calculation report Project: MC450 5.8m ID325 (BHM116) (BC-A-CB) Customer: AWT Installation Site: Middle East Hoist type: MC450 Payload: 2250kg Calculation by: Yibo Yu
MC450 BC-A-CB
2018-11-06 181106ME,5,8m(BHM116)
HOIST software revision
:
12.9.07
Project description Project location Handled by
: : :
MC450 BCACB
File name
:
ID325 Byrne BHM-116 MC450 S 260 m
Yibo Yu
Mast climbing work platform with single mast calculated according to European standard EN1495/ISO 16369 Specification of platf Platform length Configuration Total payload No of persons on platf
: : : : :
HEK MC 450 TYPE A 5,80 m 2/DU/2 2250 kg 2
Specification of mast Total height of mast Lifting height car no 1
: : :
ALIMAK 450X450 MARK II 261,50 m (Base + 173 mast sections + Base Mast) 256,75 m
Mast tube dimension Height of mast
: :
(?60.3*3.6) 261,29 m (Excluding base)
Overhang
:
Specification of tie Clamp type Mounting of bracket Distance Tie tube location Tie tubes 1 and 2 located Tie tube 3 located on the Tie base frame dimens.
: Tie type R3C-48 (665190-014) : 48/48 Swivel (2480005) MD : 655190-017 on wall : L= 1000 mm B= 600 mm C= 300 mm : Tie tube No 1 located right on the inside of the vertical pipe outside of the vertical pipe : Lframe = 395 mm Bframe = 306 mm
Number of ties Tie elevation
: :
Platform not moving, persons Dynamic factor : Location of load car no 1 : Location of personnel : Horizontal force : Location of force : Mast inclined outwards Mast inclined sideways
: :
2,50 m
36 Base = +5,100 +22,500 +37,000 +51,400 +66,200 +81,800 +95,500 +109,100 +122,700 +136,300 +149,900 +163,500 +177,100 +190,800 +206,000 +221,200 +236,700 +252,400
m, m, m, m, m, m, m, m, m, m, m, m, m, m, m, m, m, m,
+,000 +13,900 +29,800 +44,200 +58,600 +75,000 +88,600 +102,300 +115,900 +129,500 +143,100 +156,700 +170,300 +184,000 +198,400 +213,600 +229,100 +244,900 +259,000
m m m m m m m m m m m m m m m m m m m
working, wind (LC-B1). 1,00 al = -17 mm bl =-1923 mm cl = 810 mm apers = -157 mm bpers =-2620 mm cpers = Phx = 767 N Phy =367 N ah =-157 mm bh =-2620 mm ch =810 mm
810 mm
,35 deg ,35 deg
Hoist in service with constant wind speed Wind direction in service : Q2 User: Yibo Yu Alimak Phone: +8651252298713 Email: yibo.yu@alimakgroup.com
1
MC450 BC-A-CB
2018-11-06 181106ME,5,8m(BHM116)
Wind direction out of service
:
Wind Wind Wind Wind Wind Wind Base
: : : : : :
speed platform in service pressure (At base) pressure (At mast top) speed platf out of service pressure (At base) pressure (At mast top) slab elevation
Q1 : 20,0 m/s (20,0 m/s) (20,0 m/s)
250 N/m2 250 N/m2 39,4 m/s 970 N/m2 970 N/m2 ,00 m
(39,4 m/s) (39,4 m/s)
Foundation loads: Vertical force including dynamic factor: Pv = 183 kN [Pv] Total load on base frame from weight of mast, platform and including dynamic factor. Sizes of mast tubes, with wind, load case B1: Tube dimension Mast height * Tube thickness (Ø60.3*3.6) 261,50 m (173 mast sections)
