Company Overview The Original Buit to Last spacemaker.ae byrnetechnical.com
INTRODUCTION
Since its inception in 1990, Spacemaker has grown to become one of the highest quality modular building construction suppliers in the Middle East. A turnkey solution provider at the fore-front of modular construction, setting manufacturing benchmarks in the region with our engineering excellence. We are able to deliver off-site prefabricated modular building solutions, straight from our state of the art manufacturing facilities in KSA and UAE, spanning over 80,000sqm. We have the capability to build 240,000sqm of modular units in our space alone. All the engineering necessary is provided by our in-house team of various disciplines which include structure, MEP, HVAC, architecture and more. Their combined experience of more than 30 years in the field has enabled us to complete over 3000 projects within the MENA region to date, across a multitude of industries including Energy, Oil and Gas. Whatever the project and however remote or complex, we can provide design, manufacturing, logistics, installation and commissioning. Our innovation strategy ensures creative solutions and the most up to date technology are considered for every project. Spacemaker is supported by our sister company Byrne Equipment Rental, one of the largest plant and equipment rental companies in the Middle East with 20 operational bases, covering the UAE, KSA, Kuwait, Qatar, Oman and Bahrain, a fleet of over 14,000 items of plant and a team of over 1,500 people.
2
The Original Built to Last
3
The Original Built to Last
QUALITY
It is Spacemaker’s policy to identify the requirements of our customers and provide a service that meets or exceeds these requirements by the use of processes, materials, or products that avoid, reduce, or control pollution and comply with relevant laws, standards and regulations applicable to our business.
Our Certifications ISO9001:2015 ISO14001:2015 ISO45001:2018 ISO17065
(Quality) (Environment) (Health & Safety) (Product Certification fire rated wall panels)
Our internal quality procedures adhere to the highest standard in the industry - from detailed documentation of material procurement to thorough certified inspections. This internal process ensures the highest quality of workmanship is met at all times. ISO Certification Recognising the hazards present in our industry, we take every practical step to provide and maintain a safe and healthy work environment for all employees, subcontractors and visitors who may be affected by or come into contact with a Spacemaker project. At Spacemaker, our structured process for managing quality, health, safety and environmental activities in compliance with ISO certification is consistent with QHSEMS standards. Our QHSE management system procedures are documented to ensure our activity, conditions and tasks affecting quality, health, safety and environmental protection are planned, organised, executed, reviewed and improved.
4
The Original Built to Last
5
The Original Built to Last
PRODUCT RANGE
Robust skid mounted units, suitable for use in the O&G industry, able to withstand extreme weather conditions. Ideal for relocatable camps, plug and play ease of the product.
Modified ISO containers that are easily transportable, versatile and can be used in a variety of ways from accommodation to showers and sanitation facilities.
Long lasting, cost effective buildings ranging from single level to three floor accommodation. Suitable for large scale worker welfare villages that support large projects.
This unique building system is mass produced so it is a cost-effective option. Lightweight and long lasting, it is engi-neered to international standards.
Quick and cost-effective solution, with minimal deployment time required for each module, an ideal choice for immediate response as well as export projects.
Trailer mounted units which can be transported with ease. These units are most suitable for and frequently utilised as portable offices and accommodation.
Ready for immediate deployment, BlastSpace are fitted to the highest specification and are certified to withstand almost any blast of duration up to 200 ms.
Transportable flat-pack warehouse, ideal for setup in remote locations to provide secure storage. Able to install and complete a footprint of 500m2 in just one day.
DNV 2.7-1 & SOLAS certified products including certified A-60 units designed to accommodate two, four or eight people and office space.
Able to be deployed in just 20 minutes, this non-mechanical shelter is suitable for immediate response to any disaster or crisis, from healthcare clinics to full military camps.
High grade steel-based structure able to withstand a variety of penetration levels. Suitable for military camps in re-mote locations, an economical and quick solution.
Highly technical enclosures built to house and protect electrical systems, switch gears and plant control systems in a secured transportable unit.
