I N D E X Graduate work Fall 2015-Winter 2016
Intrinsic Pavilion (Thesis)
CONNECTOR
LAFAYETTE STRONG PAVILION (CAMELLIA GRIDSHELL)
Under Graduate work
Fall 2011-Spring 2014
100 West Cypress St.
401 studio
401 McKinley ST
301 studio
Other/Personel Projects Fall 2011-Present
Furniture
Hilliard Art Museum
T H O M A S
M O U T O N
Cajun Woodworks of Art: Cabinet design fabrication
2001-2010 2011-2015
(breakdown of plans and construction for residential/commercial) Student Bus driver (class B CDL) Supervisor Joey Beniot 337-582-5305
UL Parking and transit:
Chase Marshall Architects:
Architecture Internship Supervisor Jay Chase 337- 278-4218
CDW (Community Design Workshop):
Summer Intern Supervisor (Tom Sammons (337) 482-5310) Mathes Brierre Architects: Architectural Intern
Summer- 2015
Summer- Winter- 2016 February- 2017-Present
E X P E R I E N C E Design Excellence 1st year Little Library design Competition Honorable Mention Design Excellence 2nd year Tau Sigma Honor Society Architecture 705 Downtown Beautification Competition 2nd Place LA Digital 302 Urban Design Competition 2nd Place Design Excellence 3rd year Design Merit 4th year Graduate School Assistantship InDesign Gold Award(Lafayette Strong Pavilion) Design Excellence 5th year UL Alumni Association Outstanding Graduate Award
A W A R D S
R E F E R E N C E S Ashlie Latiolias Prof/AIA Architect Geoff Gjertson Prof/AIA Architect Hector Lasala Prof. Kari Smith Arch Grad Director/LEED AP Tom Sammons Director SOAD
1(337) 247- 0251 thomasmx83@gmail.com 3050 Burgundy St New Orleans LA 70117
ayg4833@louisiana.edu (337) 482–6229 wgg2100@louisiana.edu (337) 278-2722 hector@louisiana.edu (337) 322-2985 kjs9673@louisiana.edu (337) 482-5315 tcs3147@louisiana.edu (337) 482-5310
2011-2015 2015-2016 2011 2012 2012 2012 2013 2013 2013 2014 2015-2016 2016 2016 2016 2011-Present 2015 2016
University of Louisiana at Lafayette
Bachelors of Science: Concentration Architecture
University of Louisiana at Lafayette Masters of Architecture
A C A D E M I C S
Personal Projects exploratory problem solving that range
from furniture design to more industrial design based projects like bicycle lights and spawn out of unique daily needs and circumstances
Artech Fusion Water Warp: The water warp performance incorporated students from Architecture, Dance, and Music to create a performance around the grid-shell pavilion project Hilliard Art Museum Sign: In the spring of 2016 me and a
fellow student had the opportunity to design a new sign for the Hilliard Art Museum that would compliment the existing museum designed by ESKEW+DUMEZ+RIPPLE Architects
P R O J E C T S (O t h e r)
S K I L L L E V E L
INTRINSIC
Architectural elements facilitate a conversation through spatial experience. This spatial experience is manifested between the individual and their contextual relation with space, time and the environment. Therefore it is through an individualist perception that we define experience as a reaction or response from the occupant towards the space. Architecture is not merely defined by walls or roofs but the experience they create. they create.
PAV I L I O N
AXISMUNDI
6
5
4
3 The intention of this investigation was to design a piece of architecture that emphasized and accentuated the intrinsic values of architectural elements. In order to do this two parameters were set. The first was the incorporation of two historical elements; a fire pit(hearth) and an oculus(axis mundi). The second parameter was that its design and construction consist of 100% recycled or discarded material.
2
1 HEARTH
Site
The site is located in a clearing of trees that form a natural oculus with a path that frames a prominent oak tree.
