A
B
C UPPER ROOF LEVEL 90 ROOF LEVEL
4 A500
80
6
LEVEL 8
A500
70 LEVEL 7 60 LEVEL 6 50 LEVEL 5 40
3 A500
LEVEL 4 5 A500
30
THILINA HERATH 5588
LEVEL 3 20 LEVEL 2
2 A500
10
RICK MARTELL 7474
LEVEL 1 0 LEVEL -1 -10
ALEC MENESES 5242
LEVEL -2 -20 LEVEL -3 -30
KATE MONTGOMERY 0662 AVERY WOODRUFF 9498
1
SECTION 1 : 200
3
WINDOW HEAD AND SILL 1 : 10
ALEC MENESES
5
CURTAIN WALL 1 : 10
RICK MARTELL
NO.
DESCRIPTION
DATE
01
PERMIT APPLICATION
10-12-18
02
CONSTRUCTION SET
11-27-18
TECHNICAL DRAWING CONSTRUCTION SET PROJECT NO. DRAWN BY: DATE:
1B GROUP 18 11-27-18
CHECKED BY:
GROUP 18
A500 2
FOUNDATION SECTION 1 : 10
AVERY WOODRUFF
4
PARAPET 1 : 10
KATE MONTGOMERY
6
MASONRY WALL 1 : 10
THILINA HERATH
SCALE:
AS NOTED