ARCHITECTURE Portfolio of Works TOMMY TSO Academic and Professional
CONTACTS +1 (416) 277 1523 • tommy.tso.kf@gmail.com • 92 Holly Drive, Richmond Hill, ON, CA • www.tommytso.com
Now, with the mandate of sustainability, why are we more concerned with the inefficient light bulb than detriments of short-lived buildings? My intention for a M.Arch is to (re)discover feasible design strategies that transcend heir路loom architecture. 1. (n.) a family possession passed down from generation to generation. 2. (adj.) an old variety cultivated again
ARCHITECTURE Portfolio of Works 2015 TOMMY TSO Academic and Professional Heirloom Architecture Alpha
01
Lamp Trapeze
07
Collage Sketching
09
Aggregate Living
11
Regent Park Community Center
14
Installation: Agony
15
Aurora Community Service for Youths 18 Urban Canvas
19
Post-Carbon Mall
20
Toronto Yard
21
Heirloom Architecture Beta
25
Copyright 漏 2014 Tommy Tso. All rights reserved. All contents in this portfolio are produced by me, in part or in full.
HEIRLOOM ARCHITECTURE
1. FOURTH DIMENSION TYPOLOGIES: WITH TIME
[2011 Options Studio; 12 weeks]
Typologies: Root Conditions
Each Program has a defined Root Condition and Morphed Outcome
THESIS: THORNCLIFFE PARK, TO When an inner city suburb needs tower renewal, instead of a singular building solution, Heirloom offers an infrastructural resilience, detailed with public and private financial strategies. Heirloom is built to adapt and promote growth in the community over time. The result: renewed buildings that can self-supply, manage waste, and morph into other forms at nominal costs.
Typologies: Morphed Outcomes
THIS IS NOT A RENDERING.
It’s a designed time-lapse mapping 25 years of Morphing, with financial strategies. 1
2. TIME-PLAN
There is a time aspect to the traditional Architectural Plan. It tolerates growth, stagnation, and decay in finance.
Morphed @ Year 25
SECTIONS
ELEVATIONS
PLANS
Root Condition @ Year 5
Before: Southwest Elevation
After: Southwest Elevation
Before: Vacant roof, parking, and deteriorating facades
After: Pedestrian Overpass, Library, and Facade Renewal
Root Condition @ Year 5
2
Morphed @ Year 25
4A. FINANCIAL DESIGN PARALLEL TO ARCHITECTURAL
RESIDENTS BUSINESSES
TIME
DEVELOPER
Rental contract for 10 yrs; with options for 20 yrs.
Gov’t incentives for off-grid energy & waste management. Architect Developer
YR 0
MASTERPLAN COMMISSIONED!
Contract
YR 1
Owner’s Obligations: • Resilient energy network • All structures and parking Possible Benefits: • Drives up market value at Thorncliffe Park • Public-Private-Partnership
Rent Money: • 50% reserved Tower Facade Renewal future phases • Covers maintenance • Funds the Tower Facade Renewal
Developer’s Role: Phase 1 Cardo & Decumanus Max.
Enjoys below market rates
Investor
If Anchor renews Business as usual, Collects high rent Lease Renewed
YR 10
YR 5
Investors’ Obligations: • Involved design process • Occupy the Anchor Store Benefits: • Pays below market rent (A start-up incentive) • Energy Network Savings • Location: High Circulation • Parking facility by Developer
4 Investors
Contract Option
Contract: Developer continues commitments
Option: Rent raised to above market rates for next 5 yrs.
Lease Ended
(Renewal likely reflects current success)
Benefits: • Energy Exchange savings • Location: High circulation • Parking
Developer’s Role: Phase 2 Large Anchor Stores
Pays above market rates
If Anchor ends lease Benefits: Earlier Savings will be used to MORPH the vacant Anchor into community programs...
Developer’s Role: Phase 3 Local Businesses
4B. ARCHITECTURAL TIMELINE PARALLEL TO FINANCE
YR 0
SITE A
YR 1
YR 5
SITE B
Parking
Tower Facade Renewal
Year 0
Year 1
SECTION
PLAN
AXONOMETRIC
Business Anchor
3
Year 5
and Tower Renewal Parking Garage
Tower Renewal is: Renewal Energy Farm Organic Waste Manage
If Anchor renews Business as usual, Collects high rent
TOWER FACADE RENEWAL COMPLETES!