Conceptual Sketch
Model
Full scale mockups
VERMILION RIVER
PAVILION
5:00 PM
32 O
M 4:00 P
M 0P
3:0
In order to heighten the experiential qualities of the space capturing natural elements like the setting sun and the wind became design goals. Over 1800 linear feet of discarded beach wood was incorporated as a hanging element that could capture the wind and fragment the light from the setting sun. Transforming the natural elements into a spatial 3 dimensional form.
Column/Beam connection detail -2 1/2” lagg bolts connecting 6” c-channel beams to 6” by 6” ‘Shou Sugi Ban’ timber post
Milk crate joist/ beam connection detail
Column/footing connection detail
1
1” square tubing salvaged from 6 white pop up tents
4
178 milkcrates collected from various locations
5
3,600 linear Ft of Beach wood collected from the the scrap wood bin
2
4 - 6” by 6” heavy timber post collected from craigslist free section
3
4 - 6” deep c-channel beams
6
1,800 linear Ft of White Oak wood Salvaged from the half scale model built for a previous project
CONNECTOR 1990 The Louisiana Department of Transportation and Development (DOTD), working with the City of Lafayette and the Federal Highway Administration (FHWA), began studying the environmental impact Environmental Impact Statement (EIS) Elevated freeway concept was adopted.
The I-49 Lafayette Connector is a future 5.5-mile segment of highway that will extend I-49 from I-10 to the Lafayette Regional Airport. Which will provide a critically needed transportation link for Lafayette and the state of Louisiana. The I-49 Lafayette Connector is a key component of I-49 South, which will function as a: HURRICANE EVACUATION ROUTE
A MAJOR ENERGY AND TRADE CORRIDOR TO THE NATION
NEW INTERSTATE PROVIDING CONNECTIVITY FROM LAFAYETTE TO NEW ORLEANS
1987
Congress Authorizes Funding
1993
The Lafayette Areawide Planning Commission (the Metropolitan Planning Organization at that time), published the “Lafayette North/South Corridor Study: Path to Progress“.
1994
ULL “Blue Book” issued by 1999 School of Architecture Community Design Workshop.
In January and February, the 2001 Citizen Advisory Committee, the Transportation Technical Committee, and the Transportation Policy Committee of the Lafayette MPO held meetings to recommend a Locally Preferred Alternative Alignment. Federal Highway Administration issued the Record of Decision (ROD), including Measures to Minimize Harm, which includes 21 commitments intended to mitigate unavoidable effects during the design and construction process.
2003
Functional plan/CSS process re-started under an 18-month timeline:
2015
1997
FHWA and DOTD restarted the EIS process based on the Evangeline Thruway corridor and elevated freeway option.
2000
Draft EIS Public Hearing.
2002
Final Environmental Impact Statement completed.
2008
Evangeline Thruway Redevelopment Team (ETRT) advisory committee was created by LCG to serve as the public body to lead the development of the Economic Redevelopment Plan called for in the Corridor Preservation Plan.
School of Architecture and Design
Community Design Workshop 08/05/16
LaPlace
Strealing Grove HistoricDistrict
Freetown Port Rico
Mccomb- Veazey
LEGEND AREA OF INFLUENCE NEIGHBORHOOD RAILROAD
0
0.25
0.5
1
1.5
During the summer of 2016 the Community design workshop (CDW) received a contract through the primary design consultants AECOM/ STANTECH to serve as a think tank that generated design proposals based off of a series of schemes. It was at this time that I was hired on as an intern to help develop designs throughout that summer of 2016
2 Miles
5'
41'
23'
3rd St.
163' 140' 17' 5'
Jefferson St.
2nd St.
Johnston St.
64' Refinement Concepts
Current Alignment
87'
Jefferson St. Johnston St.
6th St.
6F
Taft St.
