Skip to main content

Work sample_EV Automotive

Page 1


COLLISON CENTER LANGHORNE, PA

A1.06EXTERIOR DEMOLITION ELEVATIONS ARCHITECTURE

A2.01FLOOR PLAN ARCHITECTURE

A2.01aENLARGED FLOOR PLAN ARCHITECTURE

A2.01bFINISH PLAN ARCHITECTURE

A2.01cENLARGED FINISH PLAN ARCHITECTURE

A2.02FURNITURE, FIXTURES, EQUIPMENT AND SIGNAGE PLAN ARCHITECTURE

A2.02aENLARGED FURNITURE FIXTURE

A2.03FFE

A4.01aEXTERIOR

A4.04BUILDING

ARCHITECTURE

A8.01INTERIOR DETAILS ARCHITECTURE

A8.02CHARGING EQUIPMENT DETAILSARCHITECTURE

A8.03PARTITION DETAILS ARCHITECTURE

A8.04FLOOR AND INTERIOR DETAILSARCHITECTURE

A8.05INTERIOR DETAILS ARCHITECTURE

A9.01FINISH SCHEDULE ARCHITECTURE

A9.02DOOR & HARDWARE SCHEDULEARCHITECTURE

A9.03DOOR DETAILS ARCHITECTURE

A9.04ROLL UP DOOR REFERENCE DETAILS ARCHITECTURE

STRUCTURAL

S001 GENERAL NOTES STRUCTURAL

S101 FOUNDATION PLAN STRUCTURAL

S102 PAINT BOOTH PLAN STRUCTURAL

S103 ROOF FRAMING PLAN STRUCTURAL

S201 DETAILS STRUCTURAL

S202 DETAILS STRUCTURAL

S203 DETAILS STRUCTURAL

MECHANICAL

M0.00MECHANICAL COVER SHEETMECHANICAL

M0.20MECHANICAL VENTILATION GUIDELINES MECHANICAL

M1.00MECHANICAL SCHEDULES MECHANICAL

M2.00MECHANICAL FLOOR PLAN MECHANICAL

M2.01MECHANICAL ROOF PLAN MECHANICAL

M3.00MECHANICAL DETAILS MECHANICAL

M3.10MECHANICAL DETAILS MECHANICAL

MD2.00MECHANICAL DEMOLITION PLANMECHANICAL PLUMBING

P0.01PLUMBING GENERAL NOTES, SYMBOLS, AND LEGENDS PLUMBING

P0.02PLUMBING SCHEDULES AND CALCULATIONS PLUMBING

P2.00PLUMBING FLOOR PLAN PLUMBING

P2.01PLUMBING ENLARGED PLANSPLUMBING

P2.02PLUMBING ENLARGED PLANSPLUMBING

P2.03PLUMBING ROOF PLAN PLUMBING

P3.00PLUMBING RISER DIAGRAMPLUMBING

P5.00SAND OIL INTERCEPTOR DETAILPLUMBING

P6.00PLUMBING DETAILS PLUMBING ELECTRICAL

E0.00ELECTRICAL COVER SHEETELECTRICAL

E0.01ELECTRICAL GENERAL NOTESELECTRICAL

E1.00ELECTRICAL

KEYNOTES SITE

KEYNOTES SITE

EGRESS OCCUPANTS

PLUMBING FIXTURE CALCULATION

CUSTOMER RESTROOM

EXTERIOR

CUSTOMER LOUNGE

OFFICE

CONFERENCE ROOM

EMPLOYEE RESTROOM

SERVICE AREA

IT CLOSET

RCP LEGEND

LEGEND NEW CONSTRUCTION

EV AUTOMOTIVE

EXTEND INSULATION/ SEAL TIGHT TO DECK

CAVITY, COORDINATE

ZONE 5 INSULATION REQUIRED, METAL FRAMED WALL -R7.5 CI + R13

BOD:

TO FACE OF CMU WITH INSULATION CHANNELS PER RIGID INSULATION MANUFACTURER

COORDINATE

SCOPE WITH OWNER.

COORDINATE INSULATION SCOPE WITH OWNER 3 5/8" METAL STUD FRAMING, 24" OC, CONFIRM SPAN AND SPACING R13 BATT INSULATION, NO SKRIM, FILL TIGHT BETWEEN STUDS R11.4 CI RIGID INSULATION, BOD: RMAX TSX8510 (1 3/4"),

DOOR VENDOR INFORMATION

P: 336-816-3653

VEHICLE DOOR SPECS

VEHICLE DOOR TYPES

Turn static files into dynamic content formats.

Create a flipbook
Work sample_EV Automotive by Therapon Georgiou - Issuu