Community Garden Tower Facade Renewal
Tower Facade Renewal
(Performance enhancing envelope system)
YR 15
COMMUNITY CENTER COMPLETES! MORPH Vacated Anchor into:
Lease Renewed Lease Ended
Continue to pay above market rates
Swimming Pool Community Kitchen
YR 20 If... on Year 15, Anchor decides to terminate; the vacated Anchor will be adapted as other community amenities
Activity Center
Lease Renewed Lease Ended
Continue to pay above market rates
Tower Facade Renewal
YR 25
If... on Year 20, Anchor decides to terminate; the vacated Anchor will be adapted as other community amenities
Continue to pay above market rates
TO BE CONTINUED...
MORPH Funding: • 80% from Rent • 20% Parking fee
New Post-Year-20 contract enforces even higher rent Benefits: • Funds other New Contract MORPH projects
If Anchor renews Business as usual, Collects high rent
Other MORPH projects:
Learning Center
Burgess Park Expansion Central Stage Piazza Carnival Facility Developer’s Role: Phase 4 Peripheral Catalysts
Organic Waste Management
Tower Facade Renewal
YR 20
YR 25 Community Garden Facade Renewal
Bike Lane
AXONOMETRIC Year 15
Year 25
SECTION
Year 10
SECTION
PLAN
Develop Future P
Facade Renewal
AXONOMETRIC
Parking Garage
Ped. Walk
CENTRAL BURGESS PARK COMPLETES!
PLAN
YR 15
Developer’s Role: Phase 5 Tower Renewal
4
Root Condition @ Year 5 Parking Structure
Root Condition @ Year 5 Anchor Tenant: IKEA
5
Root Condition @ Year 1
Morphed @ Year 25
Library (Filler walls, lights, furniture)
Morphed @ Year 25
Retrofitting the Vacated Anchor: Community Pool
Transformed @ Year 15
6
LAMP TRAPEZE INTER-DEPENDENT PARTS [2011 Fab Lab; 3 weeks; Group of 2] Roles: shared. A lamp is designed for flat-packing and assembly within an hour. The exoskeleton is acrylic, with exposed connectors. Then, a shell of vellum diffuses the light. The lamp is made of 40 unique parts, inter-trapezed to create subtle warps in the form.
7
PRIMARY CONNECTION METHOD
1
4, 5, 6 or 7
-
UP
COMPONENTS
TWIST
-
LOCK
ASSEMBLIES
1 (X40, A1-G5) A
B
C
D
E
F
G
H
1
A1
5
2
A2
A2
4 5
1
A1
A1
A3
A2
A4
3 4
6 2 (X40, A1-H3)) A
B
C
D
E
F
G
H
2
A1 A2
1
A3
2
A4
3
3
1 (A-H5 )
3 (X1)
4 (X64) 5 (X32)
7 Ex. A5
A1 B1 A2
6 (X16) 7 (X16)
8
A1
B2
A2
A3
B3
A3
A4
B4
A4
H1 H2
H3 G4
COLLAGE SKETCHING
DISSECTIONS
TEXTURES, SHADES, MASSING & PROGRAMS
[2011 Independent Studies; 14 weeks]
Using sketch from start to finish, the project explores this quick form of visualization in various approaches, styles, attitudes, and techniques. The end product consolidates over 250 sketches into 2 renderings. (Left) Site Study: from past to present
Site: Yonge Street & Gould Street
(Bottom) Just one medium: the Black Felt-tip
Study in Textures
Study in Shades
Study in Massing
9
(Above & Right) Current site analysis: by shades, programs, textures, and materials.