(Ø60.3*3.6)
Stresses in mast, percent of allowable 39 (Mast) 86 (Mast tube) 35 (Bolt) 17 (Diagonal, Kappa = 0,80)
Overhang 2,50 m
1 2 63 67 71
% % % % %
(Mast) (Mast tube) (Bolt) (Frame) (Diagonal, Kappa = 0,80)
Deflections of mast, with wind // x-dir // x-dir
1,7 mm 1,0 mm
// y-dir // y-dir
2,2 mm (in service) 0,3 mm (out of service)
Overhang // x-dir // x-dir
0,3 mm 0,1 mm
// y-dir // y-dir
- 0,9 mm (in service) 0,1 mm (out of service)
Forces in ties: Tie type R3C-48 (665190-014) Platform in Tie No
service, wind parallel to x-axis /Level
/Forces(N) P1
P2
P3
P4
1
+5,1
-8613
-5988
5482
-1918
2
+13,9
-6044
-5808
3709
-1862
3
+22,5
-6268
-6084
3856
-1952
4
+29,8
-6813
-6138
4259
-1969
5
+37
-6809
-6162
4289
-1979
6
+44,2
-6867
-6188
4262
-1987
7
+51,4
-6871
-6175
4293
-1981
8
+58,6
-6737
-6044
4236
-1940
9
+66,2
-6520
-5833
4025
-1871
10
+75
-6317
-6242
3878
-2004
11
+81,8
-7136
-6288
4470
-2020
12
+88,6
-7151
-6300
4468
-2023
13
+95,5
-7097
-6302
4423
-2024
User: Yibo Yu Alimak Phone: +8651252298713 Email: yibo.yu@alimakgroup.com
2
MC450 BC-A-CB
2018-11-06 181106ME,5,8m(BHM116)
14
+102,3
-7140
-6285
4445
-2019
15
+109,1
-7114
-6295
4467
-2020
16
+115,9
-7081
-6319
4486
-2028
17
+122,7
-7119
-6335
4498
-2034
18
+129,5
-7146
-6342
4503
-2036
19
+136,3
-7161
-6340
4500
-2036
20
+143,1
-7166
-6330
4489
-2033
21
+149,9
-7159
-6311
4471
-2028
22
+156,7
-7141
-6285
4446
-2019
23
+163,5
-7112
-6296
4468
-2021
24
+170,3
-7080
-6317
4485
-2028
25
+177,1
-7102
-6303
4486
-2023
26
+184
-7064
-6315
4452
-2027
27
+190,8
-7004
-6081
4408
-1951
28
+198,4
-6581
-6066
4109
-1947
29
+206
-6613
-6023
4118
-1933
30
+213,6
-6610
-6029
4087
-1934
31
+221,2
-6543
-5595
4077
-1920
32
+229,1
-6449
-6030
4020
-1935
33
+236,7
-6525
-5912
4064
-1897
34
+244,9
-6408
-6081
3960
-1951
35
+252,4
7549
-6262
-4974
-2011
36
+259
-8357
1618
4827
532
Platform in Tie No
service, wind parallel to y-axis /Level
/Forces(N) P1
P2
P3
P4
1
+5,1
-7727
4757
5192
1534
2
+13,9
-5074
-3759
-3460
-1211
3
+22,5
5499
-4011
-3778
1293
4
+29,8
-6076
-4100
4087
-1321
5
+37
-6121
-4105
4108
-1322
6
+44,2
-6153
-4121
4133
-1328
7
+51,4
-6119
-4148
4114
-1337
8
+58,6
-6036
-4010
4050
-1292
9
+66,2
-5883
-3744
3744
-1206
10
+75
-5470
-4190
-3931
-1350
11
+81,8
-6522
-4200
4389
-1354
12
+88,6
-6458
-4240
4342
-1367
13
+95,5
-6434
-4270
4325
-1377
14
+102,3
-6493
-4289
4364
-1382
15
+109,1
-6479
-4294
4353
-1384
16
+115,9
-6455
-4291
4334
-1383
17
+122,7
-6418
-4281
4308
-1380
18
+129,5
-6435
-4263
4332
-1374
19
+136,3
-6467
-4238
4351
-1366
20
+143,1
-6487
-4259
4363
-1373
21
+149,9
-6496
-4278
4367
-1379
22
+156,7
-6493
-4290
4364
-1383
User: Yibo Yu Alimak Phone: +8651252298713 Email: yibo.yu@alimakgroup.com
3
MC450 BC-A-CB
