Parking is satisfied using on-street parking, structured parking, and shared rear-lot parking strategies. The compact, walkable environment and mix of residential and non-residential uses in the center supports multiple modes of transportation, including the potential for moderate-to-intense transit-oriented development if-when-where a decision is made to invest in premium transit along major transportation corridors in the Town.
the greenway corridor that accommodates trail users, and a network of secondary trails that connect into the primary greenway corridor. Amenities in a trail-oriented Activity Center ― bike parking, outdoor furniture, bike repair stations, and public art ― should also be incorporated into the overall design concept. A larger Community Activity Center may include one or more mixed-density or mixed-use neighborhoods, which provide additional nearby home choices and encourage active living with a comprehensive and interconnected network of walkable streets. Some areas in the Town designated for a Community Activity Center are currently suburban shopping centers. Transformation of these areas to support mixed use development may require more deliberate planning and phasing to keep the areas viable during their transition.
Residential uses in a Community Activity Center are generally secondary to commercial uses and open space (combined) in terms of the size, scale, footprint, and intensity of development. The only exception should be made for transitoriented development, which should increase the number and density of residential uses in and around premium transit stations to increase the number of potential transit riders for the system. Community Activity Centers should also maximize their connections to the Town’s open space network, including safe and convenient pedestrian and bicycle access to the centers from nearby neighborhoods. An activity center located along an existing or proposed long distance greenway should incorporate trailoriented development principles into its overall design, including buildings oriented toward the greenway corridor, public or private spaces near
59
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
Framework Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
60
Regional Activity Center (R) Regional activity centers offer an alternative to more conventional industrial parks, employment centers, or retail centers. Regional Activity Centers emphasize traditional mixed-use development principles, including a concentration of employment uses in a discernible center with small-scale retail uses intermixed in the same buildings or nearby blocks to support employees’ daily needs. In larger developments, the activity center may be surrounded by one or more neighborhoods that support a variety of home types and lot sizes, including live-work units. Some Regional Activity Centers may include residential units above office, retail, or research uses in the same building. The design, scale, character, and intensity of development in a Regional Activity Center emphasizes technology, creativity, and innovation, and may support a corporate headquarters, university, research and development campus, convention center,
61
Mooresville Tomorrow 2040 Comprehensive Plan
manufacturing center, light industrial, or other centers of excellence and the nearby retail businesses and housing options needed for their employees. Taller buildings and urban parking strategies ― on-street parking, parking decks, and shared use parking strategies ― may be needed in some locations to reduce the development footprint (lot coverage) and provide more opportunities for connected open space. A grid network of walkable streets should connect destinations within the activity center and the surrounding neighborhoods. Open space throughout the center accommodates passive and active uses, including natural areas, common greens, small parks, recreation facilities, athletic fields, research plots, and other gathering places. Residential uses in the activity center are secondary to non-residential uses and open space (combined) in terms of the size, scale, footprint, and intensity of development in the activity center.
Adopted September 21, 2026
Framework
Downtown (D) Land inside the Downtown functions as a destination for residents of, and visitors to, Mooresville. Compact development patterns, horizontal and vertical land use mixes, high quality building architecture, plazas and public spaces, and civic destinations that promote social interaction celebrate the Mooresville community. Uses and buildings are located on small blocks with streets designed for walking first, and driving second. Buildings may include civic, retail, office, restaurant, residential, or entertainment uses. Condominiums, apartments, or offices may be found above storefronts. Parking is satisfied using on-street parking, structured parking, and shared rear-lot parking strategies. Areas further away from the Downtown core transition between the most intense development areas in and around Main Street and the stable, near-in neighborhoods and businesses that surround the area. Infill development and public infrastructure investments in the transition areas should aim to create smaller blocks with walkable streets designed to extend the historic grid street network. Franchise architecture is discouraged throughout the Downtown as a way to maintain unique character, and historic preservation — especially for landmark buildings — should be a priority.
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
62
Residential Building Type Matrix Accessory Dwelling Unit
Single-Family Detached Home, Large Lot
Rural Homestead
●
●
Single-Lot Residential
●
●
Single-Family Neighborhood or Townhome Community
●
●
Mixed-Density Residential
●
●
Place Type Category
Single-Family Home, Small Lot
Duplex, Side-by-Side
Passive Open Space Active Open Space
● ●
Multifamily Community Innovation & Institutional Industrial Center General Retail General Office Mixed-Use Corridor Mixed-Use Neighborhood
●
●
●
Mixed-Use Activity Center
63
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
Framework Duplex, Stacked Units
Triplex, Stacked Units
Quadplex, Stacked Units
Courtyard Cottages
Townhome
Stacked Multifamily
Live-Work Unit
● ●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
● ●
●
●
●
●
●
●
●
●
●
●
●
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
64
Accessory Dwelling Unit An accessory dwelling unit (ADU) is a small, independent home located on the same lot as a larger single family detached home. ADUs may be used as rental apartments for people not related to the homeowner, secondary suites for young or old family members, or separate offices or personal space for homeowners. The unit may be attached to the larger home, detached from the larger home, above a detached garage, or in the attic or basement of the larger home. ADUs have a separate entry from the street or driveway.
Single-Family Detached Home, Large Lot A medium-to-large (one to three stories tall) detached building used for a single dwelling unit. Large lots for a single family detached home typically exceed one-half acre in size (21,780 square feet), and include both a front and rear private yard. An attached or detached garage typically serves the home via a driveway connected to the street.
Single-Family Detached Home, Small Lot A small-to-medium (one to three stories tall) detached building used for a single dwelling unit. Small lots for a single-family detached home are less than one-half acre in size (21,780 square feet); and usually less than onequarter acre in size (10,890 square feet). The rear yard of the lot is generally larger than the front yard of the lot. Each unit has an entry from the narrow side of the home, and most include porches or stoops to transition between public and private spaces. The dwelling unit may or may not include a detached garage.
65
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
Framework
Duplex, Side-by-Side Units A small (one to two stories tall) detached building with two separate dwelling units arranged in a side-by-side configuration. Each unit has an entry from the street. The two units together appear to be one medium to large size single family detached home. The units may or may not include a rear yard or detached garage.
Duplex, Stacked Units A small (one to two stories tall) detached building with two separate dwelling units stacked one above the other. Each unit has an entry from the street, typically on different sides of the building. The two units together appear to be one medium to large size single family detached home. The units may or may not include a rear yard or detached garage. A stacked duplex accommodates a more narrow lot compared to a side-by-side duplex.
Triplex, Stacked Units A small (three to four stories tall) detached building with three separate dwelling units stacked one above the other. Each unit accesses a single entry from the street via a shared stairwell. The three units together appear to be one large size single family detached home. The units may or may not include a rear yard or detached garage.
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
66
Quadplex, Stacked Units A detached building (two to three stories tall) with four dwelling units inside. Units are single-story and stacked within the building — two ground floor units and two units above. Units may be accessed via individual entryways from the street, or a shared entry central to the building. The four units together appear to be one medium-to-largesized single family detached home. The units may or may not include a rear yard or detached garage.
Courtyard Cottages A group of small, detached buildings oriented toward a central green or courtyard. The public space is typically visible from the street. Homes are accessed from the side facing the central green or courtyard. Some courtyard cottages may include a mix of one- and two-story buildings.
Townhome (Row Home) A small-to-medium (two to three stories tall) building with up to six dwelling units arranged in a side-by-side configuration. Each unit has an entry from the narrow side of the home, and most include porches or stoops to transition between public and private spaces. Townhome buildings may face a street or common green. Some townhome buildings may include a detached garage behind the units. The space between the home and the rear detached garage is available as a private courtyard for the homeowner.
67
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
Framework
Stacked Multifamily, Apartment or Condominium A medium-to-large (three to five stories tall) building with up to sixteen dwelling units inside. Units are typically one story each, and arranged in a stacked configuration where most units share a floor, ceiling, or multiple walls with an adjacent neighbor. Each unit is accessed from one of several entry points to the building from the street. An interior elevator or shared stairwell is used to access units above the ground floor. Some units may include a detached garage. Other units are served by a parking deck or nearby surface parking lots.
Live-Work Unit A small-to-medium (two to three stories tall) attached or detached building with one living unit above or behind a flexible ground floor space that can be used for various non-residential uses. Both the living unit and the flexible ground floor space are accessed from the street. Some live-work units have separate entrances, while others use a shared entry and secured access to the living unit above via features internal to the building.
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
68
Non-Residential Building Type Matrix Place Type Category
Industrial or Warehouse
Neighborhood Commercial
Big Box, MultiTenant Center
Passive Open Space Active Open Space Rural Homestead Single-Lot Residential Single-Family Neighborhood or Townhome Community Mixed-Density Residential
●
Multifamily Community Innovation & Institutional Industrial Center General Retail
●
● ●
●
General Office
69
Mixed-Use Corridor
●
Mixed-Use Neighborhood
●
Mixed-Use Activity Center
●
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
Framework Office
Stacked Mixed-Use Building
Mixed-Use Buildings on the Same Block
●
●
●
●
●
●
●
●
Institutional
●
●
●
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
70
Industrial or Warehouse A large (one to three stories tall) building with a footprint that may reach several hundred thousand square feet in size. Some industrial or warehouse buildings will include outdoor storage or equipment to meet the needs of the business inside the building.
Neighborhood Commercial One or more small buildings (one to two stories tall) organized around a central green or main street. Buildings serve various non-residential uses, and typically avoid franchise architecture to reinforce a unique sense of place in the community. A limited number of neighborhood commercial buildings in a development may include residential units above storefronts (see the definition of live-work units).
Big Box, Multi-Tenant Shopping Center A single development that may include one or more big box stores as anchor tenants, and several smaller buildings for multiple tenants nearby. Buildings may stand one to two stories tall. The preferred configuration of buildings on a site minimizes the visual impact of a big box store from the street. Some big box stores or multitenant buildings include entrances from multiple sides of the same building.
Office A small-to-large (one to three stories tall) building with a footprint that may reach several hundred thousand square feet in size. The preferred configuration of buildings on a site orient towards a common green or main street. Several small buildings are preferred to fewer big buildings on a site, which should reinforce the feel of a campus or urban, walkable block depending on the context of surrounding development.
71
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
Framework
Institutional A small-to-large (i.e., one to three stories tall) building or group of buildings that serve an institutional purpose, such as a place of worship or school. The preferred configuration of buildings on a site orient towards a common green or main street. In the case of a place of worship, a larger primary building may be surrounded by several smaller buildings. Ideally, new schools should be located within, or adjacent to, residential neighborhoods to promote walking and biking trips for children and their parents.
Stacked Mixed-Use Building A small-to-large (one to two stories tall) building with different non-residential land uses on the ground and upper floors. Some mixed-use buildings have separate entrances, while others use a shared entry and secured access to the business above via features internal to the building. Several mixed-use buildings in a development may include residential units above storefronts (see the definition of live-work units).
Mixed-Use Buildings on the Same Block A mix of buildings that support residential and nonresidential uses on the same block of a community, or the same block of a single development. Architectural features on different building types in the same block are used to reinforce a cohesive brand or identity for the area. Buildings are placed along the street to encourage active streetscapes and high levels of pedestrian traffic.
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
72
Block Size and Structure Matrix Rural Highways
Curvilinear Streets with Cul-de-Sacs
Passive Open Space
●
●
Active Open Space
●
Rural Homestead
●
Single-Lot Residential
●
Place Type Category
Single-Family Neighborhood or Townhome Community Mixed-Density Residential
●
Curvilinear Streets in Modified Grid
Traditional Grid of Streets
●
●
● ●
●
Multifamily Community Innovation & Institutional
●
Industrial Center
●
General Retail
●
General Office
●
Mixed-Use Activity Center
73
Mooresville Tomorrow 2040 Comprehensive Plan
●
●
Mixed-Use Corridor Mixed-Use Neighborhood
●
●
● ●
Adopted September 21, 2026
There is no discernible street network or block structure. Rural highways are designed to move traffic efficiently over long distances, with limited intersections. Many areas do not have lot frontage, and those that do have lots with varying sizes and setbacks. Bicycle and pedestrian facilities are limited to a side-use path separate from the travel lane.
Framework
Rural Highways
Curvilinear Streets with Cul-de-Sacs The street network is curvilinear and irregular, with many streets terminating in a cul-de-sac. This type of network has a low level of connectivity, requiring vehicles and pedestrians to make long trips to travel short distances. There is no discernible block structure, and varying lot sizes and setbacks. Streets have sidewalks on one or both sides of the street and bicycle facilities, when present, are provided on-street. The use of curvilinear streets with cul-de-sacs is not encouraged in future development unless a specific environmental or landscape condition dictates the need. Curvilinear Streets in Modified Grid The street network is curvilinear and semi-regular, though there is some irregularity, often due to topography or natural features. This type of network demonstrates a fair level of connectivity, with limited or no cul-de-sacs. Vehicles and pedestrians are able to move around the neighborhood with relative efficiency. Blocks range in size from small-to-large, and neighborhoods with fewer intersections have less connectivity and walkability than those with more intersections. Varying block sizes result in varying lot sizes and setbacks. Streets have sidewalks on one or both sides of the street and bicycle facilities, when present, are provided on-street. Traditional Grid of Streets The street network is very regular, though there may be small areas of irregularity due to topography or natural features. Culde-sacs and dead-end streets should only be used in the case of environmental or infrastructure constraints. Blocks sizes range from small-to-medium, and a high number of intersections and a regular grid pattern provides good connectivity and walkability. The regularity of block sizes and shapes results in regular lot sizes and setbacks. Streets have sidewalks on both sides of the street and bicycle facilities are provided on-street. Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
74
Open Space and Natural Feature Matrix Place Type Category Passive Open Space
75
Natural Area
Trail or Greenway
●
●
Active Open Space
●
Rural Homestead
●
Single-Lot Residential
●
Common Green
●
Single-Family Neighborhood or Townhome Community
●
●
●
Mixed-Density Residential
●
●
●
Multifamily Community
●
●
●
Innovation & Institutional
●
●
●
Industrial Center
●
●
General Retail
●
●
●
General Office
●
●
●
Mixed-Use Corridor
●
●
●
Mixed-Use Neighborhood
●
●
●
Mixed-Use Activity Center
●
●
●
Mooresville Tomorrow 2040 Comprehensive Plan
Athletic Field or Sports Court
●
Adopted September 21, 2026
Framework Pocket Park
Community Garden
●
●
●
●
●
●
●
●
●
Playground
Public Square
Public Plaza
●
●
●
●
●
● ● ●
●
●
●
●
●
●
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
76
Natural Area Natural areas are open spaces that are typically undisturbed and dedicated for permanent conservation: water bodies, meadows, woodlands, or other land with environmentally sensitive features. Use of these areas is reserved for passive and unstructured recreation activities. Some natural areas are protected from future development by local, state, and federal agencies or public, private, or non-profit organizations. Natural areas may be found in various shapes and sizes following the trajectory of natural corridors or elements in the landscape. There is no minimum or maximum size for a natural area.
Trail or Greenway Trails or greenways are linear parks or open spaces that provide passive recreation opportunities for pedestrians or bicyclists. Trails or greenways may connect parks, schools, neighborhoods, and businesses together, and support both “recreational” and “functional” trips between destinations. All greenways should also be considered transportation corridors for programing funds or prioritizing improvements. Trails or greenways should be designed within the context of their surrounding environment: natural, rural, suburban, or urban. Trailheads may be located along a trail or greenway and provide parking lots, drinking fountains, restrooms, or signage needed to support use of the facility. Common Green Common greens are open spaces located in a residential, nonresidential, or mixed-use development. They are used primarily for informal recreation or civic purposes. The perimeter of a common green may be defined by landscaping versus buildings and streets depending upon the context of surrounding development. Greens are less formal, and may be more irregular in shape, compared to public squares or public plazas. Greens include lawns, trees, paved paths, public art, and seating areas. Some may include playgrounds or water bodies. The minimum size of a common green is 0.5 acres. The maximum size is typically 10.0 acres, but some greens may be larger, encompassing one or more entire blocks, based on the size and shape of the development. 77
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
Framework
Athletic Field or Sports Court Athletic fields or sport courts are open spaces sized and designed to support one or more sporting events played by individuals or teams. Some athletic fields or sport courts are designed to accommodate multiple activities in the same location depending upon the season or time of year (e.g., soccer, football, ultimate Frisbee, or lacrosse). A facility typically includes the field or court plus parking lots and one or more ancillary buildings to support the activities. Some locations are lit for nighttime use.
Playground Playgrounds are open spaces designed and equipped for children’s play. Playgrounds should be accessible to the public. Some playgrounds may include an open shelter for small community gatherings. Playgrounds should be included in all residential neighborhoods, and may also be appropriate in larger parks, employment areas, or mixeduse developments. There is no minimum or maximum size for a playground.
Pocket Park Pocket parks are small, sometimes irregular, open spaces located more randomly in a residential, non-residential, or mixeduse development. Multiple pocket parks should be located in a single development. Overall, pocket parks in a development may seem scattered or disconnected from one another because locations are chosen opportunistically. Each park location should be chosen and programmed with consideration of the residents, visitors, or businesses they serve nearby. Pocket parks may include small event space, play areas for children, spaces for relaxing or meeting friends, or places to take lunch breaks. Generally speaking, higher-density development in the Town’s planning area should include more pocket parks to offset the loss of private open space. Park locations should be visible from a street and well-connected to the larger open space network via sidewalks or greenways. There is no minimum size for a pocket park. The maximum size is usually 1.0 acres, but some pocket parks may exceed the maximum size based on the shape or location of the parcel. Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
78
Community Garden Community gardens are comprised of multiple garden plots in one location made available to individuals via membership or lease for small-scale, non-commercial farming. Individual gardens may be raised or fenced, and a small shed may be located adjacent to the garden for short-term storage needs. Other community gardens may include larger sheds on site for shared-storage of tools, seed, or fertilizers. Running water is required for a community garden. Community gardens may be dispersed in residential neighborhoods or natural areas. There is no minimum or maximum size for a community garden.
Public Square Public squares are formal open spaces located near the center of activity in a residential, non-residential, or mixed-use development. They are used primarily for informal recreation or civic purposes, and may include temporary (pop up) spaces for special events. Buildings and streets frame the outside of a public square on all sides. Public squares include lawns, trees, paved paths, public art, and seating areas. Some may include playgrounds. Larger squares may include a small commercial space as the focal point of activity. The minimum size of a public square is 0.5 acres. The maximum size is typically 3.0 acres, but some squares may be larger, encompassing an entire block, based on the size of the development. Larger developments may include multiple public squares in their design concept. Each public square should be a focal point in the development (or smaller defined areas within a development, if applicable).
79
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
Framework
Public Plaza Public plazas are formal open spaces located near the center of activity in a mixed-use development. They are used primarily for informal recreation or civic purposes, and may include temporary (pop up) spaces for special events. Buildings and streets frame the outside of a public plaza on all sides. Public plazas include hardscape materials (no lawns), knee walls, public art, and seating areas. Larger squares may include a small commercial space as the focal point of activity. The minimum size of a public square is 1.0 acres. The maximum size is typically 2.0 acres, but some plazas may be larger, encompassing an entire block, based on the size of the development. Larger developments may include multiple public plazas in their design concept. Each public plaza should be a focal point in the development (or smaller defined areas within a development, if applicable).