6
The Original Built to Last
7
The Original Built to Last
PROJECT PROFILE
Project – Krygestan Military Project
The FlatSpace product line supports a series of independent requirements and is the perfect solution for remote, logistically challenged project sites. The ease of assembly, embellished by a highly durable and sustainable product assures engineering ingenuity to our customers. The product allows customers to benefit from transportation efficiencies allowed by a ‘knock-down’ component. The applications include satellite offices, accommodation (labor, junior, senior), kiosks, mess halls and more. - - - - - - - - - -
8
20’ x 8’ units and stackable up to G+2 Pre-conduited and pre-plumbed allow for easier assembly on site Highly durable even for sea transportation Fire resistant Ability to place eight 20ft x 8ft open plan units within one 40ft trailer Fire rated options include 30 mins and 1 hour (ASTM E119) Colour options available Flat and low rib internal finishes available for aesthetic appeal Ease to expand or reduce in overall size of the building Easy to demobilise and remobilise to locations across the country
The Original Built to Last
Spacemaker supported a large multinational defense contractor who required a project in a military zone with intense weather conditions where the temperature often drops to below minus 20°C. This customer required accommodation and large dining facilities to house and cater for 150 key personnel. Flatspace was a perfect product range for this area as the building could be flat packed and transported easily, even after completion. Due to the remote location of the military zone, this was a great advantage for the customer. The project was successfully engineered and completed in three months.
9
The Original Built to Last
PROJECT PROFILE
Project – Hail Island 600 Man Camp
During an island expansion project at Hail Island in Abu Dhabi, we provided a complete turnkey solution including not only EcoSpace accommodation but also oilfield standard buildings, facilities management, power generation and water treatment facilities which allowed our customer to focus on their main EPC contract. Through an alliance with a reputable life support services company, we ensured a smooth changeover from the village’s earlier occupants to the new residents without any disruptions. Some of our other services provided included catering, housekeeping, laundry, on-call building and operational maintenance 24/7 STP, RO and building maintenance. Purpose-designed containerised housing solutions suitable for accommodation, kitchen and dining facilities, workshops, recreation areas, satellite offices, ablution and latrines, command centres, laundries and security checkpoints. We can also build units to support offshore requirements. Features - - - - - -
10
Highly durability and re-usability Fire rated options between 30 mins to 2 hours Several options available for different end use Utilising sustainable materials Logistically efficient 10ft, 20ft and 40ft available options
The Original Built to Last
11
The Original Built to Last
Overview With the ability to be deployed in just 20 minutes, the non-mechanical RapidSpace shelter system is suitable for implementation in the immediate aftermath of a disaster or crisis, for example as a hospital or as an initial military camp set up. Our traditional base camps/disaster shelters can be quickly supplied anywhere in the world, either as flat packs or as fully assembled modules. - - - - - - -
Hinged floor, roof and wall panels make for quick and easy installation ( 20 mins per unit ) Packed size in meters range from 6.058(L) x 0.61 (W) to 6.058(L) x 2.41 (W) Deployed size in meters range from 6.058(L) x 4.81 (W) to 6.058(L) x 6.61(W) Area size ranges from 27 sqm to 37 sqm Designed occupancy ranges from 1 – 6 persons Height of support frame is 2.591m for all units Built in fixtures like kitchen cabinets, WC, basins and showers are accommodated inside the unit in the packed condition
Overview Our modular warehouse (EasySpace) is a unique product developed for situations where an immediate space solution is required. Transportable in a flat-pack arrangement, even a warehousing need in the most remote location can be facilitated in a short space of time. Each cell has an erection time of two hours, meaning a warehouse of 500m2 can be erected in just one day. - - - - - - 12
Quick deployment Module ranges between 9.6m and 12m modules Re-deployable storage solutions Expandable options with customisations available Perfect solution for small aircraft hangers, dry storage, covered car parking Simple requirement for foundations which can be engineered in-house The Original Built to Last
13
The Original Built to Last
The Original Buit to Last spacemaker.ae byrnetechnical.com