BYRNE EQUIPMENT RENTAL Hoist and MCWP Division Daily Check Sheet for MCWP PLANT NO.
:
MAN. NO. MODEL COMPANY LOCATION
: : : :
LEGEND:
MONTH: ________________ REF.
D 1
1
2
Check that the mast and ties are sound and secure, expecially accasions following severe weather conditions.
3
Ensure that there are no obstacles either within the operating pathway of the platform or which are likely to cause hindrance during operation.
4
Check that all handrails and guards are in position and are secure. Ensure any adjustment / replacement is undertaken before operating the platform
5
Check that the area below the platform is suitably fence off. Clear the platform of all unwanted debris and materials.
6
Ensure that all instruction notices, including the maximum safe working load sign, are in position and are legible.
7
Ensure the Trailing Cable is properly uncoiled and routed to the platform safely. Make sure that it is also properly looped onto the handrail.
8
With main switch turned on, check that up/down direction of travel is correct.
9
Check condition and operation of all electrical limit switches and their functions.
2
3
4
5
6
7
8
9
10
11
12
13
14
15
A
T
DEFECTIVE
V
REPAIRED / CORRECTED
16
E 17
18
19
20
21
22
10 Check condition of the area beneath the base frame.
REMARKS
GOOD CONDITION
YEAR: ________________
CHECKLIST ITEMS Check that no part of the platform, and its associated equipment has been tampered with since last in operation. Pay particular attention after weekend or holiday periods.
✓
APPOINTED PERSON Name: Company: Signature: Date:
23
24
25
26
27
28
29
30
31