Weekly and daily check sheets

Page 1

BYRNE EQUIPMENT RENTAL Hoist and MCWP Division Daily Check Sheet for MCWP PLANT NO.

:

MAN. NO. MODEL COMPANY LOCATION

: : : :

LEGEND:

MONTH: ________________ REF.

D 1

1

2

Check that the mast and ties are sound and secure, expecially accasions following severe weather conditions.

3

Ensure that there are no obstacles either within the operating pathway of the platform or which are likely to cause hindrance during operation.

4

Check that all handrails and guards are in position and are secure. Ensure any adjustment / replacement is undertaken before operating the platform

5

Check that the area below the platform is suitably fence off. Clear the platform of all unwanted debris and materials.

6

Ensure that all instruction notices, including the maximum safe working load sign, are in position and are legible.

7

Ensure the Trailing Cable is properly uncoiled and routed to the platform safely. Make sure that it is also properly looped onto the handrail.

8

With main switch turned on, check that up/down direction of travel is correct.

9

Check condition and operation of all electrical limit switches and their functions.

2

3

4

5

6

7

8

9

10

11

12

13

14

15

A

T

DEFECTIVE

V

REPAIRED / CORRECTED

16

E 17

18

19

20

21

22

10 Check condition of the area beneath the base frame.

REMARKS

GOOD CONDITION

YEAR: ________________

CHECKLIST ITEMS Check that no part of the platform, and its associated equipment has been tampered with since last in operation. Pay particular attention after weekend or holiday periods.

APPOINTED PERSON Name: Company: Signature: Date:

23

24

25

26

27

28

29

30

31


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.