Study in Program
EXPERIMENTS IN SKETCH OVERLAY + SUBTRACT + COLLAGE
CONSOLIDATION
THE COMBINED ESSENCE OF 250 SKETCHES IN 2 FACADE DESIGNS
The North Facade: A Sum
THE RENDERING
The West Facade: A Sum
A MANUAL PRODUCE FROM START TO FINISH
+ + + + 10
RATIONALE
AGGREGATE LIVING AN URBAN CATALYST
Site
9-storey Medical Building
[2010 Integrated Studio; 6 weeks]
Future Condo 100m tall
Aggregate is a mixed-use development. The site has many presences: due Southeast is the beloved ROM (museum) by Libeskind, due Southwest is the beautiful RCM (music) by KPMB, but due East will be an undesirable condo, standing 100m tall and sitting 5.5m away. To attract and avoid these presences, the surprisingly rational resolve is a corrugating and shifting facade.
Parking
Parking
4 Influential Site Presences
(Top) The Parti: the essence diagram
Lobby
Retail
100m tower (5.5m away)
(Bottom) 25 unique floor plates
RCM (Royal Conservatory of Music) University of Toronto
Libeskind’s ROM (Royal Ontario Museum)
Retail
Office
Office
Living
Living
Living
Living
Living
Living
Living
Living
Living
100m tower (5.5m away)
Traditional grid doesn’t address site
For views, the structural grid rotates.
In typical towers, residents are like prisoners.
Living
Living
Living
Living
Living
Living
Living
11
Living
Now, residents are like neighbours.
Trapped amid towers, the form agitates
The tapestry of windows and walls
Across from Libeskind’s ROM, red marks the entrance. Facade: Insulated Panel Construction
12
The landscape of balconies
Ground Floor
Office Units
The lobby has a generous double height space.
Entry at ground, shops on the second, offices on third.
A corrugated facade rationally avoids facing the future 100m tall condo. Structure: a core w/ elevators and shafts. Perimeter walls are also load bearing. Core
Hello, Libeskind
Half Floor Units
Exterior Structural Wall System
Welcome home to the ROM (Royal Ontario Museum)
Walls Cable Support
Concept: thin edge
Full Floor Units
Penthouse Amenities
13
Foundation
COMMUNITY CENTER ASSISTANT PROJECT MANAGER, $17 MILLION NEW CONSTRUCTION
[2012-Present; CS&P Architects Inc; 18 months; Team of 2] Roles: coordinate contract administration, construction management, and all shop drawings. The new amenity is part of the revitalization of Regent Park, TO. Studying lights
COLOURED-PANELS DETAILS
Construction site, Dec 2013
Inspecting caisson constructions
Inspecting grade beams and frost porches
Coloured-Panels Construction Coloured-Panels Concept
14
COLOURED-PANELS DETAILS
INSTALLATION: AGONY
SHORT LISTED NUIT BLANCHE PROPOSAL [2011 Fab Lab; 7 week; Group of 6] Roles: Sketches, digi fab structure, pneumatics, and construction Trapped within a vulnerable space, users are given a responsive pneumatic interface to interact with. As participants move through the pavilion, they can augment the agonizing surrounding to find comfort, or simply a way through. The development of the project was divided into three areas: structure, pneumatics and lighting, and motion mechanisms.
Walk-thru The space stirs agony
A 1-meter installation sample
15 Pavilion circulation
Interface
Pneumatics: Manual routering
Pneumatics Design The intrusiveness and vulnerability of space
16
Prototype
Product
Material Tectonics
Pneumatic Rings Experimenting with materials
17
COMMUNITY SERVICE FOR YOUTHS
ASSISTANT PROJECT MANAGER, $6 MILLION RENOVATION AND REDEVELOPMENT [2013-Present; CS&P Architects Inc; 6 months on going; Team of 3] Roles: Consultant and Document Coordinator: SPA, Tender, and Addendums; expected Assistant Project Manager in Jan 2014
South Elevation
The entry tower is a climbing wall Tower facade mock-up
Week 1
Week 2
CLIMBING WALL TOWER AND FACADE
18
Week 3: Completed
2ND PLACE
URBAN CANVAS
OPEN SPACE DESIGN COMPETITION [2009 Urban Planning; 3 weeks; Group of 6]
Roles: design lead, graphics, and model.
The open forum is a ground for academic and social exchange between urban and student communities. The distinctive lines in the square can act as dividers when hosting expositions. Key features: a multipurpose Podium, Benches, and a Water Feature that reduces city noise.