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
80
Development Change and Intensity Map The Development Change and Intensity Map (DCIM) is a companion to the Conservation and Development Map (CDM) and presents the intensity of development most appropriate throughout the Town’s planning area. The DCIM, along with the place types depicted on the CDM, should be used when considering development applications and programming capital improvements. Clear purpose and intent for intended development change and intensity overlaid on top of the place types in the CDM provides focus for the community, elected officials, Town staff, development interests, conservation partners, and other agencies in terms of their mission and expected outcomes to implement the comprehensive plan. It should also inform future revisions to zoning districts or regulations in the Town’s Unified Development Ordinance. Seven development intensity categories are represented on the DCIM: level zero (open space), level one (rural preservation areas), level two (existing suburban), level three (modest infill), level four (small-scale mixed use), level five (modest-scale mixed use), and level six (intense-scale mixed use). Each category is described below with a general objective, important considerations, and targeted treatments. The matrix presented on page 84 of the document summarizes general height, bulk, and density expectations for each of the development intensity categories.
Level 0: Open Space Land in the open space category includes floodplains, conservation areas, and passive or
81
Mooresville Tomorrow 2040 Comprehensive Plan
active parks maintained by the Town of Mooresville, Iredell County, or their partners. These areas should remain undeveloped (in the case of floodplains or conservation easements), or lightly developed (in all other cases), to safeguard their primary purposes for recreation, land preservation, or stormwater management. Most sites should be accessible to the public via greenways or trails to maximize their value as places for recreation. Although not indicated on the map, open space should be programmed in all of the DCIM intensity categories as a meaningful component of the built environment.
Level 1: Rural Preservation Areas Conditions in rural areas of the community are not anticipated to change significantly within the timeframe of the comprehensive plan, 2024 to 2040, because they are unserved or underserved by municipal water and sewer utilities, curbside trash pickup, parks, or police and fire protection, and it would be expensive to expand or extend services in these areas (efficiently) at this time. The areas are not prohibited from developing in the future, and properties proposed for development should be evaluated utilizing the playbook approach described in the comprehensive plan. Town officials should resist using the playbook approach to allow development in these areas unless significant infrastructure and service commitments are made by the private developer. If a change is contemplated, it should implement the Conservation and Development Map and the recommendations presented for the individual place type categories. The areas for Level 1 on the DCIM should be evaluated, and the boundaries modified, as necessary, primarily during the next update to the comprehensive plan. (Note any change to the boundaries of Level 1 areas on the DCIM will also necessitate a change to the boundaries for
Adopted September 21, 2026
▲
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
Framework
Map 3-3: Development Change and Intensity Map
82
Areas to Preserve, Rural Landscapes on the IGAM.)
Land in the existing suburban category safeguards the low-density, single-use development patterns observed in large portions of the community. Existing site and building characteristics for standalone single-family neighborhoods, apartment complexes, shopping centers, employment centers, and institutional sites in the planning area were inventoried and reported in the DCIM matrix. The primary purpose of this category is to preserve existing suburban development patterns, intensities, and scale and the existing sense of place prevalent for large portions of the planning area.
Land in the modest-scale, mixed-use category is intended to serve multiple nearby neighborhoods with a grocery store, restaurant, bookstore, school, library, multi-tenant building, or similar land use. Residential development in the area is also encouraged to provide a mix of housing types and customers nearby (walking distance) for local businesses. A discernible center or corridor in each defined development area should include a main street, park, square, or plaza. Some areas identified for level five development intensities are currently suburban shopping centers. Transformation of these areas to support mixed-use development will require deliberate planning and phasing to keep the areas viable during their transition.
Level 3: Modest Infill
Level 6: Intense-Scale Mixed-Use
Land in the modest infill category targets development in or around previously developed areas of the community, which could help accommodate growth projected for the sixteenyear planning horizon, 2024 to 2040. Some areas on the map include smaller parcels anticipated to infill in a manner that complements existing buildings and their surrounding environment. Other areas on the map include large, undeveloped parcels that provide opportunities to be forward-thinking about a vision for conservation and development that includes a mix of uses or densities that create new, energized centers, corridors, or neighborhoods in the community.
Land in the intense-scale, mixed-use category serves as major development focal points in southern Iredell County. They are hubs for shopping, entertainment, employment, or cultural activities with a mix of housing types and prominent open space for active living. As a magnet to surrounding towns and neighborhoods, land in this category becomes an iconic symbol for the larger region. Land at level six represents the most intense development patterns and intensities proposed in the comprehensive plan.
Level 2: Existing Suburban
Level 4: Small-Scale Mixed-Use Land in the small-scale, mixed-use category targets strategic investments in both developed and undeveloped areas, which are aimed at energizing a center, corridor, or neighborhood with more activity and pedestrian movements. Development and investments in these areas should not change the overall vibe or character of the area.
83
Level 5: Modest-Scale Mixed-Use
Mooresville Tomorrow 2040 Comprehensive Plan
Zoning Translation The Conservation and Development Map (CDM) and the Development Change and Intensity Map (DCIM) presented in this chapter are largely implemented through the Town’s Unified Development Ordinance (UDO). Categories for both maps described in this chapter should be translated into one or more compatible zoning districts in the Town’s UDO.
Adopted September 21, 2026
Framework
Development & Design Considerations Matrix Category
Development Context
Development Pattern
Prevailing Building Height
Typical Block Size
Transportation Priority
Parking Strategies
Level 0
Open Space, Recreation
Separate Uses
1–2 Stories
500 – 1,500 feet
Auto – Bike Walk
Surface Lot
Level 1
Preservation
Separate Uses
1–2 Stories
500 – 1,500 feet
Auto
Private Driveway
Level 2
Preservation
Separate Uses
1–4 Stories
800 – 1,200 feet
Auto
Surface Lot
Level 3
Infill Development
Separate or Mix of Uses
1–4 Stories
500 – 800 feet
Auto – Bike Walk
Surface Lot
Level 4
(Re) Development
Mix of Uses
1–4 Stories
400 – 800 feet
Walk – Bike
Surface Lot or On-Street
Level 5
(Re) Development
Mix of Uses
1–6 Stories
400 – 800 feet
Walk – Bike Transit
Surface Lot or On-Street
Level 6
(Re) Development
Mix of Uses
1 – 20 Stories
300 – 600 feet
Walk – Bike Transit
Parking Deck or On-Street
The Town’s Official Zoning Map should be used to organize the zoning districts spatially to implement the preferred development locations, types, patterns, styles, and intensities depicted between the two maps. The direct connections between the CDM, the DCIM, and their category descriptions, the UDO, and the Official Zoning Map help meet the minimum rules and requirements for local governments in North Carolina that want to enact and enforce zoning laws in their jurisdiction (see N.C.G.S., Chapter 160D 501(a)). Each zoning district in the UDO provides a more detailed interpretation of the broader place type or development intensity categories. The districts account for site specific issues or conditions (e.g., topography, environmental features, existing development patterns, lot shape or size, viable infrastructure, or
development compatibility). General statements for the place type and development intensity categories are also refined further in the zoning districts with specific design and development standards created to regulate permitted uses or activities, building height and setbacks, building architecture (as allowed under state law), lot size and coverage, landscaping, lighting, and parking. Town officials should consider modifications to the UDO immediately that implement policies and recommendations in the comprehensive plan. In essence, this is the process of changing phrases with reference to “should” in the comprehensive plan — noting recommendations or desired outcomes — to phrases with reference to “shall” in the UDO — indicating requirements or absolute standards — for a development application.
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
84
Place Type to Zoning District Classification Matrix
Place Type Category Passive Open Space
Rural Conservation
Residential Limited Service
Residential Low-Intensity
Residential General
Historic Mill Village
●
●
●
●
●
●
Active Open Space Rural Homestead
●
Single-Lot Residential
● ●
Single-Family Neighborhood or Townhome Community
● ●
●
Mixed-Density Residential
●
Multifamily Community
●
Innovation & Institutional
●
●
●
●
Industrial Center General Retail General Office Mixed-Use Corridor Mixed-Use Neighborhood Mixed-Use Activity Center
85
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
Framework Traditional Neighborhood
Traditional Downtown
Downtown Extension
Corridor Mixed-Use
Community Commercial
Hybrid Light Industrial
Industrial
●
●
●
●
●
●
●
●
●
●
●
●
●
●
●
● ● ●
● ● ● ●
● ●
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
86
Focus Area Concepts A few example illustrations are presented in this section of the document to demonstrate the intent of different policies and preferences associated with the three-map series (presented earlier in the chapter) and the place type or activity center category descriptions associated with the Conservation and Development Map. The illustrations demonstrate one of several possibilities for a test site that would be consistent with the big ideas and concepts about brand, character, and sense of place discussed in the Mooresville Tomorrow comprehensive plan. Their primary purpose is to help the community visualize possibilities and create a platform for dialogue about the details reflected in the images and how best to implement similar ideas in the Town’s Unified Development Ordinance or other implementing documents. Though they conceptually illustrate development potential in defined geographies, they also
87
Mooresville Tomorrow 2040 Comprehensive Plan
demonstrate the application of character-driven design principles and development-related policies that could be applied in other areas of Mooresville with similar conditions. The test sites could have been any one of the properties represented by the condition on the map to the right (i.e., a regional activity center, a community activity center, a rural area developed as a conservation neighborhood, or redevelopment of an existing shopping center). Conceptual drawings and images presented in the comprehensive plan are for illustrative purposes only. They do not constitute intended outcomes or provisionary approvals for the properties represented in the document. Actual development of the areas (if it were to occur) may vary significantly from the drawings included in the document based on property owner interests, market realities, lending conditions, available infrastructure, environmental features, or other factors.
Adopted September 21, 2026
Framework
Map 3-4: Focus Area Study Location Map
▲
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
88
A new interchange is planned at Exit 38 on Interstate 77, which will provide residents, employees, and visitors better access to points north in Mooresville via Cornelius Road. Undeveloped land surrounding the new interchange presents an opportunity to create a new, vibrant mixed-use district focused on employment, entertainment, and healthy-living. It is one of only a few remaining large-scale opportunities in Mooresville to think big and bold about its development future — creating a destination that is forward-thinking, inclusive, and economically dynamic in the Lake Norman region.
▲
Focus Area 1: Regional Activity Center on I-77, Exit 38 “The Northern Gateway”
4
Employment Expansion Area
4 7
7
2
8
Residential Transition Area
5 1 6
9
3 Employment Expansion Area
89
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
Framework
Keyed Insights: 1
2
3
4
Include a primary activity center in the larger development as the iconic center of the gateway. Integrate a mix of land uses, densities, and public spaces in the primary center to support a highly-walkable environment. The primary center should be a vibrant and inviting area for residents, employees, and visitors alike. Events and activities programmed in the center should energize the spaces between buildings. Buildings targeted for employment uses (primarily office) are presented in large- and small-format configurations in the concept to vary the scenery of the built environment. Streets in the employment area are connected to nearby neighborhoods and retail destinations, which help create a “walkable, connected campus” feel for the businesses and their employees. Normal activity in this area of the gateway would be highest during normal work hours, when many nearby residents are away from their homes. A corporate headquarters in this quadrant of the gateway center could help anchor the overall development. The visibility of this prominent site from Interstate 77 could also make the building(s) for a headquarters a signature element of a bold and identifiable gateway to Mooresville. Future development adjacent to the regional activity center should be connected to it using a network of streets that (1) provide more route options and (2) help diffuse traffic patterns on the regional transportation system during peak congestion periods.
5
Housing densities should be highest in the center of an activity center, including townhomes, standalone apartment or condominium buildings, loft apartments, or condominiums in the upper floors of mixeduse buildings.
6
Formal public spaces — plazas, squares, and greens — should be programmed throughout the development.
7
Natural areas throughout the gateway center — lakeshore, streams, or small ponds — should be improved at their edges to create approachable natural amenities. They expand the quality and range of open space available to residents, employees, and visitors. Specific facilities programmed in natural areas would make them more accessible to the public: piers/docks on the lake or trails that connect to organized spaces within the larger development.
8
Underutilized properties in the gateway center should be repurposed as open space, which could simultaneously buffer existing homes from proposed development while providing a natural amenity for both.
9
Structured parking in key areas of the activity center reduces the footprint of parking, thereby increasing the amount of land available for new buildings, public open space, or natural areas in the development.
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
90
▲
Focus Area 1: Regional Activity Center on I-77, Exit 38 “The Northern Gateway”
Build a Walkable Town Center in the Southwest Quadrant of the Gateway to Anchor the Entire Development A walkable, mixed-use activity center should be located in the southwest quadrant of the interchange, and should serve as the epicenter for the larger, regional activity center. Experiential retail, fine dining, outdoor event areas, and public open spaces should create energy and buzz in the activity center. Art installations, pop-up (incubator) markets, and seasonal events should draw both local residents and visitors to the area. Architecturallydistinctive buildings throughout the activity center might house boutiques, local businesses, and regional brands, creating a retail experience that prioritizes walking, placemaking, and authenticity over big-box sameness. Built examples may include Fenton in Cary, NC or Avalon in Alpharetta, GA.
Program for Employment Uses (Primarily Office) in the Northeast Quadrant of the Gateway A concentration of corporate office users in one location instills the feeling of a knowledge campus, where “creative collisions” take place every day between co-workers and industry partners. Flexible, state-of-the-art office environments (indoor and outdoor) might range from Class A mid-rise office towers to collaborative work campuses — all surrounded by trails, cafes, and open spaces that promote wellness and creativity. The upper floors for some buildings may accommodate compatible residential units.
91
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
Framework
Development Themes: Reserve Land in the Southeast Quadrant of the Gateway for a Corporate Headquarters A second signature corporate headquarters in Mooresville — perhaps focused on clean technology, fintech, or life sciences — could anchor the employment cluster at gateway. Direct visibility and access to the site from Interstate 77 would be a major advantage, and a short drive to Charlotte-Douglas International Airport could connect employees to all corners of the world.
Activate the Lake Norman Shoreline in the Northwest Quadrant, including Public and SemiPublic Destinations A new “recreation district” within the gateway should connect directly to Lake Norman, and provide water access, a boat launch, and a regional greenway that welcomes walkers, runners, and cyclists to the shoreline. A civic-focused anchor — such as a recreation center, cultural center, wellness center, or amphitheater — could also cement the area’s identity as both a community and regional destination.
Offer a Variety of Housing Types in the Activity Center The gateway district should offer a broad spectrum of housing options — from townhomes and apartments above shops to lake-view condominiums, workforce housing, and executive homes. Different home types should be interwoven with pocket parks, community gardens, and access to high-quality schools, which are designed to attract both young professionals and long-term residents seeking to stay and thrive in the community.
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
92
▲
Focus Area 2: Shopping Center Redevelopment, NC 150 “Reimagined Neighborhood Center”
There are several shopping centers in Mooresville — primarily big box or multitenant buildings with large surface parking lots — that are aging and will need to be repurposed in the next ten to twenty years. The comprehensive plan advocates for suburban retrofit initiatives (see Chapter 5) to convert these areas into mixed-use, multi-modal activity centers. Opportunities to retrofit aging shopping centers in Mooresville are primarily located along NC 115, NC 150, or Williamson Road. The concept plan presented here reuses one existing building, preserving its character, while introducing several new buildings in a configuration that creates a public square and internal blocks that both activate the space and advocate for walking trips throughout the site. Surface parking lots in the concept plan are screened from view by the new buildings and landscaping. Additional street connections to the north and west promote more walking and biking trips to the site from nearby neighborhoods. An adjacent parcel to the north — suited for multifamily residences and townhomes — could provide regular customers for nearby shops, services, and amenities. And a future trail to the west could provide direct access to the site from parks, schools, and other nearby destinations, and influence a design concept for the reimagined site as a “trail-oriented development” activity center.
4 5 3 2 6
1
93
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
Framework
Keyed Insights: 1
Redevelopment on an existing shopping center creates opportunities to reimagine the site for smaller blocks, buildings, and public spaces. Some buildings may stay (like the white building footprint in the concept plan) while others are replaced. Large parking lots are filled in with either buildings or public open space. Existing features on the site — like driveway locations — help dictate the location of new streets or buildings on the site.
2
Previously-developed, but under-utilized, parcels adjacent to the existing shopping center lend themselves well to increase the quantity and quality of mixed-use development on the reimagined site.
3
New buildings on the site may include standalone apartments, condominiums, or townhomes, which provide more customers to visit nearby businesses on a regular basis.
4
A regional trail should be incorporated into the site’s redevelopment plans (when present) to improve access for nearby neighborhoods via a walk or bike trip. The trail also provides a recreation amenity for local residents, employees, and visitors to the site. Some redevelopment sites may elect to organize buildings toward a greenway or trail, following the principles of “trail-oriented development”.
5
Small green areas strategically placed throughout the new neighborhood center offset increased building densities. In this example, a small linear park is used to setback a row of townhomes from a retail building across the street.
6
A central green in the new neighborhood center should be programmed for outdoor events and activities.
Small-scale, interesting buildings in the new activity center frame public spaces.
New multifamily residences adjacent to the new activity center may expand its hours of operation.
One or more buildings in the new activity center may orient towards a regional trail (i.e., trail-oriented development).
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
94
The Town of Mooresville and their partners are building a new eastwest connector, starting at Langtree Road on the west and extending to NC 115, Shearers Road, and NC 3 on the east. The new road will unlock future development potential in southern Mooresville, and leaders have the opportunity to plan ahead in terms of street connections, driveway spacing, access management, and land uses and development intensities along the corridor that best support the transportation investment (see the Mooresville Mobility Plan, 2025).
1 3 7 6
The activity centers along the east-west connector should include a mix of local-serving uses, including a grocery store, drugstore, various personal services, office space (medical and financial services, for example), or civic spaces.
Mooresville Tomorrow 2040 Comprehensive Plan
2
9
The comprehensive plan contemplates four activity centers along the east-west connector (see the Conservation and Development Map in Chapter 3), which are evenly spaced to create intentional destinations for the surrounding neighborhoods they serve. Each center is envisioned to be a mixed-use, walkable development, including a town center, diverse range of housing, walkable amenities, mix of different open space, and a signature greenway feature. The activity center concept presented here for a new community activity center near West Branch of the Rocky River is predicated on connections — between people, places, and the natural environment.
95
▲
Focus Area 3: Community Activity Center on New East-West Boulevard “Vibrant Neighborhood for All Ages”
4
8
5
8
Adopted September 21, 2026
1
The town center portion of the activity center is located adjacent to the new east-west connector – maximizing visibility for businesses and eliminating cut-through traffic for adjacent neighborhoods. Uses targeted in the town center should neighborhood-serving.
2
Residential units of varying sizes and types should be considered for the upper floors of buildings located in or near the town center.
3
A central green should be designed and programmed for community events (such as live music, seasonal events, and other entertainment in an amphitheater), microretail spaces, plazas for farmers or artisan markets, food trucks, lawns for informal play or special events, interactive fountains, and seasonal floral displays.
4
A mix of housing types in a neighborhood adjacent to the town center — in this case townhomes, small-lot single-family detached homes, and accessory dwelling units —could help ensure the viability of the centers with regular customers.
5
A connected road network in the development should be built around the concept of “complete streets”, which makes accommodations for walking, biking, and driving between nearby destinations safe and comfortable.
6
A focal point for this plan concept is a regional trail along the West Branch of the Rocky River, which serves as a recreational amenity and a segment of a larger “crosstown connector” trail that expands transportation options for residents that want to access points north and south by walking or biking.