2018-11-06 181106ME,5,8m(BHM116)
23
+163,5
-6478
-4294
4352
-1385
24
+170,3
-6455
-4291
4334
-1383
25
+177,1
-6394
-4259
4291
-1373
26
+184
-6359
-4284
4281
-1381
27
+190,8
-6231
-4048
4189
-1304
28
+198,4
-5821
-4015
3903
-1294
29
+206
-5795
3970
3894
-1279
30
+213,6
-5835
-3985
3917
-1284
31
+221,2
-5759
-3922
3862
-1264
32
+229,1
-5640
-3988
3778
-1285
33
+236,7
5660
-3839
3801
-1237
34
+244,9
5512
-4040
-3791
-1302
35
+252,4
8731
-5991
-5955
-1934
36
+259
-7969
4757
5345
1540
Platform in service, wind diagonal Tie No
/Level
/Forces(N) P1
P2
P3
P4
1
+5,1
-7212
-511
4729
-1641
2
+13,9
5278
-4988
-3776
-1603
3
+22,5
5844
-5215
-4141
-1677
4
+29,8
6040
-5288
-4248
-1701
5
+37
6109
-5292
-4304
-1702
6
+44,2
6090
-5309
4299
-1708
7
+51,4
6062
-5328
-4260
-1714
8
+58,6
5900
-5162
-4167
-1660
9
+66,2
5324
-4976
-3802
-1600
10
+75
6137
-5420
-4334
-1743
11
+81,8
6367
-5357
-4470
-1724
12
+88,6
6351
-5407
-4465
-1740
13
+95,5
6383
-5437
-4482
-1750
14
+102,3
6384
-5460
-4480
-1760
15
+109,1
6360
-5471
-4458
-1761
16
+115,9
6332
-5475
-4460
-1762
17
+122,7
6357
-5471
-4480
-1761
18
+129,5
6385
-5460
-4495
-1757
19
+136,3
6402
-5441
-4502
-1751
20
+143,1
6407
-5416
-4502
-1743
21
+149,9
6402
-5442
-4495
-1751
22
+156,7
6386
-5460
-4480
-1757
23
+163,5
6359
-5474
-4460
-1761
24
+170,3
6323
-5472
-4460
-1761
25
+177,1
6285
-5447
-4434
-1753
26
+184
6335
-5433
-4464
-1755
27
+190,8
5980
-5240
-4212
-1685
28
+198,4
5816
-5206
-4124
-1675
29
+206
5840
-5156
-4130
-1658
30
+213,6
5828
-5183
-4113
-1667
31
+221,2
5674
-5129
-4009
-1650
User: Yibo Yu Alimak Phone: +8651252298713 Email: yibo.yu@alimakgroup.com
4
MC450 BC-A-CB
2018-11-06 181106ME,5,8m(BHM116)
32
+229,1
5752
-5171
-4082
-1663
33
+236,7
5520
-5044
-3830
-1622
34
+244,9
5810
-5243
-4125
-1687
35
+252,4
7394
-5712
-5104
-1840
36
+259
-5513
2066
3517
676
Forces in ties: Tie type R3C-48 (665190-014) Platform out of service, wind parallel to x-axis Tie No
/Level
/Forces(N) P1
P2
P3
P4
1
+5,1
-5484
2279
-7291
-2314
2
+13,9
-1462
612
-1959
-618
3
+22,5
-1782
748
-2353
-744
4
+29,8
-1443
604
-1918
-606
5
+37
-1526
639
-2019
-638
6
+44,2
-1503
630
-1992
-630
7
+51,4
-1513
634
-2002
-633
8
+58,6
-1499
628
-1985
-628
9
+66,2
-1783
746
-2355
-746
10
+75
-1688
706
-2230
-706
11
+81,8
-1341
561
-1777
-562
12
+88,6
-1460
611
-1930
-611
13
+95,5
-1434
600
-1897
-600
14
+102,3
-1424
596
-1883
-596
15
+109,1
-1427
597
-1886
-597
16
+115,9
-1426
597
-1885
-597
17
+122,7
-1426
597
-1886
-597
18
+129,5
-1426
597
-1886
-597
19
+136,3
-1426
597
-1886
-597
20
+143,1
-1426
597
-1885
-597
21
+149,9
-1426
597
-1886
-597
22
+156,7
-1426
597
-1885
-597
23
+163,5
-1427
597
-1887
-597
24
+170,3
-1421
595
-1879
-595
25
+177,1
-1446
605
-1911
-605
26
+184
-1414
592
-1871
-592
27
+190,8
-1511
632
-1997
-632
28
+198,4
-1614
675
-2133
-675
29
+206
-1592
666
-2104
-666
30