135' Elevated on Fill
163'
116' Elevated on Structure
132'
Railroad Elevated Pedestrian Walkway on Fill
Street On-Grade
140'
Moved 150’
GRAPHIC SCALE 0
100
200
300
400
I-49 Connector Semi-Depressed
Elevated on structure
Elevated Pedestrian Elevated pedestrian walkway on structure Walkway on Structure I-49 Connector Semi-Depressed
23'
6D
Covered Semi-Depressed I-49 Lafayette Connector Mainline
Railroad
8’ Planters 6’ Sidewalks
Alternatives
For this project we focused on the series 6 development concepts 6D, 6G, and 6F. Within the 6 series there 150' are 5 options that all incorporate a semi-depressed facility for I-49. These options either maintain an open, or uncovered, semidepressed facility, or cover the facility allowing for other programs and activities to take place on top of the facility. We chose one of the five alternatives to develop (6D). The second alternative (6F) is a strategy developed by this team that makes 163' slight alterations to the proposed 6E plan. The third alternative (6G) is another 140' that incorporates, what we felt were 132'the best strategy developed by this team 6D - Current Alignment - Covered elements from each of the five options and proposes a new alignment of the facility (moved 87’).
10'
Variations on concepts 6D, 6F, and 6G
Chestnut St.
6
10'
17'
S E R I E S
58'
Jefferson St. Johnston St.
6th St.
Railroad
GRAPHIC SCALE 0
Elevated on structure
I-49 Connector Semi-Depressed On grade street
Elevated pedestrian walkway on structure
100
200
300
400
6G
Moved Scale:87’ 1:50
6% grade / 1:14 slope 8% grade / 1:12 slope
STRATEGIES
School of Architecture and Design
Scheme 6 was a group project that involve myself and another Graduate intern within the Community Design Workshop. We began the project with diagrams of each scheme that eventually lead to the individual development of park master plan options. We then put together one master plan based off each plan’s strongest elements. My partner then began working on sections and board layouts, while I developed a three-dimensional BIM model for renderings and axons.
and Placement Alternatives
220'
407' 1 32'
162'
150'
163'
163'
2'
17' 5'
140'
10'
132'
23'
41'
8’ Planters 6’ Sidewalks
58'
140'
64'
87'
6'
163'
135' 25'
116'
132'
140'
2'
8’ Planters 6’ Sidewalks
Chestnut St.
10'
7' 2' 17'
Railroad ROW
nt
Cypress St.
5 4'
2'
29'
2 5'
14' 8' 5'
348'
59'
Community Design Workshop 08/05/16
6% grade 8% grade
URBAN REDEVELOPMENT Typical Block Configuration 2
’ 60
305’
In order to establish the projects economically viable the team designed proposals for the economic redevelopment of the typical existing block.
Apartments
39 (on 2 floors) l 51 parking spaces needed
Commercial
22,000 sqft l 88 parking spaces needed
Parking Garage
29,000 sqft l 69 parking spaces / floor
1
Pedestrian Crossing 6th Street Water Wall
Elevated Plaza and Pedestrian Walkway
Sixth Street Pedestrian Crossing
School of Architecture and Design
PARK MASTER PLAN
Community Design Workshop 08/05/16
G n do or . St
ar
m
La
rfi Ga
S ft Ta t.
3
eld
.
St
t St.
Chestnu
2
4
lvd.
geline B
1
S Evan
geline
N Evan
3rd St.
on St.
Jeffers
.
St
.
St
h
6t
h
7t
h
8t . St
ns
h Jo
t.
10th S
11th
n
to
t.
12th S
13th
14th
GRAPHIC SCALE
0
100
200
300
400
St .