Summer: Convocation
Concept sketch
Winter: Ice Festival
(Above) Various Podium use.
The Podium will be a choice meeting place
Competition Model.
Generic grid lines are receptive to a diversity of expositions
The Podium and Water Fountain
Urban Serenity: soothed by the sounds of the Water Fountain
19
1ST PLACE
POST-CARBON MALL
CITIESALIVE INTERNATIONAL COMP. [2009 Personal; 3 weeks; Group of 4] Roles: housing design, facade renewal, theatre, graphics Although the intent of American strip malls was to centralize suburban commerce, the result has been the creation of alienating buildings in large asphalt parking, with little to no greens. This renewal adds diversity, encourages urban activities, and enhances existing envelope performances.
Facade Renewal
Water Retentions
Housing Gardens
Walkable
Before: Surface Parking
After: Allotment Gardens and Sub-level Parking
Market
From asphalt to lush, importsAfter: to local, and cars tohousing pedestrians New rooftop above the mall Before: Strip Mall only
Diversity: housing, gardens, market, commerce, outdoor theatre, playground, water retentions, and urban farming.
20
TORONTO YARD
REPURPOSING THE DEAD (END)
By 1976, a segment of the unfinished Spadina Expressway, later called Allen Road, has decimated a midtown community. The Allen is the antithesis of public space: it’s loud, hasty, pungent, and ugly.
[2014 Studio; 4 weeks] So, the Yard will be 6 new districts: characterized by services indigenous to Toronto’s culture: arts, food, market, sports, water, and retail. The objective is to build a pedestrian public yard for Toronto. By 1976, a segment of the unfinished Spadina Expressway, later called Allen Road, has decimated a midtown community. The Allen is the antithesis of public space: it’s loud, hasty, pungent, and ugly.
2050 Masterplan
21
22
Retail District
Sensitive Development
Pedestrian Ground Plane
Market District
Water District
Food District
Sports District
Arts District
23
24
2050 Masterplan
HEIRLOOM ARCHITECTURE THESIS: TEL AVIV, ISRAEL [2010 Studio Abroad; 12 weeks] Only when we’ve realized that design is collaging will we be liberated from the fear to create. Heirloom Architecture audaciously collage local typologies and cultural heritage, in order to relevantly address urban needs. With an added element of time, the proposal hopes to become a long-term planning and architectural solution. This is an option studio abroad, studying the southern region of Tel Aviv. The UNESCO heritage city has the largest collection of modern architecture in the world. However at its center, the city is divided by a large man-made ‘fissure’ - a scar left behind by a demolished railway, which once gave life to the city.
Principle of Design:
25
One of many potential outcomes
1. PROGRAMS 2. GENOTYPES Derived from local needs & conditions
Growth tolerable typologies: defining embryos (plan & section types), genes, and sizes
BASKETBALL COURT EXPANDS TO SOCCER FIELD
PLAN
SECTION
AREA
3. BREEDING
Mating compatible programs: based on the need for sun, public or private use, and unimpeded growth types
GENES
PLAN
SECTION
GENES
26
East Elevation
West Elevation
4. DISTRICT BUILDINGS From 2D Typologies to 3D Form
5. GROWTH OVER TIME Paths of Development
Arts
Arts
Cultural
Cultural
Cultural
Business Recreation Industrial
Recreation
Power
Stage 1 Population 300
Industrial
Business Recreation Industrial
Stage 4 Population 1000
Arts
Arts Cultural
Cultural Business Recreation Business
Power
Industrial
Power
Stage 2 Population 400
Business Recreation Industrial
Power
Stage 5 Population 1300
Power Arts
Arts Cultural
Cultural
Arts
Business
Business
Power
Recreation Stage 3 Population 600
Industrial
6. MASTERPLAN
Industrial
Arts
Recreation
Site and Street Specific Industrial
Recreation
Power
Cultural
Business
27
Power
Stage 6 Population 1500
7. ECOSYSTEM Energy Exchange
