MFG – Auto Shear

Page 1


AUTO SHEAR AUTO SHEAR

Lock-out machine

Take out the three shear dies

Clean the dies and put them back on the rack

Clean the inside of the die housing

Put dies in the machine, hand tighten the nut down, and set the keeper

Load the bars on the feeder table

Adjust lifting finger if needed for bar size

Roll one bar onto rollers to set the pinch roller in place

Line the bar to the center of the dies; you may have to move up and down or right to left

Set the stop to the proper cut length

Unlock machine, power the machine up, and run a test bar; if length is incorrect, make adjustments until at proper length

PLEASE FOLLOW ALL SAFETY PROCESSES NAD PROCEDURES WHEN OPERATING THIS MACHINE

ACKNOWLEDGEMENT OF TRAINING ACKNOWLEDGEMENT OF TRAINING

AUTO SHEAR

Once the trainer is confident the trainee has the basic tools and knowledge to perform their job, the trainer will meet with the manager to discuss the training. Once the manager is confident in the completion of the training, he or she will sign and date each area provided below.

TRAINER: DATE:

TRAINEE: DATE:

SUPERVISOR: DATE:

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.