2
Elevated Plaza Located on Berm
Water Ladder
Fountain
3 Elevated Plaza
Pedestrian Walkway
4
Sculpture Garden South East Corner Raised Walkway
Terraced Ramp Condition for Seating and Sculptures
Sculpture Garden
Johnston Street Bridge Pedestrian Access over Johnston St. Johnston St. over I-49 Facility
Bridge Infrastructure
LAFAYETTE STRONG PAVILION (CAMELLIA GRIDSHELL)
THINKING Thinking While Doing (TWD) is a $2.48 million (Canadian) Partnership grant awarded by the Social Sciences and Humanities Research Council of Canada in March 2013. The grant entails a 6 year project consisting of design-build collaboration between UL Lafayette, Dalhousie University, University of Arizona, University of North Carolina Charlotte, University of King’s College, University of Manitoba, University of Alberta, University of Toronto, and Parks Canada. The goal of the partnership is to develop, test, and prototype new construction technologies and processes through collaborative workshops and student conducted designbuild installations and buildings.
WHILE DOING
SITE CA M
EL
LIA
BO
UL
EV AR
D
LAFAYETTE LOUISIANA
FALL 2014
LINEAR SCULPTURE PARK
PHASE 1 - FORM FINDING - MATERIAL STUDIES - SCHEME STUDIES - MASTER PLAN FORM FINDING
GENERAL NOTES :
CAMELLIA GRIDSHELL
2. no parking is required.
3
Attach telescopic arms with perfurated metal panels
LOCATION:LAFAYETTE, LA
SITE PLAN SCALE: 1 : 20
1. THe site is not zoned on current zoning maps, however we have allowed for a 30’ setback to maintain traffic sight triangles at intersections.
4. connecting sidewalks to be provided by city/parish of lafayette. 5. underground electric service is to be provided to project by city/parish/lus. 6. temporary power connections to be provided by city/parish/lus at closest power pole.
12
7. a water line is to be provided to site during construction and for a permanent hose bibb AC K
CA
.8. temporary chainlink fencing with locked CONTACT gate to be provided during construction by INFORMATION W. GEOFF GJERTSON city/parish.
ME
DRIVE CAMELLIA
3
LL
IA
12
ENGINEER, BLACKWELL
BO
29
1
EV
1
2
D
3
26’-2”
84’-0 ”
5
28’-0”
6 7
12
6
8
F.F. = 32.0’ A.S.L.
30’-0 ”
SCULPTURE
4
7’-11”
2
9
7
8
9
5
110’6”
10
SCULPTURE
10
11 2
MOU
NT VE
RNON
Attach swivel connection to Aluminum node plate.
SETBAC
K
DRIV
E
12
PAIR OF 4’ WIDE BY 6’ High GATES WITH LOCK RANDALL HEBERT ENGINEER OF RECORD 30’ SETBACK
2 Attached node plate BICYCLE RACK by city andy & DON BEGNEAUD with swivel piecesBEGNEAUD MANUFACTURING TRASH AND RECYCLE CANS by cityandyb@begno.com attached on to lathes RANDY@RJHEBERTASSOC.COM
gridshell - RE: 1A3
7’ WIDE CONCRETE SIDEWALK BY L.C.G. (APPROX. 1,902 SF) DRAIN FOR TRENCH grate ENGINEERS STAMP EXISTING POWER POLE DATE:DECEMBER 5, 2014 NEW POWER rACK POLEFOR PANEL AND SQUARE FOOTAGE: ELECTRIC METER UNDERGROUND ELECTRIC SERVICE TO SUBPANEL S.F. IN CONCRETE WALL IN GRIDSHELL EXISTING CONCRETE SIDEWALK 2 12
,
,
940
SHEET ___ OF ___
A.1
SHEET #: ________
BLACKWELL
SETBACK
EACH TOPO LINE REPRESENTS AN ELEVATION CHANGE, FROM 35’-0” TO 31’-6”
SCULPTURE
8
BRIAN SCHOPF ENGINEER, BLACKWELL 6’ High temp. CHAINLINK CONSTRUCTION FENCE BSCHOPF@BLACKWELL.CA
AR
4
2
ASPICK@BLACKWELL.CA
KEY NOTES :
UL
’-0 ”
7
1
PROFESSOR/ ARCHITECT
9. temporary toilet for construction toGJERTSON@LOUISIANA.EDU be provided by city/parish. ANTHONY SPICK
”
