Skip to main content

MFG – Plate Shear

Page 1


PLATE SHEAR PLATE SHEAR

Turn machine off

Set the stop to the proper length

Adjust your guides to the right width and make sure the guide is squared (use speed square for this)

Turn on the machine and set the blade to the proper stroke (using the limit switches)

Set the guard to where it is 1/16" over the plate

Run a test bar; make adjustments if needed; QC inspect

PLEASE FOLLOW ALL SAFETY PROCESSES NAD PROCEDURES WHEN OPERATING THIS MACHINE

“Ability is what you’re capable of doing. Motivation determines what you do. Attitude determines how well you do it.”
– Lou Holtz

ACKNOWLEDGEMENT OF TRAINING ACKNOWLEDGEMENT OF TRAINING

PLATE SHEAR

Once the trainer is confident the trainee has the basic tools and knowledge to perform their job, the trainer will meet with the manager to discuss the training. Once the manager is confident in the completion of the training, he or she will sign and date each area provided below.

TRAINER: DATE:

TRAINEE: DATE:

SUPERVISOR: DATE:

Turn static files into dynamic content formats.

Create a flipbook