7
An activity center located along an existing or proposed long-distance trail should consider trail-oriented development principles in its design concept, including buildings oriented toward the trail corridor, outdoor seating that fronts the trail, public or private spaces near the trail corridor that accommodate trail users, and a network of secondary trails in the development that connect into the primary trail corridor. Road crossings with the trail in the activity center should be minimized. Amenities in a trail-oriented activity center ― bike parking, outdoor furniture, bike repair stations, or public art ― should be considered in the overall design concept.
8
The concept for a community activity center should include a hierarchy of open spaces to expand the type and number of opportunities for spending time outdoors: formal greens, pocket parks, playgrounds, and natural areas as a few examples.
9
Civic and institutional uses should be considered appropriate and complementary anchors in community activity centers.
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
Framework
Keyed Insights:
96
▲
Focus Area 3: Community Activity Center on New East West Boulevard “Vibrant Neighborhood for All Ages”
Create a Vibrant, Human-Scale, Mixed-Use “Town Center” within the Activity Center that Serves the Daily Needs of Nearby Residents The town center portion of a community activity center should include one-, two-, and three-story buildings that help (1) create a variable streetscape and (2) accommodate retail, service, and residential uses in a walkable footprint. Ground floor commercial uses — cafés, local markets, beauty salons, co-working spaces, or professional offices — should be considered for their contributions to fostering a “complete neighborhood” and reducing the number of external trips from the site to meet residents’ daily needs. Residential lofts above storefronts or small, walk-up apartment buildings should be intermixed in the town center to support higher residential densities and enhance activity in the town center for extended hours. Include Different Neighborhoods in the Activity Center to Support Intergenerational Living, Economic Diversity, and a Strong Sense of Place Different housing types and sizes arranged in one or more walkable neighborhoods are encouraged in an activity center. Some neighborhoods should consider a mix of different home types and sizes in the same neighborhood. Neighborhood design principles used in an activity should consider: •
•
•
•
97
Mooresville Tomorrow 2040 Comprehensive Plan
Single-Family Homes on Large and Small Lots: Treelined streets with a mix of traditional and compact lots that allow for a range of price points and lifestyle preferences, from growing families to downsizing retirees. Duplexes and Townhomes: Medium-density options that support attainable homeownership and rental opportunities while reinforcing the architectural rhythm of the neighborhood. Cottage Courts: Clusters of small-footprint homes surround shared greens, offering a charming and social environment ideal for first-time buyers, empty nesters, or those seeking community-oriented living. Accessory Dwelling Units (ADUs): Integrated into backyards and above garages, ADUs provide opportunities for aging in place, guest accommodations, or rental income without disrupting overall neighborhood character. Adopted September 21, 2026
Emphasize a Signature Element of the Activity Center in its Design (in this case the West Branch of the Rocky River) The plan concept’s defining feature is its relationship to the adjacent stream and floodplain, which are transformed from constraints to a treasured amenity. As part of a regional trail network, this multi-use path could provide safe, car-free access to nature and connect residents to nearby neighborhoods, shops, parks, and employment. Trailheads and access points should be integrated into the edges of the street network to encourage more frequent use of the trail. The trailheads should include spaces to gather with benches, shade structures, and public art included.
Framework
Development Themes:
Include Both Active and Passive Open Space in the Activity Center Open spaces in the activity center should consider both active and passive recreation areas, including venues for civic gatherings. Larger public greens may provide organizing elements and flexible, programmable space for community events in the town center, while neighborhoodfocused pocket parks and playgrounds are thoughtfully interspersed throughout the development. Features such as gardens, fountains, an amphitheater, and areas for farmers markets or pop-up micro-retail create a lively, engaging destination that welcomes residents and visitors alike to gather, celebrate, and connect. Ensure Every Component of an Activity Center Supports Walkable, Low-Stress Mobility Mobility design principles used in an activity center should consider: •
•
•
•
Safe, Pedestrian-Friendly, Complete Streets: Wide sidewalks, street trees, furnishings, bike parking, and traffic calming measures should make walking and biking comfortable and enjoyable for all ages. Design streets with lighting and stormwater features. Transit-Ready Design: Bus stops and mobility hubs should be located within walking distance of the town center and most homes to integrate with local or regional transit in the future. Network of Sidewalks, Side Paths, and Trails: Internal facilities should link homes to a regional trail, community gathering spaces, and the town center. Parking: Parking should be located on-street or behind buildings to reduce visual clutter and support a pedestrian-friendly streetscape.
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
98
▲
Focus Area 4: Conservation Neighborhood Concept “The Naturehood”
8
6
2
7
1
5 3 4
Some areas presently identified as Areas to Preserve (Rural Landscapes) on the Intentional Growth Areas Map may develop as a conservation neighborhood in the future. The plan concept presented here contemplates a large conservation neighborhood in the southeast portion of the Mooresville planning area. It integrates residential living with ecological stewardship, environmental sustainability, community well-being, and resilient land use. The concept also reflects a commitment to preserving and enhancing the site’s natural systems while fostering healthy lifestyles, environmental education, and social connection. The “naturehood” plan concept clusters homes in compact footprints to conserve large areas of contiguous open space. The preserved lands — woodlands, meadows, wetlands, and riparian corridors — form the ecological backbone of the neighborhood. 99
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
1
Natural areas should be the primary feature of a conservation design neighborhood. Important tree canopy and floodplains should be maintained, and development areas delineated only after the highest-quality natural features worthy of protection are protected.
2
Trails targeted throughout the neighborhood should provide for recreation and greater access to the natural amenities.
3
Gardens managed by the residents should complement the natural areas, expand the biodiversity of the developed areas, support habitats (and pollinators), and produce vegetables and flowers for the enjoyment of the residents and visitors.
4
Residential estate lots proposed at the edges of the conservation neighborhood should help maintain the overall rural character of the area. Here, existing homes would remain, and new homes respecting the same building sites and setbacks introduced.
5
Different home types and sizes should be introduced into the conservation neighborhood with density reallocated from natural areas to smaller areas for development. The proposed housing footprints could include small-lot homes, townhomes, and cottage courts.
6
Larger parcels for homesites should be strategically-located in the neighborhood to maintain the look and feel of a rural environment while introducing additional housing choices. On these sites, “barndominiums” may offer a multifamily option that architecturally have the appearance of a barn or farm complex.
7
Pastures visible from the adjacent roads should be preserved to the established tree lines that screen development behind.
8
A small-scale commercial center could provide an outlet for local produce while accommodating a few complementary uses that serve the larger area. Demonstration gardens could raise appreciation for goods sold as well as, more generally, the intent of the conservation neighborhood design and development.
Framework
Keyed Insights:
Preserve existing agriculture areas on a site as defining features of a conservation neighborhood.
Activate water bodies proposed in a conservation neighborhood.
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
100
▲
Focus Area 4: Conservation Neighborhood Concept “The Naturehood”
Organize the Neighborhood Around a Series of Connected Open Spaces that Serve as the Social and Ecological Heart of the Community Shared spaces in a conservation neighborhood should be directly accessible from all housing clusters and support a variety of activities aligned with the naturehood’s mission: •
•
•
•
•
•
•
101
Mooresville Tomorrow 2040 Comprehensive Plan
Recreation loops and walking trails should provide car-free connections between homes and natural features such as woodlands, wetlands, and meadows. Community gathering spaces should be placed in or near natural areas to support mental wellness and informal interactions between people and nature. They may offer flexible space for events, workshops, socializing, and advancing health goals with time in nature (e.g., yoga, reflection, or meditation). Nature play areas or environmental learning stations should be distributed along trails and within view of homes, which promote safety, education, and everyday engagement with nature. Community gardens should be located in central areas to maximize participation and access. They should be supported by nearby greenhouses, tool sheds, and composting areas. Food forests and other edible landscapes should be established using food-producing plants, including fruit trees and shrubs, herbaceous plants, root plants, and vines. Pollinator pathways and cutting flower gardens should be interspersed in housing clusters to enhance ecological connections and seasonal landscapes. Green infrastructure should be considered throughout the neighborhood, including rain gardens, bioswales, and permeable surfaces to manage stormwater runoff on-site while enhancing beauty and habitat value. Composting should be encouraged to reduce the neighborhood’s environmental impacts.
Adopted September 21, 2026
Cluster Homes of Different Types and Sizes in the Interior of the Neighborhood, Tucked into the Woodlands and in the Clearings that are Remnants of Past Agriculture Activities on the Site
Framework
Development Themes:
Homes and neighborhood clusters in a conservation neighborhood should emphasize "eyes on open space" — orienting homes and porches toward greens, trails, and gardens that best promote safety, stewardship, and a shared sense of ownership. Different home types and patterns that should be considered in a conservation neighborhood include: Estate Lots Along Rural Edges Larger estate lots should be located along existing public roads at the project’s perimeter to honor the agricultural legacy and rural context of the site. The lots should preserve pastoral viewsheds and reinforce the transition between the new neighborhood and its rural surroundings. Estate lots should be carefully sited to maintain visual openness and protect long views across open fields, meadows, or working lands. Medium-Size Homes Homes on medium-size lots should support resource efficiency, and walkable neighborhood design. These homes should be oriented toward shared greens, trails, and gardens, and encourage a strong sense of place and community. Small-Lot and Cottage Clusters Groups of smaller homes arranged around a common green or courtyard may create cozy, sociable neighborhoods within the larger fabric. These clusters prioritize walkability, shared amenities, and a high degree of connectivity to open space. Barndominiums Versatile structures that may comprise multiple residential units in the same building. They also may support communal spaces and workspaces. Barndominiums feature flexible interior layouts and a rustic-modern aesthetic. Their larger footprint and live-work potential make them ideal for artisans, small business owners, or residents seeking a blend rural character and modern living.
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
102
▲
Focus Area 4: Conservation Neighborhood Concept “The Naturehood”
Retain Existing Homes, Barns, and Agriculture Buildings or Structures as Heritage Assets in the Neighborhood Where feasible, the plan for a conservation neighborhood should retain existing homes, barns, and agricultural buildings or structures found on the site, and incorporate them into the overall community design as heritage assets, working spaces, or repurposed facilities. These structures should provide continuity with the character of the naturehood’s context. Tree lined open space should also be protected near NC 3 and Patterson Road to preserve pastoral views into the neighborhood.
Reserve Space for a Small Community Hub within the Larger Conservation Neighborhood A modest, place-sensitive rural community hub should be considered within a large conservation neighborhood. It should be designed with a development scale, lot siting, and materials that reflect the surrounding rural character. A hub should support both everyday needs of residents and the broader community’s connection to the land. Reuse of a farm complex along with the addition of new structures (e.g., a small farm stand or open-air market pavilion) could provide space for the sale of seasonal produce, flowers, and other items grown or crafted by residents and neighboring farms.
103
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
Framework
Conservation Neighborhood Built Examples Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
104
Governments have certain responsibilities to construct, operate, maintain, and replace community facilities and services (infrastructure) to keep pace with existing and future year development patterns. Some infrastructure categories are planned and funded solely by the Town of Mooresville, while others are provided by Iredell County, Iredell-Statesville School District, Mooresville Graded School District, Duke Energy, the North Carolina Department of Transportation, or private utility operators. The type, location, and capacity of infrastructure in the community (its service delivery) are critical to the Town’s ability to grow and develop in accordance with the General Growth Framework presented in Chapter 3. Service delivery is also critical to managing the cost and timing of improvements needed, which can dramatically impact property owners with increased taxes if expenditures are not well-planned or wellfunded in future capital and operating budgets.
Changing Infrastructure Needs Infrastructure needs in Mooresville change over time as some portions of the community transition from rural to suburban to urban. Demands for service generally increase over time in these areas, and existing facilities expand, or new facilities are built, to provide minimum levels of service to existing and new customers. Solutions for meeting new infrastructure demands also change as portions of the community transform. In more rural areas, minimal infrastructure is provided by the Town and its partners to meet existing needs, and local residents or businesses rely on private solutions to meet at least some of their demands (e.g., well and septic systems or private open space). In more suburban areas, infrastructure
105
Mooresville Tomorrow 2040 Comprehensive Plan
investments are increased and provide either “point of-service delivery” at the property line (water distribution and sewer collection systems or curbside trash pickup) or “close proximity to nearby facilities” in defined services areas for the different providers (e.g., parks and recreation facilities, schools, fire protection, or police protection). In many U.S. cities, providing infrastructure to serve areas that are primarily single land use, low density, and not well connected is expensive, and over time, demands for service eventually surpass available supply to the point that systems break down. As the Town grows, some activity centers or development nodes identified in the General Growth Framework may become denser and take on certain urban characteristics: mixed-use development, taller buildings, different living options, different mobility solutions, or formal public spaces. Increased density or new land uses not anticipated at the time original infrastructure was provided may create various stresses on the system and a need to retrofit (make larger) existing systems to accommodate increased demands. In addition, one or more suburban models used previously for delivering specific facilities and services — such as school location and construction standards, street design, or park design and location standards — may need rethinking to meet the needs associated with a more urban condition. Changes in the economy, consumer preferences, climate, and lifestyle choices may also impact how the Town and its partners plan for and invest in new infrastructure. Forward-thinking and close coordination with officials that influence land use and development standards — the demand factors for the various systems — will be needed to control costs and manage the timing of new infrastructure to meet demand.
Adopted September 21, 2026
Infrastructure
Supporting Infrastructure Maps Several supporting infrastructure maps are presented in other Town documents, which recommend new or expanded infrastructure to keep pace with growth and development envisioned in the General Framework Plan. Information for the infrastructure categories presented in the maps should be refined further, as needed, in future master plans or feasibility studies completed after the Mooresville Tomorrow comprehensive plan is adopted. They should provide detailed information — service area maps, preferred technologies or solutions, level of service standards, candidate projects, project timing or schedules, and more specific policies — to implement broad ideas or
concepts in the comprehensive plan. The followup plans and studies also serve as another bridge between the policies in the comprehensive plan and specific rules and requirements in the Town’s Unified Development Ordinance. General expectations for number, location, alignment, spacing, connectivity, or service areas depicted on supporting infrastructure maps in other Town documents should instill minimum expectations or intended outcomes for development applications considered by Town officials. The actual location or design of a facility on the maps may change for a specific site during site development activities; however, the omission of a recommended facility or feature from one of the maps is discouraged on a site unless approved by Town leaders during the development review process.
Preface | Introduction | Planning Process | Framework | Infrastructure | Concepts | Policies | Action Plan
106
The documents identified below are incorporated into the comprehensive plan by reference. The needs, maps, policies, recommendations, project lists, service criteria, or implementation plans presented in each document, in their entirety, should have the same standing and authority provided under Chapter 160D of the North Carolina General Statutes and the Town’s Unified Development Ordinance as if they were physically included in the comprehensive plan document.
Mooresville Mobility Plan The Mooresville Mobility Plan recommends a transportation network — roads, transit routes, bicycle facilities, sidewalks, trails and greenways, and mobility hubs — for the Town’s planning area that was developed simultaneously with the Mooresville Tomorrow comprehensive plan. Current projects to expand the road network and increase vehicle capacity include (1) widening Brawley School Road, (2)
107
Mooresville Tomorrow 2040 Comprehensive Plan
widening NC Highway 150, (3) extending Timber Road, and (4) construction of the East-West Connector. Additional projects are targeted at creating a connected and efficient bicycle and pedestrian network (including greenways). An implementation matrix in the Mobility Plan summarizes recommendations for short-, mid-, and long-term transportation projects in and around Mooresville. A copy of the document is available from the Town’s Planning and Community Development Department.
Town of Mooresville Comprehensive Recreation and Parks Master Plan The Town of Mooresville Comprehensive Recreation and Parks Master Plan provides a framework for future park and recreation planning to meet the needs of a growing community. It includes a recreation needs assessment, list of goals and recommendations, and an implementation plan
Adopted September 21, 2026
Infrastructure A copy of the document is available from the Town’s Parks and Recreation Department.
The Town is currently evaluating several options to expand wastewater treatment capacity for its growing service population, which are being influenced, in part, by the Mooresville Tomorrow comprehensive plan.
Town of Mooresville Water and Wastewater Comprehensive Master Plan
A copy of the document is available from the Town’s Water and Sewer Utility.
The Town of Mooresville Water and Wastewater Comprehensive Plan provides an assessment of existing conditions (treatment plants and collection/distribution systems), forecasted demand to meet future year needs, general expansion or inter-basin transfer alternatives, and a recommended capital improvements plan. The Town of Mooresville Proposed Capital Improvement Plan for Fiscal Years 2023 through 2027 supports the master plan, and identifies water and wastewater service projects and budget allocations including line maintenance, replacement, and expansion; road widening; vehicle and equipment replacement; and lift station upgrades.
Mooresville Fire Department FourMinute Response Time Map
to improve and expand services to Town residents.
The Mooresville Fire Department maintains a map that depicts the four-minute response time service area for all of its stations, which is the maximum response time used by Town officials to evaluate its service delivery for proposed development in the planning area. A copy of the map is available from the Town’s Fire Department.
Preface | Introduction | Planning Process | Framework | Infrastructure | Concepts | Policies | Action Plan
108
A copy of the map is available from the Town’s Police Department.
Public Education, K-12 Mooresville community members depend on the Iredell-Statesville School District and the Mooresville Graded School District to meet their K-12 public education needs. High performing schools with modern amenities are a major draw for new families moving to the area and the two school districts are working hard to provide new, expanded, or renovated schools to keep pace with increasing demands created by new residents. The Iredell-Statesville School District maintains a list of capital project needs on its website, which is reviewed and recommended by a Facilities Task Force. The Mooresville Graded School District maintains a similar list in its Long-Range Capital Planning Report, which is updated annually, and available from the school district. Trends in school enrollment should be monitored in the coming years to determine if-when-howwhere public education is delivered in the future. Key trends to considered include: (1) declining birth rates in the United States, (2) shifts to private school, charter school, or homeschool solutions for families, (3) student turnover in apartments, (4) the frequency of existing home resales, and (5) new residential construction.
Mooresville Police Department Service Zones Map The Mooresville Police Department maintains a map that depicts the boundaries for nine patrol zones in the service area, which is used to evaluate its service delivery for proposed development in the planning area.
109
Mooresville Tomorrow 2040 Comprehensive Plan
Coordination between the Town of Mooresville and the two school districts should continue to ensure efficient and high-quality public education is delivered in the future. Specifically, future strategic planning or capital project planning by the two school districts should consider the location, timing, and magnitude of development identified in the Mooresville Tomorrow comprehensive plan (see Chapter 3).
Adopted September 21, 2026
Infrastructure
Coordination Activities Anticipating new infrastructure needs for the Town’s planning area is essential to planning, programming, and funding new capacity for the future. Direct coordination with the different service providers, and the officials that influence development patterns and intensities in and around Mooresville, is critical to ensuring capacity (supply) keeps pace with new development (demand) throughout the community. Town leaders should communicate with service providers on future year needs associated with the General Growth Framework presented in Chapter 3 no later than one year after the Mooresville Tomorrow comprehensive plan is adopted. Coordination activities may include, but not be limited to, (1) sharing intended growth area maps and data with service providers so they understand where future demands for service may be concentrated, (2) Town participation in master plans or feasibility studies completed by the different service providers to better coordinate local demand and regional supply considerations, or (3) discussions with service providers (like the North Carolina Department of Transportation) to communicate preferred design applications or travel mode priorities for proposed development activity centers.
