RISK ASSESSMENT Project Name: BOULEVARD POINT TOWER
MSRA Ref. RA No. RA Rev No.
Client Task Description Task Site Location
BER-MC-003-19 RA-003-19 0
ACC Erection of Triple-decker Mast Climber Working Platform (MC450) BOULEVARD POINT TOWER
RISK MATRIX Key to Risk Assessment: (L = LIKELIHOOD, S = SEVERIY, RR – RISK RATING) LIKELIHOOD 5
Likely to occur repeatedly.
SEVERITY 5
Fatality / Permanent Disability
RR 1–5
4
Likely to occur more than once.
4
Major Injury / Long term Absence
6–9
3
Likely to occur
3
3-Day injury / Temporary Disability
10 – 15
2
Unlikely to occur
2
Injury requiring medical attention or first aid.
1
Extremely unlikely to occur
1
Minor Injury (e.g. Bruising, abrasion, etc.)
Page 1 of 12
16 - 25
RESULTANT Acceptable – Work may proceed. Work may proceed subject to implementation of mitigation measures, if no alternative available. Re – assess mitigation measures to reduce the risk. Work may not proceed – consider alternative method.