+213,6
-1583
663
-2093
-663
31
+221,2
-1638
685
-2165
-685
32
+229,1
-1618
677
-2138
-677
33
+236,7
-1645
688
-2175
-689
34
+244,9
-1758
736
-2319
-734
35
+252,4
-1144
480
-1519
-480
36
+259
-1876
784
-2478
-785
Platform out of service, wind parallel to y-axis Tie No
/Level
User: Yibo Yu Alimak Phone: +8651252298713 Email: yibo.yu@alimakgroup.com
/Forces(N)
5
MC450 BC-A-CB
2018-11-06 181106ME,5,8m(BHM116) P1
P2
P3
P4
1
+5,1
4394
-3093
-3760
-1210
2
+13,9
1305
-405
2728
871
3
+22,5
1506
-665
1692
538
4
+29,8
1241
-506
1713
544
5
+37
1300
-545
1688
536
6
+44,2
1282
-535
1695
537
7
+51,4
1289
-539
1698
538
8
+58,6
1276
-534
1686
534
9
+66,2
1517
-634
2000
634
10
+75
1436
-601
1895
600
11
+81,8
1140
-477
1510
478
12
+88,6
1242
-520
1640
519
13
+95,5
1219
-510
1612
510
14
+102,3
1211
-507
1600
507
15
+109,1
1213
-508
1603
508
16
+115,9
1212
-507
1603
507
17
+122,7
1212
-507
1603
507
18
+129,5
1212
-507
1603
507
19
+136,3
1212
-507
1603
507
20
+143,1
1212
-507
1603
507
21
+149,9
1212
-507
1603
507
22
+156,7
1212
-507
1603
507
23
+163,5
1213
-508
1604
508
24
+170,3
1208
-505
1597
506
25
+177,1
1229
-514
1625
514
26
+184
1202
-503
1591
503
27
+190,8
1284
-537
1698
537
28
+198,4
1372
-574
1813
574
29
+206
1353
-566
1789
566
30
+213,6
1346
-563
1780
563
31
+221,2
1393
-583
1840
583
32
+229,1
1375
-575
1817
575
33
+236,7
1398
-585
1849
585
34
+244,9
1494
-625
1971
624
35
+252,4
973
-408
1291
408
36
+259
1595
-667
2107
667
Platform out of service, wind diagonal Tie No
/Level
/Forces(N) P1
P2
P3
P4
1
+5,1
-33
-651
-5215
-1655
2
+13,9
1339
-1326
-4187
-1329
3
+22,5
1028
-1095
-3827
-1214
4
+29,8
966
-998
-3377
-1070
5
+37
970
-1013
-3464
-1098
6
+44,2
969
-1009
-3440
-1090
7
+51,4
970
-1012
-3452
-1094
8
+58,6
964
-1005
-3425
-1086
User: Yibo Yu Alimak Phone: +8651252298713 Email: yibo.yu@alimakgroup.com
6
MC450 BC-A-CB 9
2018-11-06 181106ME,5,8m(BHM116) +66,2
1137
-1192
-4060
-1289
10
+75
1077
-1128
-3845
-1220
11
+81,8
866
-900
-3069
-972
12
+88,6
934
-975
-3328
-1055
13
+95,5
921
-960
-3273
-1038
14
+102,3
913
-953
-3249
-1030
15
+109,1
915
-954
-3255
-1032
16
+115,9
914
-954
-3253
-1031
17
+122,7
914
-954
-3254
-1032
18
+129,5
914
-954
-3253
-1032
19
+136,3
914
-954
-3254
-1032
20
+143,1
914
-954
-3253
-1032
21
+149,9
914
-954
-3254
-1032
22
+156,7
914
-954
-3253
-1031
23
+163,5
915
-955
-3257
-1032
24
+170,3
912
-951
-3243
-1028
25
+177,1
926
-967
-3297
-1045
26
+184
909
-947
-3230
-1024
27
+190,8
968
-1010
-3446
-1093
28
+198,4
1032
-1079
-3679
-1167
29
+206
1020
-1065
-3630
-1151
30
+213,6
1015
-1059
-3612
-1145
31
+221,2
1048
-1095
-3735
-1185
32
+229,1
1036
-1082
-3688
-1170
33
+236,7
1055
-1102
-3754
-1191
34
+244,9
1118
-1172
-3997
-1269
35
+252,4
744
-768
-2625
-829
36
+259
1198
-1255
-4274
-1357
User: Yibo Yu Alimak Phone: +8651252298713 Email: yibo.yu@alimakgroup.com
7