Preface | Introduction | Planning Process | Framework | Infrastructure | Concepts | Policies | Action Plan
110
Introduction Chapter 5 describes big ideas, general concepts, and best practices that should be considered throughout the Mooresville planning area. Together, they address topics important for safeguarding community character, building a more complete and connected town, and promoting Mooresville as a community focused on high-quality design, unique experiences, and special places. Specific policies, recommendations, or design considerations that implement one or more of the Town-wide concepts presented here are included in Chapter 6 of the document.
Emphasis on the Public Realm Every place a person visits leaves an impression — sometimes referred to as its “sense of place” — that gives it a distinct identity and reputation. Factors influencing sense of place may include street network, size and scale of buildings, number and quality of public spaces, connections between destinations, streetscape, lighting, landscaping, and art. The Mooresville Tomorrow comprehensive plan recognizes sense of place as a strong influencer for promoting transformational change in specific areas of the community, especially in terms of investments in the “public realm” that may leverage other public and private investments throughout the Town’s planning area. Town leaders recognize major investments in the spaces around, between, and within buildings are needed to keep pace with development. Thinking about a more complete and consistent public realm, and coordinating investments in the public spaces and transportation corridors that primarily make up the public realm, offers the opportunity to synchronize projects that reinforce a common vision and work together to make great spaces for the community. The ability to create walkable environments through investments in the public realm can also influence travel behavior and nearby land uses and development densities.
111
Mooresville Tomorrow 2040 Comprehensive Plan
Coordinating investments in the public realm — whether by public or private interests — has the potential to significantly influence the form and function of the Mooresville planning area and create a sense of place for pedestrians and the community. Establishing a framework for investing in the public realm starts with the recommendations presented in the comprehensive plan and continues with new rules and requirements in the Town’s Unified Development Ordinance (UDO) or capital projects in the Town’s Capital Improvements Plan. It should also include coordinated private investments within and adjacent to the public realm. The context of buildings, their uses, and interactions near the public realm (especially within the first thirty feet of a building) will also be important for instilling a distinct identity and sense of place for a street, neighborhood, or activity center. Initiatives for creating a stronger public realm in Mooresville should help unify the natural and built environments. They should also emphasize a comprehensive and connected brand for the Town that will create a unique sense of place and community pride for living and working in Mooresville. More specific concepts and recommendations for some elements of the public realm are covered in the other Town-wide concepts presented in Chapter 5.
Adopted September 21, 2026
Concepts Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
112
Land Use Mix and Development Intensity Land use mix and development intensities greatly influence a community’s abilities to provide home choices and greater home affordability, reduce traffic congestion, make more efficient use of infrastructure, and create more livable communities. Built examples from across the United States demonstrate the potential for creating “great places” in a community that balance land use mix and development intensities with strong support for high-quality community design and placemaking strategies. Coordinated recommendations for these topics generally improve an area’s economic vitality, perceived security, and sense-of-place or character. Additional standards enacted by a community for land use mix and development intensities ensure places are compatible with adjacent properties and contribute positively to the character of surrounding streets and neighborhoods. Considerations for the Mooresville Tomorrow comprehensive plan focus on more generalized recommendations for land use mix and development intensities, including a preferred proportion of land uses, the physical relationship between land uses, and the compatibility of land uses to each other. Stated preferences for maximizing opportunities in Mooresville are presented in Chapter 3 of the document, including three maps, a matrix series, and the place types presented for the Conservation and Development Map. Additional considerations to influence preferred land use mix and development intensity topics are largely addressed in the Town’s UDO, including setbacks, parking standards, open space requirements, privacy and compatibility between land uses, and buffers. One type of project gaining in popularity in the United States is mixed-use development. By
113
Mooresville Tomorrow 2040 Comprehensive Plan
creating places where people can live, play, work, and shop in one general area, these projects are able to combine various public amenities with compatible land uses in a centralized location. Successful mixed-use developments noted around the country generally include residential uses and one or more of the following: commercial, office, light industrial, civic, education, hotel, public parks or plazas, and dedicated open space. While mixed-use developments come in a variety of forms, they typically are categorized as either vertical mixed-use buildings or horizontal mixed-use sites (or blocks). As described in the book Planning and Urban Design Standards published for the American Planning Association (APA), “Vertical mixed-use buildings combine different uses in the same building. The lower floors generally have more public uses, with private uses on the upper levels. Examples include residential space over commercial establishments, street-level retail with floors of office above, residential and hotel uses in the same building, and retail wrapped around a parking structure with multiple uses above. Vertical mixed-use development may have any number of revenue-producing and mutually supportive uses in the same building.” The APA’s Planning and Urban Design Standards also describes how “Horizontal mixed-use development combines single-use buildings on distinct parcels (or blocks) in one planned development project (or blocks identified for a specific place, like downtown) with a range of uses. Examples include residential neighborhoods surrounding commercial or office development, or a medical campus with surrounding professional offices. This approach avoids the financing and code complexities of vertically mixed-use buildings while achieving the goals of place-making made possible by
Adopted September 21, 2026
Concepts conveniently bringing together complementary land uses in one place.” Both vertical and horizontal mixed-use developments contribute positively to the creation of places that enliven activity centers while meeting the everyday needs of the community.
Challenges for Building Mixed Use Development The size, shape, depth, or land ownership for a specific parcel or area in the community may create challenges for building mixed-use development, especially in more urban or suburban locations where infill development or redevelopment is appropriate. Town officials and their staff should recognize the challenges in these areas and consider deliberate (often sitespecific) planning and phasing solutions to make mixed-use development viable. Items to take
into consideration may include, but are not limited to, the following: Parcel Size Some parcels may be too small to support the scale, land use mix, or design complexity associated with a typical mixed-use development, and are only viable if considered as a component of the larger mixed-use center envisioned around it. Parcel Shape Irregular shaped parcels may complicate the design or construction of a mixed-use development. Designing for efficient building floor plans, circulation patterns, or the visibility and accessibility needs of certain businesses (especially retail) is more difficult when
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
114
presented with angled boundaries or limited street frontage. Parcel Depth Shallow parcels may lack the depth needed to accommodate parking, service access, or building floor plans that support a vertical mix of uses. These parcels may best be used to emphasize improvements in their limited spaces that create more connected and consistent walkable/bikeable environments for travelers adjacent to larger mixed-use parcels. Parcel Ownership Parcel ownership might be a major obstacle for planning a well-designed and cohesive mixeduse development, where land uses, public spaces, site lines, and circulation patterns are optimized for a successful activity center. Developers should consolidate adjacent parcels for a single project to avoid these issues to the maximum extent possible. Alternatively, Town officials may consider the parcels immediately adjacent to a proposed project as future phases of the same mixed-use development for evaluating the development program or site design elements proposed for one or more of the specific parcels within it.
Target Mix of Uses for a Large Activity Center The mix of land uses targeted for a specific activity center in Mooresville will vary based on the size of the proposed center, market demand, local demographics, surrounding development context, and transit access. Professional organizations — like the Urban Land Institute, Congress for New Urbanism, Smart Growth America, American Planning Association, and U.S. Environmental Protection Agency — recommended land use mix ranges for a typical
115
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
Residential – 40% to 60% The goal is to provide the rooftops (customers) needed to support local businesses, and to extend the “energy” observed in the core of a mixed-use activity center into evenings and weekends. Commercial – 15% to 25% The goal is to increase the amount of activity on streets or plazas in the core of the center, serving the daily needs of nearby residents and visitors to the area. Employment – 15% to 25% The goal is to increase the number of people in the activity center during normal work hours, and to increase the economic viability of a mixed-use development. Civic or Institutional – 5% to 10% The goal is to create community destinations in the activity center, including, but not limited to, a post office, school, or local government building that serves local residents and visitors to the area.
Open Space – 5% to 15%
Concepts
mixed-use development for discussion purposes:
The goal is to site parks, plazas, and other open space elements within convenient walking distance for residents, employees, and business customers. Public open space is also used as a trade-off for a reduction in private open space (usually front or back yards) associated with more dense, mixed-use development.
Transit-Oriented Development Transit-oriented development should be considered in Mooresville if, when, and where premium transit corridors are identified by Town officials and their partners. A concentration of mixed-use, dense buildings (potentially the highest densities allowed in the community) are typically located within one quarter mile of the transit station, with progressively lower densities spreading out into neighborhoods surrounding the center. Multifamily buildings ― apartments or condominiums ― should be integrated into a transit-oriented development activity center to increase the number of transit riders (more likely pick-ups and drop-offs) in close proximity to premium transit service. In some cases, the mixed-use development form, pattern, and intensity intended for a transitoriented development activity center may extend outward along a designated premium transit corridor.
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
116
Development Compatibility and Site Transitions The Town will have opportunities to support (and advocate for) infill development and redevelopment in the future. It is important new buildings, open space, parking lots, landscaping, or outdoor facilities in new development complement existing development intensities and patterns nearby to avoid incompatible adjacencies. On smaller infill or redevelopment sites where existing development patterns are established and expected to remain in the future, the massing and scale of new buildings should be similar to nearby surrounding buildings. On larger infill or redevelopment sites, new lots or buildings that are significantly different in mass or scale from adjacent development should be stepped back from the property line, or located toward the center of the site, with lots and building sizes near the perimeter designed to transition to the scale or massing of existing surrounding development. New commercial, light industrial, or flex space developments in close proximity to residential areas should limit their operations to those considered low-intensity, unobtrusive, or at a scale and design compatible with nearby neighborhoods. The design of new development activity centers in the Town’s planning area should also transition effectively between residential and non-residential uses, and include safe and convenient pedestrian and bicycle access for nearby residents. Future development in larger activity centers should focus density and intensity around existing or new street intersections on or adjacent to the site, and provide appropriate transitions to less intense edges of a site more compatible with existing development. New development across the street from existing development should be complementary in lot size, building mass, and placement. Similar
117
Mooresville Tomorrow 2040 Comprehensive Plan
building types should face each other on a public street to protect the character of the streetscape. Land use transitions are preferred in alleyways, the abutment of two rear yards, or across a large common green. Architectural elements should also be used as transitional features for new infill development or redevelopment sites. Where a clearly established building character is expected to remain in an area of Mooresville, new buildings or site design elements should be similar in size and architectural detail, including roof types, windows, doors, awnings, arcades, cornices, façade materials, outdoor furniture, and other building or site details. The diagram to the right shows different site design considerations for a hypothetical site, which together help transition effectively between different land uses and building types in close proximity. (A) An interior parking lot and abundant landscaping provides separation between light industrial or flex space uses in the buildings along the primary street and nearby townhouses interior to the site. (B) Rear-facing garages serving townhouses provide a physical and visual barrier between private home space and the parking lot. (C) A community green with an abundance of trees (potentially a tree-save area from the site’s original condition) provides separation between single-family detached homes, a parking lot, and the low-profile office buildings across the street. (D) Bicycle and pedestrian access between buildings provides safe and efficient connections between destinations in the activity center and nearby homes.
Adopted September 21, 2026
(G) Stormwater features on the site are designed to be community amenities and include green space or walking trails adjacent to activate the space.
(F) Architecture for non-residential buildings in the development (in this case a flex space building) is interesting and complements more historic elements from older building periods.
(H) Building heights in the new activity center reflect the condition of existing development across the street.
Concepts
(E) Public space integrated into the overall design of the activity center provides connected “outdoor rooms” for employees, residents, and visitors.
G C D
H
B A E F
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
118
Home and Neighborhood Choices Mooresville has attracted — and continues to attract — new residents of all ages. As the population grows, so does the range of preferences in housing. Preferences for different housing products and price points vary by locale in the community. Market conditions are influenced by the different consumer groups represented, and the decisions they are making based on income, age, household size, and available financing. Retirees, empty nesters, and young professionals are among the segments of the population expected to drive real estate preferences in the next few decades. Young professionals, especially single and newly married, will continue to drive demand for rental and higher-density housing products in more urban, walkable areas. Young professionals starting families may seek ‘near-in’ neighborhoods close to downtown, or new development activity centers that emphasize safety, schools, privacy, convenience, amenities, and walkable areas. “Boomers” will be aging out of conventional single-family dwellings and looking for lower maintenance housing products. Many may choose to live in multi-family housing (condominiums or apartments) in more walkable locations, which may offer greater independence in future years. Others may choose to down-size to patio homes or townhouses, especially as they acquire second homes in other places. There is also a need for senior housing to allow and encourage seniors in Mooresville to age in place. These types include age-restricted and assisted living developments as well as accessory dwelling units where seniors can be close to family and caregivers.
119
Mooresville Tomorrow 2040 Comprehensive Plan
Housing variety should continue to expand over time to accommodate the demands of Mooresville’s current and future residents. Some developments may be ideally suited for a diversification of housing products to appeal to the variety of people that live in the Town or will do so in the future. In some communities, aspirations for mixeddensity housing are captured in local initiatives to create or support “missing middle” housing options for residents. The term refers to a range of small- to medium-size home choices provided at different price points in the same neighborhood. The homes are compatible in scale and character to a surrounding neighborhood (infill development), or made part of the solutions identified to effectively transition between land uses and densities in a new activity center (development or redevelopment). Missing middle home types are represented by single buildings with multiple units on a single lot, multiple buildings with multiple units on multiple lots, or a cluster of single- or multi-unit homes oriented toward a common green. Common home types in the missing middle category may include duplex, triplex, quadplex, courtyard apartments, live-work units, cottage courtyards, townhomes, and small-scale apartments. Allowing an increase in density, coupled with a design approach that ensures complementary relationships between different housing types in the same neighborhood, can lead to multigenerational and age-in-place living. In other words, the residents can remain neighbors even as they enter new chapters of life. Respecting the adjacent development patterns with comparable lot sizes and building scale at the edges can ensure the transitions to existing neighborhoods are also compatible.
Adopted September 21, 2026
Landscaping, setbacks, and open space throughout the neighborhood help transition between the different housing types and sizes. The large natural area (F) is provided as a community asset, and provides convenient access to public open space as a tradeoff for living with less private open space in the neighborhood (usually in the form of front or rear yards).
Concepts
The diagram below shows different housing types and how they might be integrated into a single, cohesive neighborhood. The neighborhood includes single-family homes on small lots with rear loaded garages (A), duplexes (B), townhomes with rear loaded garages (C), apartments (D), and a senior living center (E). The homes are located on adjacent blocks.
F
A
E C B
C
C
C
D
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
120
Site Design and Development Scale High-quality site design and development scale topics are critical to creating an attractive and more-lively community. Purposeful actions in these topic areas promote visual interest, create unique sense of place, and increase residents’ pride in their community. It also creates places that are desirable for visitors, which draws more people to the area and supports a sustainable local economy.
usually more refined, to influence preferred site design and development scale topics are largely addressed in the Town’s UDO, including setbacks, parking standards (quantity and location), buffers, landscaping, lighting, street furniture, building materials, multi-modal site access and circulation.
Generally speaking, topics considered for site design and development scale in a comprehensive plan include building form and massing, building location, building architecture, open space, development compatibility, site transitions, and redevelopment of existing shopping centers as mixed-use activity areas. The topics presented in this section of the document further refine and implement some of the ideas presented for the land use mix and development intensity topic earlier.
One goal for the comprehensive plan is to create “highly-sociable” places for the community. It is a difficult quality to instill for some places, but once accomplished, it is hard to undo and the places become highly-desirable destinations. Finding opportunities for people to see friends, meet neighbors, and feel comfortable interacting with strangers creates a strong sense of place and attachment to the community. Creating spaces that are comfortable and present well provides the framework for creating highlysociable places in Mooresville — places that are safe, clean, energized, accessible, and with enough capacity to accommodate formal or informal events at the location.
The focus area studies presented in Chapter 3 test some of the themed-recommendations presented for the topic of site design and development scale. Additional considerations,
121
Mooresville Tomorrow 2040 Comprehensive Plan
Socialable Places
Adopted September 21, 2026
The comprehensive plan recognizes competition for space in some portions of the Town’s planning area, which fosters an environment for infill development and redevelopment considerations to accommodate future growth. It is important that future infill development or redevelopment in maturing areas of the community respect the character of both the built and natural environments. New development should consider existing development adjacent to the site early in the application and conceptual design process. It should be compatible with the scale, bulk, massing, and proportion of the surrounding community. Architectural features may also reflect existing character and can help new development assimilate with nearby buildings through similarly sized and patterned architectural features, such as windows, doors, awnings, arcades, cornices, facade materials, roof types, and other details. Small infill sites where existing development patterns are established and expected to remain can use building form and placement to avoid incompatible adjacencies. For example, a quadplex with four units can be designed to look nearly the same as a single-family home, allowing it to fit seamlessly into the neighborhood. Allocating parking to the rear of the lot, accessed from an alley or a front-loaded driveway, allows the occupancy of the building to appear comparable to adjacent houses. This infill approach provides an opportunity to include a variety of housing types and price points to address housing needs in the same neighborhood. On larger infill sites, new development across the street from existing development should be complementary in lot size and building massing and placement. New lots and buildings that differ significantly in massing and scale should be stepped back from the property line or located towards the center of the development, with lots and building sizes
gradually transitioning to the scale of existing surrounding development. Where these transitions are not possible due to existing neighborhood patterns, infill buildings should still maintain a consistent structure setback and provide a new massing and architecture that correlate to the adjacent building heights and architectural massing, proportion, and patterns.
Concepts
Infill Development
Similar treatments should be considered for small commercial or office buildings near existing neighborhoods. Commercial and industrial development near neighborhoods should be limited to operations that are low intensity, unobtrusive, and at a scale and design compatible with nearby residential development. The design of these centers should transition effectively between residential and nonresidential uses, and include safe and convenient pedestrian and bicycle access for nearby residents. New development should focus density and intensity around major intersections and provide appropriate transitions to less intense edges of the neighborhood. Similarly, massing should consider the edge transitions as well. New, taller, more dense buildings may occur at one end of the new development block, with medium, less dense buildings mid-block, and smaller, low-density buildings meeting the scale of the existing neighborhood. Transitions may also take place over rear lot lines, where one side of an existing block may have a different character than the opposite side of the new development block. Context-sensitive infill may be further achieved through design guidelines that are specific to surrounding areas. New development and redevelopment regulations should incorporate architectural and site design principles that better reflect unique areas, address pedestrianfriendly opportunities in larger developments, and result in meaningful open spaces. Updates to the Town’s UDO should address infill development options in residential districts, which include standards to ensure that new
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
122
123
development is appropriate to the site and its surroundings to the extent allowable by state law. Architectural elements can also serve as important transitional features for new development. Where a clearly established
building character is expected to remain, infill development should blend with nearby buildings by using similarly sized and patterned architectural features.
New homes should blend into established neighborhoods through compatible site orientation, bulk, massing, and proportion. In the diagram above, the new home in the center (shown in blue) is oriented to the street, with the facade parallel to the existing homes (shown in brown), and the same setback from the street as the existing homes. The new home’s proportions (depth and width) are comparable to the other existing homes, and the porch (shown in light blue) spans the width of the home, like others on the street with porches. This is a good example of compatible infill development.
Compared with the example above, the new home in the diagram below (shown in blue) is oriented to the street and adheres to the same setbacks as the other buildings on the block; however, the new home is significantly larger than the existing ones. It is disproportionate in terms of massing (footprint), which makes it an example of incompatible infill development for the block.