WEST
RECREATION Sports Hall, Housing, Market
Amphitheatre
WEST
Allotment Gardens
The Final Tower AMALGAMATION Growth Constraint Mechanism
BUSINESS Offices Hotel
CULTURAL Farmer’s Market Wellness Center Activity Center
INDUSTRIAL Synagogue, Amphitheatre
Florentine Live-work Units
CENTRAL
CENTRAL
Hotels
Spiral House (Private)
Park SOCIAL VOID
Synagogue
Wellness Center
EAST
EAST
POWER Greenhouse, Night Club, Energy Plant
Offices
ARTS Opera Hall
Activity Trail Education Facility
Farmer’s Market
Neve Tzedek Rental Units
Activity Center
Higher Education
Bike Route
Supermarket
Clubs
Energy Plant
Opera House
Cafes & eateries
8. PLAN 3-Tiers
CULTURAL
Middle
RECREATION Sports Hall, Housing, Market
Higher Education The Final Tower AMALGAMATION Growth Constraint Mechanism Park SOCIAL VOID
INDUSTRIAL Synagogue, Amphitheatre
Florentine Live-work Units Spiral House (Private)
Top
Allotment Gardens
Neve Tzedek Rental Units
Activity Trail
Supermarket
Clubs
Bottom Hotels
Offices
Energy Plant
Farmer’s Market Wellness Center
Middle
Cafes & Eateries
Bike Route
Education Facility Activity Center
Amphitheatre Synagogue
Top Opera House
Farmer’s Market Wellness Center Activity Center
WEST
WEST
ARTS Opera Hall
POWER Greenhouse, Night Club, Energy Plant
BUSINESS Offices, Hotel
CENTRAL
EAST
EAST
CENTRAL
Bottom
9. SPIRAL HOUSE
10. THE FINAL TOWER
An Infinite Expansion Typology
Growth Constraint Mechanism, via Congestion
Allotment Gardens
28
WESTERN DISTRICTS Industrial & Recreation
WEST
RECREATION Sports Hall, Housing, Market
Spiral House (Private)
WEST
INDUSTRIAL Synagogue, Amphitheatre
Allotment Gardens
Amphitheatre PARK SOCIAL VOID
Florentine Live-work Units
Synagogue
CENTRAL DISTRICTS Cultural & Business
CENTRAL CULTURAL Farmer’s Market Wellness Center Activity Center
CENTRAL BUSINESS Offices, Hotel
Activity Center
Florentine Live-work Units Education Facility
Farmer’s Market
Wellness Center
Offices Hotels
Neve Tzedek Rental Units
Spiral House (Private)
The Final Tower AMALGAMATION Growth Constraint Mechanism
Offices Bike Route
CENTRAL BUSINESS Offices, Hotel
Hotels
Neve Tzedek Rental Units
Activity Trail Clubs Energy Plant
Supermarket
EAST
EAST
POWER Greenhouse, Night Club, Energy Plant
ARTS Opera House
Higher Education
Cafes & Eateries
EASTERN DISTRICTS Power & Arts
29
Opera House
Industrial District: Amphitheatre and Synagogue
Cultural District: Farmer’s Market, Recreation Center, Private Housing
Art District: Opera House, Cafe and Higher Education
30
Power District: Kinetic energy from the Club is harnessed by a Power Plant
Therefore, when we build, let us think that we build for ever. Let it not be for present delight, nor for present use alone‌
and that men will say as they look upon the labour and wrought substance of them, “See! This our fathers did for us.” John Ruskin, The Seven Lamps of Architecture, 1907
is inherent to architecture; consequently, the threats of revival and demolition is always on the brink. Yet, our concern shouldn’t be in flawed ideals or materials, but rather, it should be in the lack of awareness and intents architects have for longevous designs. Now, with a mandate of sustainability, why are we more concerned with the inefficient light bulbs than detriments of short-lived buildings? My intention for a Master of Architecture hopes to (re)discover feasible design strategies that transcend heirloom architecture possessions that can be passed from one generation to one generation. Being heirloom is not a critique on mainstream sustainability, nor is this a narrowed study on conservation or adaptive reuse. Heirloom ideas are both progressive and future-oriented. It’s intended to reinstate buildings to their responsibility of centennial service, by design and not fortuitously.
CONTACTS +1 (416) 277 1523 • tommy.tso.kf@gmail.com • 92 Holly Drive, Richmond Hill, ON, CA • www.tommytso.com