Risk Assessment

Page 1

RISK ASSESSMENT Project Name: BOULEVARD POINT TOWER

MSRA Ref. RA No. RA Rev No.

Client Task Description Task Site Location

BER-MC-003-19 RA-003-19 0

ACC Erection of Triple-decker Mast Climber Working Platform (MC450) BOULEVARD POINT TOWER

RISK MATRIX Key to Risk Assessment: (L = LIKELIHOOD, S = SEVERIY, RR – RISK RATING) LIKELIHOOD 5

Likely to occur repeatedly.

SEVERITY 5

Fatality / Permanent Disability

RR 1–5

4

Likely to occur more than once.

4

Major Injury / Long term Absence

6–9

3

Likely to occur

3

3-Day injury / Temporary Disability

10 – 15

2

Unlikely to occur

2

Injury requiring medical attention or first aid.

1

Extremely unlikely to occur

1

Minor Injury (e.g. Bruising, abrasion, etc.)

Page 1 of 12

16 - 25

RESULTANT Acceptable – Work may proceed. Work may proceed subject to implementation of mitigation measures, if no alternative available. Re – assess mitigation measures to reduce the risk. Work may not proceed – consider alternative method.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.