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
Open space includes the parks, plazas, squares, greenways, floodplains, forests, natural areas, and other amenities existing now or planned in the future. Together, they form a general open space framework that helps Town officials and their partners prioritize land acquisitions, organize infrastructure projects, and coordinate land or facility dedications from future development applications. Individual decisions about open space in Mooresville should consider the context and needs of a larger open space framework, which is aimed at maximizing a comprehensive, connected, and continuous open space network that is easily recognizable and accessible to Town residents.
space elements that are recommended in the different place type categories (see Chapter 3). Suburban areas may emphasize parks, greenways, sports fields, or natural open space. Urban areas should emphasize plazas, squares, pocket parks, greenways, and active sidewalks with outdoor dining or pedestrian amenities. Emphasis on open space in more urban areas should be accepted as a viable trade-off for living with higher densities and less private open space in a residential neighborhood or mixed-use living environment. Open space for all three conditions — rural, suburban, or urban — in private development should be made accessible to the general public, as appropriate.
A coordinated open space network for the Town’s planning area may help (1) manage stormwater runoff, (2) support new parks and recreation centers that provide residents greater access to active or passive uses, (3) increase tree canopy for shade, heat absorption, and CO2 exchange, and (4) provide interesting gathering places for residents, employees, and visitors in different parts of the community. The size, location, and design of open space in the planning area should be sensitive to their surroundings. It should also support a resource hierarchy — town-wide parks serving residents of Mooresville, community parks serving large areas of the community, neighborhood parks serving nearby residents, and public spaces in different activity centers designed as plazas, cafes, or attractive streets for walking. In more rural areas, open space should be preserved using large natural parks or conservation development patterns, which concentrate homes in a specific area of the neighborhood with large amounts of land — sometimes over 50% of the total land area — preserved as permanent open space. Development and redevelopment in more suburban and urban areas should include a broad range of open
Preserving floodplains in the planning area for open space provides a great opportunity to quickly and effectively connect different rural, suburban, and urban open space features into one complete and connected network. Thoughts and ideas for an open space initiative in the comprehensive plan should be coordinated with similar ideas and recommendations in the Town of Mooresville’s new Comprehensive Parks and Recreation Master Plan. Town officials should also consider new rules, standards, and definitions in the Town’s UDO that incorporate open space as a meaningful component of new development. New definitions for qualifying certain amenities as open space in more urban settings may be needed in the UDO to support important (re)development efforts identified on the maps in Chapter 3. In limited cases, Town officials may also want to consider open space elements not at ground level — rooftop parks, gardens, or community-gathering spaces — to meet the needs of residents living in more urban areas of the community.
Concepts
Comprehensive, Connected, and Continuous Open Space
The illustrations on pages 125 and 126 present examples for creating a comprehensive, connected, and continuous open space network
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
124
using coordinated decisions on individual development applications. The illustrations provide examples for implementing a town-wide open space initiative into different development types or contexts. The viability of an open space network that represents this much of a development site rests on the Town’s willingness to allow taller buildings, promote smaller building footprints because of taller buildings, and relax minimum surface parking requirements. Even then, a financial incentive may be needed to offset lost revenue potential for the developer if they set aside open space to the levels depicted in this drawing. (A) A common green is designed to be the focal point of a mixed-use area.
(B) A second common green is less formal and functions like a park serving the needs of a nearby townhouse community. (C) A prominent intersection in the development physically connects the two green spaces by sidewalk. (D) A trail spur to a regional greenway system connects residents, workers, and visitors to the larger open space network in the community. (E) Open space elements are also included in the median of the major road adjacent to the development to instill a parkway feel for the corridor. (F) Large tree stands preserved during the development review process provide another form of open space in the community.
F D
C
B
A
E
125
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
Concepts
(1) Open space elements should be considered in all parts of the Town’s planning area. In this example, a pocket park and pavilion are included in an industrial area to support a local brewery and food kitchen incubator that are present on the site. Separate entrances for trucks and vehicles help minimize conflicts between the various activities. A park in this location may be considered by some as “cool” in the community.
(2) Greenways and other open space elements should be used to connect residents with nearby parks, athletic fields or courts, and other open space amenities. In this example, the emphasis is placed on moving bicycles and pedestrians (versus automobiles) between a park and nearby neighborhoods. This is done, in part, to promote more active lifestyles in the community.
(3) Open space elements should be considered in more rural areas of the community as well. In this example, agriculture fields or horse pastures are still active up to the edge of development, and an experimental field behind one of the buildings acts as an education center for visitors. A small common green signifies an important civic building in the development. Large and random setbacks between buildings, and the open space in between, reinforce a more rural context for the area.
(4) A large common green is the focal point of this residential neighborhood, and provides multiple opportunities — including a clubhouse, pool, community gardens, and walking trails — to interact with neighbors. Open space is equally important to home lots in this example, and often times meaningful open space like this in a neighborhood generates a lot premium (i.e., additional fee) for homebuyers.
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
126
Greater Transportation – Land Use Coordination The Mooresville Tomorrow comprehensive plan advocates for a transportation system that is safe and efficient for moving people and goods throughout the community by vehicle, bus, rail, bicycle, or walking. Equal emphasis on land use (i.e., demand), transportation (i.e., supply), and urban design (i.e., character) in the Town’s transportation and land use decision-making processes should improve overall efficiency of the transportation system while promoting livability principles important to new neighborhoods and development activity centers identified in the General Growth Framework (see Chapter 3). Supply-side solutions for improving the transportation system should focus on (1) a complete and integrated grid street network of major streets, (2) a complete streets initiative, (3) access management standards, (4) maximum street spacing guidelines, and (5) different street design standards for rural,
127
Mooresville Tomorrow 2040 Comprehensive Plan
suburban, and urban development conditions that nest within the place type categories presented in Chapter 3. Demand-side solutions for improving the transportation system should focus on opportunities to reduce the number of trips in the system, the time-of-day trips in the system, and the length of trips between origin and destination. Reducing demand on the transportation system, especially during peak periods, could delay or eliminate the need for expensive transportation projects to increase vehicle capacity. The type, pattern, and intensity of development recommended for the General Growth Framework aims to lower vehicle trip generation (through internal capture), shorten travel distances between origin and destination (in mixed-use development activity centers), and emphasize non-vehicular travel modes (via a comprehensive and complete greenway and trail network).
Adopted September 21, 2026
Simply stated: attractive building architecture and good site design sells, and sells at a premium, which increases total assessed values for neighborhoods, shopping centers, business parks, and mixed-use areas and the property taxes they generate for the Town. Emphasizing community character in Mooresville, and increasing minimum building architecture and site design standards to instill a unique brand or identity for the Town, has the potential to increase total assessed values in the future. Some design considerations that promote community character may also have direct impact on the efficiency of providing Town services. For example, some communities find smaller minimum lot sizes increase lot values while lowering infrastructure costs, which results in higher net property tax revenue for the local government. Other communities observe a premium paid for buildings or lots sold in an area with a strong locational brand or sense of place, which translates to higher total assessed values for the tax roll because assessed value is calculated as a portion of the market (i.e., transaction) value.
land or real estate increases as a result of the investment. Capturing the value increase from proximity to the investment area generates additional (and reoccurring) tax revenue for the local government and increases sale or rent prices for the developer to offset the costs of the improvement.
Concepts
Long-Term Financial Stability
An article published by the National Recreation and Park Association (NRPA) in 2020 (see Note #1) quantified the value capture added for residential development located near a passive or active park. Citing thirty-three case studies, the authors concluded a premium of eight to ten percent on total assessed value was reasonable as a guide – especially for homes located within 500 to 600 feet of the park. A larger park was generally associated with higher premiums in the case studies. Premiums associated with multifamily buildings or small lot single-family homes were higher compared to large-lot, singlefamily homes because nearby access to public open space was deemed highly-desirable
Below are three topics to consider for improving Mooresville’s overall financial stability when (1) contemplating Town-led capital investments in the public realm, (2) deciding whether or not to require high-quality site design, open space, or building architecture for a site or concept plan, or (3) considering the merits of land use mix and development intensity for a private development application.
Value Capture The term “value capture” for town planning purposes refers to a belief that local governments or developers can recover some, or in some cases all, of the costs associated with providing public infrastructure or amenities in a specific location because the value of nearby
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
128
by homeowners without large front or rear yards for private open space.
and Research in 2015. The authors were Wei Li and Kenneth Joh from Texas A&M University.)
A separate study of residential neighborhoods in Austin, Texas (see Note #2) by researchers from Texas A&M University found a one percent increase in walkability score for a neighborhood translated into a $1,329 increase in total assessed property value. A one percent increase in sidewalk density for a neighborhood translated into a $785 increase in total assessed property value.
(Walkability = The ability to safely walk to services and amenities within a reasonable distance, usually defined as a walk of thirty minutes or less. [Planetizen Website, 2023]. The study in Austin, Texas used a web application, Walk Score, to quantify the walkability of residential neighborhoods. It can be accessed at www.walkscore.com.)
Other studies and reports have been published documenting increased values observed in mixed-use developments that are focused on creating vibrant, pedestrian-friendly destinations with a mix of complementary land uses and public spaces. The experiences created for visitors using high-quality and well-thought-out site design, building architecture, and public amenities generally create desirability for the development and increases total assessed values for homeowners and businesses located within it. Capturing the value increase for properties in desirable locations of Town generates additional (and reoccurring) tax revenue for the local government and increases sale or rent prices for the developer to offset the costs of the improvement. Note 1: (The information presented was summarized from an article “How Much Impact Do Parks Have on Property Values?” published in NRPA Magazine on March 26, 2020. The author was John L. Crompton, Ph.D. from Texas A&M University.) Note 2: (The information presented for Austin, Texas in the paragraph above was summarized from an article “Assessing Benefits of Neighborhood Walkability to Single-Family Property Values, A Spatial Hedonic Study in Austin, Texas” published in the Journal of Planning Education
129
Mooresville Tomorrow 2040 Comprehensive Plan
(Re)development Intensity and Efficient Infrastructure Service Areas One factor that increases the total assessed value for a parcel is its (re)development potential, which includes the land uses and development intensities programmed for the property. Increasing potential development on a property may significantly increase tax production and the amount of tax collected for a parcel. Local governments typically update total assessed value for a property at the completion of a construction project, which generates additional revenue for the local government immediately without raising tax rates. Communities may also experience efficiencies through density when it comes to providing public facilities and services. Certain economies of scale result in cost advantages that are realized in smaller service areas that use capacity fully before extending services to new areas. Cost per unit decreases in these areas, which creates a direct monetary benefit to the service provider and increases net revenue potential for the local government. The combination of increased tax production and reduced service costs creates a strong argument for increasing development density and the mix of uses allowed in specific areas of the community (i.e., the development activity centers presented in Chapter 3).
Adopted September 21, 2026
Concepts
Active Property Values Generally speaking, an active property that is well-maintained creates higher total assessed value, and thus more tax revenue for the local government, compared to an inactive or declining property. To this end, some communities are proactively evaluating their development activity and its quality, and identifying quickly locations in decline as candidates for beautification grants or infill development and redevelopment initiatives. Reinvesting in these properties eliminates potential blight in a community and maintains strong property values, which generates strong reoccurring real property taxes for the Town.
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
130
Interstate 77 Bridge Treatments Interstate 77 creates a physical, visual, and psychological divide in the Mooresville community. Some communities in the United States are working with their state departments of transportation to stylize certain bridges and underpasses that accompany an interstate to address these issues. Most aesthetic improvements are programmed with other safety or capacity improvements identified for the bridges or underpasses. Recommended aesthetic improvements for bridges or underpasses on Interstate 77 in Mooresville — especially Exits 31 and 38 as bookend gateways to the community — should consider unique colors, materials, shapes, lettering, art, or structures that say, “I am in Mooresville”, and welcome visitors traveling north or south between home, work, shopping, and entertainment destinations.
131
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
Concepts Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
132
Suburban Retrofit Suburban retrofit is the process of converting areas that are already developed in conventional suburban patterns into mixed-use, multi-modal, activated corridors or centers. This approach reflects a change in preference from suburban, auto-oriented development to a more traditional mixed-use form, where people will want to walk between new residences and a range of small and large retail shops, businesses, offices, and recreational opportunities. Context-sensitive suburban retrofit addresses typical conflicts between commercial and residential uses by carefully transitioning from small- to large-scale building types. Suburban retrofit occurs in areas that are mostly developed, but may have underutilized parcels or excessive surface parking. Retrofitting existing building sites allows developers to take
advantage of existing infrastructure and services, and helps to mitigate the effects of sprawl by improving transportation connections. Suburban retrofit also helps address barriers to bicycle and pedestrian connectivity in places like aging shopping centers by enhancing pedestrian connections and recreating internal driveways and internal streets with infill buildings fronting onto them. This redevelopment approach relocates parking to the rear of buildings, rather than having large surface parking lots between the building and the street. The illustrations show a conceptual and incremental approach to suburban retrofit of a suburban, big-box shopping center with a large parking lot between the street and the building.
(1) A typical layout for a suburban, big box shopping center located several hundred feet back from the public street with a large surface parking lot in between. One or more outparcels in the shopping center support restaurants with drive-throughs, banks, or other uses. The outparcel buildings appear to almost float in the sea of asphalt allocated for surface parking. Vacant land to the right of the big box store (shown in green) represents a prime infill development opportunity for the community.
133
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
Concepts
(2) Early infill development on vacant property next to the existing big box shopping center is sensitive to the overall vision and plan for the new development activity center. Buildings are oriented toward the access driveway that will become a new main street in future phases of the project. Parking is located behind buildings to reinforce a walkable and activated streetscape planned for the new main street.
(3) Infill development on vacant property next to the big box shopping center continues. In this case, new townhouses are added to the development activity center. A new park is also built behind the big box store that is phased in construction to allow for continued operations at the declining business. The park is also connected with an adjacent greenway. Redevelopment of some portions of the existing surface parking lot swap under-utilized parking areas for new buildings and civic spaces.
(4) Redevelopment of the remaining portions of the existing surface parking continues as the big box store is now closed. A new block pattern for the activity center is completed by converting additional drive aisles into walkable streets.
(5) The closed big box store is demolished to make room for additional mixed-use development, which brings new residential uses (in this case townhouses) into the development activity center. Access to the new park built in phase three (3) is also increased via the new grid street network. The former suburban shopping center is now a walkable, mixed-use activity center.
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
134
Town Policies & Recommendations Chapter 6 presents policies and recommendations intended to guide the Town’s decision-making as it allocates resources, acts on development applications, creates or modifies regulations, enters into agreements for the provision of services or public facilities, or takes other actions affecting the short- and longterm futures of Mooresville. The policies and recommendations are intended to be advisory and no individual policy is intended to stand alone. Like a toolkit, policies should be applied in a way that best achieves the comprehensive plan’s stated vision and guiding principles, while considering available community resources and competing priorities. The information presented in this chapter is organized by the nine guiding principles presented in Chapter 3. There is no relationship or prioritization intended with the order of the policies and recommendations presented in the chapter.
1 – Planned & Orderly Growth
1.1 – Use the Mooresville Tomorrow comprehensive plan as a key resource in development application review, infrastructure planning, and coordination with outside service providers. The document should be widely accessible to residents, business owners, and property owners throughout the Town’s planning area. At a minimum, the comprehensive plan should be reviewed every three to five years and updated every eight to ten years to evaluate changing conditions in markets, demographics, residents’ preferences and values, or new state and federal legislation.
(1) Town of Mooresville Unified Development Ordinance, (2) Town of Mooresville Land Development Standards Manual, (3) Town of Mooresville Capital Improvements Plan, (4) Town of Mooresville Annual Budget, and (5) various town master plans or feasibility studies to implement the policies and recommendations presented in the Mooresville Tomorrow comprehensive plan. In doing so, recognize the different needs and conditions acknowledged in the comprehensive plan for three development conditions observed in Mooresville: greenfield development, infill development, and redevelopment. Evaluate and decide if certain rules and requirements should vary by development conditions for different topics including, but not limited to, permitted land uses and densities, adjacent site compatibility, building height and setbacks, buffers, environmental stewardship, open space preservation, parking, adaptive reuse, and new infrastructure provisions. Specific locations to apply different rules and requirements by development conditions may be guided by the boundaries presented in the Intentional Growth Areas Map (see Chapter 3).
1.3 – Evaluate future opportunities presented to the Town in the context of an overarching goal to create a self-sustaining community in the future. This means, in part, an emphasis on bringing new employment, retail, and services to Town residents, increasing access to Town parks and recreation areas communitywide, and providing greater home choices in the community to support different backgrounds: the creative class, working class, retirees, and children.
1.4 – Concentrate future development in mixed use activity centers depicted on the Conservation and Development Map.
1.2 – Program Town resources to review and
revise, as needed, rules and requirements in the
135
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
Policies
1.5 – Establish compatibility and transition standards in the Town’s Unified Development Ordinance that better address the spaces between existing and future development; especially in terms of height, bulk, density, connectivity, or screening concerns between properties. This is important as the Town advocates for more infill development and redevelopment in the community. For implementation purposes, a small infill development or redevelopment project, sometimes as small as a single lot in an existing neighborhood, should adhere to stricter rules of compatibility with the surrounding environment since it is considered an incremental change to an already existing and defined neighborhood or district character. This does not mean a new land use should not be considered for an existing neighborhood or district in the future if the size, shape, height, and massing of the building, and its setbacks from property lines, can be made compatible with lots visible from the project location.
Larger infill development or redevelopment projects, sometimes representing the last tract of vacant land surrounded by one or more existing neighborhoods, should emphasize varying rules of compatibly for the site proportionate to the project size and visibility from adjacent neighborhoods or districts. More strict rules of compatibility with the surrounding environment should be enforced where the project property abuts an existing development. More flexible rules of compatibility with the surrounding environment should be considered on a case-by-case basis for portions of the project further away from abutting development.
1.6 – Encourage infill development and redevelopment in areas of Town identified on the Intentional Growth Areas Map. The intensification of existing development in these areas should contribute to a more memorable, thriving, and sustainable community, and should aim to manage existing Town resources efficiently.
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
136
1.7 – Rethink suburban commercial corridors in the community as walkable, mixeduse areas that increase the quality of retail experience for visitors, and enhance quality-of life for nearby neighborhoods. Retrofitting existing commercial corridors should not be about taking commercial uses and replacing them entirely with residential uses. Corridor retrofits should maintain a commercial focus, add new public spaces or amenities, and include some new housing for Town residents.
1.8 – Protect and maintain historic structures in Mooresville by ensuring (1) development applications within, or adjacent to, known national or local historic or cultural resources include measures to protect those resources from demolition or encroachment, (2) developers utilize existing historic structures and features in the design of new developments, (3) developers relocate historic structures to appropriate locations to maintain glimpses of the Town’s past within its future.
1.9 – Influence the design and layout of new neighborhoods, districts, or activity centers in Mooresville as a means to increase residents’ physical activity levels, maintain mental health, and improve overall well-being.
1.10 – Place responsibilities on the
development applicant to demonstrate their compliance with the rules, requirements, targets, maps, and thresholds expressed in the Mooresville Tomorrow comprehensive plan. Require each development application include statements for how the development program, site layout, building densities or intensities, open space features, etc. proposed for a property meet the intentions of the comprehensive plan. The Planning and Community Development Department should formalize a process and reporting template in the Town’s Unified Development Ordinance to evaluate compliance
137
Mooresville Tomorrow 2040 Comprehensive Plan
with the comprehensive plan for different development applications (possibly using different requirements for different development application types, as needed).
