CHAMFER MACHINE CHAMFER MACHINE
Lock-out the machine and turn off air
Take out gripper blocks
Put the proper gripper blocks for bar diameter in
Unlock the machine and turn on air
Set the stroke and feed speed for diameter
Run test bar; make adjustments as needed
Get QC to sign off on part
PLEASE FOLLOW ALL SAFETY PROCESSES NAD PROCEDURES WHEN OPERATING THIS MACHINE
ACKNOWLEDGEMENT OF TRAINING ACKNOWLEDGEMENT OF TRAINING
CHAMFER MACHINE
Once the trainer is confident the trainee has the basic tools and knowledge to perform their job, the trainer will meet with the manager to discuss the training. Once the manager is confident in the completion of the training, he or she will sign and date each area provided below.
TRAINER: DATE:
TRAINEE: DATE:
SUPERVISOR: DATE: