MFG – Header

Page 1


HEADER SET UP Header Set Up

Lock-out and tag machine

Move bar stop our of the way

Take the die tooling out of the machine

Put in the new die tooling and tighten set screw

Take our the gripper blocks and replace them with the new gripper block; make sure to put the shims back on each side of the gripper blocks

Set the bar stop to proper length

Take off your lock and turn the machine off

Jog machine one cycle

Turn machine off wait for machine to come to a complete stop, then make sure to tighten the lock down bolts on the gripper blocks

Turn the induction unit (heater) on

Run a test bar

Make adjustments as needed until the part meets specs

PLEASE FOLLOW ALL SAFETY PROCESSES NAD PROCEDURES WHEN OPERATING THIS MACHINE

ACKNOWLEDGEMENT OF TRAINING ACKNOWLEDGEMENT OF TRAINING

HEADER SET UP

Once the trainer is confident the trainee has the basic tools and knowledge to perform their job, the trainer will meet with the manager to discuss the training. Once the manager is confident in the completion of the training, he or she will sign and date each area provided below.

TRAINER: DATE:

TRAINEE: DATE:

SUPERVISOR: DATE:

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.