1.11 – A community report card should be
prepared by the Planning and Community Development Department and used to monitor and evaluate progress for implementing items in the Mooresville Tomorrow comprehensive plan. Formal presentation of the community report card should be made to the Town’s Board of Commissioners in the first quarter of the calendar year. Adjustments to the comprehensive plan’s action plan, if necessary, should be made during the annual Board retreat.
1.12 – Town officials should convene a UDO Task Force immediately after the comprehensive plan is adopted, which will work with the Board of Commissioners and Planning and Community Development Department staff to implement policies and recommendations in the document, changing phrases with reference to “should” in the comprehensive plan — noting recommendations or desired outcomes — to phrases with reference to “shall” in the UDO — indicating requirements or absolute standards — for a development application.
1.13 – Add a provision to the Town’s Unified Development Ordinance that allows for an independent, third-party evaluation of a development application if the Town’s Planning and Community Development Director decides it is appropriate and in the best interest of the Town.
2 – Town Character & Authenticity
2.1 – Adopt design and development standards that enhance community appearance, activate public spaces, and maintain a unique sense of place for Mooresville. Topics to address should include, but are not limited to, signature building architecture, building dimensions, public open
Adopted September 21, 2026
2.2 – Develop a Mooresville Public Spaces Plan that organizes future Town investments in public streets and spaces, and establishes minimum rules, criteria, or design standards that may apply to private development during a development application review.
2.3 – Emphasize public spaces as a unifying
feature when contemplating new development or redevelopment projects. General goals for investments within and adjacent to the Town’s public, or semi-public, spaces include:
(1) use elements of public spaces as organizing features for a neighborhood, district, or activity center; (2) emphasize consistent design features or treatments for a corridor or destination that create a common sense of place for users; (3) think of streets as linear parks with public spaces and active private spaces (e.g., outdoor seating) located throughout the corridor. (4) increase minimum open space requirements for private property adjacent to public spaces in terms of size, shape, and location to activate spaces; and
(5) reimagine the definition of open space adjacent to public spaces to include, but not be limited to, plazas, outdoor seating, and pocket parks that activate spaces. The expanded definition of open space should create vibrant public spaces while recognizing the needs of private investment to make a project viable.
Policies
space, streetscapes, parking solutions, light or noise level standards, setbacks, and development compatibility standards.
General goals presented under item 2.3 may be overruled based on more specific recommendations included in a forthcoming Mooresville Public Spaces Plan.
2.4 – Require that multiple non-residential
buildings on the same lot or parcel be architecturally-unified in terms of building features and building materials.
2.5 – Limit the use of franchise architecture in the downtown and all development activity center place type categories as one means to reinforce a unique brand and identity for Mooresville.
2.6 – Create one or more Town grant programs for businesses that improve the physical appearance or functionality of their properties.
This should be done primarily to accelerate private investments in declining centers or corridors.
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
138
2.7 – Create recognizable entrances
3 – Home & Neighborhood Choices
(gateways) into Mooresville that reinforce a brand and identity, acknowledging the need to potentially brand or message certain districts in the Town differently.
3.1 – Support housing diversity in the
2.8 – Support neighborhood brand and identity initiatives, including unique entrance signs, street blade signs, landscaping, public art, and painted crosswalks as a means to celebrate unique areas of the community.
2.9 – It is important new buildings, open space,
parking lots, landscaping, or outdoor facilities in new development complement existing development intensities and patterns nearby to avoid incompatible adjacencies. On smaller infill or redevelopment sites, where existing development patterns are established and expected to remain in the future, the massing and scale of new buildings should be similar to nearby surrounding buildings. On larger infill or redevelopment sites, new lots or buildings that are significantly different in mass or scale from adjacent development should be located toward the center of the site, with lots and building sizes near the perimeter designed to transition to the scale or massing of existing surrounding development.
2.10 – New development across the street from existing development should be complementary in lot size, building mass, and placement. Similar building types should face each other on a public street to protect the character of the streetscape. Land use transitions are preferred in alleyways, the abutment of two rear yards, or across a large common green.
2.11 – Identify opportunities to expand public
art in the community, which may include sculptures, murals, memorials, digital media, or live performances. Rotate exhibits in public display areas to keep spaces interesting and encourage repeat visitors to the area.
139
Mooresville Tomorrow 2040 Comprehensive Plan
community, including different home types and sizes intermingled in close proximity, as a means to attract greater demographic diversity in the community (i.e., age, income level, culture, and race).
3.2 – Establish a discernible structure for new
neighborhoods in Mooresville. The center of a neighborhood should include a civic open space ― such as a park, square, or plaza depending on its location, size, and development context. Neighborhoods should also be organized around pedestrian walk sheds, which represent a fiveminute walk distance from the center to the edge. The pedestrian shed concept ensures that all residents are within a short walk of a meaningful destination. These destinations may include mixed-use areas or other civic open spaces. In the case of corridor development, the pedestrian shed may be linear.
3.3 – Create policies, ordinances, or incentives that advocate for missing middle home types in the community. Design exceptions or alternative design treatments and standards for infill development opportunities in existing neighborhoods may be needed in the future, which acknowledge unique conditions or circumstances in different neighborhoods. General considerations for promoting missing middle housing in existing neighborhoods may include: (1) new home building architecture, orientation, and compatibility with existing adjacent homes, (2) infill development and potential flooding issues associated with changed amounts of impervious surface or drainage patterns, and (3) parking provisions, on street and on-lot, needed to effectively accommodate the target number of residents in each building.
3.4 – Join partners in exploring opportunities to support more affordable housing in Mooresville
Adopted September 21, 2026
Policies
perspective of a tourist economy versus the needs to protect neighborhood character. The Town should study the use of STRs in the community using local data, a best practices literature review, peer community interviews, and public meetings. Topics addressed in the study may include, but are not limited to, (1) the need to define tiers of STRs to regulate use, the location of the use, and intensity or duration of use, (2) a cap on the number of STRs that may be permitted in the same neighborhood, (3) the requirement for STRs to pay local and state accommodation taxes, (4) required licenses and certifications needed to qualify as a STR in Mooresville, (5) specific needs or preferences for a local property manager, defined parking areas and individual parking spaces, guest stay limitations, vehicle stay limitations, or increased landscaping or screening requirements generated by the home type, neighborhood character, and number of bedrooms, and (6) best practices for compliance tracking. The Town should act upon the reasonable findings and conclusions in its study (potentially adopting a resolution or ordinance to manage STRs in Mooresville).
4 – Life Outdoors
4.1 – Develop standards that protect open and greater Iredell County. Consider solutions that capitalize on federal housing subsidy programs, or find partners that build affordable housing in a community (e.g., Dream Key).
3.5 – Adopt Town policies, rules, and criteria
that allow for the purchase of land or buildings with Town resources, or through resources dedicated to the Town by others, to increase the number of affordable housing units in the community.
3.6 – Evaluate the presence and utility of short-
space as a meaningful component of new development, including, but not limited to, natural areas, forests, floodplains, parks, plazas, squares, or greenways. Partner with state, regional, or non-profit groups working in the area to mitigate the impacts of new development on natural systems.
4.2 – Advocate for natural stormwater management strategies (drainage and infiltration) in larger neighborhoods or development activity centers. Incorporate stormwater best management practices ― bioswales, infiltration
term rentals (STR) in Mooresville from the
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
140
planters, underground storage, etc. ― in more urban development activity centers.
4.3 – Advocate for a comprehensive and connected system of natural green space integrated into the built environment as (1) a deliberate effort to protect natural areas, and (2) as an amenity accessible to residents to enjoy the outdoors.
modes. Street design standards for more urban conditions serving new walkable centers or communities should help bind together land use, transportation, and urban design decisions.
5.3 – Support premium transit service in
4.4 – Build the Town’s local trail system and its
Mooresville (bus rapid transit or commuter rail) as one option to improve congestion on Interstate 77 — subject to favorable findings and conclusions for the Town in subsequent plans and studies.
5 – Community in Motion
5.4 – Work with the Town’s transit partners to
connections to “The Seam Trail” and other regional trails planned in the future.
5.1 – Implement recommendations from the Mooresville Mobility Plan to improve the Town’s transportation system, including: (1) a complete and connected street network, (2) complete street design principles, (3) mobility hubs serving multiple travel modes, and (4) an interconnected bicycle and pedestrian network.
5.2 – Implement demand-side solutions to
improve the Town’s transportation system, which may be focused on land use, development density, and urban design principles that lower vehicle trip generation (internal capture), shorten travel distance, and support non-vehicular travel
141
Mooresville Tomorrow 2040 Comprehensive Plan
find bus or micro transit options for moving people within the Town; especially between existing or proposed development activity centers.
5.5 – Evaluate the Town’s roles and
responsibilities for implementing the Centralina Regional Council’s Transportation Demand Management Plan, which is aimed at reducing the number of single-occupant automobile trips in a ten-county region. Ideas to consider may include incentives, information, or infrastructure needed to promote carpooling, telecommuting, or non-automobile modes of travel to work. Ride-sharing programs should also be
Adopted September 21, 2026
6 – Community Facilities and Services
5.6 – Incorporate the function and design
expenditures with those of other infrastructure providers to keep pace with the timing and location of future growth in the planning area.
principles for mobility hubs described in the Mooresville Mobility Plan into new or expanded development activity centers depicted on the Conservation and Development Map.
5.7 – Build a complete and connected network of bicycle and pedestrian facilities in the community consistent with the maps and recommendations included in the Mooresville Mobility Plan to support preferred development types, locations, patterns, and intensities depicted on the Conservation and Development Map.
5.8 – Improve street, sidewalk, greenway, and bicycle facility connectivity within, and between, new or existing neighborhoods, retail areas, employment areas, and development activity centers. Require new development connects to adjacent, existing development unless topographic or ecological constraints prohibit it.
5.9 – Coordinate with neighboring jurisdictions
and agencies to link parks and greenway networks depicted in the comprehensive plan or its implementing function plans (e.g., the Mooresville Mobility Plan or the Town of Mooresville Comprehensive Recreation and Parks Master Plan).
5.10 – Lead a town-wide initiative to
encourage “active living” in Mooresville, including plans and policies that promote more walkable development, a comprehensive and connected bicycle network, and programs that increase the frequency and level of daily physical activity for students, families, employees, seniors, and visitors.
Policies
considered as a viable solution for reducing the number of single-occupant automobile trips in the community (especially during peak travel periods).
6.1 – Coordinate the Town’s capital
6.2 – Think about new or expanded infrastructure needs to serve future residents when reviewing development applications. Sometimes new development or redevelopment will afford the opportunity to request land or building space for new community facilities. If appropriate, the Town may ask development applicants to consider some of these needs in their site concept plans. In some cases, the Town, or their service provider partners, may need or want to compensate the developer or landowner for upsized infrastructure or dedication of land or building space for a public purpose.
6.3 – Evaluate the use of municipal services districts (MSDs) to fund certain infrastructure projects. The districts are used to levy additional property tax used by the local government to provide extra services to residents, businesses, or property owners in the identified district. In North Carolina, an MSD may be enacted pursuant to the rules and requirements set forth in Chapter 160A, Article 23 of the General Statutes. The list of spending categories for the district is limited by state law to include downtown revitalization, historic district enhancements, urban area revitalization, transitoriented development, drainage projects, sewer collection and disposal systems, off-street parking facilities, and watershed improvements.
6.4 – The Town and its partners should identify opportunities that increase the type, number, and location of civic and culturally-important spaces in the community. Examples of new spaces may include, but are not limited to, public
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
142
gathering spaces, a local museum, performing arts center, or community center. New or expanded facilities could also benefit from public-private partnerships.
6.5 – Look for opportunities to use Smart City
technology in future infrastructure projects, which links together different information systems and provides more opportunities for real-time information-sharing in the community. Look for outside implementation partners ― like Google or Microsoft ― to start a program in Mooresville.
6.6 – Encourage construction of new schools adjacent to the neighborhoods they serve, and demand they include the infrastructure needed to promote walking and biking to school from all sides of the school.
7 – Economic Vitality
7.1 – Work with landowners, businesses, and state or local economic development organizations to find the resources needed to increase the number and location of site-ready properties for future industrial, business, or office growth.
7.2 – Leverage the Town’s unique character and
sense of place to attract high-quality jobs and investment; acknowledging the Town’s quality oflife and its appeal to a wide range of skilled and educated workers as a desirable place to live and work are directly related.
7.3 – Continue supporting local businesses and
entrepreneurship in the community; especially for entrepreneurs, artists, start-up businesses, technology innovators, or similar “new economy” businesses.
7.4 – Consider key industries for Mooresville in proposed development activity centers on the Conservation and Development Map: advanced
143
Mooresville Tomorrow 2040 Comprehensive Plan
manufacturing, medical, corporate office, and creative or artisan activities.
7.5 – Explore opportunities to retain or expand businesses in the Town’s planning area using more flexible land use, landscaping, parking, or other site design considerations. This should be a priority for infill development or redevelopment projects located in areas designated as “Areas to Enhance” or “Areas to Transform” on the Intentional Growth Areas Map.
7.6 – Promote adaptive reuse of existing non-
residential buildings that are abandoned or in decline. Adaptive reuse represents a change in use or activity for an existing building that was previously used for something different. It is generally credited with being faster, more cost effective, and more sustainable for bringing new or expanded businesses online in a community compared to constructing new buildings on undeveloped land.
Old shopping centers, old school sites, and old warehouses are all candidate locations for adaptive reuse. Reuse of an existing site or building provides the opportunity to reinvest in building architecture, parking lot design, landscaping, or open space that addresses potential eyesores in a community. It furthers the belief that an active property will always create more value in a community compared to an inactive property. Town officials should encourage adaptive reuse of existing non-residential buildings in the planning area, and incentivize such actions using their policies and ordinances.
7.7 – Monitor potential economic disrupters for the Town, including but not limited to, new technologies, autonomous vehicles, teleworking, and e-commerce, and employ adaptive and innovative strategies to meet emerging economic shifts. Consider a full update to the comprehensive plan if the economic disruption
Adopted September 21, 2026
communication channels with all stakeholders as a means to make well-informed decisions.
8 – Livable Town
9 – Long-Term Financial Security
8.1 – Plan and program town-sponsored events and activities that are inviting and appealing to a wide range of residents’ interests and backgrounds. Target events in different locations, in part, to celebrate different experiences that come with living in the Town.
9.1 – Identify and protect areas in the Town’s
8.2 – Explore opportunities for evaluating neighborhood or resident vulnerabilities, including displacement, when evaluating development applications.
8.3 – The Town should work with its partners to celebrate local history and culture. Ideas to explore may include, but are not limited to, an expanded history page on the Town’s website, events held in the community to demonstrate local traditions, public art exhibits that highlight local history or culture (like the timeline downtown), or a small Mooresville history museum located somewhere in the community.
8.4– Consider the utility of, and potential applications for, a “My Mooresville App” designed to help residents interact directly with the Town on a variety of topics. Key features in the App may include, but are not limited to, reporting an issue (like potholes or zoning violations), emergency alerts, customer service, news and information, live or on demand meeting watches, or access to other agencies or services (like park reservations, pet adoption, library services, or county government). If determined to be feasible, the Town should partner with a third-party vendor to develop, test, launch, and host the App in the future.
8.5 – Promote transparent and inclusive engagement, and safeguard two-way
Policies
will create significant challenges or opportunities for the planning area.
planning area for future non-residential development; particularly for those areas that generate jobs and bolster the local tax base. Competition for land in a fast-growing area can sometimes result in parcels that are ideally situated for commercial, office, or industrial uses converting to residential development. The short-term gain realized on these parcels precludes opportunities in the future for job creation and higher levels of tax revenue generation. Delineating key parcels in the community and protecting them for their highest and best use in the future ensures the Town has long-term opportunities to be a jobs center in the region.
To this end, Town officials should resist reclassifying non-residential development on the Conservation and Development Map to residential uses unless it is part of a mixed-use development proposal. Even in this situation, the residential component of a proposed mixed-use development should be subservient to the nonresidential components of the same development.
9.2 – Continue to monitor opportunities to
supplement local funds with state and federal grants to help pay for community investments.
9.3 – Establish an internal program that aims to learn from communities facing similar challenges or opportunities in Mooresville. Support an annual site visit for Town officials to learn about “best practices” that may be implemented locally to address similar issues being faced in the community. Allow Town staff one day per year to visit a peer community and learn best practices from local officials that they can bring back to Mooresville.
Preface | Introduction | Planning Process | Framework | Infrastructure
| Concepts | Policies | Action Plan
144
Inviting Success Successful implementation of the policies, recommendations, and plan concepts presented in the Mooresville Tomorrow comprehensive plan will depend greatly upon the interests and abilities of property owners, developers, elected officials, Town staff, and the general public to work together for a common purpose. Recommendations in the comprehensive plan begin and end with the needs of Mooresville in mind. Balancing the public’s needs with those of partner agencies, developers, and private landowners will be critical for comprehensive plan implementation. The action plan presented in Chapter 7 furthers three primary objectives. First, it provides decision-makers with a playbook for implementation. Second, clearly defined projects and action items identify public or private investment opportunities that are healthy, sustainable, and achievable. Third, regularly measuring achievements against the action plan — the community report card described later in the chapter — provides stakeholders the opportunity to track progress and hold elected officials accountable for implementing the comprehensive plan. One important note, the action plan presented in Chapter 7 advocates for the best possible community outcomes without regard to available Town budgets or staff resources. It is a “wish list” of actions or investments needed to fulfill the vision of the comprehensive plan. Budget realities and staff time available for comprehensive plan implementation activities — measured against other staff responsibilities or duties — could impact the timing or prioritization of items presented in the action plan. Priorities are assigned in the action plan to create urgency and build momentum for keeping things moving quickly and in a positive direction
145
Mooresville Tomorrow 2040 Comprehensive Plan
after adoption of the comprehensive plan. Items may move up or down the priority list based upon available outside funds, public-public and public-private partnership opportunities, or the ability to bundle several items together to realize budget efficiencies. Residents are encouraged to visit the Town’s Planning and Community Development Department to see the most current action plan guiding the implementation of the comprehensive plan.
Plan Implementation Matrix The Comprehensive Plan Implementation Matrix that begins on pages 147-148 summarizes action items presented earlier in the document as short-, mid-, and long-term priorities. Detailed information for each item includes a policy number and title, an implementing action, an intended work product (if applicable), target time frame for implementation, lead party, cost estimate category, and potential funding source. Generally speaking, there are fifty-five items in the short-term category. Thirty-five of them could be absorbed within regular staff duties if time is available for increased work responsibilities. Seven mid-term items in the action plan may become more or less urgent in future years as opportunities or challenges present themselves in the community. Again, opportunities to bundle projects for cost-savings may influence moving items between priority categories. Still other items may benefit from a volunteer group in the community that decides to focus its resources on item implementation. Three long-term items in the action plan include large capital projects or big initiatives that may take patience to see through. For example, an expensive road project may take several years to realize, or the desire to see a big-box, suburban
Adopted September 21, 2026
Action Plan shopping center redevelopment as a mixed-use activity center may take ten or more years to build the needed momentum.
Monitor the Comprehensive Plan A community report card should be used to monitor and evaluate progress for implementing items in the action plan. Formal presentation of the community report card should be made to the Town’s Board of Commissioners in the first quarter of the calendar year. Adjustments to the comprehensive plan’s action plan, if necessary, should be made during the annual Board retreat.