TB
49’-0
SE
UL LAFAYETTE BUILDING INSTITUTE
3. THE scope of the project does not include sidewalks.
SPRING 2015 PHASE 2 - CONSTRUCTION DOCUMENTATION - CLADDING DESIGN/DETAILING - NODE DETAILING/DESIGN - SCARF JOINT DETAILING
Colaborators My involvement with this project began during the spring of 2015 and started with design development and the design and detailing of the shading elements and the connection points of the structure. During this time, I was assigned to develop a shading element that incorporated perforated panels that were previously donated. This tasked involved coordination with local fabricators. Along with this I was involved with correspondence with the structural consultants Blackwell engineers based in Canada. t\ This tinvolded 3-dimensional modeling of the structure to be analyzed
During the spring of 2015 schematic design and CD’s were finished. In the summer of 2015 it was finally time to begin construction and the daunting task of processing 9000 linear feet of white oak into 2040 ft laths so that this unique structure could be assembled. This process was very time consuming and pushed back the actual erection of the pavilion into the fall semester of 2015. Many visitors stopped by to see the structure we were creating and to see how the project was going, like acting city president Joey Durel. These visitors gave us the boost in energy to push extra hard and complete the project.
SUMMER/FALL 2016 PHASE 3 - ASSEMBLY PROCESS OF PARTS - FABRICATION OF NODE CONNECTION - ERECTION OF GRIDSHELL
During the construction process my asigned responsibilities included. -production of marine plywood node spacers -mock up design of seats -panel connection and assembly -edge beam shear blocking -lath attachment to foundation
AWARDS/PUBLICATIONS
In the spring of 2016 the Lafayette strong Pavilion won the Indesign Gold award. In the spring of 2016 the pavilion was featured project in Architect magazine
WINTER 2016 DEDICATION The final dedication ceremony was held on January 11 with the pavilion complete and the first sculpture installed. The total budget of the whole project came to 86,000 USD
1
---
2
REF.
REF.
DN
UP
DN
REF.
UP
UP
REF.
REF.
REF.
REF. REF.
DN
UP
UP
-
3
DN
---
REF.
1
REF.
DN
DN
DN
UP
porous pavers
UP
2 East Cypress St
DN
3
This coffee table was constructed with recycled cypress wood strips pulled from a old shootgun house in New Orleans under renovation. The design intention behind this table was to manipulated a single plane by curving in back and forth. Eventually creating a structural shape out of a simple linear plane
The goal of this project was to develop a seat using common materials found at any local hardware store like Lowes or Home Depot. The legs were made from a combination of dows and shelf brackets provide a unique connection that made the top portion float above the legs providing a nice detail. This simple kit of parts then allowed me to develop variations through material exploration with each variation embodying unique characteristics. Like the warm hue of the Beach wood seat or the smooth texture of the concrete finish.
9' - 0"
3' - 0"
30' - 0"
Site plan/Section
Client Goals:
Spring 2016
-Establish presence on two main intersecting streets -Clean minimalist asthetics that allign with museum -Dynamic signage that doubles as sculpture
In March of 2016 I along with another classmate Josh Floyd in the graduate program were recommended and chosen to design new signage for the Paul and Lulu Hilliard University Art Museum. This commissioned project was made possible through the recommendation of Professor Geoff Gerjtson, with whom we both work with on the Lafayette Strong Pavilion. This project was my first commissioned design project in which I along with Joshua Floyd were in complete control. The project involved many meetings with clients and local fabricators and was an extremely valuable learning experience that yielded a great final design that complements the existing building and design language. The projects budget/bid was 15,300 USD
Form exploration
Material exploration
Final renderings
Publication
July 2016
June 2016
The project was featured in the Fall 2016 publication of View Finder. Which is the Hilliard Art Museum’s Quarterly magazine
Completion of design development and construction documents with plan construction in February of 2017.
Base tectonic exploration
Nov 2016
On site meeting
Completed construction
THANK YOU