Comprehensive Plan Updates The comprehensive plan should be reviewed in three to five years and updated in five to ten years to evaluate changing conditions in markets, demographics, residents’ preferences and values, or new state and federal legislation. A review of the comprehensive plan is primarily an internal effort using Town resources, which is focused primarily on new state or federal legislation enacted since comprehensive plan adoption and/or an itemized list of small edits needed to make the document more clear, efficient, or effective. An update of the comprehensive plan includes a robust community engagement process, data assessment, alternative scenario testing, and validation (or refinement) of the vision, principles, maps, policies, and recommendations presented in the document.
Preface | Introduction | Planning Process | Framework | Infrastructure | Concepts | Policies | Action Plan
146
POLICY
ACTION SHORT-TERM PRIORITIES
1.1
Use the Mooresville Tomorrow comprehensive plan as a key resource in development application review, infrastructure planning, and coordination with outside service providers.
Reference the comprehensive plan for a range of town decisions, including entitlements, capital investments, annual budgets, or grant applications. Encourage public agencies and organizations, utility service providers, developers, and members of the general public use the comprehensive plan for their planning efforts, volunteer initiatives, or investment decisions.
1.2
Program Town resources to review and revise, as needed, rules and requirements in the (1) Town of Mooresville Unified Development Ordinance, (2) Town of Mooresville Land Development Standards Manual, (3) Town of Mooresville Capital Improvements Plan, (4) Town of Mooresville Annual Budget, and (5) various town master plans or feasibility studies to implement the policies and recommendations presented in the Mooresville Tomorrow comprehensive plan.
Identify a Special Projects Manager to coordinate the Town’s efforts to update these documents consistent with the vision, values, policies and recommendations in the Mooresville Tomorrow comprehensive plan. One or more initiatives may benefit from the formation of a Task Force, comprise of citizens and subject matter experts familiar with Mooresville and North Carolina state law. Some tasks needed to implement Policy 1.2 may require the hire consultant or consultant team to assist.
1.3
Evaluate future opportunities presented to the Town in the context of an overarching goal to create a selfsustaining community in the future.
1.4
Concentrate future development in mixed use activity centers depicted on the Conservation and Development Map.
Emphasize new employment, retail, and services to Town residents, and provide greater home choices in the community, to support different backgrounds: the creative class, working class, retirees, and children. Engage the Iredell County Economic Development Corporation to pool resources for implementation.
1.5
Establish compatibility and transition standards in the Town’s Unified Development Ordinance that better address the spaces between existing and future development; especially in terms of height, bulk, density, connectivity, or screening concerns between properties.
Use the Town’s rules, policies, requirements, incentives, infrastructure investments, etc. to support mixed use, walkable development in the activity centers depicted on the Conservation and Development Map.
Update the Development Ordinance to address infill development options in the different zoning districts, which includes standards to ensure that new development is appropriate to the site and its surroundings to the extent allowable by state law.
Note: Some policy statements listed in the table were shortened for brevity. See Chapter 6 for a full description.
147
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
TIMEFRAME
LEAD PARTY
ESTIMATED COST
FUNDING SOURCE
SHORT-TERM PRIORITIES Staff Reports for Development Applications
Short-Term (0 to 3 Years)
Planning and Community Development Department
N/A
Staff Resources
Short-Term (0 to 3 Years)
Town Administration
$$ (Bundle Potential)
Annual Town Budget and Staff Resources
N/A
Short-Term (0 to 3 Years)
Planning and Community Development Department
N/A
Staff Resources
N/A
Short-Term (0 to 3 Years)
Planning and Community Development Department
N/A
Staff Resources
Unified Development Ordinance (Revised)
Short-Term (0 to 3 Years)
Planning and Community Development Department
$$ (Bundle Potential)
Annual Town Budget and Staff Resources
Expanded CIP Project Statements
Action Plan
WORK PRODUCT
Service Provider Meetings Unified Development Ordinance (Revised) Land Development Standards (Revised) CIP and Budget Documents (Updated)
Planning and Community Development Department
Different Master Plans (Updated)
Key for Estimated Cost Column in the Table: $ = able to be implemented using annual discretionary funds available to the Town department. $$ = able to be implemented with a line item in the annual Town budget. $$$ = able to be implemented with a line item in the Town’s Capital Improvements Plan. $$$$ = able to be implemented (at least partially) with third-party funding such as a grant or partner resources.
Preface | Introduction | Planning Process | Framework | Infrastructure | Concepts | Policies | Action Plan
148
POLICY
ACTION SHORT-TERM PRIORITIES
1.6
Encourage infill development and redevelopment in areas of Town identified on the Intentional Growth Areas Map.
Advocate for and, if possible, incentivize infill development and redevelopment projects inside Town limits as a way to reinvest in areas with existing infrastructure capacity.
1.7
Rethink suburban commercial corridors in the community as walkable, mixeduse areas that increase the quality of retail experience for visitors, and enhance quality-of life for nearby neighborhoods.
Prioritize transformation of traditional suburban (strip) commercial centers along NC 150, Brawley School Road, Williamson Road, and Statesville Highway as new mixeduse, walkable destinations that are accessible to nearby homes by walking or bicycle. Connect centers in the reimagined areas via internal streets and blocks.
1.8
Protect and maintain historic structures in Mooresville.
1.9
Influence the design and layout of new neighborhoods, districts, or activity centers in Mooresville as a means to increase residents’ physical activity levels, maintain mental health, and improve overall well-being.
Ensure development applications within, or adjacent to, known historic or cultural resources include measures to protect those resources from demolition or encroachment. Encourage developers to utilize existing historic structures and features in the design of new developments, or to relocate them to appropriate locations to maintain glimpses of the Town’s past within its future. Provide staff comments on development applications submitted to the Town from the perspective of minimizing social isolation. Spatial topics important for minimizing social isolation include (1) home choices and neighborhood design, (2) access to community amenities, (3) travel and mobility options, (4) inclusive culture and arts program, and (5) environmental quality, access, and safety.
1.10
Place responsibilities on the development applicant to demonstrate their compliance with the rules, requirements, targets, maps, and thresholds expressed in the Mooresville Tomorrow comprehensive plan.
Revise the rules and procedures for certain development applications to require (1) a statement of consistency with the Mooresville Tomorrow comprehensive plan, and (2) a list of specific values, principles, policies, or recommendations in the plan that are, or are not, supported by the development application.
1.11
A community report card should be prepared by the Planning and Community Development Department and used to monitor and evaluate progress for implementing items in the Mooresville Tomorrow comprehensive plan.
Prepare a community report card for the Mooresville Tomorrow comprehensive plan that is highlighted in an annual “State of the Town” address by the Mayor. Post the report card online for easy access to the general public. Create fun posters to post in different Town department offices that focus on implementation activities for a specific year and tracks progress for completion.
1.12
Town officials should convene a UDO Task Force immediately after the comprehensive plan is adopted.
Appoint a UDO Task Force within one year after the Mooresville Tomorrow comprehensive plan is adopted to act as a sounding board for Town staff and their hired consultant (if needed) while updating the UDO consistent with the policies and recommendations in the new comprehensive plan.
Note: Some policy statements listed in the table were shortened for brevity. See Chapter 6 for a full description.
149
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
TIMEFRAME
LEAD PARTY
ESTIMATED COST
FUNDING SOURCE
SHORT-TERM PRIORITIES N/A
Short-Term (0 to 3 Years)
Planning and Community Development Department
N/A
Staff Resources
N/A
Short-Term (0 to 3 Years)
Planning and Community Development Department
N/A
Staff Resources
N/A
Short-Term (0 to 3 Years)
Planning and Community Development Department
$$ (Bundle Potential)
Annual Town Budget and Staff Resources
N/A
Short-Term (0 to 3 Years)
Planning and Community Development Department
N/A
Staff Resources
Expanded Development Applications
Short-Term (0 to 3 Years)
Planning and Community Development Department
N/A
Staff Resources
Community Report Card, Document, Posters, and Presentation
Short-Term (0 to 3 Years)
Town Administration
N/A
Staff Resources
Task Force
Short-Term (0 to 3 Years)
Town Administration
N/A
Staff Resources
Action Plan
WORK PRODUCT
Planning and Community Development Department
Planning and Community Development Department
Key for Estimated Cost Column in the Table: $ = able to be implemented using annual discretionary funds available to the Town department. $$ = able to be implemented with a line item in the annual Town budget. $$$ = able to be implemented with a line item in the Town’s Capital Improvements Plan. $$$$ = able to be implemented (at least partially) with third-party funding such as a grant or partner resources.
Preface | Introduction | Planning Process | Framework | Infrastructure | Concepts | Policies | Action Plan
150
POLICY
ACTION SHORT-TERM PRIORITIES
1.13
Add a provision to the Town’s Unified Development Ordinance that allows for an independent, third-party evaluation of a development application if the Town’s Planning and Community Development Director decides it is appropriate and in the best interest of the Town.
Consider contracting with a consultant to conduct certain development application reviews for proposed projects in the town’s planning jurisdiction. Subject matter experts needed for a specific development application may change based on the size, location, environmental conditions, development program, infrastructure needs, or key concerns expressed by elected officials and the public.
2.1
Adopt design and development standards that enhance community appearance, activate public spaces, and maintain a unique sense of place for Mooresville.
Create a predictable environment for land preservation and/or development in terms of size, scale, orientation, landscaping, and general aesthetic using new rules or standards in the Unified Development Ordinance. Town officials should also consider resolutions that communicate formal positions or opinions about community character that may influence the work of other public or quasi-public agencies in the future.
2.2
Develop a Mooresville Public Spaces Plan that organizes future Town investments in public streets and spaces, and establishes minimum rules, criteria, or design standards that may apply to private development during a development application review.
Identifies key needs, features, and design elements to ensure a recognizable and consistent theme for the Town’s public spaces. Recommendations from the plan should be programmed in the town’s Capital Improvements Plan and used during the development application review process to leverage private investments in the public realm.
2.3
Emphasize public spaces as a unifying feature when contemplating new development or redevelopment projects.
2.4
Require that multiple non-residential buildings on the same lot or parcel be architecturally-unified in terms of building features and building materials.
Some corridors or destinations in the Town may have a Public Spaces Master Plan to guide investments (see Policy 2.2). In the absence of a specific plan, the goals for investments within and adjacent to the Town’s entire public realm should adhere to the criteria in Policy 2.3. All new non-residential development in the planning area consisting of two or more buildings on a single lot or parcel should be required to construct architecturally-unified buildings and use compatible quality and type of building materials.
2.5
Limit the use of franchise architecture in the downtown and all development activity center place type categories as one means to reinforce a unique brand and identity for Mooresville.
Add provisions to the Town’s Unified Development Ordinance focused on the topic of franchise architecture (and limitations on its use) in the downtown and all planned development activity centers. Suggest alternatives in the new provisions to promote business names and identity.
2.6
Create one or more Town grant programs for businesses that improve the physical appearance or functionality of their properties.
Administer a “new starts” grant program inside Town Limits that provides matching funds for improvements made to commercial building exteriors or their on-site site design features (parking lots, landscaping, or public open space). Up to 50% of the project cost could be covered by the grant.
Note: Some policy statements listed in the table were shortened for brevity. See Chapter 6 for a full description.
151
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
TIMEFRAME
LEAD PARTY
ESTIMATED COST
FUNDING SOURCE
SHORT-TERM PRIORITIES Unified Development Ordinance (Revised)
Short-Term (0 to 3 Years)
Planning and Community Development Department
N/A (Bundle Potential)
Staff Resources
Unified Development Ordinance (Revised)
Short-Term (0 to 3 Years)
Planning and Community Development Department
$$ (Bundle Potential)
Annual Town Budget and Staff Resources
Short-Term (0 to 3 Years)
Planning and Community Development Department
$$
Annual Town Budget and Staff Resources
Land Development Standards (Revised)
Mooresville Public Spaces Plan
Action Plan
WORK PRODUCT
Engineering Department N/A
Short-Term (0 to 3 Years)
Planning and Community Development Department
N/A
Staff Resources
Unified Development Ordinance (Revised)
Short-Term (0 to 3 Years)
Planning and Community Development Department
$$ (Bundle Potential)
Annual Town Budget and Staff Resources
Unified Development Ordinance (Revised)
Short-Term (0 to 3 Years)
Planning and Community Development Department
$$ (Bundle Potential)
Annual Town Budget and Staff Resources
Grant Program
Short-Term (0 to 3 Years)
Town Administration
$$
Annual Town Budget
Key for Estimated Cost Column in the Table: $ = able to be implemented using annual discretionary funds available to the Town department. $$ = able to be implemented with a line item in the annual Town budget. $$$ = able to be implemented with a line item in the Town’s Capital Improvements Plan. $$$$ = able to be implemented (at least partially) with third-party funding such as a grant or partner resources. Preface | Introduction | Planning Process | Framework | Infrastructure | Concepts | Policies | Action Plan
152
POLICY
ACTION SHORT-TERM PRIORITIES
2.8
Support neighborhood brand and identity initiatives, including unique entrance signs, street blade signs, landscaping, public art, and painted crosswalks as a means to celebrate unique areas of the community.
2.9
It is important new buildings, open space, parking lots, landscaping, or outdoor facilities in new development complement existing development intensities and patterns nearby to avoid incompatible adjacencies.
2.10
New development across the street from existing development should be complementary in lot size, building mass, and placement.
Add new rules, requirements, or targets to the Town’s Unified Development Ordinance that help development on either side of a street be more compatible (i.e., a like versus like condition).
2.11
Identify opportunities to expand public art in the community, which may include sculptures, murals, memorials, digital media, or live performances.
Evaluate the potential for a Town-led public arts program that targets investments in specific areas of the community and provides an opportunity to show off people’s creativity and appreciation for unique experiences.
3.1
Support housing diversity in the community.
3.2
Establish a discernible structure for new neighborhoods in Mooresville.
Advocate for different types, sizes, and price points of homes mixed in the community (and ideally in a neighborhood), with a range of living experiences from rural to suburban to urban, so that there is something for everyone.
3.3
Create policies, ordinances, or incentives that advocate for missing middle home types in the community.
3.4
Join partners in exploring opportunities to support more affordable housing in Mooresville and greater Iredell County.
Neighborhoods in Mooresville should be recognized and celebrated for their unique characteristics. In some cases, this begins with a specific name chosen to represent the neighborhood. Unique entrance signs, street blade signs, landscaping, public art, or painted crosswalks should also be considered to reinforce a unique sense of place or brand identity for the neighborhood. Some improvements may be programmed and funded as Town projects, but others should be accomplished organically by the residents of a neighborhood with support (or acknowledgment) from Town officials.
Add new rules, requirements, or targets to the Town’s Unified Development Ordinance that help improve conditions for site compatibility between adjacent developments.
New neighborhoods should contain a discernible center and a clear edge. Neighborhoods should also be organized around a pedestrian shed, or a circle with a radius approximately onequarter mile in length, which represents a five-minute walk distance from the center to the edge. The pedestrian shed concept ensures that all residents are within a short walk of a meaningful destination. Add new rules, requirements, or targets to the Town’s Unified Development Ordinance that support the construction of missing middle home types in specific areas of the community (i.e., duplex, triplex, quadplex, courtyard apartments, live-work units, cottage courtyards, townhomes, and small-scale apartments).
Collaborate with neighboring communities and agencies that are looking at workforce housing needs in the Southern Iredell and Northern Mecklenburg County region.
Note: Some policy statements listed in the table were shortened for brevity. See Chapter 6 for a full description.
153
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
TIMEFRAME
LEAD PARTY
ESTIMATED COST
FUNDING SOURCE
$$$
Annual Town Budget and Capital Improvements Plan
SHORT-TERM PRIORITIES Physical Improvements in Neighborhoods
Short-Term (0 to 3 Years)
Town Administration
Unified Development Ordinance (Revised)
Short-Term (0 to 3 Years)
Planning and Community Development Department
$$ (Bundle Potential)
Annual Town Budget and Staff Resources
Unified Development Ordinance (Revised)
Short-Term (0 to 3 Years)
Planning and Community Development Department
$$ (Bundle Potential)
Annual Town Budget and Staff Resources
Public Art Installations
Short-Term (0 to 3 Years)
Planning and Community Development Department
$$$
Annual Town Budget and Capital Improvements Plan
N/A
Short-Term (0 to 3 Years)
Planning and Community Development Department
N/A
Staff Resources
N/A
Short-Term (0 to 3 Years)
Planning and Community Development Department
N/A
Staff Resources
Unified Development Ordinance (Revised)
Short-Term (0 to 3 Years)
Planning and Community Development Department
$$ (Bundle Potential)
Annual Town Budget and Staff Resources
N/A
Short-Term (0 to 3 Years)
Planning and Community Development Department
N/A
Staff Resources
Planning and Community Development Department
Action Plan
WORK PRODUCT
Key for Estimated Cost Column in the Table: $ = able to be implemented using annual discretionary funds available to the Town department. $$ = able to be implemented with a line item in the annual Town budget. $$$ = able to be implemented with a line item in the Town’s Capital Improvements Plan. $$$$ = able to be implemented (at least partially) with third-party funding such as a grant or partner resources.
Preface | Introduction | Planning Process | Framework | Infrastructure | Concepts | Policies | Action Plan
154
POLICY
ACTION SHORT-TERM PRIORITIES
3.5
Adopt Town policies, rules, and criteria that allow for the purchase of land or buildings with Town resources, or through resources dedicated to the Town by others, to increase the number of affordable housing units in the community.
Pass a Town resolution establishing the framework to dedicate funds for increasing the type, location, and number of affordable housing options in Mooresville. Then dedicate funds in the Town’s Capital Improvements Plan and Annual Budget to fund the program.
3.6
Evaluate the presence and utility of short-term rentals (STR) in Mooresville from the perspective of a tourist economy versus the needs to protect neighborhood character.
Evaluate the use of Short-Term Rentals in the community via a study and public planning process.
4.1
Develop standards that protect open space as a meaningful component of new development.
Partner with state, regional, or other non-profit groups working in the area to mitigate the impacts of new development on existing natural systems. At a minimum, include new rules and standards in the Unified Development Ordinance that incorporates open space as a meaningful component of new development, including parks, tree preservation areas, floodplains, stormwater retention, recreation, animal habitat protection, or preserving scenic views.
4.2
Advocate for natural stormwater management strategies (drainage and infiltration) in larger neighborhoods or development activity centers.
Incorporate low-impact or light-imprint development strategies in the Town's Unified Development Ordinance that find ways to reduce dependence on complicated infrastructure systems for stormwater management.
4.3
Advocate for a comprehensive and connected system of natural green space integrated into the built environment.
5.2
Implement demand-side solutions to improve the Town’s transportation system.
Add new rules, requirements, and targets to the Town’s Unified Development Ordinances that help create a system of natural green space within the built environment as (1) a deliberate effort to protect natural areas, and (2) as an amenity accessible to residents to enjoy the outdoors.
5.5
Evaluate the Town’s roles and responsibilities for implementing the Centralina Regional Council’s Transportation Demand Management Plan.
Determine if-when-how the Town might best implement the findings and conclusions from the Transportation Demand Management Plan. Revised rules, requirements, or targets in different Town documents, as needed.
5.6
Incorporate the function and design principles for mobility hubs described in the Mooresville Mobility Plan into new or expanded development activity centers depicted on the Conservation and Development Map.
Explore opportunities to implement one or more mobility hubs in new or expanded development activity centers depicted on the Conservation and Development Map in partnership with the North Carolina Department of Transportation and others.
Revise the Town’s Unified Development Ordinance to focus on land use, development density, and urban design principles that promote lower vehicle trip generation (internal capture), shorter travel distance, and nonvehicular travel modes. Street design standards in the Town’s Land Development Standards Manal should also be revised to better coordinate land use, transportation and urban design decisions.
Note: Some policy statements listed in the table were shortened for brevity. See Chapter 6 for a full description.
155
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
TIMEFRAME
LEAD PARTY
ESTIMATED COST
FUNDING SOURCE
$$$
Annual Town Budget and Capital Improvements Plan
SHORT-TERM PRIORITIES Town Resolution and Policies
Short-Term (0 to 3 Years)
Town Administration
Unified Development Ordinance (Revised)
Short-Term (0 to 3 Years)
Planning and Community Development Department
$$ (Bundle Potential)
Annual Town Budget and Staff Resources
Unified Development Ordinance (Revised)
Short-Term (0 to 3 Years)
Planning and Community Development Department
$$ (Bundle Potential)
Annual Town Budget and Staff Resources
Unified Development Ordinance (Revised)
Short-Term (0 to 3 Years)
Planning and Community Development Department
$$ (Bundle Potential)
Annual Town Budget and Staff Resources
Unified Development Ordinance (Revised)
Short-Term (0 to 3 Years)
Planning and Community Development Department
$$ (Bundle Potential)
Annual Town Budget and Staff Resources
Unified Development Ordinance (Revised)
Short-Term (0 to 3 Years)
Planning and Community Development Department
$$ (Bundle Potential)
Annual Town Budget and Staff Resources
N/A
Short-Term (0 to 3 Years)
Town Administration
N/A
Staff Resources
Site Design Concepts
Short-Term (0 to 3 Years)
Planning and Community Development Department
$$
Annual Town Budget and Staff Resources
Planning and Community Development Department
Action Plan
WORK PRODUCT
Engineering Dept. Key for Estimated Cost Column in the Table: $ = able to be implemented using annual discretionary funds available to the Town department. $$ = able to be implemented with a line item in the annual Town budget. $$$ = able to be implemented with a line item in the Town’s Capital Improvements Plan. $$$$ = able to be implemented (at least partially) with third-party funding such as a grant or partner resources.
Preface | Introduction | Planning Process | Framework | Infrastructure | Concepts | Policies | Action Plan
156
POLICY
ACTION SHORT-TERM PRIORITIES
5.8
Improve street, sidewalk, greenway, and bicycle facility connectivity within, and between, new or existing neighborhoods, retail areas, employment areas, and development activity centers.
Add rules, requirements, and targets to the Town’s Unified Development Ordinance to require street, bicycle, pedestrian, or greenway facilities on one site connect to facilities on adjacent sites to maximize the number of routes to and from a destination.
5.9
Coordinate with neighboring jurisdictions and agencies to link parks and greenway networks depicted in the comprehensive plan or its implementing function plans.
Coordinate with Iredell County and nearby cities and towns to further the goal of connecting various greenway facilities and trail segments with local and regional parks, schools, and other popular destinations.
5.10
Lead a town-wide initiative to encourage “active living” in Mooresville.
Partner with other health advocacy groups in Mooresville to host events, programs, seminars, etc. to get people moving in the community.
6.1
Coordinate the Town’s capital expenditures with those of other infrastructure providers to keep pace with the timing and location of future growth in the planning area.
Town leaders should communicate with service providers on its future year needs generated by the General Framework within one year of the comprehensive plan’s adoption. Coordination activities may include (1) sharing intended growth area maps and data with service providers so they understand where future demands for service may be concentrated, (2) town participation in master plans or feasibility studies completed by the different service providers to better coordinate local demand and regional supply considerations, or (3) discussions with service providers (like the NCDOT) to communicate preferred design applications or travel mode priorities for proposed mixed-use activity centers.
6.2
Think about new or expanded infrastructure needs to serve future residents when reviewing development applications.
6.3
Evaluate the use of municipal services districts (MSDs) to fund certain infrastructure projects.
6.6
Encourage construction of new schools adjacent to the neighborhoods they serve, and demand they include the infrastructure needed to promote walking and biking to school from all sides of the school.
Town officials should consider future year needs when reviewing development applications. If appropriate, the Town should ask development applicants to consider some of these needs in their site concept plans. In some cases, the town, or their service provider partners, may need or want to compensate the developer or landowner for upsized infrastructure or dedication of land or building space for a public purpose. Explore opportunities to designate MSDs in the community if, when, or where extra Town-led services or projects may be needed that directly benefit nearby residents, businesses, or property owners. Coordinate with the two school districts serving Mooresville to locate schools near neighborhoods and ensure safe and efficient walking and biking connections between them.
Note: Some policy statements listed in the table were shortened for brevity. See Chapter 6 for a full description.
157
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
TIMEFRAME
LEAD PARTY
ESTIMATED COST
FUNDING SOURCE
SHORT-TERM PRIORITIES Unified Development Ordinance (Revised)
Short-Term (0 to 3 Years)
Planning and Community Development Department
$$ (Bundle Potential)
Annual Town Budget and Staff Resources
N/A
Short-Term (0 to 3 Years)
Town Administration
N/A
Staff Resources
N/A
Short-Term (0 to 3 Years)
Town Administration
N/A
Staff Resources
N/A
Short-Term (0 to 3 Years)
Town Administration
N/A
Staff Resources
Expanded Staff Reports
Short-Term (0 to 3 Years)
Planning and Community Development Department
N/A
Staff Resources
Findings and Conclusions Report
Short-Term (0 to 3 Years)
Town Administration
N/A
Staff Resources
Town Resolution
Short-Term (0 to 3 Years)
Town Administration
N/A
Staff Resources
Action Plan
WORK PRODUCT
Engineering Department
Legal Department
Key for Estimated Cost Column in the Table: $ = able to be implemented using annual discretionary funds available to the Town department. $$ = able to be implemented with a line item in the annual Town budget. $$$ = able to be implemented with a line item in the Town’s Capital Improvements Plan. $$$$ = able to be implemented (at least partially) with third-party funding such as a grant or partner resources. Preface | Introduction | Planning Process | Framework | Infrastructure | Concepts | Policies | Action Plan
158
POLICY
ACTION SHORT-TERM PRIORITIES
7.1
Work with landowners, businesses, and state or local economic development organizations to find the resources needed to increase the number and location of site-ready properties for future industrial, business, or office growth.
Keep an inventory of properties available for economic development needs (jobs) in the Town’s planning area and share the list with local, regional, and state economic development partners.
7.2
Leverage the Town’s unique character and sense of place to attract highquality jobs and investment.
Advertise the Town’s attractiveness to a wide range of employers spanning global corporations to regionally-based startups competing for increasingly scarce knowledge, skilled, and creative talent. The town should work to improve its quality-of-life to attract top-level employees.
7.3
Continue supporting local businesses and entrepreneurship in the community.
Work with the Town’s partners to expand networking and collaboration opportunities for entrepreneurs, artists, start-up businesses, technology innovators, and similar “new economy” businesses. Under this effort, Town officials should (1) support seasonal and weekend businesses that enliven public open spaces or natural areas, (2) support pop-up retail uses, (3) continue support for food trucks in recognition that these businesses often transition to brick and mortar locations, (4) provide access to Town data, as appropriate, to recruit businesses to Mooresville or support existing businesses, and (5) identify opportunities and connect businesses with organizations that provide business assistance or mentorship.
7.4
Consider key industries for Mooresville in proposed development activity centers on the Conservation and Development Map: advanced manufacturing, medical, corporate office, and creative or artisan activities.
Safeguard locations in Mooresville of a certain parcel size to support key industries in the community. Proactively zone these properties for the intended industrial uses to make them more attractive for economic development partners.
7.5
Explore opportunities to retain or expand businesses in the Town’s planning area.
It may become necessary to allow more flexibility in land use and parking for infill development or redevelopment requirements. Such flexibility can help current business owners maintain their presence in the existing location and improve the overall experience for their workers.
7.6
Promote adaptive reuse of existing nonresidential buildings that are abandoned or in decline.
Encourage adaptive reuse of existing non-residential buildings in the planning jurisdiction, and incentivize such actions using its policies and ordinances (e.g., reduced building permit fees, modified parking requirements to address unique site conditions, or beautification grants for building facade improvements).
Note: Some policy statements listed in the table were shortened for brevity. See Chapter 6 for a full description.
159
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
TIMEFRAME
LEAD PARTY
ESTIMATED COST
FUNDING SOURCE
$
Discretionary Funds Available to the Economic Development Director
SHORT-TERM PRIORITIES N/A
Short-Term (0 to 3 Years)
Town Administration
N/A
Short-Term (0 to 3 Years)
Economic Development Corporation
N/A
Staff Resources
N/A
Short-Term (0 to 3 Years)
Economic Development Corporation
$
Discretionary Funds Available to the Economic Development Director
N/A
Short-Term (0 to 3 Years)
Economic Development Corporation
N/A
Staff Resources
N/A
Short-Term (0 to 3 Years)
Economic Development Corporation
N/A
Staff Resources
N/A
Short-Term (0 to 3 Years)
Planning and Community Development Department
N/A
Staff Resources
Economic Development Corporation
Action Plan
WORK PRODUCT
Key for Estimated Cost Column in the Table: $ = able to be implemented using annual discretionary funds available to the Town department. $$ = able to be implemented with a line item in the annual Town budget. $$$ = able to be implemented with a line item in the Town’s Capital Improvements Plan. $$$$ = able to be implemented (at least partially) with third-party funding such as a grant or partner resources. Preface | Introduction | Planning Process | Framework | Infrastructure | Concepts | Policies | Action Plan
160
POLICY
ACTION SHORT-TERM PRIORITIES
8.1
Plan and program town-sponsored events and activities that are inviting and appealing to a wide range of residents’ interests and backgrounds.
Survey Town residents for preferred bands, musicals, movies, events, activities, etc. that they would like to see scheduled in the future. Work to program events for a variety of interests in the community throughout the year.
8.2
Explore opportunities for evaluating neighborhood or resident vulnerabilities, including displacement, when evaluating development applications.
Conduct research to identify potential ways to consider vulnerabilities to neighborhood gentrification and displacement during the review of development applications.
8.3
The Town should work with its partners to celebrate local history and culture.
Ideas to explore may include, but are not limited to, an expanded Town history page on the official website, events held in the community to demonstrate local traditions, public art exhibits that highlight local history or culture (like the timeline downtown), or a small Mooresville history museum located somewhere in the community.
8.5
Promote transparent and inclusive engagement, and safeguard two-way communication channels with all stakeholders as a means to make wellinformed decisions.
Establish a platform and different communication strategies that promote two-way communication between Town officials and the community: web applications, robo calls, email blasts, community meetings, drop-in office hours at the planning department, monthly “coffee with the planning director” events.
9.1
Identify and protect areas in the Town’s planning area for future non-residential development.
To this end, Town officials should resist reclassifying nonresidential development on the Conservation and Development Map to residential uses unless it is part of a mixed-use development proposal. And, even in this situation, the residential component of a proposed mixeduse development should be subservient to the nonresidential components of the same development.
9.2
Continue to monitor opportunities to supplement local funds with state and federal grants to help pay for community investments.
Find opportunities to stretch local dollars with grants or appropriations from the state and federal government to help pay for community needs.
9.3
Establish an internal program that aims to learn from communities facing similar challenges or opportunities in Mooresville.
Submit topics/needs to the Town Administrator for research. Staff assigned to the topic should (1) complete a literature review, (2) contact representatives for the peer community to learn more, and (3) schedule a visit for Town officials, if needed, to learn more about best practices from the peer community for facing a similar issue in Mooresville.
Note: Some policy statements listed in the table were shortened for brevity. See Chapter 6 for a full description.
161
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
TIMEFRAME
LEAD PARTY
ESTIMATED COST
FUNDING SOURCE
SHORT-TERM PRIORITIES Expanded Events
Short-Term (0 to 3 Years)
Parks and Recreation Department
$$
Annual Town Budget and Staff Resources
N/A
Short-Term (0 to 3 Years)
Planning and Community Development Department
N/A
Staff Resources
N/A
Short-Term (0 to 3 Years)
Town Administration
$
Discretionary Funds Available to the Town Manager
N/A
Short-Term (0 to 3 Years)
Town Administration
N/A
Staff Resources
N/A
Short-Term (0 to 3 Years)
Planning Board
N/A
Staff Resources
N/A
Short-Term (0 to 3 Years)
Town Administration
N/A
Staff Resources
Peer Community Site Visits
Short-Term (0 to 3 Years)
Town Administration
$$
Annual Town Budget and Staff Resources
Action Plan
WORK PRODUCT
Board of Commissioners
Key for Estimated Cost Column in the Table: $ = able to be implemented using annual discretionary funds available to the Town department. $$ = able to be implemented with a line item in the annual Town budget. $$$ = able to be implemented with a line item in the Town’s Capital Improvements Plan. $$$$ = able to be implemented (at least partially) with third-party funding such as a grant or partner resources.
Preface | Introduction | Planning Process | Framework | Infrastructure | Concepts | Policies | Action Plan
162
POLICY
ACTION MID-TERM PRIORITIES
2.7
Create recognizable entrances (gateways) into Mooresville that reinforce a brand and identity.
Public investment in gateway treatments should be considered to reinforce the brand identified for the Town and stimulate private investment in the corridor consistent with the new brand. Next steps for bringing gateway treatments to the study area include: identify appropriate locations for new signage, prepare design concepts, reach out to local property owners for easements, develop construction documents, and identify available funding sources.
4.4
Build the Town’s local trail system and its connections to “The Seam Trail” and other regional trails planned in the future.
Program funds in the Town’s Capital Improvements Plan to plan, design, and build segments of the regional greenway network that connects residents with in-town destinations and beyond. Require developers build segments of the trail proposed on their property as the Town’s most efficient method to expand the greenway network.
5.4
Work with the Town’s transit partners to find bus or micro transit options for moving people within the Town; especially between existing or proposed development activity centers.
Contact representatives for the Iredell County Area Transportation System (ICATS) and discuss opportunities to run short route transit or micro transit in the community (especially between proposed development activity centers).
6.4
The Town and its partners should identify opportunities that increase the type, number, and location of civic and culturally-important spaces in the community.
Actively work with the Town’s partners to identify opportunities that increase the type, number, and location of civic and culturally-important spaces in the community.
6.5
Look for opportunities to use Smart City technology in future infrastructure projects.
Consider opportunities to integrate smart city technologies for improved facilities and services in the community, smart water meters, pedestrian or bicycle counters, transit service trackers, solar or wind powered street lights, etc.
7.7
Monitor potential economic disrupters for the Town, including but not limited to, new technologies, autonomous vehicles, teleworking, and e-commerce, and employ adaptive and innovative strategies to meet emerging economic shifts. Consider the utility of, and potential applications for, a “My Mooresville App” designed to help residents interact directly with the Town on a variety of topics.
Consider a full update to the comprehensive plan if the economic disruption will create significant challenges or opportunities for the planning area.
8.4
Explore interests in the community for a My Mooresville App and evaluate if the time and resources needed to create and maintain it are worth the investment. If favorable, create a web app concept, find a vendor to create, beta test the app, and launch the app in the community.
Note: Some policy statements listed in the table were shortened for brevity. See Chapter 6 for a full description.
163
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
TIMEFRAME
LEAD PARTY
ESTIMATED COST
FUNDING SOURCE
$$$
Annual Town Budget and Capital Improvements Plan
$$$
Annual Town Budget and Capital Improvements Plan
$$$$
State or County Funds
MID-TERM PRIORITIES Physical Improvements at Gateways
Mid-Term (4 to 8 Years)
Town Administration
New Trails and Greenways
Mid-Term (4 to 8 Years)
Town Administration
New Transit Service
Mid-Term (4 to 8 Years)
Town Administration
New or Expanded Spaces in the Community
Mid-Term (4 to 8 Years)
Town Administration
$$$
Annual Town Budget and Capital Improvements Plan
New Smart Infrastructure
Mid-Term (4 to 8 Years)
Town Administration
$$$
Annual Town Budget and Capital Improvements Plan
Comprehensive Plan Update
Mid-Term (4 to 8 Years)
Planning and Community Development Department
$$
Annual Town Budget
Town Web Application
Mid-Term (4 to 8 Years)
Town Administration
$$$
Annual Town Budget and Capital Improvements Plan
Engineering Department
Engineering Department
Engineering Department
Engineering Department
Information Technology
Action Plan
WORK PRODUCT
Key for Estimated Cost Column in the Table: $ = able to be implemented using annual discretionary funds available to the Town department. $$ = able to be implemented with a line item in the annual Town budget. $$$ = able to be implemented with a line item in the Town’s Capital Improvements Plan. $$$$ = able to be implemented (at least partially) with third-party funding such as a grant or partner resources. Preface | Introduction | Planning Process | Framework | Infrastructure | Concepts | Policies | Action Plan
164
POLICY
ACTION LONG-TERM PRIORITIES
5.1
Implement recommendations from the Mooresville Mobility Plan to improve the Town’s transportation system.
Work aggressively to implement projects identified in the Mobility Plan that (1) decrease traffic congestion in the community and (2) increase the number of viable travel modes available to residents. Pursue state and federal funds (earmarks) to expedite construction, lobby CRTPO officials to prioritize projects in Mooresville, dedicate Town funds for transportation improvements, like the East-West Connector, when feasible, engage non-profit partners to build system infrastructure (like greenways), and require developers dedicate right-of-way and build portions of new or expanded roads that touch their property.
5.3
Support premium transit service in Mooresville (bus rapid transit or commuter rail) as one option to improve congestion on Interstate 77.
Support construction of the CATS Red Line commuter rail line and/or the CATS North Corridor Bus Rapid Transit corridor if the final findings and conclusions of the studies, funding strategies, and design plans are beneficial to the Town of Mooresville.
5.7
Build a complete and connected network of bicycle and pedestrian facilities.
Work with the Town’s partners at the NCDOT and CRTPO to plan, program, and fund bicycle and pedestrian improvements in the area. New ideas for bicycle or pedestrian infrastructure should be included in the region's next Metropolitan Transportation Plan to the extent practical.
Note: Some policy statements listed in the table were shortened for brevity. See Chapter 6 for a full description.
165
Mooresville Tomorrow 2040 Comprehensive Plan
Adopted September 21, 2026
TIMEFRAME
LEAD PARTY
ESTIMATED COST
FUNDING SOURCE
$$$$
State or County Funds to Supplement Town Resources
$$$$
State or County Funds
$$$$
State or County Funds to Supplement Town Resources
LONG-TERM PRIORITIES New or Expanded Streets, Transit Service, and Bicycle/Pedestrian Facilities
Long-Term (9 to 14 Years)
Town Administration
New Premium Transit Service Along I-77
Long-Term (9 to 14 Years)
Town Administration
New or Expanded Bicycle and Pedestrian Facilities
Long-Term (9 to 14 Years)
Town Administration
Engineering Department
Engineering Department
Engineering Department
Action Plan
WORK PRODUCT
Key for Estimated Cost Column in the Table: $ = able to be implemented using annual discretionary funds available to the Town department. $$ = able to be implemented with a line item in the annual Town budget. $$$ = able to be implemented with a line item in the Town’s Capital Improvements Plan. $$$$ = able to be implemented (at least partially) with third-party funding such as a grant or partner resources.
Preface | Introduction | Planning Process | Framework | Infrastructure | Concepts | Policies | Action Plan
166